INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol...

12
© 2009, Snow Performance, Incorporated INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL INJECTION SYSTEMS

Transcript of INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol...

Page 1: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Incorporated

INSTALLATION INSTRUCTIONSFOR PART #20011

WATER / METHANOL INJECTIONSYSTEMS

Page 2: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

CONTENTSKit Contents.........................................................................3Introduction.........................................................................4Nozzle Identification Chart:................................................4Installation Mechanical....................................................5Installation - Electrical......................................................10Variable Controller Installation ........................................10Variable Controller Tuning...............................................11Controller Operation Example .........................................11Testing the System ...........................................................12Tuning Quick Reference...................................................13Fluid Level Switch.............................................................15Solenoid Upgrade (optional) ............................................16Install Notes/Warranty Information .................................17Contact Us ..21

Have a question?

FAQ: www.snowperformance.net/faqs.php

CAUTIONYou must completely read though these instructions beforeinstalling and operating this product. Failure to due so canresult in damage to this product and the vehicle.

Page 3: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Kit Contents

Partso SHO Pump (Special

High Output)o 3 Qt Reservoiro 10 ft High Pressure

Tubingo 3 ft Black Wire Loomo Installation Instructions

Electrical Packeto 1 Green LEDo 2 Blue Butt Connectorso 1 Large Eyehooko 1 Small Eyehooko 1 Male Connectoro 1 Female Connectoro 1 Wire Spliceo VC-25/MAF Controller

With Harnesso 10 Tie Wraps

Required ToolsElectric Drill w/ Drill BitsUtility KnifeScrewdriver – PhillipsAssorted Wrenches1/8” - 27 NPT Tap

Mechanical Packeto 1 Nozzle Holdero 1 3/8” NPT – ¼” Tube

Straight Fittingo 7 #8x1&1/2” Screwso 4 #8 Washerso 4 #6x1/2” Screwso 1 E-6000® (GOOP)

Nozzleso 60ML/MN (Yellow)o 100ML/MN (Black)o 175ML/MN (Green)o 225ML/MN (Purple)o 375ML/MN (Red)o 625ML/MN (Blue)

Upgradeso Bulkheado 2.5 Gallon Reservoiro Solenoido Hose Adaptor or Bungo Level Switcho SafeInjection®o Nitrobooster®o Dual Nozzleo Boost Juice

Page 4: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Introduction- Please refer to the diagram below during install. The optional FluidLevel Switch (#40030) is shown.

Nozzle Identification Chart:

Nozzle Color Nozzle Size Nozzle Color Nozzle SizeYellow 60 ml/min Purple 225 ml/minBlack 100 ml/min Red 375 ml/minGreen 175 ml/min Blue 625 ml/min

Pump

Low Fluid LED

Injection Status LED

Air Flow

Throttle Plate

+12 Volt Key On

Engine Ground

Wire Connection

To MAFSensor Signal

Red

Red

Red

White

Black

Black

Yellow

Green

Red

Black

Black

© 2009, Snow Performance, Inc

Contact Us:

PhoneOffice (719) 633-3811Fax (719) 633-3496Tech Support Line (Toll Free) (866) 365-2762

Webhttp://www.snowperformance.net

[email protected]@[email protected]

MailSnow Performance, Inc1017-A East Highway 24Woodland Park, CO 80863

NotesThe contents of this document are subject to change without prior notice.No part of or this entire document may be reproduced in any formwithout prior written permission of Snow Performance, Inc under thecopyright except for private use.

The names, addresses and telephone numbers mentioned are current asof July 1, 2009. Note that this information is subject to change. Pleaserefer to www.snowperformance.net for current information.

