INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all...

8
INDUSTRIAL CURTAINS INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under the opening. Next, look in the box containing the curtain(s). Managing Environments™ Allow the curtain(s) to reach room temperature (above 50°F/10°C) before unfolding. The width and height of the curtain will be listed on a tag attached to the curtain. CHAIN SUPPORT MOUNTING

Transcript of INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all...

Page 1: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

INDUSTRIAL CURTAINSINSTALLATION INSTRUCTIONS

GETTING STARTEDOpen all carton(s) containing hardware and remove all items. Position the hardware on the floor under the opening. Next, look in the box containing the curtain(s).

Managing Environments™

Allow the curtain(s) to reach room temperature (above 50°F/10°C) before unfolding.

The width and height of the curtain will be listed on a tag attached to the curtain.

Managing Environments™

Phone: 800.888.9750Fax: 412.787.3665

5350 Campbells Run Road • Pittsburgh, PA 15205

www.tmi-pvc.com • E-Mail: [email protected]

Copyright © 2013 Catalog NumberII-ICCHM-07-13

NOTES

CHAIN SUPPORT MOUNTING

Page 2: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

12

WHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of items.

TotalLength

Straight Track

ES-16

End Stop

Steel BallBearing

Roller with1” Hook

SR-16-1

NylonRoller with

1” Hook

NR-16-1

4 Wheel,Steel BallBearing

Roller with1” Hook

HDSR-16-1

2 WheelRoller withConnector

P-SW-16

Curtain(s) withGrommets

2

Number ofCurtains

Custom Pieces

Straight SpliceConnector

SSC-16

Double TrackSplice

Connector

DTSC-16

Heavy Duty#2 Suspension Chain

Chain SupportCorner

Connector90°

CHSCC-16

CHSSC-16

Chain SupportSplice Connector

DoubleChain Support

Splice Connector

DCHSSC-16

CHSTWC-D-16

Chain SupportThree WayConnector

CHSC-16

Chain SupportConnector

Chain SupportCurved Track 90°

CHSCT-16

SC-2

SH-3-16

Heavy Duty3/16” “S” Hook

7

Step 6

HANGING THE CURTAIN(S)

INSERTING ROLLERS WITH HOOKS

2. Affix the second End Stop to the open end of the track.

1. Place each roller into the open end of the track. The number of rollers must be equal to the number of grommets on the top edge of the curtain.

Step 5

Place each curtain grommet over a roller hook and mounting is complete. The dull side with the logo is the front and should face to the outside.

Page 3: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

IMPORTANTAllow the curtain(s) to reach room temperature

(above 50°F/10°C) before unfolding.

NOTE: The installer will need an assistant to mount your curtain.

3

TRACK CONFIGURATIONS

Plan Views

Straight Run

“T” Joint

Corner Joint

Curved Corner JointCurved Track 90°

Chain Support Corner Connector 90°

Chain Support “T” Connector

Chain Support Splice Connector Chain Support Connector

The hardware for the Chain Support Mounting Method allows for a large number of configurations and is only restricted by the location of roof trusses or beams. The 3 corner joints and straight run are shown here.

Roof Trusses

Roof Trusses

* * * *** * * *

** * *

DESIGNING A PLAN The design of your curtain assembly will be determined by the position of the roof trusses or beams. How you attach the support chain to the trusses is your decision. That support hardware is supplied by others.

Ideally there should be 3’ or less between attachment points but the span between trusses could be slightly greater than 3’.

3’

3’

From your design, measure and position the attachment hardware.

How you attach the top end of the support chain to the ceiling is your decision. Screw eye bolts with “S” hooks could be used with steel trusses or beams. If tying into wood, lag threaded screw eyes with “S” hooks could be used.

AttachmentPoints Attachment

Points**

6

Step 4

ATTACHING THE TRACKS

For convenience and ease of attaching the tracks to the Track Connectors, already in place (Step 3), disassemble your configuration into manageable sections.

End StopRemoved

End StopIn Place

NOTE: Leave one of the End Stops off the end of the track assembly.

First, place the track into the Track Connector.

Then, place the Support Plate and secure with a nut.

TIP: Do not fully tighten the nut. This will allow you to easily make final adjustments to the hardware assembly.Of course, firmly tighten all nuts once the entire assembly is in place.

TrackConnector

Support Plate

Support Plate Nut

SpliceConnector

If the track is being placed into a Splice Connector, loosen the allen screws just one and a half turns, insert the track and tighten the allen screws.

TIP: When inserting Track into a Splice Connector, lightly clamp a pair of vice grips onto the Track about 4” from the end. This should narrow the Track allowing easier insertion.

NOTE: The installer will need an assistant to help with this step.

Other Splice Connectors

Page 4: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAIN

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAINSUPPORT

TRACKCONNECTOR

“S” HOOK

Step 1

Loosen the 2 allen screws on each Chain Support Splice Connector, just one and a half turns.

