Installation Guide for DBS3900
Transcript of Installation Guide for DBS3900
-
8/13/2019 Installation Guide for DBS3900
1/52
HUAWEI TECHNOLOGIES Co., Ltd.
BBU3900
Installation Guide
-
8/13/2019 Installation Guide for DBS3900
2/52
Safety Information1
1. Information About the Installation 2
2. Installing the BBU in the APM308
3. Installing the BBU in the APM30H 15
4. Installing the BBU in the APM30 (+24 V)17
5. Installing the BBU in the 19-Inch Cabinet 19
6. Installing the BBU on the Wall23
7. Installing the BBU in the PS4890 Cabinet
28
8. Installing the BBU in the OMB Cabinet 33
9. Installing the BBU in the TMC 38
10. Installing the BBU in the TMC11H
40
11. Checking the Power-On Status of the BBU41
12. Reference42
Content
-
8/13/2019 Installation Guide for DBS3900
3/52
Safety Information
1
Copyright Huawei Technologies Co., Ltd. 2009. All rights reserved.
Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the
documents are supplementary. You must comply with the local safety regulations.
Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning work.
Symbols
Safety of Personnel The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
Non-standard and improper high voltage operations may result in fire and electric shock.
In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
Power off the device before performing operations on the power supply equipment.
High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down. When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
When working at a height, be cautious about falling objects.
Device Safety Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards. The BTS3900A must be powered on within one week after installation.
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.
-
8/13/2019 Installation Guide for DBS3900
4/522
1 Information About the Installation
Installation Tools
-
8/13/2019 Installation Guide for DBS3900
5/52
b Installation Scenarios APM30 2 APM30H
BBU BBU
BBU BBU
3 TEC 4 TEC H
3
-
8/13/2019 Installation Guide for DBS3900
6/52
b Installation Scenarios5.APM30 (+24V) 6.PS4890
7. In OMB cabinet 8.In other 19-inch cabinet 9.On the Wall
BBU
BBU
BBU
BBUBBU
4
-
8/13/2019 Installation Guide for DBS3900
7/52
c BBU Hardware and Cables1. Appearance of the BBU (Unit : mm)
5
FE surge protection transfer cable
FE cable
E1 surge protection transfer cable
E1 Cable
Alarm Cable
Monitoring Cable
CPRI Optical
BBU Power Cable
2. Cable connections of the BBU
Monitoring
Equipment
Alarm
Equipment
Power System
-
8/13/2019 Installation Guide for DBS3900
8/526
Board Mandatory
/Optional
Full
Configuration
Installation
Slot
Remarks
WMPT Mandatory 2 S6 and S7 Preferentially configured in
Slot 7.
WBBP Mandatory 4 S0 to S3 Preferentially configured in
Slot 3, then Slot 2, at last
Slot 0,1.
UPEU Mandatory 2 PWR1 and
PWR2
Preferentially configured in
PWR2.
UBFA Mandatory 1 FAN Only in the FAN slot.
UTRP Optional 5 S0 to S5 Preferentially configured in
Slot 4, 5.
UELP Optional 2 S0 and S4 Preferentially configured in
Slot 4.
UFLP Optional 2 S0 and S4 Preferentially configured in
Slot 4.
UEIU Optional 1 PWR1 Preferentially configured in
PWR1.
3. Configuration Princip les of the BBU Boards
c BBU Hardware and Cables
-
8/13/2019 Installation Guide for DBS3900
9/52
e Procedure
7
-
8/13/2019 Installation Guide for DBS3900
10/52
Installing the BBU in the APM30
Cable connections
Installation PositionNO.
From... To ...
1
2
3
4 Monitoring cable TX/RX on APMI MON1on BBU
5 CPRI CPRI on BBU CPRI on RRU
BBU power cable LOAD3 on PDU PWR on BBU
E1 transfer cable E1/T1 on WMPT INSIDE on UELP
E1cable OUTSIDE on UELP Transmission equipment
Cable
8
-
8/13/2019 Installation Guide for DBS3900
11/52
b Installing BBU
BBU
PDU
c Installing cables1. Install power cable.
