Installation Instruction --Rubber Rolls

2
Rubber Rolls I. Foundation  Aclin ic Level: Error is less than 2mm. Concr ete foundation, Marble floor ing etc. are applicabl e.  There are no crack s, sand, power , grease, oil, dus t, mud or other debris on the groun d.  New concrete foundation needs to be maintained for about 30 days before starti ng installation. (About 60 days or more in winter ) II. Materials  Two-component Adhesive  Rubber rolls  water-base coating III. Installation Procedures 1. Foundation Processing  Clean off al l the dusty and rub bish, wash of f oils wi th 50% of Sulfuri c Acid li quid (H 2SO4)  Use adhesi ve and concret e grout to fill and level up any lacunose are as (seams ). 2. Waterproof layer processing ( This step is extremely important)  Mix one-component adhesive with Butyl Acetate (3:7, this ratio can be adjusted according to the actual condition of the installation site), then spray them on the foundation (6m2/kg)  Leave about 1 to 2 hours to let the adhesive dry. 3. Star Light series roll Installation  Pre-installation: Outspread the rubber rolls on the ground. After 12 hours, measure them to fit the size of the ground. Mark installation orders and upsides on materials. Leave extra 5cm of rolls at the edges.  Spread ing Adhes ive: Spread the glue on the ground (appr .1.5m 2 /kg).  A. Use the notched trowel with teeth B. Note the quantity of using the glue; it can not be spread too thick.  Pasting Rolls: Lay the Star Light series rolls on the ground and ensure the tight connection between two rolls. Put some fast dry glue (such as Glue 502) on the cross section of the rolls at each 10 cm position. Join the connection with low glutinosity transparent tapes (about 1-2cm) (The tapes must be colorless and less glutinous)  A. The first roll must be installed very well  (Important) B. Carefully following the seam of the preceding roll.  Fastening Roll s: Use long wood bars (t hi ckness 2-3 mm, width 4- 5cm) and steel nails (2*25mm/30mm) to fasten the rolls by steel nails.  Press ing Rolls: Pres s the rolls with heavy roller  (50kg) to make sure the adhesive, rolls and the ground fully combine. Pressing takes about 3 ~ 4 hours. (Keep pressing in the initial 2.5 hours. It’s the best period of time for rolls and adhesive combination). Tilting 45 degrees, use knife to eliminate the air entrapment when the roll is swelling  Clear ing up: After the adhesiv e get dried (about 8 hours), remov e the wood bars and clean the rolls. Installation Pictures:

Transcript of Installation Instruction --Rubber Rolls

Page 1: Installation Instruction --Rubber Rolls

 

Rubber Rolls

I. Foundation   Aclinic Level: Error is less than 2mm. Concrete foundation, Marble flooring etc. are applicable.

  There are no cracks, sand, power, grease, oil, dust, mud or other debris on the ground.

  New concrete foundation needs to be maintained for about 30 days before starting installation.

(About 60 days or more in winter )

II. Materials

  Two-component Adhesive

  Rubber rolls

  water-base coating

III. Installation Procedures

1. Foundation Processing

  Clean off all the dusty and rubbish, wash off oils with 50% of Sulfuric Acid liquid (H2SO4)

  Use adhesive and concrete grout to fill and level up any lacunose areas (seams).

2. Waterproof layer processing (This step is extremely important)

  Mix one-component adhesive with Butyl Acetate (3:7, this ratio can be adjusted according to the

actual condition of the installation site), then spray them on the foundation (6m2/kg)

 Leave about 1 to 2 hours to let the adhesive dry.

3. Star Light series roll Installation

  Pre-installation: Outspread the rubber rolls on the ground. After 12 hours, measure them to fit the

size of the ground. Mark installation orders and upsides on materials. Leave extra 5cm of rolls at

the edges.

  Spreading Adhesive: Spread the glue on the ground (appr.1.5m2/kg).

 A. Use the notched trowel with teeth

B. Note the quantity of using the glue; it can not be spread too thick.

  Pasting Rolls: Lay the Star Light series rolls on the ground and ensure the tight connection

between two rolls. Put some fast dry glue (such as Glue 502) on the cross section of the rolls at

each 10 cm position. Join the connection with low glutinosity transparent tapes (about 1-2cm)

(The tapes must be colorless and less glutinous)

 A. The first roll must be installed very well (Important)

B. Carefully following the seam of the preceding roll.

  Fastening Rolls: Use long wood bars (thickness 2-3 mm, width 4-5cm) and steel nails

(2*25mm/30mm) to fasten the rolls by steel nails.

  Pressing Rolls: Press the rolls with heavy roller  (≥50kg) to make sure the adhesive, rolls and the

ground fully combine. Pressing takes about 3 ~ 4 hours. (Keep pressing in the initial 2.5 hours.

It’s the best period of time for rolls and adhesive combination).

Tilting 45 degrees, use knife to eliminate the air entrapment when the roll is swelling

  Clearing up: After the adhesive get dried (about 8 hours), remove the wood bars and clean the

rolls.

Installation Pictures:

Page 2: Installation Instruction --Rubber Rolls

 

Pre-Installation Spreading Adhesive

Seam Processing Pressing

4. Water-base coating

(1) Water-base coating

(2) Dosage: 6-10  ㎡/kg

(3)Advantages

 A: make the mats more bright and more beautiful

B: maintain the mats more effectively

C: clean the mats more easily

IV. Cleaning   Clean with wet cloth.

  Clean the mats with vacuum twice a week, depending on the usage frequency.