Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level...

32
Installation and Operating Manual Gauges Switches Transmitters Magnetic Liquid Level Indicators A Magnetrol Company

Transcript of Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level...

Page 1: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

Installation and Operating Manual

Gauges

Switches

Transmitters

Magnetic LiquidLevel Indicators

A Magnetrol Company

Page 2: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

Read this Manual Before InstallingThis manual provides information on Magnetic LiquidLevel Indicators. It is important that all instructions areread carefully and followed in sequence.

Conventions Used in this ManualCertain conventions are used in this manual to conveyspecific types of information. General technical material,support data, and safety information are presented innarrative form. The following styles are used for notes,cautions, and warnings.

NotesNotes contain information that augments or clarifiesan operating step. Notes do not normally containactions. They follow the procedural steps to whichthey refer.

CautionsCautions alert the technician to special conditions thatcould injure personnel, damage equipment, or reducea component’s mechanical integrity. Cautions are alsoused to alert the technician to unsafe practices or theneed for special protective equipment or specificmaterials. In this manual, a caution box indicates apotentially hazardous situation which, if not avoided,may result in minor or moderate injury.

WarningsWarnings identify potentially dangerous situations orserious hazards. In this manual, a warning indicates animminently hazardous situation which, if not avoided,could result in serious injury or death.

Safety MessagesFollow all standard industry procedures for servicingelectrical equipment when working with or around highvoltage. Always shut off the power supply before touch-ing any components.

WARNING! Explosion hazard. Do not connect ordisconnect equipment unless power has been switched offor the area is known to be non-hazardous.

Low Voltage DirectiveFor use in Installation Category II, Pollution Degree 2.If equipment is used in a manner not specified by themanufacturer, protection provided by the equipmentmay be impaired.

Notice of Trademark, Copyright, and LimitationsAtlas, Aurora, Eclipse, Gemini, and Jupiter, are trade-marks of Magnetrol International.

Copyright © 2004 Magnetrol International.All rights reserved.

Magnetrol reserves the right to make changes to theproduct described in this manual at any time withoutnotice. Magnetrol makes no warranty with respect to theaccuracy of the information in this manual.

WarrantyAll Magnetrol/Orion mechanical level controls arewarranted free of defects in materials or workmanship forfive full years from the date of original factory shipment.

All Magnetrol/Orion electronic level controls arewarranted free of defects in materials or workmanship forone full year from the date of original factory shipment.

If returned within the warranty period; and, upon factoryinspection of the control, the cause of the claim isdetermined to be covered under the warranty; then,Magnetrol/Orion will repair or replace the control at nocost to the purchaser (or owner) other than transportation.

Magnetrol/Orion shall not be liable for misapplication,labor claims, direct or consequential damage or expensearising from the installation or use of equipment. Thereare no other warranties expressed or implied, except specialwritten warranties covering some Magnetrol products.

Quality AssuranceThe quality assurance system in placeat Magnetrol guarantees the highestlevel of quality throughout the com-pany. Magnetrol is committed to pro-viding full customer satisfaction bothin quality products and quality service.

Magnetrol’s Corporate quality assurance system is regis-tered to ISO 9001 affirming its commitment to knowninternational quality standards providing the strongestassurance of product/service quality available.

Page 3: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

Table of Contents

1.0 Installation

1.1 Unpacking.............................................................1

1.2 Pre-installation Checklist .......................................1

1.3 Equipment and Tools ............................................1

1.4 Side Mount Installation.........................................2

1.5 Top Mount Installation .........................................3

1.6 Top/Bottom Connection Installation.....................3

1.7 Start-up .................................................................3

1.8 Special Accessory Installation.................................4

1.8.1 Insulation or Blanket Installation................4

1.8.2 Steam Heat Tracing Installation ..................5

1.8.3 Electric Heat Tracing Installation................51.8.3.1 Units with a fixed-point

thermostatic switch..............................51.8.3.2 Units with an adjustable “bulb-type”

thermostatic switch..............................6

1.9 Switch Installation .................................................7

1.9.1 OES-100 Cam Operated Switch.................71.9.1.1 Mounting to an

Atlas™ or Gemini™ MLI..................71.9.1.2 Mounting to an Aurora® MLI .............71.9.1.3 Wiring.................................................8

1.9.2 OPS-200 Pneumatic Switch........................81.9.2.1 Mounting to an

Atlas or Gemini MLI...........................81.9.2.2 Mounting to an Aurora MLI ...............91.9.2.3 Air line connections.............................9

1.9.3 ORS-300 Electric Reed Switch ...................91.9.3.1 Mounting to an

Atlas or Gemini MLI.........................101.9.3.2 Mounting to an Aurora MLI .............101.9.3.3 Wiring...............................................10

1.10 Analog Transmitter Installation............................11

1.10.1 OCT-400 Reed Transmitter ......................11

1.11 Internal Electronic Transmitter Installation .........11

1.12 Internal Eclipse® Transmitter Installation.............12

2.0 Reference Information

2.1 Description..........................................................12

2.2 Theory of Operation ...........................................13

2.2.1 Side Mount...............................................13

2.2.2 Top Mount ...............................................13

2.3 Troubleshooting...................................................14

2.3.1 Side Mount...............................................14

2.3.2 Top Mount ...............................................15

2.4 Spare Parts ...........................................................15

2.5 Maintenance........................................................16

2.6 Agency Approvals ................................................16

2.7 Specifications.......................................................17

2.7.1 Magnetic Level Indicator ..........................17

2.7.2 Model OES-100 Switch............................18

2.7.3 Model OPS-200 Switch............................18

2.7.4 Model ORS-300 Switch ...........................18

2.7.5 Model OCT-400 Analog Transmitter .......18

2.7.6 Model 2XX Jupiter™ MagnetostrictiveTransmitter ...............................................18

2.7.7 Model 705 Eclipse Transmitter .................18

2.7.8 Physical – Atlas.........................................19

2.7.9 Physical – Aurora......................................21

2.7.10 Physical – Gemini.....................................22

2.8 Model Numbers ..................................................25

2.8.1 Magnetic Level Indicator ..........................25

2.8.2 Eclipse Guided Wave Radar Transmitter ...27

2.8.3 Jupiter Magnetostrictive Transmitter.........28

2.8.4 Reed Chain Transmitter............................28

2.8.5 Electric Switches .......................................28

MagneticLiquid Level Indicators

Page 4: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

1

1.0 Installation

Caution: If equipment is used in a manner not specified by manu-facturer, protection provided by equipment may beimpaired.

