Installation Guide for DBS3900

download Installation Guide for DBS3900

of 52

Transcript of Installation Guide for DBS3900

  • 8/13/2019 Installation Guide for DBS3900

    1/52

    HUAWEI TECHNOLOGIES Co., Ltd.

    BBU3900

    Installation Guide

  • 8/13/2019 Installation Guide for DBS3900

    2/52

    Safety Information1

    1. Information About the Installation 2

    2. Installing the BBU in the APM308

    3. Installing the BBU in the APM30H 15

    4. Installing the BBU in the APM30 (+24 V)17

    5. Installing the BBU in the 19-Inch Cabinet 19

    6. Installing the BBU on the Wall23

    7. Installing the BBU in the PS4890 Cabinet

    28

    8. Installing the BBU in the OMB Cabinet 33

    9. Installing the BBU in the TMC 38

    10. Installing the BBU in the TMC11H

    40

    11. Checking the Power-On Status of the BBU41

    12. Reference42

    Content

  • 8/13/2019 Installation Guide for DBS3900

    3/52

    Safety Information

    1

    Copyright Huawei Technologies Co., Ltd. 2009. All rights reserved.

    Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility

    of accidents.

    The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be

    followed. They only provide the generic safety precautions for operations.

    When operating Huawei products and equipment, you must comply with safety precautions and special safety

    instructions related to corresponding equipment provided by Huawei. The safety precautions in the document

    are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of

    universal regulations for safety operations and safety codes on design, production, and equipment use.

    Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the

    documents are supplementary. You must comply with the local safety regulations.

    Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating

    methods and safety precautions before beginning work.

    Symbols

    Safety of Personnel The high voltage power supply provides power for running the system. Direct contact with the high voltage

    power supply or contact through damp objects may result in fatal danger.

    Non-standard and improper high voltage operations may result in fire and electric shock.

    In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel

    tower and mast.

    Ground the device before powering on the device. Otherwise, the personnel and device are in danger.

    Power off the device before performing operations on the power supply equipment.

    High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna

    on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all

    parties to ensure that the transmitter antennas are shut down. When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.

    Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.

    Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.

    When working at a height, be cautious about falling objects.

    Device Safety Check the electrical connection of the device before operation and ensure that the device is reliably grounded.

    The static electricity generated by the human body may damage the electrostatic sensitive components on

    the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when

    performing the operation.

    When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.

    The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards. The BTS3900A must be powered on within one week after installation.

    This symbol indicates that casualty or serious accident may occur if you ignore

    the safety instruction.

    This symbol indicates that serious or major injury may occur if you ignore the

    safety instruction.

    This symbol indicates that the operation may be easier if you pay attention to the

    safety instruction.

  • 8/13/2019 Installation Guide for DBS3900

    4/522

    1 Information About the Installation

    Installation Tools

  • 8/13/2019 Installation Guide for DBS3900

    5/52

    b Installation Scenarios APM30 2 APM30H

    BBU BBU

    BBU BBU

    3 TEC 4 TEC H

    3

  • 8/13/2019 Installation Guide for DBS3900

    6/52

    b Installation Scenarios5.APM30 (+24V) 6.PS4890

    7. In OMB cabinet 8.In other 19-inch cabinet 9.On the Wall

    BBU

    BBU

    BBU

    BBUBBU

    4

  • 8/13/2019 Installation Guide for DBS3900

    7/52

    c BBU Hardware and Cables1. Appearance of the BBU (Unit : mm)

    5

    FE surge protection transfer cable

    FE cable

    E1 surge protection transfer cable

    E1 Cable

    Alarm Cable

    Monitoring Cable

    CPRI Optical

    BBU Power Cable

    2. Cable connections of the BBU

    Monitoring

    Equipment

    Alarm

    Equipment

    Power System

  • 8/13/2019 Installation Guide for DBS3900

    8/526

    Board Mandatory

    /Optional

    Full

    Configuration

    Installation

    Slot

    Remarks

    WMPT Mandatory 2 S6 and S7 Preferentially configured in

    Slot 7.

    WBBP Mandatory 4 S0 to S3 Preferentially configured in

    Slot 3, then Slot 2, at last

    Slot 0,1.

