Installation of AFS on Barudan BEDT - ZG -...

12
MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected] Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal from the machine, it is necessary to install a connecting cable. For that purpose the user panel has to be opened 2. This is the top view of the motherboard.

Transcript of Installation of AFS on Barudan BEDT - ZG -...

Page 1: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG - 501

1. To obtain the start signal from the machine, it is

necessary to install a connecting cable. For that

purpose the user panel has to be opened

2. This is the top view of the motherboard.

Page 2: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

3. Drill a hole at the backside of the user panel so that

the connecting cable can be introduced.

4. Fix the socket of the connecting cable.

Page 3: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

5. Soldering the connecting cable on the motherboard(1).

6. Soldering the connecting cable on the motherboard(2).

Page 4: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

7. Place the cable in a way that the user panel can

be closed.

8. Close the user panel.

Page 5: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

9. Position the mounting rail at the frame as shown.

10. Fix the mounting rail at the frame with the screws.

Page 6: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

11. Fix all screws.

12. Position the frame with the installed mounting rail at

the pantograph rail.

Page 7: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

13. Control the correct position of the frame. It should lie

on the machine table.

14. Make fine tuning of the mounting rail fixation if

necessary. Make use of the “variable” holes in the

mounting rail.

15. Fix the frame when it is in the right position.

Page 8: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

16. Here the frame is in the correct position.

17. Prepare the AFS-cable box with adhesive material.

Page 9: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

18. Fix the AFS-cable box on the machine.

19. Connect the 9-pin-cable from the frame to the

AFS-cable box.

Page 10: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

20. Connect the cable from the user panel (start box) to

the AFS-cable box.

21. Introduce the E-ZEE-preframes.

Page 11: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

22. Pull the E-ZEE-preframes through the rear part of the

frame.

23. Connect the docking station with the AFS-cable

station.

Page 12: Installation of AFS on Barudan BEDT - ZG - 501de.automatic-frame.com/.../AFS_Installatin_Barudan_EN.pdf · Installation of AFS on Barudan BEDT - ZG - 501 1. To obtain the start signal

MADEIRA Garnfabrik - Rudolf Schmidt KG - Zinkmattenstr. 38 - D-79108 Freiburg

Tel: +49 (0)761-510400 - Fax: +49 (0)761-508456 - www.madeira.com - [email protected]

Installation of AFS on Barudan BEDT - ZG 501

24. Fix the docking station with adhesive material right

behind the pantograph maintaining a distance of few

millimetres.