2. Attach an End Stop to just one open end.

SPLICING MULTIPLE TRACKS TOGETHER

TIP: When inserting Track into a Splice Connector, lightly clamp a pair of vice grips onto the Track about 4” from the end. This should narrow the Track allow-ing easier insertion.

The same steps should be taken if Double Track hardware is being used.

1. Insert the two Straight Tracks into the Splice Connector and tighten the screws. Repeat this process until all pieces of track are spliced together.

MEASURING FOR MOUNTING

Step 2

12

4

Chain SupportTrack Connector

Chain SupportSplice Connector

The total height of the assembly includes the height of the curtain, the height of the hardware including an “S” hook plus an additional 1” to keep the curtain above the floor. A tag on your curtain(s) should show the overall dimensions.The hardware height is shown on the drawings to the right.

5 1/2”

Curtain Height+ Hardware Height (including “S” Hook)

+ 1”= Overall Assembly Height

Determining the length of the chain depends on how the top of the chain is connected to

the ceiling. Use the following formula:

Distance from Floor to Ceiling(i.e. Bottom of Truss or Beam)– Overall Assembly Height

= Length of Chain

Next, cut all the sections of chain to their proper length.

ATTACHING SUPPORT CHAIN and TRACK CONNECTORSStep 3

2. Using your planned design (see Designing a Plan - Pg. 3), measure then attach the Top Chain Support Hardware (supplied by others) to the ceiling (i.e. trusses or beams).

4. Attach the Chain with the Connector to the Top Chain Support Hardware. NOTE: Each section of chain must be the same length.

3. Using an “S” Hook, attach a section of Chain to a Connector using the center hole.

1

2

34

5

Support Plate Nuts

Support Plate

5 1/2”

1”

1”

TIP: Add a few extra links to the chain length so the height of the assembly can be adjusted more accurately.

FLOOR

CURTAIN

Top ofCurtain

BOTTOM OFROOF TRUSS

Dis

tan

ce f

rom

Flo

or

to B

ott

om

of

Tru

ss o

r B

eam

1”

Overa

ll A

ssem

bly

Heig

ht

Len

gth

of

Ch

ain

CHAIN

TOPCHAIN

SUPPORTHARDWARE

CHAIN SUPPORTTRACK

CONNECTOR

“S” HOOK

Chain SupportTrack Connector

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAIN

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAINSUPPORT

TRACKCONNECTOR

“S” HOOK

1. Remove the Support Plate from all Track Connectors.

Page 5: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAIN

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAINSUPPORT

TRACKCONNECTOR

“S” HOOK

Step 1

Loosen the 2 allen screws on each Chain Support Splice Connector, just one and a half turns.

2. Attach an End Stop to just one open end.

SPLICING MULTIPLE TRACKS TOGETHER

TIP: When inserting Track into a Splice Connector, lightly clamp a pair of vice grips onto the Track about 4” from the end. This should narrow the Track allow-ing easier insertion.

The same steps should be taken if Double Track hardware is being used.

1. Insert the two Straight Tracks into the Splice Connector and tighten the screws. Repeat this process until all pieces of track are spliced together.

MEASURING FOR MOUNTING

Step 2

12

4

Chain SupportTrack Connector

Chain SupportSplice Connector

The total height of the assembly includes the height of the curtain, the height of the hardware including an “S” hook plus an additional 1” to keep the curtain above the floor. A tag on your curtain(s) should show the overall dimensions.The hardware height is shown on the drawings to the right.

5 1/2”

Curtain Height+ Hardware Height (including “S” Hook)

+ 1”= Overall Assembly Height

Determining the length of the chain depends on how the top of the chain is connected to

the ceiling. Use the following formula:

Distance from Floor to Ceiling(i.e. Bottom of Truss or Beam)– Overall Assembly Height

= Length of Chain

Next, cut all the sections of chain to their proper length.

ATTACHING SUPPORT CHAIN and TRACK CONNECTORSStep 3

2. Using your planned design (see Designing a Plan - Pg. 3), measure then attach the Top Chain Support Hardware (supplied by others) to the ceiling (i.e. trusses or beams).

4. Attach the Chain with the Connector to the Top Chain Support Hardware. NOTE: Each section of chain must be the same length.

3. Using an “S” Hook, attach a section of Chain to a Connector using the center hole.

1

2

34

5

Support Plate Nuts

Support Plate

5 1/2”

1”

1”

TIP: Add a few extra links to the chain length so the height of the assembly can be adjusted more accurately.