1.1 Unpacking

Unpack the instrument carefully. Inspect all units for damage. Report any concealed damage to carrier within24 hours. Check the contents of the packing slip andpurchase order. Check and record the serial number forfuture reference when ordering parts.

Caution: Do not discard the shipping container until all parts arechecked.

1.2 Pre-installation Checklist

1. Manually move the float from 0% to 100% to 0% priorto start up/check out in order to reinitialize accessoryproducts, if so equipped. Accessories may inadvertentlychange state due to rough handling in shipment.

2. Remove float prior to pressure testing tank.

Caution: Float damage will occur if not removed from chamber priorto pressure testing the tank.

3. Verify the MLI’s center to center distance equals thevessel’s center to center.

1.3 Equipment and Tools

• Open-end wrenches or adjustable wrench to fit the processstuds and nuts. A torque wrench is highly desirable.

• Flat-blade screwdriver

• Digital multimeter or digital volt/ammeter if transmittersor switches are attached

• Level

• Gasket for mating flanges

• Teflon tape & “never seize” for threaded units

• Pipe wrench for threaded units

46-638 Magnetic Liquid Level Indicators

Page 5: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

246-638 Magnetic Liquid Level Indicators

1.4 Side Mount Installation

Caution: This instrument is intended for use in InstallationCategory II, Pollution Degree 2 locations.

NOTE: Top of gauge nameplates are available as an option.

The MLI nameplate can be used as bottom reference ofthe external cage. Install the cage to the vessel with name-plate at bottom. Isolation valves are recommended forinstallation between vessel and external cage. Check toensure the external cage is vertical. All piping should bestraight and free of “low spots” or “pockets” so that thelower liquid connection will drain toward the externalcage. Adjust piping as required.

It is recommended a drain valve be installed in the bottomflange to allow cleaning and checking level. Close theisolation valves until start up.

Initial installation of the Magnetic Level Indicator is sim-ple. Unless otherwise specified, MLIs will be shipped fromthe factory fully assembled. All flanges will be torqued toANSI specifications. Make sure all process connectionsattached to the vessel which the gauge will be mounted toare vertically level, and flanges, if any are level.

Carefully unpack the MLI and stand it up vertically.

NOTE: Longer units require support of the entire length of the cham-ber while being lifted in place vertically. This will prevent bow-ing of the chamber, that could result in glass breakage. Oncethe gauge is mounted to the vessel and the liquid level risesinside the vessel, the gauge will become operational

Isolation valves are recommended, but not required. Ifisolation valves are used, care must be used when openingthe valves to prevent a surge of fluid or gases through thechamber. A surge can cause the float to be propelled to thefar end of the chamber, and float damage could result.

Caution: If for any reason the MLI is pressurized higher than themaximum pressure indicated on the name tag, the floatinside the chamber is subject to collapsing and causingfloat failure.

NOTE: Float is shipped in chamber.

Page 6: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

3 46-638 Magnetic Liquid Level Indicators

1.5 Top Mount Installation

Caution: This instrument is intended for use in InstallationCategory II, Pollution Degree 2 locations.

The top mount gauge can be installed as one completeunit or disassembled to allow access from inside the tank.

Correct vertical installation is required to assure properfloat movement.

To disassemble you need only to unscrew the threaded capat the bottom mounting flange or connection.

Caution: Proper precautions should be taken to prevent thebending of the guide rod.

1.6 Top/Bottom Connection Installation

Caution: This instrument is intended for use in InstallationCategory II, Pollution Degree 2 locations.

Carefully unpack the MLI and stand the unit up vertically.Note the float stop disc at the bottom flange. Note thefloat stop bar (welded in place) at the top of the gauge.This always indicates the top of gauge.

The float is shipped in the chamber.

Caution: Overall length should be ± 1⁄16". Smooth float travel must beassured by no bending of the chamber pipe.

1.7 Start-up

Increase system pressure slowly while commissioning theinstrument. Thoroughly check for leaks, and verify thatthe local indicator device accurately tracks the liquid level.Verify external accessory devices (switches, transmitter, etc.)are functional and properly calibrated.

Caution: Do not open the bottom isolation valve quickly. Allow thelevel to rise until the MLI displays the correct level in thevessel.

Page 7: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

4

1.8 Special Accessory Installation

1.8.1 Insulation or Blanket Installation

Factory recommended high temperature insulation specifications:

Temperature Thickness Liner Jacket

0° to +250° F (-18° to +121° C) 1⁄2"Weather resistant silicone cloth

+251° to +500° F (+122° to +260° C) 1" Weather resistant silicone cloth

+501° to +1000° F (+261° to +538° C) 2" Weather resistant aluminized silicone cloth

• Thickness is 1⁄2" when the MLI has switches or a transmitter.

• Insulation used is 8 lb. density ceramic blanket

• All removable insulated blankets are fastened to the MLI byvelcro and straps. Quilting pins available as an option.

• All removable insulation blankets are sewn with fire retardantteflon thread.

• High temperature guide for the level flow gauge side mount:Consult factory for specific temperature guide lines.

Figure 1Low Temperature

Insulated MagneticLevel Indicator

• Purpose: To maintain the required low temperature of theservice fluid to be measured.

• All insulation joints will be staggered.

• All insulation joints will be sealed with a non-breathingmoisture resistant mastic.

• All weather resisting jacketing seams will be sealed with aweather resistant caulk.

• The weather resistant jacket will be sealed to the 2" or 4"plexiglass frost extension, with weather resistant caulk.

• The face of the frost extension must always be exposed.

• Cryogenic units will be flipper style indicators.