    UPEU Mandatory 2 PWR1 and

    PWR2

    Preferentially configured in

    PWR2.

    UBFA Mandatory 1 FAN Only in the FAN slot.

    UTRP Optional 5 S0 to S5 Preferentially configured in

    Slot 4, 5.

    UELP Optional 2 S0 and S4 Preferentially configured in

    Slot 4.

    UFLP Optional 2 S0 and S4 Preferentially configured in

    Slot 4.

    UEIU Optional 1 PWR1 Preferentially configured in

    PWR1.

    3. Configuration Princip les of the BBU Boards

    c BBU Hardware and Cables

  • 8/13/2019 Installation Guide for DBS3900

    9/52

    e Procedure

    7

  • 8/13/2019 Installation Guide for DBS3900

    10/52

    Installing the BBU in the APM30

    Cable connections

    Installation PositionNO.

    From... To ...

    1

    2

    3

    4 Monitoring cable TX/RX on APMI MON1on BBU

    5 CPRI CPRI on BBU CPRI on RRU

    BBU power cable LOAD3 on PDU PWR on BBU

    E1 transfer cable E1/T1 on WMPT INSIDE on UELP

    E1cable OUTSIDE on UELP Transmission equipment

    Cable

    8

  • 8/13/2019 Installation Guide for DBS3900

    11/52

    b Installing BBU

    BBU

    PDU

    c Installing cables1. Install power cable.

    LOAD3

    NEG(-)

    RNT(+)

    PWR

    9

    1 Install the mounting ears at both sides of the BBU reversely.

    2 Slide the BBU case into the cabinet.

    3 Check the DIP switches (see appendix).

    Connect the OT terminal of the power

    cable to the LOAD3 terminal of the PDU,

    and then fix the 3V3 connector of the

    power cable to the PWR port on the BBU.

  • 8/13/2019 Installation Guide for DBS3900

    12/52

    Connect one end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP.

    Then, connect the other end to the RRU.

    Remove the dustproof caps from

    the optical connectors.

    Wrap the fiber tail with the winding pipe

    till the first cable tie.

    The TX port on the BBU is

    connected to the RX port on

    the RRU.

    The RX port on the BBU is

    connected to the TX port on

    the RRU.

    b Installing the BBU cables2. Install optical cables.

    Insert the optical module into CPRI0,

    CPRI1, or CPRI2.

    Turn outwards the puller on the

    optical module.

    Insert the optical connector at one end

    of the CPRI optical cable into the optical

    module. lead the CPRI optical cable out

    of the cabinet along the left side of the

    cabinet.

    Optical module

    Puller

    Optical cable

    connector

    Winding pipe

    10

  • 8/13/2019 Installation Guide for DBS3900

    13/52

    Strip the jacket off the E1 cable

    near the grounding point at the

    lower right corner of the cabinet toexpose the shielding layer

    Thread the E1 cable through thegrounding clip. Then, tighten the screw on

    the grounding clip to make the shielding

    layer of the E1 cable in full contact with

    the grounding clip. Finally, connect the

    PGND cable on the grounding clip to the

    grounding bolt of the APM30.

    Fix the DB26 connector of the E1

    cable to the OUTSIDE port on the

    UELP.

    Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the

    UELP and the DB26 connector to the E1/T1 port on the WMPT.

    b Installing the BBU cables3. Install the E1 transfer cable.

    4. Install the E1 cable.

    E1 transfer cable

    Cabling the E1 cable.

    E1cable

    Shielding layerof the E1 cable

    (25mm)

    INSIDE

    E1/T1

    OUTSIDE

    11

  • 8/13/2019 Installation Guide for DBS3900

    14/52

    Connect one end of the FE transfer cable

    to the FE0 port near the INSIDE label onthe UFLP and the other end to the FE0 port

    on the WMPT.

    b Installing the BBU Cables5. Install the FE transfer cable (FE transmissionmode).

    6. Install the FE cable (FE transmission).

    Connect one end of the FE cable to the FE0

    port near the OUTSIDE label on the UFLP.

    Then, lead the other end out of the cabinet

    along the right side of the cabinet.

