Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl Bauer Managing Director LEONI NBG Fiber Optics GmbH

Transcript of Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last...

Page 1: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

Installation, Last mile and last meter challenges and issues

The Quality Connection

Presenter: Karl Bauer

Managing Director LEONI NBG Fiber Optics GmbH

Page 2: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Presentation Outline

LEONI AG

Last mile challenges when building FTTH networks

Lessons learned rolling out FTTH networks throughout Europe and recommendations

2

Page 3: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

LEONI_AG___________________

3

Page 4: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

LEONI-Group in few wordsWorldwide one of the largest manufacturer of wires, cables and wiring systems, as well as a provider of related development services

More than 47.000 employees

About 70 locations in 46 countries

Tailor-made products and solutions for different fields of application

at MDAX listed on the stock exchange

Page 5: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Sales/Employees 2007

LEONI GroupGroup sales: € 2.4 bn

Employess: approx. 37.000 worldwide

Wire & Cable SolutionsSales: approx. €1.381 m

Employees: approx. 9.000 worldwide

Wiring SystemsSales: approx: € 986 m

Employees: approx: 28.000 worldwide

Page 6: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Last mile challenges when building FTTH networks________

6

Page 7: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 7

Regulatory Framework

Regulation vs. Public policy

A stable and predictable regulatory and public policy environment is key to enabling FTTH investment

The current Regulatory Framework is being reviewed – to conclude in Summer 2008?

We are pleased to see that Next Generation Access (NGA) is a major component of the Review

We believe a strong pro-investment NGA based on FTTH position needs to be further developed

Page 8: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Outside plant challengesCivil costs are still prominent in most projects varying from 65 to 85%

• The costs for civil vary between the European countries from about €15/m to €125/m

• The rules regarding rights of ways are different between the European countries

Speed of the roll-out defines the success of the business planSpace limitations within dense cities to build larger POPs Larger scale compressed roll-outs do result into disturbing the city live through traffic issues

8

Page 9: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

In-House challenges

New MDU• The Fiber cabling needs to be

foreseen during the planning phase of the architecture and the landlords need to be convinced from day one

• The cabling system needs to be protected during the building of the in-house infrastructure

• The cabling system needs to become an easy to install solution enabling lower skilled labor to be used

Existing MDU• Customised solutions for the

different buildings need to be engineered.

• Each building requires a site survey prior to installation

• The cabling solutions needs to be prepared both to connect the customer on day one and the future customers

• MDU - (Multi Dwelling Unit)

9

Page 10: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Lessons learned rolling out FTTH networks throughout Europe and recommendations

10

Page 11: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 11

Innovation

NEXT GENERATION ACCESS SYSTEMCombination of the advantages of

• Tube-system• Direct buried cable• In-house cabling

integrated into one product offering

Our goal with this system is:

Reduction of the costs for installation byreducing the requirement for highly skilled resources

Page 12: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 12

Network ConceptSingle Tube Cable

14/10 mm 96f

12/8 mm 72f

10/6 mm 24f

7/4 mm 12f

Single Tube

Cable

14/10 mm 96f

12/8 mm 72f

HandholeStreet Cabinet 01

Access Node

Connector

SC 1

SC 1

SC 1

Handhole

SC 1

Up to 3 km

up to 500 m

1.000 to 10.000subscriber

Connector

Multi Tube Cable

7 x 14/10 mm

96f

7 x 12/8 mm 72f

7 x 10/6 mm 24f

12 x 7/4 mm 12fMulti Tube Cable

7 x 14/10 mm

96f

7 x 12/8 mm 72f

Page 13: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 13

Network Concept for Existing Ducts

HandholeStreet Cabinet 01

Access Node

Y-Connector

SC 1

SC 1

SC 1 SC 1

Handhole

existingduct ø 50 mm

Mini Cable 96f

SC 1

existing duct ø 50 mmSingle Tubes 7 x 7/5,5 mm

Micro Cable 2f to 24f

Up to 3 km

Up to 500 m

1.000 to 10.000 subscriber

Single Tube 14/10 mm

Single Tubes for later installation(blowing process)5x 12/10 mm

Single Tube 10/6 mm

Micro Cable 2f to 24f

Y-Connector

Mini Cable 96f

Page 14: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 14

Termination Boxes

Network Concept In-House

In-House Cable 1f to 4f

Single Tube Cable

14/10 mm 96f

12/8 mm 72f

10/6 mm 24f

7/4 mm 12f

Page 15: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

Alternative FTTH roll-out conceptsReutilisation of existing ductsUtilisation of the Sewer –Drainage networksMicrotrenching

Areal cable ultisation where possibleTechnologies for extraction of the copper elements in copper legacy cables and exchange them with ducts for FO cable

15

Page 16: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 16

NGA network concept

Multi Tube forMini Cables

96 fibers Single Tube with pre-installed cable

2 to 96 fibers

ODF

…..

1

n

Closure with splitter

1

2 n

……

……

.

...

•No splice point at the building inlet•Possibility to cut the outer sheath anchange the material to LSOH

Single Tube with Mini Cable96 fibers

Page 17: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 17

Next Generation Access Cabling SystemNext Generation Access Cabling

Benefits:• Reduction of the required skilled human

resourcesNew development of blowing process → higher pressure → longer distancesNo splice point at the building inlet → reduction of the number of splices (-40%)

• Direct buried (no blowing process needed)• Homes past with pre-installed or empty tubes

possible (possibility to blow in the cables)• Possibility to change the material of the tube in

the in-house area (to LSOH)• Bending insensitive through cable construction

supported with G657 fiber

Page 18: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007

ODF solution Rack system 03Rack-system 03

• 19” frame with roof and patch-cord guidance• Distribution box 46 for the dividing of FO cables

and MCS• Patch-cord management set for differential

lengths and excessive length management• Rack system 03 splice and patch-shelves

Offered capacity• Up to 2.256 can be spliced-connected and

managed in a 2,2m high 19 rackExperience in Europe

• Up to today already >200.000 FTTH connections have been realized Utilizing the Rack system 03 including the projects FTTH in The Netherlands – Germany – Denmark –Sweden – Slovenia - …

18

Page 19: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 19

Thank you for your attention!

Weitergabe an Dritte nur mit Genehmigung der Firma LEONI NBG Fiber Optics GmbH – Alle Rechte vorbehalten.Technische Änderungen und Irrtümer behalten wir uns vor.

Page 20: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 20

Notizen

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 21: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 21

Notizen

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 22: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 22

Notizen

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 23: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 23

Notizen

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Page 24: Installation, Last mile and last meter challenges and issues · 2016-03-29 · Installation, Last mile and last meter challenges and issues The Quality Connection Presenter: Karl

LEONI NBG Fiber Optics GmbH, 7.12.2007 24

Notizen

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________