46-638 Magnetic Liquid Level Indicators

Factory recommended cryogenic insulation specifications:

Temperature Thickness Liner Jacket

+32° to -100° F (0° to -73° C) 2" Outdoor .016 smooth aluminum Polyurethane with all-101° to -320° F (-74° to -196° C) 4" jacket with vapor barrier service jacket vapor barrier

Page 8: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

5 46-638 Magnetic Liquid Level Indicators

1.8.2 Steam Heat Tracing Installation

Steam Heat Tracing is available as a factory installedoption. Steam traced units are generally supplied with afactory installed insulation blanket (also optional).

Two steam connections (typically 3⁄8" × 0.035" tubing)protrude from the unit. See Figure 2. The followinginstallation procedure is suggested:

• Remove factory installed plastic caps from the tube ends.

• Inspect tube ends for dents and burrs. Tubing length maybe adjusted (cut), if required.

• Compressed air may be applied to either end to verify thatno foreign material exists in the tube tracing assembly.

• A suitable saturated steam source and drain should be con-nected. Do not exceed applicable pressure ratings for theparticular tubing size. Standard compression fittings maybe used to make the connections, and either connectionmay be used as inlet or outlet.

• Apply steam to the unit and check for leaks.

• Contact factory or local representative for assistance, ifrequired.

1.8.3 Electric Heat Tracing Installation

Electric Heat Tracing is available as a factory installedoption. Electric traced units are generally supplied with afactory installed insulation blanket (also optional).

Electrical connections are supplied, based on specificcustomer requirements. Operating voltage and powerconsumption will vary for each particular configuration.More specific information is supplied with each unit,and is also available from the factory (unit serial numberis required).

The two most common configurations are units with afixed-point thermostatic switch or units with an adjustable“bulb-type” thermostatic switch.

1.8.3.1 Units with a fixed-point thermostatic switch

With a fixed-point thermostatic switch (customer specifiedtemperature set point), a wiring harness, or optionaljunction box with terminal strip will be available toaccommodate field wiring. See Figure 3 (typical).

NOTE: It is the responsibility of the customer to comply with applica-ble installation codes and practices. Installation should beperformed by qualified personnel.

Figure 3

Figure 2

Page 9: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators 6

1. Locate specific power specification and wiring diagramsupplied with unit.

2. Provide appropriate conduit and wiring to the unit.

3. Apply sufficient operating power.

4. Verify that unit will generate sufficient heat and maintainproper temperature.

NOTE: Wiring diagrams are supplied with units manufactured withthis option.

1.8.3.2 Units with an adjustable “bulb-type” thermostaticswitch

With an adjustable “bulb-type” thermostatic switch, thetemperature may be preset at the factory, however fieldpersonnel should verify this setting during installation. Awiring harness, or optional junction box with terminalstrip will be available to accommodate field wiring.

NOTE: For supply connections, use wire with a minimum rating of+167° F (+75° C) as required by process conditions. Use aminimum of 14 AWG wire for power and ground field wires.

NOTE: Housing must be grounded via protective ground screw in thebase of the housing.

NOTE: It is the responsibility of the customer to comply with applica-ble installation codes and practices. Class I, Division 1 loca-tions may contain explosive gas mixtures. Appropriateprecautions must be taken. Installation should be performedby qualified personnel.

1. Locate specific power specification and wiring diagramsupplied with unit.

2. Provide appropriate conduit and wiring to the unit.

3. Verify thermostat setting. Adjust, if necessary.

4. Apply sufficient operating power. Circuit breaker shouldbe a GFI (ground fault interrupter) type with maximum30 mA ground leakage current trip setting. GFI shouldbe sized at 125% of rated load.

5. Verify that unit will generate sufficient heat and maintainproper temperature.

NOTE: Wiring diagrams are supplied with units manufactured withthis option.

Caution: In hazardous areas, do not power the unit until the conduitis sealed and the enclosure cover is screwed down securely.

Page 10: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators7

1.9 Switch Installation

1.9.1 OES-100 Cam Operated Switch

The Model OES-100 snap switch is utilized to expand thecontrol capabilities of Orion’s extensive line of magneticlevel indicators. This cam-operated double pole doublethrow mechanism is clamp-mounted to the outside of theMLI. This mounting style allows easy addition or reposi-tioning of switches without disruption of the process.

The OES-100 switch(es) are pre-installed, calibrated, andchecked for proper orientation at the factory. Your unit maybe equipped with one or more switches for alarming orcontrol. To change the location of the switch in the field,simply unscrew the clamp and slide the switch to a newlocation. See Figure 4.

1.9.1.1 Mounting to an Atlas or Gemini MLI

Caution: If equipment is used in a manner not specified by themanufacturer, protection provided by the equipment maybe impaired.

Remove the cover of the enclosure. Position the OES-100cam-operated snap switch on the MLI body so that thecenterline of the switch enclosure is at the desired switchpoint level. Ensure that the switch is oriented so that thearrow on the switch mechanism is pointing toward the topof the MLI. Install the clamps around the MLI and overthe mounting brackets on the top and bottom of theswitch housing. Tighten the clamps so that the switch issecured to the MLI. Replace housing cover. If required,place the insulation between the MLI body and the switchbefore tightening the clamps.

1.9.1.2 Mounting to an Aurora MLI

The Aurora may be ordered with one or more OES-100clamp-on switches. During assembly Orion can ensureproper function of the switches. Special care must be takenwhen adding OES-100 switches to an Aurora after initialpurchase. For proper function, the switch must be locatedas close to the internal float magnet as possible. This isachieved by marking the location of the indicator on theAurora body. The indicator must be rotated on the cham-ber so that the switch can be positioned closest to thefloat. Loosen the indicator clamps, rotate the indicator90 degrees around the chamber and retighten the clamps.Mount the OES-100 switch where the indicator wasoriginally located. Move the float, or move level, to verifyproper operation of the switch.

3.0 (76)REF.

5.5 (139)REF.

8.375 (212)REF.

(2) 3/4" NPTconduit connections

.5 (12)REF.