LOAD3
NEG(-)
RNT(+)
PWR
9
1 Install the mounting ears at both sides of the BBU reversely.
2 Slide the BBU case into the cabinet.
3 Check the DIP switches (see appendix).
Connect the OT terminal of the power
cable to the LOAD3 terminal of the PDU,
and then fix the 3V3 connector of the
power cable to the PWR port on the BBU.
-
8/13/2019 Installation Guide for DBS3900
12/52
Connect one end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP.
Then, connect the other end to the RRU.
Remove the dustproof caps from
the optical connectors.
Wrap the fiber tail with the winding pipe
till the first cable tie.
The TX port on the BBU is
connected to the RX port on
the RRU.
The RX port on the BBU is
connected to the TX port on
the RRU.
b Installing the BBU cables2. Install optical cables.
Insert the optical module into CPRI0,
CPRI1, or CPRI2.
Turn outwards the puller on the
optical module.
Insert the optical connector at one end
of the CPRI optical cable into the optical
module. lead the CPRI optical cable out
of the cabinet along the left side of the
cabinet.
Optical module
Puller
Optical cable
connector
Winding pipe
10
-
8/13/2019 Installation Guide for DBS3900
13/52
Strip the jacket off the E1 cable
near the grounding point at the
lower right corner of the cabinet toexpose the shielding layer
Thread the E1 cable through thegrounding clip. Then, tighten the screw on
the grounding clip to make the shielding
layer of the E1 cable in full contact with
the grounding clip. Finally, connect the
PGND cable on the grounding clip to the
grounding bolt of the APM30.
Fix the DB26 connector of the E1
cable to the OUTSIDE port on the
UELP.
Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the
UELP and the DB26 connector to the E1/T1 port on the WMPT.
b Installing the BBU cables3. Install the E1 transfer cable.
4. Install the E1 cable.
E1 transfer cable
Cabling the E1 cable.
E1cable
Shielding layerof the E1 cable
(25mm)
INSIDE
E1/T1
OUTSIDE
11
-
8/13/2019 Installation Guide for DBS3900
14/52
Connect one end of the FE transfer cable
to the FE0 port near the INSIDE label onthe UFLP and the other end to the FE0 port
on the WMPT.
b Installing the BBU Cables5. Install the FE transfer cable (FE transmissionmode).
6. Install the FE cable (FE transmission).
Connect one end of the FE cable to the FE0
port near the OUTSIDE label on the UFLP.
Then, lead the other end out of the cabinet
along the right side of the cabinet.
FE transfer
cable
FE
cable
Strip the jacket off the FE cable
near the grounding point at the
lower right corner of the cabinet to
expose the shielding layer
(25mm)
Thread the FE cable through the grounding clip. Then, tighten the screw
on the grounding clip to make the shielding layer of the FE cable in full
contact with the grounding clip. Finally, connect the PGND cable on the
grounding clip to the grounding bolt of the APM30.
Shielding layer ofthe FE cable
12
-
8/13/2019 Installation Guide for DBS3900
15/52
When the MON0 port on the BBU is available, fix the RJ45connector of the EMUA monitoring signal cable to the MON0 port
on the UPEU, and the DB9 connector to the corresponding port on
the EMUA.
b Installing the BBU cables
9. Install the EMUA monitoring signal cable.
MON0
RS485
Fix the RJ45 connector at one end of the
cable to the MON1 port on the UPEU.
7. Install the monitoring signal cable between theAPMI and the BBU.
External alarm
cable
Connect one end of the alarm cable to the
EXT-ALM port on the UPEU, and the
other end to the associated alarm device.
8. Install the external alarm cable.
MON1
RJ45
Monitoring signal cable
between the APMI and the
BBU
The port on the external alarm device is
added depending on field requirements.
EXT-ALM1
13
-
8/13/2019 Installation Guide for DBS3900
16/52
b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector
of the EMUA monitoring signal cable, and then connect the four exposed barewires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship
between the ports and wires. Fix the DB9 connector to the corresponding port
on the EMUA.
b Installing the BBU cables
RS485
14
EMUA monitoring signal cable
Pin on the RJ45
Connector
Pin on the DB9
Male Connector
Color Type Port on the APMI
X1.1 X2.3 White TX+
X1.2 X2.7 Orange TX-
X1.4 X2.2 Blue RX+
X1.5 X2.6 White RX-
Twisted
pair
Twistedpair
-
8/13/2019 Installation Guide for DBS3900
17/52
3 Installing the BBU in the APM30H
The procedure for installing the BBU case in the APM30H is the same as that in the APM30.