Page 5: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

LIMITATION OF LIABILITY

REPAIR OR REPLACEMENT OF A DEFECTIVE PRODUCT ISTHE ORIGINAL RETAIL PURCHASER’S EXCLUSIVEREMEDY UNDER THIS WARRANTY.DAMAGE OR INJURY TO THE ORIGINAL RETAILPURCHASER, TO HIS OR HER VEHICLE, CARGO, ORPROPERTY, AND/OR TO ANY OTHER PERSON ORPROPERTY IS NOT COVERED BY THIS WARRANTY.THIS WARRANTY IS EXPRESSLY MADE IN LIEU OF ANYAND ALL OTHER EXPRESS WARRANTIES, WHETHERORAL OR WRITTEN. SNOW’S SOLE LIABILITY IS LIMITEDTO THE REMEDY SET FORTH ABOVE. IN NO EVENT WILLSNOW BE LIABLE FOR ANY DIRECT, INDIRECT,CONSEQUENTIAL, INCIDENTAL, SPECIAL, EXEMPLARY,OR PUNITIVE DAMAGES OR FOR ANY OTHER DAMAGESOF ANY KIND OR NATURE (INCLUDING, BUT NOTLIMITED TO, LOST PROFITS OR LOST SALES). SOMESTATES DO NOT ALLOW THE EXCLUSION ORLIMITATION OF INCIDENTAL OR CONSEQUENTIALDAMAGES, SO THE ABOVE LIMITATIONS MAY NOTAPPLY TO YOU.

Non-Warranty Repair/Retest

Products returned due to damage or misuse and Products retestedwith no problem found are subject to repair/retest charges. Productwill be returned to customer at customer’s expense. A credit cardnumber must be provided in order to obtain an RMA (ReturnMerchandise Authorization) number prior to returning Product.

© 2009, Snow Performance, Inc

Installation MechanicalStep 1 Reservoir Install

Install straight fitting with asmall amount of E6000®sealant and mount reservoiras high in enginecompartment as possibleusing #8x1½” sheet metalscrews and washersprovided. Note that thenozzle must be the highestpoint in the system, not thereservoir.

Optional: The factory windshield washer reservoir can be used as thereservoir for your system.

• Drill 9/16” hole in desired bulkhead location.

• Remove one nut from bulkhead and turn the remaining nut to the end.

• Feed red tubing through the hole and out of the top of the reservoir.

• Attach tubing to the bulkhead on the side opposite the nut.

• Pull the tubing through the bulkhead hole until the bulkhead seatsagainst the inside of the reservoir.

• Apply E6000® sealant (included) around bulkhead.

• Slide the nut you had previously removed up onto the tube and threadonto bulkhead.

• While pulling firmly on the red tubing, tighten the outer nut using a17mm socket (only needs to be hand tight). A ratchet is not needed.

• Once sealant has set, fill reservoir with water and check for leaks.

You can mount the tank in the rear of the vehicle.The pump is a pusher type by design so it needs to

be mounted as close to the reservoir as possible. Because thepump is oversized, injection pressure will not be affected. ASolenoid Upgrade is recommended for rear mounted reservoirs.

Page 6: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Step 2 Pump Install

Mount the pump so the inlet is positioned at the lowest point of thereservoir or lower. Pump can be mounted horizontally or vertically usingthe supplied screws and washers. Ensure that no sharp bends in thehigh pressure tube occur near the pump. Sharp bends can cause stresson the inlet and outlet ports of the pump, causing leaks. Trim tube with autility knife or razor blade, making sure to eliminate any burrs or kinks onthe end. Insert firmly into the pump about ½ inch through the light greylocking collar. Note the arrows indicating flow direction on the top of thepump. To remove the hose, gently and evenly push the light grey lockingcollar into the head unit of the pump, then pull on the hose gently.

Measure the distance from the reservoir outlet to the pump inlet. Cut the¼” red tubing using utility knife. Make cuts are as square as possible.

Ensure there are no kinks in the tubing and insert tubing into quickdisconnects at pump and reservoir until fully seated. Keep the pumpwithin 2 feet of the reservoir.

Mount pump away from direct road spray anddebris.

© 2009, Snow Performance, Inc

This warranty does not cover problems caused by normal wear andtear including aesthetic oxidation of surfaces, accidents, unlawfulvehicle operation, or modifications or repairs to product notperformed or authorized by Snow. This includes any product thatis disassembled or taken apart for any reason.In addition, this warranty does not cover problems resulting fromconditions beyond Snow’s control including, but not limited to,theft, misuse, overloading, or failure to assemble, mount or use theproduct in accordance with Snow’s written instructions orguidelines included with the product or made available to theoriginal retail purchaser.In the event of failure, Snow will repair or replace the part atSnow's sole discretion. Failures resulting from misapplication ormisuse of the Product, failure to adhere to any specifications orinstructions, or failure resulting from neglect, abuse, accidents, oract of nature are not covered under this warranty.