    FE transfer

    cable

    FE

    cable

    Strip the jacket off the FE cable

    near the grounding point at the

    lower right corner of the cabinet to

    expose the shielding layer

    (25mm)

    Thread the FE cable through the grounding clip. Then, tighten the screw

    on the grounding clip to make the shielding layer of the FE cable in full

    contact with the grounding clip. Finally, connect the PGND cable on the

    grounding clip to the grounding bolt of the APM30.

    Shielding layer ofthe FE cable

    12

  • 8/13/2019 Installation Guide for DBS3900

    15/52

    When the MON0 port on the BBU is available, fix the RJ45connector of the EMUA monitoring signal cable to the MON0 port

    on the UPEU, and the DB9 connector to the corresponding port on

    the EMUA.

    b Installing the BBU cables

    9. Install the EMUA monitoring signal cable.

    MON0

    RS485

    Fix the RJ45 connector at one end of the

    cable to the MON1 port on the UPEU.

    7. Install the monitoring signal cable between theAPMI and the BBU.

    External alarm

    cable

    Connect one end of the alarm cable to the

    EXT-ALM port on the UPEU, and the

    other end to the associated alarm device.

    8. Install the external alarm cable.

    MON1

    RJ45

    Monitoring signal cable

    between the APMI and the

    BBU

    The port on the external alarm device is

    added depending on field requirements.

    EXT-ALM1

    13

  • 8/13/2019 Installation Guide for DBS3900

    16/52

    b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector

    of the EMUA monitoring signal cable, and then connect the four exposed barewires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship

    between the ports and wires. Fix the DB9 connector to the corresponding port

    on the EMUA.

    b Installing the BBU cables

    RS485

    14

    EMUA monitoring signal cable

    Pin on the RJ45

    Connector

    Pin on the DB9

    Male Connector

    Color Type Port on the APMI

    X1.1 X2.3 White TX+

    X1.2 X2.7 Orange TX-

    X1.4 X2.2 Blue RX+

    X1.5 X2.6 White RX-

    Twisted

    pair

    Twistedpair

  • 8/13/2019 Installation Guide for DBS3900

    17/52

    3 Installing the BBU in the APM30H

    The procedure for installing the BBU case in the APM30H is the same as that in the APM30.

    For details, see pages 814. The following figure shows the cable connections of the BBU.Page 16 shows how to install the monitoring signal cable between the HEUA and the BBU in

    the APM30H.

    Installation PositionNo.

    One end is connected to... The other end is connected

    to...

    1

    2

    3

    4 Monitoring signal

    cable

    COM IN port on the HEUA MON1 port on the BBU

    5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

    BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

    E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

    E1 cable OUTSIDE port on the UELP External transmission device

    Cable

    BBU Cable Connections

    15

  • 8/13/2019 Installation Guide for DBS3900

    18/52

    MON1

    COM IN

    UPEU on the

    BBU

    HEUA

    b Installing the Monitoring Signal Cable between the HEUA andthe BBU

    16

  • 8/13/2019 Installation Guide for DBS3900

    19/52

    4 Install ing the BBU in the APM30 (+24 V)

    Installation PositionNo.

    One end is connected to... The other end is connected

    to...

    1

    2

    3

    4 Monitoring signal

    cable

    COM IN port on the HEUA MON1 port on the BBU

    5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

    BBU power cable LOAD3 terminal of the PDU PWR port on the BBU

    E1 surge protection

    transfer cableE1/T1 port on the WMPT INSIDE port on the UELP

    E1 cable OUTSIDE port on the UELP External transmission device

    Cable

    The procedure for installing the BBU in the APM30 (+24 V) is the same as that in

    the APM30. For details, see pages 814. The following figure shows the cable

    connections of the BBU. Page 18 shows how to install the monitoring signal

    cable of the cabinet.