For details, see pages 814. The following figure shows the cable connections of the BBU.Page 16 shows how to install the monitoring signal cable between the HEUA and the BBU in
the APM30H.
Installation PositionNo.
One end is connected to... The other end is connected
to...
1
2
3
4 Monitoring signal
cable
COM IN port on the HEUA MON1 port on the BBU
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
BBU Cable Connections
15
-
8/13/2019 Installation Guide for DBS3900
18/52
MON1
COM IN
UPEU on the
BBU
HEUA
b Installing the Monitoring Signal Cable between the HEUA andthe BBU
16
-
8/13/2019 Installation Guide for DBS3900
19/52
4 Install ing the BBU in the APM30 (+24 V)
Installation PositionNo.
One end is connected to... The other end is connected
to...
1
2
3
4 Monitoring signal
cable
COM IN port on the HEUA MON1 port on the BBU
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD3 terminal of the PDU PWR port on the BBU
E1 surge protection
transfer cableE1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
The procedure for installing the BBU in the APM30 (+24 V) is the same as that in
the APM30. For details, see pages 814. The following figure shows the cable
connections of the BBU. Page 18 shows how to install the monitoring signal
cable of the cabinet.
BBU Cable Connections
17
-
8/13/2019 Installation Guide for DBS3900
20/52
Pin assignment of the monitoring signal cable of the cabinet
b Installing the Monitoring Signal Cable of the Cabinet
18
Pin on the RJ45
Connector
Pin on the RJ45
Connector
Wire Color Wire Type
X1.1 X2.1 White/orange
X1.2 X2.2 Orange
X1.3 X2.3 White/green
X1.6 X2.6 Green
X1.5 X2.5 White/blue
X1.4 X2.4 Blue
X1.7 X2.7 White/brown
X1.8 X2.8 Brown
Twisted pair
Twisted pair
Twisted pair
Twisted pair
-
8/13/2019 Installation Guide for DBS3900
21/52
5 Installing the BBU in the 19-Inch Cabinet
BBU Cable Connections
Installation PositionNo.
From... To...
1
2
3
4 Monitoring
signal cable
External monitoring device MON/ALM on the BBU
5 CPRI optical
cable
CPRI port on the RUU CPRI port on the BBU
BBU power
cable
External power supply PWR port on the BBU
E1 cable External transmission device E1/T1 port on the WMPT
FE cable
(optional)
External transmission device FE0 port on the WMPT
Cable
19
-
8/13/2019 Installation Guide for DBS3900
22/52
Installing the BBU Case
Space Requirements
20
1. 25 mm on the left of the BBU for ventilation
2. 25 mm on the right of the BBU for ventilation
3. 70 mm in front of the BBU for cabling
4. 800mm for maintenance
Slide the BBU case into the cabinet. Then, tighten the four M6 screws.
-
8/13/2019 Installation Guide for DBS3900
23/52
2 Install the power cable.
PWR
3 Install the signal cable.EXT-ALM0 MON1
Installing BBU Cables
1 Install the PGND cable. Grounding bolt
on the right side
of the BBU
PGND cable
21
-
8/13/2019 Installation Guide for DBS3900
24/52
Installing the BBU Cables
4 Install the CPRI optical cable and the E1 cable.
E1/T1
Remove the dustproof caps from the optical connectors.
Turn outwards the puller on the optical module.
Insert the optical connector at one end of the CPRI optical cable into the
optical module. Lead the CPRI optical cable out of the cabinet along the
left side of the cabinet.
Optical module
Puller
Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
22
-
8/13/2019 Installation Guide for DBS3900
25/52
6 Installing the BBU on the Wall
BBU Cable Connections
RRU power cable
CPRI optical cable
BBU power cable
DCDU-03C PGND cable
23
TO RRU
-
8/13/2019 Installation Guide for DBS3900
26/52
BBU
DCDU-03C
Space Requirements
Installing the BBU Case
1 Install the mounting ears for wall installation.
Mounting
ear
for wall
installation
Mounting ear on the BBU case
The DCDU is installed near the
BBU.