Warranty service may be obtained by calling 866-365-2762,getting an RMA (Return Merchandise Authorization), deliveringthe part to Snow along with proof of purchase. Customer agrees toinsure the Product or assume the risk of loss or damage in transit,to prepay shipping charges to Snow, and to use the originalshipping container or equivalent. Shipping for Warrantyreplacement parts shipped outside the continental US will becharged to customer.

Page 7: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Warranty

Snow Performance's commitment to providing the bestwater/methanol systems is reflected in the components andconstruction of all Snow Performance Boost Cooler® kits.

A lifetime warranty for injection systems is available withexclusive use of Boost Juice™ injection fluid. The standardwarranty is 2-years from purchase and covers all SnowPerformance products and accessories purchased on or after June1, 2009 manufactured by Snow Performance, Inc. (Snow). Thiswarranty terminates when the original retail purchaser sells orotherwise transfers the product to any other person.

Warranty Policy

Snow Performance, Inc. warrants that the Product shall conform toand perform in accordance with published technical specificationsand shall be free of defects in materials and workmanshipproviding:

1. You are the original purchaser and provide proof of purchase.

2. For lifetime warranty, the Warranty Card that came with system(not applicable to separate parts purchases) is returned to Snowwithin 90-days of purchase. If valid warranty card not on file withSnow, the standard 2-year warranty applies from date of purchase.

3. An RMA # has been attained and is displayed on packagecontaining returned part.

Subject to Snow’s inspection of the product, Snow will remedydefects in materials and/or workmanship by repairing or replacing,at Snow’s option, the defective product without charge for parts orlabor, subject to the limitations and exclusions described in thiswarranty.

© 2009, Snow Performance, Inc

Step 3 Nozzle Selection

Nozzle sizing is a function of horsepower, which approximates theengine airflow, and boost, which approximates intake charge heat.

Recommended starting points:

250 - 350 RWHP: 175ml/min nozzle. 350 - 475 RWHP: 375ml/min nozzle 475 - 600 RWHP 625ml/min nozzle

Seal the nozzle into the nozzle holder usingincluded GOOP® sealant. Using a sealant that is

not permanent will allow for nozzle changes during tuning. Simplyremove the nozzle, clean the threads, and reinstall using sealant.

Assemble desired nozzle into nozzle holder using E6000® sealant. Theend of the nozzle with the fine mesh screen is to be inserted intothe nozzle holder. Torque 1/2 turn past finger tight. Do not use Teflonsealants on Snow Performance fittings.

Correct Incorrect

NOTE: If nozzle is mounted lower then the reservoir, a Solenoid Upgrade(#40060) must be used to prevent draining.

Page 8: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Step 4 Nozzle Mounting

The nozzle assembly should be installed 90° to the direction of airflow.On round intake tubes, this is 360° around the tube meaning the nozzlecan be mounted in any direction. This will ensure maximum cooling asthe nozzle sprays in a cone pattern. Be sure that the nozzle is thehighest point in the system.

Drill and tap (11/32" pre-drill, 1/8”-27 NPT tap) air inlet tube as close aspossible to throttle body/throttle plate.

The nozzle is mounted using its external 1/8 NPT threads. Tighten thenozzle and nozzle holder assembly one half turn past finger tight usingE6000® to seal the threads.

You can mount the nozzle in a plastic or rubber air inlet tube using aNozzle Mounting Adapter (#40110). Weld-in aluminum (#40120) andsteel (#40130) bungs are also available.

The typical nozzle mounting point is before thethrottle body/plate. If you mount the nozzle after

the throttle body/plate, a Solenoid Upgrade (#40060) must be usedto prevent siphoning at idle.

© 2009, Snow Performance, Inc

Install Notes

Pump Setting ____________(psig)

Nozzle Size ____________(ml/min)

Boost / Vacuum setting _________

Misc:

DisclaimerDo not use this product until you have carefully read the following agreement.This sets forth the terms and conditions for the use of this product. The installation of thisproduct indicates that the BUYER has readand understands this agreement and accepts its terms and conditions.Performance products by their nature are designed to increase horsepower andperformance not engineered in the original vehicle and the increased stress could result indamage to related systems. This is a high performance product – use at your own risk.Snow Performance Inc., Its agents, employees or owners shall not be under any liabilitywhether in contract or otherwise whether or not resulting from our negligence or contents ofinformation supplied for any damage or loss resulting from such information.The BUYER is responsible to fully understand the capability and limitations of his/hervehicle according to manufacturer specificationsand agrees to hold the SELLER harmless from any damage resulting from failure to adhereto such specifications.The SELLER disclaims any warranty and expressly disclaims any liability for personalinjury or damages. The BUYER acknowledgesand agrees that the disclaimer of any liability for personal injury is a material term for thisagreement and the BUYER agrees toindemnify the SELLER and to hold the SELLER harmless from any claim related to theitem of the equipment purchased. Under nocircumstances will the SELLER be liable for any damages or expenses by reason of use orsale of any such equipment.The BUYER is responsible to obey all applicable federal, state, and local laws, statutes,and ordinances when operating his/hervehicle, and the BUYER agrees to hold SELLER harmless from any violation thereof.The SELLER assumes no liability regarding the improper installation or misapplication of itsproducts.It is the installer's responsibility to check for proper installation and if in doubt, contact themanufacturer.

Page 9: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Pump

Injection Status LED

Red

Red

WhiteGreen from

Relay/S2 Harness

Black

Black

Black

Air Flow

Throttle Plate

EngineAir Intake

IN CYL

Solenoid Upgrade (optional)

The optional Solenoid Upgrade (#40060) is required if the nozzle is to beinstalled after the intake throttle plate (as shown), or the fluid reservoir ismounted higher then the nozzle. It is highly recommended for trunk-mount reservoirs.

Finger thread the two 1/8” NPT quick connect fittings into ports labeledIN and CYL on the solenoid. Tighten an additional half turn past fingertight.

Cut high pressure line at location solenoid is to be installed. Insert endsof cut line into quick connect fittings of solenoid. The port labeled IN isthe inlet and the port labeled CYL is the outlet. Gently pull on line tocheck secure connection. If line pulls out, re-insert farther into fitting toengage locking clips. If high pressure line removal is required, firmlypress in metal fitting ring to disengage locking clips while pulling hosefrom fitting.

Connect one of the BLACK wires from solenoid to the RED positivepump wire. Note that connecting the wire to any other power sourceother then the pump wire will result in improper operation of solenoid.Connect the second BLACK wire to a secure chassis ground location.

Or White fromS3 Harness

© 2009, Snow Performance, Inc

Step 5 Nozzle Connection

Measure the distance from the pump outlet to the nozzle holder. Cut the¼” tubing using utility knife. Make cuts are as square as possible.

Ensure there are no kinks in the tubing and insert tubing into quickdisconnects until fully seated. Gently pull on tubing to ensure a goodconnection.

Use tie wraps to help route tubing and to ensure it doesn't contactmoving or hot parts in the engine compartment. Have tubing connect toquick connect fittings at shallow angles. Having an immediate sharpbend may unseat the tubing from the internal o-ring and create a leak.

Continual insertion and removal from quick connect fittings will mar theend of the tubing. Over time the internal gripping teeth may lose theirhold of the tubing which may create a leak. If this occurs simply removethe tubing and make a fresh cut using a razor blade.

Page 10: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Installation - ElectricalVariable Controller Installation

The figure above shows the back view of the VC-MAF/25 controller.Attach controller to secure location with easy access in engine bay orpassenger compartment. The VC series controllers are designed towithstand engine bay conditions, but should not be mounted directly tothe engine block. Plug wire harness into back of controller. Note theterminal positions are numbered on the bottom side of wire harnessconnector.

CAUTION: Disconnect the negative battery terminal whileconnecting wires to prevent electrical fire or damage to controller.

• Connect GREEN wire at position 4 to Pump Red power wire.

• Connect RED wire at position 3 to +12V key on source. Whenselecting a 12V key-on source, try to find a dedicated circuit fused for10-15 amps.

• Connect YELLOW wire at position 2 to MAF sensor output (0-5volts). Verify output wire with multimeter. At idle, MAF output shouldbe 0.8-1.2 volts.

• Connect BLACK wire at position 1 to a good ground location.

Always have a good electrical ground connection.Poor ground will result in erratic operation of

controller.

1 2 3 4

© 2009, Snow Performance, Inc

Fluid Level Switch

Instructions

• After mounting reservoir, mount red LED in dash. Next to the green“injection” LED is usually easiest.