    BBU Cable Connections

    17

  • 8/13/2019 Installation Guide for DBS3900

    20/52

    Pin assignment of the monitoring signal cable of the cabinet

    b Installing the Monitoring Signal Cable of the Cabinet

    18

    Pin on the RJ45

    Connector

    Pin on the RJ45

    Connector

    Wire Color Wire Type

    X1.1 X2.1 White/orange

    X1.2 X2.2 Orange

    X1.3 X2.3 White/green

    X1.6 X2.6 Green

    X1.5 X2.5 White/blue

    X1.4 X2.4 Blue

    X1.7 X2.7 White/brown

    X1.8 X2.8 Brown

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

  • 8/13/2019 Installation Guide for DBS3900

    21/52

    5 Installing the BBU in the 19-Inch Cabinet

    BBU Cable Connections

    Installation PositionNo.

    From... To...

    1

    2

    3

    4 Monitoring

    signal cable

    External monitoring device MON/ALM on the BBU

    5 CPRI optical

    cable

    CPRI port on the RUU CPRI port on the BBU

    BBU power

    cable

    External power supply PWR port on the BBU

    E1 cable External transmission device E1/T1 port on the WMPT

    FE cable

    (optional)

    External transmission device FE0 port on the WMPT

    Cable

    19

  • 8/13/2019 Installation Guide for DBS3900

    22/52

    Installing the BBU Case

    Space Requirements

    20

    1. 25 mm on the left of the BBU for ventilation

    2. 25 mm on the right of the BBU for ventilation

    3. 70 mm in front of the BBU for cabling

    4. 800mm for maintenance

    Slide the BBU case into the cabinet. Then, tighten the four M6 screws.

  • 8/13/2019 Installation Guide for DBS3900

    23/52

    2 Install the power cable.

    PWR

    3 Install the signal cable.EXT-ALM0 MON1

    Installing BBU Cables

    1 Install the PGND cable. Grounding bolt

    on the right side

    of the BBU

    PGND cable

    21

  • 8/13/2019 Installation Guide for DBS3900

    24/52

    Installing the BBU Cables

    4 Install the CPRI optical cable and the E1 cable.

    E1/T1

    Remove the dustproof caps from the optical connectors.

    Turn outwards the puller on the optical module.

    Insert the optical connector at one end of the CPRI optical cable into the

    optical module. Lead the CPRI optical cable out of the cabinet along the

    left side of the cabinet.

    Optical module

    Puller

    Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.

    22

  • 8/13/2019 Installation Guide for DBS3900

    25/52

    6 Installing the BBU on the Wall

    BBU Cable Connections

    RRU power cable

    CPRI optical cable

    BBU power cable

    DCDU-03C PGND cable

    23

    TO RRU

  • 8/13/2019 Installation Guide for DBS3900

    26/52

    BBU

    DCDU-03C

    Space Requirements

    Installing the BBU Case

    1 Install the mounting ears for wall installation.

    Mounting

    ear

    for wall

    installation

    Mounting ear on the BBU case

    The DCDU is installed near the

    BBU.

    24

  • 8/13/2019 Installation Guide for DBS3900

    27/52

    Installing the BBU Case

    2 Place the BBU against the wall, and then use the marking pen to mark

    the holes of the mounting ears for wall installation.

    3 Install the expansion bolts.

    BBU

    Wall

    25

  • 8/13/2019 Installation Guide for DBS3900

    28/52

    Installing the BBU Case

    5 Mount the BBU on the wall.

    d Installing the DCDU-03C Case1 Turn the mounting ears on the

    DCDU-03C by 90 degrees.

    2 Place the DCDU-03C against the wall ,

    and then use the marking pen to mark the

    anchor points of the mounting ears for

    wall installation.

    26

    Flat washer

    Spring washer

  • 8/13/2019 Installation Guide for DBS3900

    29/52

    e Installing the DCDU-03C Case3 Install the expansion bolts.

    4 Mount the DCDU-03C on the wall.

    27

  • 8/13/2019 Installation Guide for DBS3900

    30/52

    7 Installing the BBU in the PS4890 Cabinet

    BBU Cable Connections

    Installation PositionNo.

    From... To...