24
-
8/13/2019 Installation Guide for DBS3900
27/52
Installing the BBU Case
2 Place the BBU against the wall, and then use the marking pen to mark
the holes of the mounting ears for wall installation.
3 Install the expansion bolts.
BBU
Wall
25
-
8/13/2019 Installation Guide for DBS3900
28/52
Installing the BBU Case
5 Mount the BBU on the wall.
d Installing the DCDU-03C Case1 Turn the mounting ears on the
DCDU-03C by 90 degrees.
2 Place the DCDU-03C against the wall ,
and then use the marking pen to mark the
anchor points of the mounting ears for
wall installation.
26
Flat washer
Spring washer
-
8/13/2019 Installation Guide for DBS3900
29/52
e Installing the DCDU-03C Case3 Install the expansion bolts.
4 Mount the DCDU-03C on the wall.
27
-
8/13/2019 Installation Guide for DBS3900
30/52
7 Installing the BBU in the PS4890 Cabinet
BBU Cable Connections
Installation PositionNo.
From... To...
1
2
3
4 Monitoring signal cable
between the PMU and the
BBU
RS232/RS422 port on
the PMU
MON0 port on the BBU
5 CPRI optical cable CPRI port on the RRU CPRI port on the BBU
BBU power cable LOAD6 terminal on the
DCDU
PWR port on the BBU
E1 cable External transmission
device
E1/T1 port on the WMPT
BBU alarm cable
(optional)
External transmission
device
ALM port on the UPEU
Cable
28
-
8/13/2019 Installation Guide for DBS3900
31/52
Installing the BBU
Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.
29
-
8/13/2019 Installation Guide for DBS3900
32/52
Installing the BBU Cables
1 Install the power cable.
PWR
LOAD 6
30
-
8/13/2019 Installation Guide for DBS3900
33/52
Installing the BBU Cables
2 Install the signal cable.
EXT ALM1 MON0
RS232/RS422
Install the BBU alarm cable (optional).
Install the monitoring signal cable between the PMU and the BBU.
31
-
8/13/2019 Installation Guide for DBS3900
34/52
Installing the BBU Cables
3 Installing the CPRI opt ical cable
and the E1 cable.
E1/T1
Remove the dustproof caps from
the optical connectors.
Turn outwards the puller on the
optical module.
Insert the optical connector at oneend of the CPRI optical cable into
the optical module. lead the CPRI
optical cable out of the cabinet
along the left side of the cabinet.
Optical module
Puller
Insert the optical module into the
CPRI0, CPRI1, or CPRI2 port.
32
-
8/13/2019 Installation Guide for DBS3900
35/52
8 Installing the BBU in the OMB Cabinet
BBU Cable Connections
Installation PositionNo.
From... To...
1 PGND cable External grounding bar Grounding bar of the OMB
cabinet
2
3
4
5 E1 cable OUTSIDE port on the UELP External transmission device
6 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
Input power cable
of the OMB
External DC power supply DC input terminal of the
DCDU
BBU power cable LOAD6 output terminal on the
DCDU
PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
Cable
33
-
8/13/2019 Installation Guide for DBS3900
36/52
Installing the BBU
Slide the BBU case into the OMB cabinet gently. Then,
tighten the four M6 screws.
Installing the BBU Cables
1 Install the PGND cable of OMB Cabinet.
34
-
8/13/2019 Installation Guide for DBS3900
37/52
Installing the BBU Cables
2 Install the input power cable.
3 Install the CPRI optical cable.
3. Remove the dustproof caps from the
optical connectors.
2. Turn outwards the puller on the optical
module.
4. Insert the optical connector at one end
of the CPRI optical cable into the optical
module. lead the CPRI optical cable out of
the cabinet along the left side of thecabinet.
