Installation Guide - FCC ID · PDF fileDBS3900 LampSite Installation Guide Issue 06 Date...

download Installation Guide - FCC ID · PDF fileDBS3900 LampSite Installation Guide Issue 06 Date 2015-10-30 HUAWEI TECHNOLOGIES CO., LTD

If you can't read please download the document

Transcript of Installation Guide - FCC ID · PDF fileDBS3900 LampSite Installation Guide Issue 06 Date...

  • DBS3900 LampSite

    Installation Guide

    Issue 06

    Date 2015-10-30

    HUAWEI TECHNOLOGIES CO., LTD.

  • Copyright Huawei Technologies Co., Ltd. 2015. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respectiveholders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees orrepresentations of any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied.

    Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

    Bantian, LonggangShenzhen 518129People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Issue 06 (2015-10-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    i

    http://www.huawei.commailto:[email protected]

  • About This Document

    OverviewThis document describes how to install the modules and cables for the BBU, DCU, RHUB,pRRU3901, pRRU3902, and pRRU3907 indoors. It also provides checklists for hardwareinstallation.

    NOTE

    l Unless otherwise specified, BBU in this document refers to BBU3900 and BBU3910.

    l DCU3900 in this document refers to DCU.

    l RHUB3908 in this document refers to RHUB.

    l Unless otherwise specified, pRRU in this document refers to pRRU3901, pRRU3902, and pRRU3907.

    Product VersionThe following table lists the product version related to this document.

    Product Name Solution Version Product Version

    DBS3900 LampSite l SRAN10.1 and later versionsl RAN17.1 and later versionsl eRAN8.1 and later versionsl eRAN TDD 8.1 and later

    versions

    V100R010C10 and laterversions

    Intended AudienceThis document is intended for:l BTS installation personnel

    DBS3900 LampSiteInstallation Guide About This Document

    Issue 06 (2015-10-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    ii

  • Contents

    About This Document.....................................................................................................................ii

    1 Changes in DBS3900 LampSite Installation Guide................................................................1

    2 Installation Preparations..............................................................................................................42.1 Reference Documents.....................................................................................................................................................52.2 Preparing Tools and Instruments.................................................................................................................................... 52.3 Requirements for Installation Personnel.........................................................................................................................6

    3 Unpacking and Checking............................................................................................................ 7

    4 Installing a BBU.............................................................................................................................9

    5 Installing a DCU.......................................................................................................................... 10

    6 Installing an RHUB.....................................................................................................................116.1 Information About the Installation............................................................................................................................... 126.1.1 Installation Scenarios.................................................................................................................................................126.1.2 Installation Clearance Requirements......................................................................................................................... 176.1.3 Installation Environment........................................................................................................................................... 196.2 Installation Process....................................................................................................................................................... 216.3 Installing an RHUB...................................................................................................................................................... 226.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack....................................................................................................226.3.2 Installing an RHUB in a 19-Inch Shelf..................................................................................................................... 256.3.3 Installing an RHUB on a Wall................................................................................................................................... 286.4 Installing RHUB Cables............................................................................................................................................... 326.4.1 Requirements for Cable Layout.................................................................................................................................326.4.2 Cable List...................................................................................................................................................................356.4.3 Cable Connections.....................................................................................................................................................366.4.4 Cable Installation Process..........................................................................................................................................376.4.5 Installing PGND Cable..............................................................................................................................................386.4.6 Installing Ethernet Cable........................................................................................................................................... 396.4.7 Installing CRPI Optical Cables..................................................................................................................................416.4.8 Installing Alarm Cable (Optional).............................................................................................................................446.4.9 Installing Power Cable...............................................................................................................................................456.5 Checking the RHUB Hardware Installation................................................................................................................. 466.6 Power-on Check on an RHUB......................................................................................................................................48

    DBS3900 LampSiteInstallation Guide Contents

    Issue 06 (2015-10-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    iii

  • 7 Installing a pRRU3901................................................................................................................ 507.1 Information About the Installation............................................................................................................................... 517.1.1 Product Family.......................................................................................................................................................... 517.1.2 Installation Scenario.................................................................................................................................................. 517.1.3 Space Requirements.................................................................................................................................................. 557.1.4 Installation Environment Requirements.................................................................................................................... 567.2 Obtaining the MAC Address (Optional) ..................................................................................................................... 577.3 Installation Process....................................................................................................................................................... 577.4 Installing a pRRU3901................................................................................................................................................. 587.4.1 pRRU3901 Mounting Kits.........................................................................................................................................597.4.2 Installing a pRRU3901 on a Wall..............................................................................................................................607.4.3 Installing a pRRU3901 on a Ceiling..............