    1

    2

    3

    4 Monitoring signal cable

    between the PMU and the

    BBU

    RS232/RS422 port on

    the PMU

    MON0 port on the BBU

    5 CPRI optical cable CPRI port on the RRU CPRI port on the BBU

    BBU power cable LOAD6 terminal on the

    DCDU

    PWR port on the BBU

    E1 cable External transmission

    device

    E1/T1 port on the WMPT

    BBU alarm cable

    (optional)

    External transmission

    device

    ALM port on the UPEU

    Cable

    28

  • 8/13/2019 Installation Guide for DBS3900

    31/52

    Installing the BBU

    Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

    29

  • 8/13/2019 Installation Guide for DBS3900

    32/52

    Installing the BBU Cables

    1 Install the power cable.

    PWR

    LOAD 6

    30

  • 8/13/2019 Installation Guide for DBS3900

    33/52

    Installing the BBU Cables

    2 Install the signal cable.

    EXT ALM1 MON0

    RS232/RS422

    Install the BBU alarm cable (optional).

    Install the monitoring signal cable between the PMU and the BBU.

    31

  • 8/13/2019 Installation Guide for DBS3900

    34/52

    Installing the BBU Cables

    3 Installing the CPRI opt ical cable

    and the E1 cable.

    E1/T1

    Remove the dustproof caps from

    the optical connectors.

    Turn outwards the puller on the

    optical module.

    Insert the optical connector at oneend of the CPRI optical cable into

    the optical module. lead the CPRI

    optical cable out of the cabinet

    along the left side of the cabinet.

    Optical module

    Puller

    Insert the optical module into the

    CPRI0, CPRI1, or CPRI2 port.

    32

  • 8/13/2019 Installation Guide for DBS3900

    35/52

    8 Installing the BBU in the OMB Cabinet

    BBU Cable Connections

    Installation PositionNo.

    From... To...

    1 PGND cable External grounding bar Grounding bar of the OMB

    cabinet

    2

    3

    4

    5 E1 cable OUTSIDE port on the UELP External transmission device

    6 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

    Input power cable

    of the OMB

    External DC power supply DC input terminal of the

    DCDU

    BBU power cable LOAD6 output terminal on the

    DCDU

    PWR port on the BBU

    E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

    Cable

    33

  • 8/13/2019 Installation Guide for DBS3900

    36/52

    Installing the BBU

    Slide the BBU case into the OMB cabinet gently. Then,

    tighten the four M6 screws.

    Installing the BBU Cables

    1 Install the PGND cable of OMB Cabinet.

    34

  • 8/13/2019 Installation Guide for DBS3900

    37/52

    Installing the BBU Cables

    2 Install the input power cable.

    3 Install the CPRI optical cable.

    3. Remove the dustproof caps from the

    optical connectors.

    2. Turn outwards the puller on the optical

    module.

    4. Insert the optical connector at one end

    of the CPRI optical cable into the optical

    module. lead the CPRI optical cable out of

    the cabinet along the left side of thecabinet.

    Optical module

    Puller

    1. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.

    35

  • 8/13/2019 Installation Guide for DBS3900

    38/52

    Installing the BBU Cables

    4 Install the E1 cable (E1 transmission).

    E1/T1

    INSIDE

    36

  • 8/13/2019 Installation Guide for DBS3900

    39/52

    8 Installing the BBU in the OMB Cabinet

    Installing the BBU Cables

    5 Install the BBU power cable.

    6 Install the FE cable (FE transmission).

    LOAD6

    37

  • 8/13/2019 Installation Guide for DBS3900

    40/52

    9 Installing the BBU in the TMC

    BBU Cable Connections

    Installation PositionNo.

    From... To...

    1

    2

    3

    4 Monitoring signal

    cable

    Wiring terminal of cabinet

    monitoring

    ALM1 port on the BBU

    5 CPRI optical cable CPRI port on the BBU CPRI port on the RRU

    BBU power cable LOAD6 terminal of the PDU PWR port on the BBU

    E1 transfer cable E1/T1 port on the WMPT INSIDE port on the UELP

    E1 cable OUTSIDE port on the UELP External transmission device

    Cable

    38

  • 8/13/2019 Installation Guide for DBS3900

    41/52

    Installing the BBU

    Installing the BBU Cables

    APMIDoor status

    sensor

    Wiring terminal of DCDU

    surge protection

    39

    Slide the BBU case into the

    TMC cabinet. Then, tightenthe four M6 screws.