Figure 4

Figure 5Wiring of OES-100

cam operated switchContact closure is shown with themagnetic float below the switch

INSTALLTHIS SIDE

UP

ORION INSTRUMENTS

FLOAT BELOW SWITCH

inches (mm)

Page 11: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators 8

1.9.1.3 Wiring

The lower conduit opening is protected with a plasticshipping plug. The upper opening is sealed with a steelplug. If it is preferable to wire through the upper conduitentry, the steel plug may be moved to the lower opening.

NOTE: For supply connections, use wire with a minimum rating of+167˚ F (+75˚ C) as required by the process conditions. Use aminimum of 14 AWG wire for power and ground field wires.

NOTE: Housing must be grounded via protective ground screw inbase of housing.

Caution: In hazardous areas, do not power the unit until the conduitis sealed and the enclosure is screwed down securely.

The DPDT switch has two sets of contacts. See Figure 5on page 7 and label on mechanism. To wire switch, stripabout 1⁄2" of insulation from end of wire. Using a flat headscrewdriver or pliers, push orange tab away from the wireopening on the terminal block. DO NOT pry up on theorange tab as damage to the terminal block may result.Insert wire into opening and release tab. Check that thewire is securely fastened within the terminal block. Repeatfor balance of connections.

1.9.2 OPS-200 Pneumatic Switch

The OPS-200 is a non-bleed pneumatic switch for usewith Orion’s extensive line of magnetic level indicators.The OPS-200 utilizes a clamp-on mounting style for easyattachment to the outside of the MLI chamber.

The OPS-200 switch(es) are pre-installed, calibrated, andchecked for proper orientation at the factory. Your unit maybe equipped with one or more switches for alarming orcontrol. To change the location of the switch in the field,simply unscrew the clamp and slide the switch to a newlocation. See Figure 6.

1.9.2.1 Mounting to an Atlas or Gemini MLI

Caution: If equipment is used in a manner not specified by themanufacturer, protection provided by the equipment maybe impaired.

With mounting clamps loosened, position OPS-200 pneu-matic switch on the MLI body so that the centerline of theswitch enclosure is at the desired switch point level. Theswitch should be oriented so that supply ports 1 and 2point toward the ground. Output port 3 will be on theupper front of the switch when it is properly positioned.

OPS–200PNEUMATIC SWITCH

NON–BLEED

WARNING

SUPPLYVACUUM TO 200PSIG

A 20 MICRON IN-LINE FILTERMUST BE INSTALLED ON SUPPLY LINE

7.41(188)REF.

Figure 6

inches (mm)

Page 12: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

9 46-638 Magnetic Liquid Level Indicators

Tighten the clamps so that the switch is secured to theMLI. If required, place the insulation between the MLIbody and the switch before tightening the clamps.

1.9.2.2 Mounting to an Aurora MLI

Follow procedure for mounting to Atlas or Gemini, but besure that the switch is positioned on the circumference ofthe Aurora body as close to the indicator as possible.

1.9.2.3 Air line connections

In order to prevent blockage or corrosion of the switch dueto contaminants, the supply medium should be clean, dryair or gas and should be run through a 20 micron in-linefilter. Supply ports 1 and 2 are located on the bottom ofthe switch. See Figure 7. Connect the supply air to one ofthese ports according to the following:

Port 1 Airflow output when float passesabove switch

Port 2 Airflow output when float passesbelow switch

Port 3 Is the output port that should be connect-ed to the device to be activated. All airline ports are 1⁄4" NPT.

The muffler should be installed on the unused supply portand must be kept clean and unobstructed for proper func-tion of the switch.

WARNING: Failure to keep muffler unobstructed may causeinterior of switch to pressurize and burst, causingserious injury.

1.9.3 ORS-300 Electric Reed Switch

The Model ORS-300 reed switch is available to augmentthe control capabilities of Orion’s extensive line of magnet-ic level indicators. Housed in an explosion proof stainlesssteel enclosure, the ORS-300 mounts to the outside of theMLI via clamps. This mounting style allows addition orrepositioning of switches at any time, without disruptionof the process.

The ORS-300 switch(es) are pre-installed, calibrated, andchecked for proper orientation at the factory. Your unit maybe equipped with one or more switches for alarming orcontrol. To change the location of the switch in the field,simply unscrew the clamp and slide the switch to a newlocation.

7.35(187)

1.50(38)

MountingTab

OutputPort

OutputPort

Supply portoutput onhigh level

Supply portoutput onlow level

7.41(188)

Front Side

Bottom

MountingTab NPT1/4"

Port3-way

Diverter Selector2-way

N.O. N.C N.O N.C

1 Inlet Exhaust Outlet Inlet Inlet Plug

2 Exhaust Inlet Outlet Inlet Plug Inlet

3 Outlet Outlet Inlet Outlet Outlet Outlet

Figure 7

inches (mm)

Page 13: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

1046-638 Magnetic Liquid Level Indicators

1.9.3.1 Mounting to an Atlas or Gemini MLI

Caution: If equipment is used in a manner not specified by themanufacturer, protection provided by the equipment maybe impaired.

With mounting clamps loosened, position ORS-300 reedswitch on the MLI body so that the centerline of the stain-less steel tube which houses the switch is at the desiredswitch point level. The switch should be oriented so thatthe green ground screw is closest to the top of the MLI.See Figure 8. Tighten the clamps so that the switch issecured to the MLI. If required, place the insulationbetween the MLI body and the switch before tighteningthe clamps.

1.9.3.2 Mounting to an Aurora MLI

Follow procedure for mounting to Atlas or Gemini, butensure that the switch is positioned on the circumferenceof the Aurora body as close to the indicator as possible.

1.9.3.3 Wiring

The leads protruding from the potted end of the switchhousing are color coded as follows:

White = CommonBlack = Normally ClosedRed = Normally Open

NOTE: For supply connections, use wire with a minimum rating of+167° F (+75° C) as required by the process conditions. Use aminimum of 14 AWG wire for power and ground field wires.

NOTE: Housing must be grounded via protective ground screw onupper mounting tab.