• Wire LED per diagram with Red wire to a 12v key-on source, and theWhite wire to one of the Black wires of the level switch.

• Connect other Black wire of the level switch to vehicle ground.

• With key-on source enabled, the red LED should be “on” with no fluidin the reservoir. Upon filling the reservoir, the red LED should be“off”.

The level switch is designed to indicate when thereis less than 1 of fluid in the reservoir.

Low Fluid LED

Red

Black

Black

Page 11: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Maintenance Remove nozzle(s) and clean screen filters atleast once per year using carb cleaner.

The Boost Cooler® has been designed to operate with highconcentrations of methanol. Oil or other additives are not requiredfor system lubrication.

For best performance, cooling and system life it is recommend thatSnow Performance Boost Juice , part #40008, be the exclusivefluid used in the system.

© 2009, Snow Performance, Inc

Variable Controller Tuning

• Rotate the MODE switch counter-clockwise to select MAF mode.

• Adjust the START volt setting.For most applications, a goodstart point is approximately 3volts. DO NOT SET STARTPOINT BELOW 2 VOLTS.

• Adjust START upward if bucking or bogging occurs at the onset ofinjection.

• Road test vehicle and adjust FULL dial. Often the full point can beset as low as 4 volts. If bucking or quenching occurs, increase thefull point until a smooth power curve is felt with no misfiring.

Controller Operation ExampleFor setting 1, GREEN, the chart shows the Start dial at 2 volts and theFull dial at 4 volts. At 2 volts from the MAF, the pump will operate at10%. At 4 volts from the MAF, the pump will deliver 100% of injectionpressure.

For MAF voltage readings between the Start and Full settings, thecontroller will linearly adjust the pump output as shown on the graph.

0

20

40

60

80

100

2 2.5 3 3.5 4 4.5 5

Mass Air Flow (MAF) Sensor Voltage

StartPu

mp

Out

put %

Full

Page 12: INSTALLATION INSTRUCTIONS FOR PART #20011 WATER / METHANOL ... · PDF filewater/methanol systems is reflected in the components and construction of all Snow Performance Boost Cooler®

© 2009, Snow Performance, Inc

Testing the System

Step 1 Test Pump and Mechanical System

Disconnect all control and SafeInjection® modules. Disconnect tube fromthe outlet port of the pump. Using a 12 volt source, apply power to redwire of pump. Pump should activate, green LED should go on, and fluidlevel in tank should go down. It is recommended to also check thenozzle spray pattern while following this procedure. Also check for leaks.Never flow liquid through a SafeInjection® module without all nozzlesconnected.

If pump goes on and fluid level doesn't go down, there is an obstructionin the tube or nozzle.

Step 2 Test Controller

• Begin the testing process with both dials on the VC-MAF at theirhighest settings (clockwise).

• Turn ignition key on so that the system has 12volt power. If thepump runs, inspect ground wires for secure connection.

• The Pump should be off at this point, start vehicle. Slowly turn theStart dial lower (counter clock wise) until the pump activates. If thelowest setting is reached without pump activating, it may benecessary to rev engine to increase airflow signal to the controller.Turn Start dial back up (clockwise) until pump shuts off.

© 2009, Snow Performance, Inc

Tuning Quick ReferenceThe kit enables the use of increased timing and/or boost whichprovides for over 50% of the potential power increase (denserintake charge the remainder). All other factors being the same, ifspark timing or boost is not increased over the non-Boost Cooler®settings, power increase will be less.

Increase base timing in 2 degree increments until the first hint ofdetonation - then back off 2 degrees (use 3rd gear pulls from2000RPM).

If you install the kit and do not tune the engine, you will see minimalresults. The kit is for detonation control and will allow more poweryielding boost and/or timing to be utilized.

The Boost Cooler® adds an alternate fuel source as well assignificantly cools combustion. With the Boost Cooler®, one doesnot need to cool combustion with overly rich air/fuel ratios. Tominimize combustion quench, you should start with an air to fuelratio of 12.0-12.5:1 with a conservative timing setting.

Injecting water/methanol lower than 3300-3500 RPM could result incombustion quench. All vehicles are different. If the engine bogs orloses power, then it is coming on too early, the quantity is toomuch, or there is not enough methanol in the mixture (50/50water/methanol recommended).

If you have to increase the onset too high in the rpm range(detonation control is needed sooner), go to a smaller nozzle.