    Installing

    the TMC alarm cable:

    b. Connect the two bare

    terminals X1.4 (blue) and

    X1.5 (white) to the alarm

    wiring terminals on the

    door status sensor.

    c. Connect the two bare

    terminals X1.1 (white)

    and X1.2 (orange) to the

    OUT+ and OUT- alarmwiring terminals on the

    APMI.

    d. Connect the two bare

    terminals X1.3 (white)

    and X1.6 (green) to the

    alarm wiring terminals on

    the DCDU.

    a. Fix the RJ45 connector

    at one end of the alarm

    cable to the EXT_ALM1

    port on the BBU.

  • 8/13/2019 Installation Guide for DBS3900

    42/52

    10 Installing the BBU in the TMC11H

    BBU Cable Connections

    Installation PositionNo.

    From... To...

    1

    2

    3

    4 BBU power

    cable

    LOAD6 terminal on the PDU PWR port on the BBU

    5 Monitoring

    signal cable

    Wiring terminal of cabinet

    monitoring

    MON1 port on the BBU

    CPRI optical

    cable

    CPRI port on the BBU CPRI port on the RRU

    E1 transfer

    cableE1/T1 port on the WMPT INSIDE port on the UELP

    E1 cable OUTSIDE port on the UELP External transmission device

    Cable

    40

  • 8/13/2019 Installation Guide for DBS3900

    43/52

    Procedure for checking the power-on status of the BBU:

    11 Checking the Power-On Status of the BBU

    41

  • 8/13/2019 Installation Guide for DBS3900

    44/52

    12 Reference

    Cable Connector Connects to

    OT terminal Grounding bolt of the BBU3900

    DB26 male connector E1/T1 port on the GTMU or WMPT,

    or OUTSIDE port on the UELP

    E1 cable

    The connector needs to be made

    on site according to the field

    requirements.

    Peer device

    DLC connector Connect the fiber tails labeled 1A

    and 1B to the CPRI_W port on the

    RRU

    CPRI optical cable

    DLC connector Connect the fiber tails labeled 2A

    and 2B to one of the CPRI0 to

    CPRI3 ports on the WBBP

    PGND cable

    OT terminal Protection grounding bar

    3V3 connector PWR port on the UPEUBBU power cable

    Bare wire. The connector needs to

    be made on site according to the

    field requirements. (The followingfigure shows the BBU power cable

    by taking OT terminals as an

    example.)

    External power supply

    Cable Lista

    42

  • 8/13/2019 Installation Guide for DBS3900

    45/52

    12 Reference

    Cable Connector Connects to

    DB26 male connector PWR port on the UPEU

    DB25 male connector E1/T1 port on the GTMU or

    WMPT

    RJ45 connector FE0 port on the WMPT

    RJ45 connector FE0 port on the WMPT

    RJ45 connector FE0 port near the INSIDE label on

    the UFLP

    FE transfer

    cable

    RJ45 connector RS232/RS422 port on the PMU

    RJ45 connector MON port on the BBU

    Monitoring

    signal cable

    between the

    PMU and the

    BBU

    RJ45 connector Routing equipment

    FE cable

    E1 transfer

    cable

    c Cable Lista

    43

  • 8/13/2019 Installation Guide for DBS3900

    46/52

    12 Reference

    Checking the DIP Switches of the BBUc

    Remove the BBU boards.

    Wear an ESD wrist strap or a pair of ESD gloves when performing

    operations related to the boards, as shown in the figure below.

    Check the DIP switch settings of the WMPT, GTMU, UTRP, and UELP.

    ESD gloves

    ESD strap

    Engineering Specifications of the BBUb

    Item Specification

    Dimensions 86 mm (height) x 442 mm (width) x 310 mm (length)

    Weight Typical configuration: 7 kg; full configuration: 11 kg

    Input voltage 48 V DC or +24 V DC

    44

  • 8/13/2019 Installation Guide for DBS3900

    47/52

    c Setting the DIP Switches

    12 Reference

    Settings of the DIP switches on the UELP

    Settings of the DIP switches on the WMPT

    Set the DIP switches of the BBU.