Figure 9Wiring of ORS-300

Reed SwitchContact closure shown for

both conditions of the switchrelative to the magnetic float

FLOAT ABOVE SWITCH

FLOAT BELOW SWITCH

1 (RED)

C (WHITE)

C (WHITE)

2 (BLACK)

1 (RED)

2 (BLACK)

8-32 Ground Screw

3.00(76.2)

3.00(76.2)

1/2"MNPT

1.00(25.4)

0.84(21.3)

Figure 8

inches (mm)

Page 14: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

11

1.10 Analog Transmitter Installation

1.10.1 OCT-400 Reed Transmitter

The OCT-400 analog transmitter mounts directly to theside of the Atlas or Gemini chamber, providing a continu-ous 4–20 mA output signal proportional to liquid level.Using simple and reliable reed switches surface mounted toa printed circuit board, the unit provides level accuracy of±0.50" (13 mm).

The OCT-400 reed transmitter is shipped attached to theMLI gauge and is precalibrated to the customer specifiedspan. See Figure 10. Refer to Figure 11 for wire termina-tions for the OCT-400.

Installation is simplified by utilizing gear clamps that canbe repositioned with a screw driver.

Caution: If the MLI is insulated, the analog transmitter probe must belocated outside of the insulation blanket.

NOTE: For supply connections, use wire with a minimum rating of+167° F (+75° C) as required by process conditions. Use aminimum of 14 AWG wire for power and ground field wires.

NOTE: Housing must be grounded via protective ground screw in thebase of the housing.

NOTE: It is the responsibility of the customer to comply with applicableinstallation codes and practices. Class I, Division 1 locationsmay contain explosive gas mixtures. Appropriate precautionsmust be taken. Installation should be performed by qualifiedpersonnel.

Caution: In hazardous areas, do not power the unit until the conduitis sealed and the enclosure cover is screwed down securely.

1.11 Internal Electronic Transmitter Installation

The Gemini Model enables the customer to install severaldifferent types of either continuous measuring instruments(transmitters) or point level control devices (switches). Theelectronic instrument is installed in the 2" or 3" secondarychamber of the Gemini MLI. The factory should be con-sulted for these applications to review operating parametersand to ensure that the desired instrument is properlyapplied.

As the electronic instrument is supplied separately fromthe Gemini MLI, the instruction manual for the electronicunit should be carefully reviewed prior to installation inthe chamber. The instruction manual will be shipped withthe instrument.

46-638 Magnetic Liquid Level Indicators

4.0 (102) REF.Inactive length

XXX = Spanactive length

3.8 (140)REF.

3.5 (90)REF.

4.5 (115)REF.

0.4 (10) REF.Label bracket

3/4" NPTconduitconnection

redyellowblack

ResistorChain

ReedSwitch

Figure 11

black: common connection of reed contacts

yellow: upper end of the resistor chain

red: lower end of the resistor chain

Figure 10

inches (mm)

Page 15: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

1246-638 Magnetic Liquid Level Indicators

1.12 Internal Eclipse Transmitter Installation

The Eclipse Guided Wave Radar Transmitter can bemounted in either the Gemini or the Aurora MLIs. TheAurora is designed to support operation of the Eclipse inthe same chamber as the float. Due to this, the coaxialtype probe must be used. With the dual chamber Geminidesign, either the twin rod, coaxial, or single rod typesmay be used. Caution should be exercised in probe selec-tion to take into account, media dielectric, viscosity, tem-perature, pressure, transition zone distances and overfillrequirements. Each Eclipse will be supplied complete withan instruction manual. A review of the manual is recom-mended prior to installation of the Eclipse transmitter inthe Gemini or Aurora MLI.

NOTE: Flag or shuttle indicator can be designed for mounting at anyangle. Do not rotate indicator after gauge is manufactured,due to inability to rotate baffle plate once welding has beencompleted.

2.0 Reference Information

2.1 Description

Magnetic Level Indicators (MLIs) are suitable for installa-tion on process applications that will not restrict float travelin the piping column. It is a magnetic coupled, local levelindicator which is isolated from the process in a sealednon-magnetic external cage. Bi-color flags provide visualindication of level up to 100 feet. Field-adjustable levelswitches and transmitters are available as options.

The Atlas is a magnetically coupled local level indicatorisolated from the process via a sealed non-magnetic exter-nal chamber. A fluorescent orange shuttle or series of bi-colored flags provide visual indication of liquid level fromdistances of up to 100 feet. Available switches for pointalarms include electronic DPDT, reed and pneumatictechnologies. Transmitter technologies for continuous4–20 mA outputs include reed and guided wave radar.

Atlas is suitable for installation on process applicationsincluding corrosive services that do not impede the move-ment of the float in the piping column.

Aurora and Gemini incorporate a combination of theAtlas magnetic level gauge and Magnetrol’s EclipseGuided Wave Radar. This represents the industries firsttotally redundant mag gauge/transmitter combination.

Page 16: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

13 46-638 Magnetic Liquid Level Indicators

Local indication, 4–20 mA output, HART and Fieldbusprotocols are available. Float damage will not result in lossof the 4–20 mA signal

Aurora: The Eclipse Guided Wave Radar probe is mount-ed directly inside of the Gemini chamber. a minimum3" chamber is utilized to accommodate the Eclipse probeand allow unobstructed float travel. Patent pending.

Gemini: The dual chamber approach also accomplishestotal redundancy but increases the ease of gauge or trans-mitter isolation. The Atlas gauge provides local indicationwhile the Eclipse is mounted directly inside a connectedsecond chamber. The units perform independently ofeach other.

2.2 Theory of Operation

2.2.1 Side Mount

A float equipped with a strong magnet assembly inside andweighted to the specific gravity of the fluid to be measured,moves up and down in a non-magnetic chamber, as thefluid inside rises and falls with the level of the liquid inthe vessel.

Attached to the external wall of the non-magnetic chamberis a non-porous glass tube. Inside this hermetically sealedglass tube is a highly visible fluorescent orange indicator orflags with a strong magnetic assembly inside. See Figures12 and 13.

The indicator is always coupled to the float magnetically,to indicate the exact measurement of the fluid.