FLOOR

CURTAIN

Top ofCurtain

BOTTOM OFROOF TRUSS

Dis

tan

ce f

rom

Flo

or

to B

ott

om

of

Tru

ss o

r B

eam

1”

Overa

ll A

ssem

bly

Heig

ht

Len

gth

of

Ch

ain

CHAIN

TOPCHAIN

SUPPORTHARDWARE

CHAIN SUPPORTTRACK

CONNECTOR

“S” HOOK

Chain SupportTrack Connector

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAIN

TOPCHAIN

SUPPORTHARDWARE

BOTTOM OFROOF TRUSS

CHAINSUPPORT

TRACKCONNECTOR

“S” HOOK

1. Remove the Support Plate from all Track Connectors.

Page 6: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

WALL with DOORWAY OPENING

Straight Splice Connector

Straight TrackWall Mount Track Connector

or

Universal Mounting Bracketwith Ceiling Support Connector

Curved Track 90°

EndStop

EndStop

IMPORTANTAllow the curtain(s) to reach room temperature

(above 50°F/10°C) before unfolding.

NOTE: The installer will need an assistant to mount your curtain.

3

TRACK CONFIGURATIONS

Plan Views

Straight Run

“T” Joint

Corner Joint

Curved Corner JointCurved Track 90°

Chain Support Corner Connector 90°

Chain Support “T” Connector

Chain Support Splice Connector Chain Support Connector

The hardware for the Chain Support Mounting Method allows for a large number of configurations and is only restricted by the location of roof trusses or beams. The 3 corner joints and straight run are shown here.

Roof Trusses

Roof Trusses

* * * *** * * *

** * *

DESIGNING A PLAN The design of your curtain assembly will be determined by the position of the roof trusses or beams. How you attach the support chain to the trusses is your decision. That support hardware is supplied by others.

Ideally there should be 3’ or less between attachment points but the span between trusses could be slightly greater than 3’.

3’

3’

From your design, measure and position the attachment hardware.

How you attach the top end of the support chain to the ceiling is your decision. Screw eye bolts with “S” hooks could be used with steel trusses or beams. If tying into wood, lag threaded screw eyes with “S” hooks could be used.

AttachmentPoints Attachment

Points**

6

Step 4

ATTACHING THE TRACKS

For convenience and ease of attaching the tracks to the Track Connectors, already in place (Step 3), disassemble your configuration into manageable sections.

End StopRemoved

End StopIn Place

NOTE: Leave one of the End Stops off the end of the track assembly.

First, place the track into the Track Connector.

Then, place the Support Plate and secure with a nut.

TIP: Do not fully tighten the nut. This will allow you to easily make final adjustments to the hardware assembly.Of course, firmly tighten all nuts once the entire assembly is in place.

TrackConnector

Support Plate

Support Plate Nut

SpliceConnector

If the track is being placed into a Splice Connector, loosen the allen screws just one and a half turns, insert the track and tighten the allen screws.

TIP: When inserting Track into a Splice Connector, lightly clamp a pair of vice grips onto the Track about 4” from the end. This should narrow the Track allowing easier insertion.

NOTE: The installer will need an assistant to help with this step.

Other Splice Connectors

Page 7: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

12

WHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of items.

TotalLength

Straight Track

ES-16

End Stop

Steel BallBearing

Roller with1” Hook

SR-16-1

NylonRoller with

1” Hook

NR-16-1

4 Wheel,Steel BallBearing

Roller with1” Hook

HDSR-16-1

2 WheelRoller withConnector

P-SW-16

Curtain(s) withGrommets

2

Number ofCurtains

Custom Pieces

Straight SpliceConnector

SSC-16

Double TrackSplice

Connector

DTSC-16

Heavy Duty#2 Suspension Chain

Chain SupportCorner

Connector90°

CHSCC-16

CHSSC-16

Chain SupportSplice Connector

DoubleChain Support

Splice Connector

DCHSSC-16

CHSTWC-D-16

Chain SupportThree WayConnector

CHSC-16

Chain SupportConnector

Chain SupportCurved Track 90°

CHSCT-16

SC-2

SH-3-16

Heavy Duty3/16” “S” Hook

7

Step 6

HANGING THE CURTAIN(S)

INSERTING ROLLERS WITH HOOKS

2. Affix the second End Stop to the open end of the track.

1. Place each roller into the open end of the track. The number of rollers must be equal to the number of grommets on the top edge of the curtain.

Step 5

Place each curtain grommet over a roller hook and mounting is complete. The dull side with the logo is the front and should face to the outside.

Page 8: INSTALLATION INSTRUCTIONS - TMI€¦ · INSTALLATION INSTRUCTIONS GETTING STARTED Open all carton(s) containing hardware and remove all items. Position the hardware on the floor under

INDUSTRIAL CURTAINSINSTALLATION INSTRUCTIONS

GETTING STARTEDOpen all carton(s) containing hardware and remove all items. Position the hardware on the floor under the opening. Next, look in the box containing the curtain(s).

Managing Environments™

Allow the curtain(s) to reach room temperature (above 50°F/10°C) before unfolding.

The width and height of the curtain will be listed on a tag attached to the curtain.

Managing Environments™

Phone: 800.888.9750Fax: 412.787.3665

5350 Campbells Run Road • Pittsburgh, PA 15205

www.tmi-pvc.com • E-Mail: [email protected]

Copyright © 2013 Catalog NumberII-ICCHM-07-13