    Settings of the DIP switches on the UTRP

    Reinstall the boards.

    45

  • 8/13/2019 Installation Guide for DBS3900

    48/52

    12 Reference

    Pin Assignment of the BBU Signal Cablesed

    75-ohm E1 cable

    Pin on the DB26 Male

    Connector

    Wire Type Coaxial SN. Label

    X1.1 Tip RX1+

    X1.2 Ring RX1-

    X1.3 Tip RX2+

    X1.4 Ring RX2-

    X1.5 Tip RX3+

    X1.6 Ring RX3-

    X1.7 Tip RX4+

    X1.8 Ring RX4-

    X1.19 Tip TX1+

    X1.20 Ring TX1-

    X1.21 Tip TX2+

    X1.22 Ring TX2-

    X1.23 Tip TX3+

    X1.24 Ring TX3-

    X1.25 Tip TX4+

    X1.26 Ring TX4-

    8

    6

    4

    2

    7

    5

    3

    1

    46

  • 8/13/2019 Installation Guide for DBS3900

    49/52

    12 Reference

    Pin Assignment of the BBU Signal Cablesd

    120-ohm E1 cable

    Pin on the DB26 Male

    Connector

    Wire Color Wire Type Label

    X1.1 Blue RX1+

    X1.2 White RX1-

    X1.3 Orange RX2+

    X1.4 White RX2-

    X1.5 Green RX3+

    X1.6 White RX3-

    X1.7 Brown RX4+

    X1.8 White RX4-

    X1.19 Grey TX1+X1.20 White TX1-

    X1.21 Blue TX2+

    X1.22 Red TX2-

    X1.23 Orange TX3+

    X1.24 Red TX3-

    X1.25 Green TX4+

    X1.26 Red TX4-Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    47

  • 8/13/2019 Installation Guide for DBS3900

    50/52

    12 Reference

    Pin Assignment of the BBU Signal Cablesd

    Pin on the RJ45

    Connector

    Wire Color Wire Type Pin on the RJ45

    Connector

    X1.2 Orange X2.2

    X1.1 White/orange X2.1

    X1.6 Green X2.6

    X1.3 White/green X2.3

    X1.4 Blue X2.4

    X1.5 White/blue X2.5

    X1.8 Brown X2.8

    X1.7 White/brown X2.7

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    RX-Twisted

    pair

    X5WhiteX1.5

    RX+Twisted

    pair

    X4BlueX1.4

    TX-Twisted

    pair

    X3OrangeX1.2

    TX+Twisted

    pair

    X2WhiteX1.1

    Port on the

    APMI

    Wire TypePins on the

    X2, X3, X4,

    and X5

    Wire

    Color

    Pin on the RJ45

    Connector

    FE cable

    Monitoring signal cable between the APMI and the BBU

    48

  • 8/13/2019 Installation Guide for DBS3900

    51/52

    12 Reference

    Pin Assignment of the BBU Signal Cablesd

    EMUA monitoring signal cable

    Pin on the RJ45

    Connector

    Pin on the RJ45

    Connector

    Wire Color Wire Type

    X1.1 X2.1 White/orange

    X1.2 X2.2 Orange

    X1.3 X2.3 White/green

    X1.6 X2.6 Green

    X1.5 X2.5 White/blue

    X1.4 X2.4 Blue

    X1.7 X2.7 White/brown

    X1.8 X2.8 Brown

    Twisted pair

    Twisted pair

    Twisted pair

    Twisted pair

    Alarm cable

    RX-Twisted

    pair

    WhiteX2.6X1.5

    RX+Twisted

    pair

    BlueX2.2X1.4

    TX-Twisted

    pair

    OrangeX2.7X1.2

    TX+Twisted

    pair

    WhiteX2.3X1.1

    Port on the

    APMI

    Wire

    Type

    Wire

    Color

    Pin on the

    DB9 Male

    Connector

    Pin on the RJ45

    Connector

    49

  • 8/13/2019 Installation Guide for DBS3900

    52/52

    HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang

    Shenzhen 518129

    Peoples Republic of China

    www.huawei.com