2.2.2 Top Mount

A top mounted float assembly consisting of a magnetassembly at the top, a guide rod in the middle, and a floatat the bottom. The float at the bottom is submerged in theliquid inside the vessel. The entire guide rod assembly isweighted to the specific gravity of the fluid to be measured.

Attached to the external wall of the non-magnetic chamberis a non-porous glass tube. Inside this hermetically sealedglass tube is a highly visible fluorescent orange indicator orflags with a strong magnetic assembly inside. See Figures12 and 13.

The indicator or flags are always coupled to the magneticassembly, to indicate the exact measurement of the fluid.

Stainless steelchamber wall

Floatmagnets

Liquidlevel

Float

Flux ring

Indicatingflags

Flux ring Magnet

spacer

Figure 13

Figure 12

Page 17: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

14

2.3 Troubleshooting

2.3.1 Side Mount

Problem Solution

Flags do not rotate with level change. Test flags with a magnet from bottom to top (magnet notincluded). If flags test okay, check for float obstruction.(See Section 2.5, Maintenance on page 16)

Flags rotate at different height than actual level. Float selected for different specific gravity. Replace float witha float with correct specific gravity rating. Confirm correctnessof float orientation. Top is up.

Float inside the level gauge is moving Make sure the MLI is level vertically.slow or not at all.

The process fluid being measured may be too viscous andheat tracing may be required to make the material more fluid.Heat tracing can be purchased from the factory.

The specific gravity of the process fluid and the float weightmay need to be reverified.

The liquid being measured may contain magnetic particlescollecting on the magnetic section of the float causing drag.If this happens, magnetic trap assemblies can be purchasedfrom the factory.

Visual inspection of the float may be required to see if the floathas collapsed.

Switch does not actuate with level change. Check micro switch for continuity. Replace if damaged. Ifokay, remove switch from piping column and test switch mag-net assembly with re-alignment magnet, by moving magnetover the housing face. If the switch magnet assembly fails torespond, replace the switch. If the switch tests okay, checkfloat travel.

Reed transmitter does not track level. Remove transmitter assembly from piping column and testwith re-alignment magnet. Run magnet from bottom to top ofreed chain. Check zero and span calibration. If no change inoutput, replace.

Scale is at zero to the center of the bottom The scale assembly is mounted to the chamber using stainlessprocess connection, but the indicator is above steel gear clamps. It can be easily adjusted in the field using a or below zero. screwdriver. Make sure the scale zero is in line with the center

of the process connection.

The float stop spring at each end of the chamber is there tocushion as well as position the float assembly to the center ofthe process connection. Make sure top or bottom float stopsprings are not bent or broken.

46-638 Magnetic Liquid Level Indicators

Page 18: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators15

2.3.1 Side Mount (continued)

Problem Solution

Shuttle indicator has uncoupled and In some “flashing” applications, the float may rise or fall quickly.fallen to the bottom of the glass tube. Consult factory for suggestions to help avoid this.

To re-couple the indicator to the float, simply use a small mag-net and run it along the length of the chamber to locate thefloat. Mark the location of the float on the outside chamber.Use the small magnet to couple with the indicator and pull theindicator up to meet and couple with the float.

Make sure all stainless steel gear clamps are tight. The scalechannel must be tight against the chamber.

NOTE: Ensure unit installation is level.

2.3.2 Top Mount

Problem Solution

The float assembly or visual indicator is Make sure the vessel opening or flange connection that the to moving slowly or not at all. mount flange connects to is level.

The top mount guide rod assembly may be bent. Visual inspec-tion is required.

The process fluid in the vessel may be too viscous, Heating thevessel to make the process fluid more liquid may be required.

The specific gravity of the process fluid and the float may needto be reverified.

Visual inspection of the float inside the process fluid may berequired to see if the float has collapsed.

My scale is at the center of the zero mark on The scale assembly is mounted to the chamber using stainlessthe outside of the top mount chamber but steel gear clamps. It can be easily adjusted in the field using a the indicator is above or below zero. screwdriver. Make sure the scale zero is in line with the zero

mark on the outside of the top mount chamber.

The float stop spring at the top of the chamber is there to cush-ion the magnet assembly. Make sure the bottom float stop tubeis not bent or broken

The float stop tube is at the bottom inside the chamber. It isthere to stop the magnet assembly at the zero mark on the out-side of the chamber

2.4 Spare Parts

Spare parts are available for Magnetrol/Orion MLIs andcertain switches and transmitters. Please consult the factory.Have the unit model number and serial number availablefor reference.

Page 19: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

Factory 2XX-100X-XXX Class I, Div. 1, Grps B, C, & DMutual Class I, Div. 2, Grps A, B, C, & D

Class II, Div. 1, Grps E, F, & GClass II, Div. 2, Grps F & GClass III, Type 4X, IP66

Canadian OES-100E-001 Class I, Div. 1, Grps B, C, & DStandards Class II, Div. 1 Grps E, F, & G

Association Class III, Type 4X

ORS-300E-001 Class I, Div. 1, Grps B, C, & DClass I, Div. 2, Grps A, B, C, & DClass II, Div. 1, Grps E, F, & GClass III, Type 4X

OCT-400X-XXX Class I, Div. 1, Grps B, C, & DClass I, Div. 2, Grps A, B, C, & DClass II, Div. 1, Grps E, F, & GClass III, Type 4X

CE ORS-300E-001 Installation Category II, Pollution Degree 2OES-100E-001 Low Voltage Directives, 73/23/EEC & 93/68/EEC

per Harmonized Standard EN 61010-1/1993 &Amendment No. 1

2XX-100X-XXX These units have been tested to EN 50081-2 and705-5XXX-XXX EN 50082-2 and are in compliance with theOCT-4XXX-XXX EMC Directive 89/336/EEC

ATEX 705/7/8-5XXX-AXX Intrinsically Safe705/7/8-5XXX-BXX II 1G, EEx ia IIC T4

705/7/8-5XXX-CXX Explosion Proof ➀705/7/8-5XXX-DXX II 1/2G, EEx d [ia] IIC T4

705/7/8-5XXX-EXX Non-Incendive ➁705/7/8-5XXX-FXX II 3G, EEx n IIC T6

➀ Factory Sealed: This product has been approved by Factory Mutual Research (FM), andCanadian Standards Association (CSA), as a Factory Sealed device.