Optical module
Puller
1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
35
-
8/13/2019 Installation Guide for DBS3900
38/52
Installing the BBU Cables
4 Install the E1 cable (E1 transmission).
E1/T1
INSIDE
36
-
8/13/2019 Installation Guide for DBS3900
39/52
8 Installing the BBU in the OMB Cabinet
Installing the BBU Cables
5 Install the BBU power cable.
6 Install the FE cable (FE transmission).
LOAD6
37
-
8/13/2019 Installation Guide for DBS3900
40/52
9 Installing the BBU in the TMC
BBU Cable Connections
Installation PositionNo.
From... To...
1
2
3
4 Monitoring signal
cable
Wiring terminal of cabinet
monitoring
ALM1 port on the BBU
5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU
BBU power cable LOAD6 terminal of the PDU PWR port on the BBU
E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
38
-
8/13/2019 Installation Guide for DBS3900
41/52
Installing the BBU
Installing the BBU Cables
APMIDoor status
sensor
Wiring terminal of DCDU
surge protection
39
Slide the BBU case into the
TMC cabinet. Then, tightenthe four M6 screws.
Installing
the TMC alarm cable:
b. Connect the two bare
terminals X1.4 (blue) and
X1.5 (white) to the alarm
wiring terminals on the
door status sensor.
c. Connect the two bare
terminals X1.1 (white)
and X1.2 (orange) to the
OUT+ and OUT- alarmwiring terminals on the
APMI.
d. Connect the two bare
terminals X1.3 (white)
and X1.6 (green) to the
alarm wiring terminals on
the DCDU.
a. Fix the RJ45 connector
at one end of the alarm
cable to the EXT_ALM1
port on the BBU.
-
8/13/2019 Installation Guide for DBS3900
42/52
10 Installing the BBU in the TMC11H
BBU Cable Connections
Installation PositionNo.
From... To...
1
2
3
4 BBU power
cable
LOAD6 terminal on the PDU PWR port on the BBU
5 Monitoring
signal cable
Wiring terminal of cabinet
monitoring
MON1 port on the BBU
CPRI optical
cable
CPRI port on the BBU CPRI port on the RRU
E1 transfer
cableE1/T1 port on the WMPT INSIDE port on the UELP
E1 cable OUTSIDE port on the UELP External transmission device
Cable
40
-
8/13/2019 Installation Guide for DBS3900
43/52
Procedure for checking the power-on status of the BBU:
11 Checking the Power-On Status of the BBU
41
-
8/13/2019 Installation Guide for DBS3900
44/52
12 Reference
Cable Connector Connects to
OT terminal Grounding bolt of the BBU3900
DB26 male connector E1/T1 port on the GTMU or WMPT,
or OUTSIDE port on the UELP
E1 cable
The connector needs to be made
on site according to the field
requirements.
Peer device
DLC connector Connect the fiber tails labeled 1A
and 1B to the CPRI_W port on the
RRU
CPRI optical cable
DLC connector Connect the fiber tails labeled 2A
and 2B to one of the CPRI0 to
CPRI3 ports on the WBBP
PGND cable
OT terminal Protection grounding bar
3V3 connector PWR port on the UPEUBBU power cable
Bare wire. The connector needs to
be made on site according to the
field requirements. (The followingfigure shows the BBU power cable
by taking OT terminals as an
example.)
External power supply
Cable Lista
42
-
8/13/2019 Installation Guide for DBS3900
45/52
12 Reference
Cable Connector Connects to
DB26 male connector PWR port on the UPEU
DB25 male connector E1/T1 port on the GTMU or
WMPT
RJ45 connector FE0 port on the WMPT
RJ45 connector FE0 port on the WMPT
RJ45 connector FE0 port near the INSIDE label on
the UFLP
FE transfer
cable
RJ45 connector RS232/RS422 port on the PMU
RJ45 connector MON port on the BBU
Monitoring
signal cable
between the
PMU and the
BBU
RJ45 connector Routing equipment
FE cable
E1 transfer
cable
c Cable Lista
43
-
8/13/2019 Installation Guide for DBS3900
46/52
12 Reference
Checking the DIP Switches of the BBUc
Remove the BBU boards.
Wear an ESD wrist strap or a pair of ESD gloves when performing
operations related to the boards, as shown in the figure below.
Check the DIP switch settings of the WMPT, GTMU, UTRP, and UELP.