➁ Measured media inside vessel must be non-flammable only.

46-638 Magnetic Liquid Level Indicators 16

2.5 Maintenance

Periodic inspections are a necessary means to keep yourlevel control in good working order. This control is a safetydevice to protect the valuable equipment it serves.

If the process liquid is clean (no solids or deposits), theMLI should require minimum maintenance. If the processliquid is dirty (solids and deposits), it is recommended theexternal cage be isolated from the process and flushed peri-odically. For complete cleaning, after draining the unit,remove the bottom flange and float, inspect cage and floatfor buildup and clean if required.

Magnetic traps are available to prevent magnetic particu-late travel from the vessel to the chamber.

2.6 Agency Approvals

AGENCY MODEL AREA CLASSIFICATION

Page 20: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

17 46-638 Magnetic Liquid Level Indicators

2.7 Specifications

2.7.1 Magnetic Level Indicator

Design Atlas and Aurora – single chamber

Gemini – dual chamber

Materials of construction – MLI Metal alloys 316/316L or 304/304L stainless steel,

321 stainless steel, 347 stainless steel,

Titanium, Monel, Hastelloy B,

Hastelloy C-276, Inconel 625, Inconel 825,

Alloy 20, Electropolished 316 stainless steel,

904L stainless steel and other non-magnetic alloys

Plastics Fiberglass, PVC, CPVC, kynar, polypropylene

Materials of construction – Float Same as chamber materials, 316 SS or titanium standard

Construction options Conformance to ASME B31.1, ASME B31.3 or NACE MR0175

available

Certified material test reports (CMTR) Available upon request

Pressure class ratings ANSI 150#, 300#, 600#, 900#, 1500#, 2500#

DIN PN16, PN25/40, PN64, PN100, PN160, PN250, PN320

Process connection sizes 1⁄2" to 8"

DN 20 to DN 150

Process connection types MNPT, FNPT, weldolet®, sockolet®, threaded couplings,

threaded nipples, buttweld nipples, plain-end nipples,

slip-on flanges, weldneck flanges, lap joint flanges,

tri-clamp fitting, Van Stone flanges

Measuring range 12 to 600 inch (30 to 1524 centimeters) standard

Consult factory for lengths over 600 inch (50 feet)

Temperature range -320° to +1000° F (-196° to +538° C)

Pressure range Full vacuum to 4500 psig (310 bar)

Specific gravity range As low as 0.35 S.G.U.

Indicators Magnetically actuated flag assembly in contrasting orange/black,

yellow/black, red/white colors, or high visibility shuttle follower

Flag assembly seal Inert gas filled and hermetically sealed with Insta-seal valve

Visual indication Easily visible from 75 to 100 feet (23 to 30 meters)

Scale options Etched stainless steel with either height, volume, or

percentage units

Switch options Model OES-100 electric cam operated snap action

Model OPS-200 pneumatic

Model ORS-300 electric reed type

Transmitter options Model 705 Eclipse Guided Wave Radar

Model 2xx Jupiter Magnetostrictive

Model OCT-400 analog reed chain

High temperature options Electric or steam tracing with or without special high

temperature insulation

Low temperature options Cryogenic insulation with special polymeric frost extension

Page 21: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

1846-638 Magnetic Liquid Level Indicators

2.7.2 Model OES-100 Switch• Electric snap action switch

• 10 amp DPDT

• ±0.75" (19 mm) float travel

• -58° to +392° F (-50° to +200° C)

• Cast aluminum enclosure, (2) 1⁄2" NPT conduit entries

See bulletin OES-100 for further information

2.7.3 Model OPS-200 Switch• Bi-stable non-bleed pneumatic switch

• Vacuum to 200 psig (13.8 bar)(Clean filtered air or gas supply passed througha 20 micron filter)

• (3) 1⁄4" NPT

• ±0.75" (19 mm) float travel

• 0° to +200° F (-18° to +93° C)(Consult factory for higher temperature options)

See bulletin OPS-200 for further information

2.7.4 Model ORS-300 Switch• Electric reed switch, hermetically sealed

• 1 amp SPDT

• Stainless steel enclosure with mounting tabs

• ±0.5" (13 mm) float travel

• -58° to +482° F (-50° to +250° C)

• Stainless steel enclosure with mounting tabs

See bulletin ORS-300 for further information

2.7.5 Model OCT-400 Analog TransmitterPower: 24 VDC

Maximum Range: Up to 20 feet standard(Consult factory for longer lengths)

Accuracy: ±0.5" (13 mm)

Output: 4–20 mA

Temperature range: -40° to +500° F (-40° to +260°C)

See bulletin OCT-400 for further information

2.7.6 Model 2XX Jupiter Magnetostrictive TransmitterPower: 24 VDC

Maximum Range: Up to 35 feet (10.67 meters)

Accuracy: ±0.015" (0.38 mm)

Output: 4–20 mA (HART optional)

Temperature range: -40° to +175° F (-40° to +79°C)

See bulletin ORI-148 for further information

2.7.7 Model 705 Eclipse Transmitter

See bulletin 57-101 for details

Page 22: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

7"

10"

AsRequired

AsRequired

4"

7"

10"

AsRequired

AsRequired

4"

Figure 18Side mount interface

Figure 193" side mount interface

19 46-638 Magnetic Liquid Level Indicators

2.7.8 Physical – Atlas

7"4"

10"

Centerto

Center

7"4"

10"

Centerto

Center

7"

10"

Centerto

Center

4"

7"

10"

Centerto

Center

4"

Figure 16Side mount chamber

Figure 173" side mount chamber

Figure 14Side mount chamber

Figure 15Side mount chamber

Page 23: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators 20

2.7.8 Physical – Atlas (continued)

CustomerSpecified

7"

10"

4"

CustomerSpecified

4''

7"

10"

Figure 20Top in, bottom out

Figure 21Top in, bottom out with

spool pieces

9

3

6

in.

0

4''

VisualIndicatorLength

10''

9

3

6

in.