ESD gloves
ESD strap
Engineering Specifications of the BBUb
Item Specification
Dimensions 86 mm (height) x 442 mm (width) x 310 mm (length)
Weight Typical configuration: 7 kg; full configuration: 11 kg
Input voltage 48 V DC or +24 V DC
44
-
8/13/2019 Installation Guide for DBS3900
47/52
c Setting the DIP Switches
12 Reference
Settings of the DIP switches on the UELP
Settings of the DIP switches on the WMPT
Set the DIP switches of the BBU.
Settings of the DIP switches on the UTRP
Reinstall the boards.
45
-
8/13/2019 Installation Guide for DBS3900
48/52
12 Reference
Pin Assignment of the BBU Signal Cablesed
75-ohm E1 cable
Pin on the DB26 Male
Connector
Wire Type Coaxial SN. Label
X1.1 Tip RX1+
X1.2 Ring RX1-
X1.3 Tip RX2+
X1.4 Ring RX2-
X1.5 Tip RX3+
X1.6 Ring RX3-
X1.7 Tip RX4+
X1.8 Ring RX4-
X1.19 Tip TX1+
X1.20 Ring TX1-
X1.21 Tip TX2+
X1.22 Ring TX2-
X1.23 Tip TX3+
X1.24 Ring TX3-
X1.25 Tip TX4+
X1.26 Ring TX4-
8
6
4
2
7
5
3
1
46
-
8/13/2019 Installation Guide for DBS3900
49/52
12 Reference
Pin Assignment of the BBU Signal Cablesd
120-ohm E1 cable
Pin on the DB26 Male
Connector
Wire Color Wire Type Label
X1.1 Blue RX1+
X1.2 White RX1-
X1.3 Orange RX2+
X1.4 White RX2-
X1.5 Green RX3+
X1.6 White RX3-
X1.7 Brown RX4+
X1.8 White RX4-
X1.19 Grey TX1+X1.20 White TX1-
X1.21 Blue TX2+
X1.22 Red TX2-
X1.23 Orange TX3+
X1.24 Red TX3-
X1.25 Green TX4+
X1.26 Red TX4-Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
47
-
8/13/2019 Installation Guide for DBS3900
50/52
12 Reference
Pin Assignment of the BBU Signal Cablesd
Pin on the RJ45
Connector
Wire Color Wire Type Pin on the RJ45
Connector
X1.2 Orange X2.2
X1.1 White/orange X2.1
X1.6 Green X2.6
X1.3 White/green X2.3
X1.4 Blue X2.4
X1.5 White/blue X2.5
X1.8 Brown X2.8
X1.7 White/brown X2.7
Twisted pair
Twisted pair
Twisted pair
Twisted pair
RX-Twisted
pair
X5WhiteX1.5
RX+Twisted
pair
X4BlueX1.4
TX-Twisted
pair
X3OrangeX1.2
TX+Twisted
pair
X2WhiteX1.1
Port on the
APMI
Wire TypePins on the
X2, X3, X4,
and X5
Wire
Color
Pin on the RJ45
Connector
FE cable
Monitoring signal cable between the APMI and the BBU
48
-
8/13/2019 Installation Guide for DBS3900
51/52
12 Reference
Pin Assignment of the BBU Signal Cablesd
EMUA monitoring signal cable
Pin on the RJ45
Connector
Pin on the RJ45
Connector
Wire Color Wire Type
X1.1 X2.1 White/orange
X1.2 X2.2 Orange
X1.3 X2.3 White/green
X1.6 X2.6 Green
X1.5 X2.5 White/blue
X1.4 X2.4 Blue
X1.7 X2.7 White/brown
X1.8 X2.8 Brown
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Alarm cable
RX-Twisted
pair
WhiteX2.6X1.5
RX+Twisted
pair
BlueX2.2X1.4
TX-Twisted
pair
OrangeX2.7X1.2
TX+Twisted
pair
WhiteX2.3X1.1
Port on the
APMI
Wire
Type
Wire
Color
Pin on the
DB9 Male
Connector
Pin on the RJ45
Connector
49
-
8/13/2019 Installation Guide for DBS3900
52/52
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Shenzhen 518129
Peoples Republic of China
www.huawei.com