0

4''

VisualIndicatorLength

10''

7"

10"

Centerto

Center

4" 7"

10"

Centerto

Center

4"

Figure 24Side mount with weldneck

bottom flange

Figure 25Side mount

Figure 22Top mount

Figure 23Top mount with stillwell

Page 24: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

2.7.9 Physical – Aurora

10 5/8"

7''

Centerto

Center

10''

4"

10 5/8''

7''

Centerto

Center

10''

4"

Figure 28Side mount

Figure 29Side mount

7"

10"

Centerto

Center

4"

7"

10"

AsRequired

AsRequired

4"

Figure 26Side mount

Figure 27Side mount interface withweldneck bottom flange

21 46-638 Magnetic Liquid Level Indicators

2.7.8 Physical – Atlas (continued)

10 5/8"

7''

Centerto

Center

10''

4"

10 5/8''

7''

Centerto

Center

10''

4"

Figure 31Side mount chamber

Figure 30Side mount chamber

Page 25: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators 22

4"

10"

7"

As Required

As Required

3 1/2"

3 1/2"

9

3

6

in.

0

CustomerSpecified

9

3

6

in.

0

4"

3 1/2"

9 1/2"

Figure 35Interface twin chamber

Figure 36Top in bottom out

twin chamber

4" 9 1/2"

4"

3 1/2"

9

3

6

in.

0

4"

CustomerSpecified

Figure 37Top in bottom out twin

chamber with spool pieces

10"

Centerto

Center

7"

3 1/2"

3 1/2"

9

3

6

in.

0

4"

4"3 1/2"

3 1/2"

10"

Centerto

Center

7"

9

3

6

in.

0

Figure 32Side mount twin chamber

Figure 33Side mount twin chamber

9

3

6

in.

0

10"

Centerto

Center

7"

3 1/2"

3 1/2"

4"

Figure 34Side mount twin chamber

2.7.10 Physical – Gemini

Page 26: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

23 46-638 Magnetic Liquid Level Indicators

2.7.10 Physical – Gemini (continued)

4"

10"

7"

As Required

As Required

3 1/2"

3 1/2"

9

3

6

in.

0

10"

Centerto

Center

7"3 1/2"4"

3 1/2"

9

3

6

in.

0

Figure 41Side mount interface

twin chamber

Figure 42Side mount twin chamber

10"

Centerto

Center

7"

3 1/2"

4"3 1/2"

9

3

6

in.

0

Figure 43Side mount twin chamber

10"

Centerto

Center

7"

3 1/2"4"

3 1/2"

9

3

6

in.

0

3 1/2"

3 1/2"

10"

Centerto

Center

7"

9

3

6

in.

0

4"

Figure 38Side mount twin chamber

Figure 39Side mount twin chamber

9

3

6

in.

0

10"

Centerto

Center

7"

3 1/2"

3 1/2"

4"

Figure 40Side mount twin chamber

Page 27: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

46-638 Magnetic Liquid Level Indicators 24

2.7.10 Physical – Gemini (continued)

4"

10"

Centerto

Center

7"3 1/2"

3 1/2"

9

3

6

in.

0

4"

10"

Centerto

Center

7"

3 1/2"

3 1/2"

9

3

6

in.

0

Figure 47Side mount twin chamber

Figure 48Side mount twin chamber

9

3

6

in.

0

10"

Centerto

Center

7"4"

3 1/2"

3 1/2"

Figure 49Side mount twin chamber

10"

Centerto

Center

7"

3 1/2"

9 1/2"

9

3

6

in.

0

4"

9

3

6

in.

0

4"

3 1/2"

9 1/2"

Figure 44Side mount twin chamber

Figure 45Top in bottom out

twin chamber

CustomerSpecified

9 1/2"

4''

3 1/2"

9

3

6

in.

0

4"

4"

Figure 46Top in bottom out

twin chamber

Page 28: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

Atlas, Aurora chamber or Gemini indicator chamber Gemini Eclipse chamberProcess Connections Top Bottom Top Bottom

1 Side/side dome cap RF slip-on w/blind flange dome cap dome cap2 Side/side RF slip-on w/blind flange dome cap dome cap dome cap3 Side/side RF slip-on w/blind flange RF slip-on w/blind flange dome cap dome cap4 Side/side for interface dome cap RF slip-on w/blind flange dome cap dome cap

■ 5 Top/bottom RF slip-on flange RF slip-on flange dome cap dome cap■ 6 Top/bottom spool pieces RF slip-on flange RF slip-on flange dome cap dome cap• 7 Top mounted n/a RF slip-on flange n/a n/a• 8 Top mounted w/stilling well n/a RF slip-on flange n/a n/a

A Side/side dome cap RF weldneck w/blind flange dome cap dome capB Side/side RF weldneck w/blind flange dome cap dome cap dome capC Side/side RF weldneck w/blind flange RF weldneck w/blind flange dome cap dome capD Side/side for interface dome cap RF weldneck w/blind flange dome cap dome cap

▲E Side/side RF slip-on w/blind flange dome cap n/a n/a▲ F Side/side RF slip-on w/blind flange RF slip-on w/blind flange n/a n/a▲G Side/side for interface RF slip-on w/blind flange RF slip-on w/blind flange n/a n/a✱ J Side/side dome cap RF slip-on w/blind flange RF slip-on flange dome cap✱ K Side/side RF slip-on w/blind flange dome cap RF slip-on flange dome cap✱ L Side/side RF slip-on w/blind flange RF slip-on w/blind flange RF slip-on flange dome cap✱M Top/bottom RF slip-on flange RF slip-on flange RF slip-on flange dome cap✱ N Top/bottom spool pieces RF slip-on flange RF slip-on flange RF slip-on flange dome cap✱ P Side/side dome cap RF weldneck w/blind flange RF weldneck flange dome cap✱ Q Side/side RF weldneck w/blind flange dome cap RF weldneck flange dome cap✱ R Side/side RF weldneck w/blind flange RF weldneck w/blind flange RF weldneck flange dome cap▲S Side/side RF slip-on w/blind flange dome cap n/a n/a▲T Side/side RF slip-on w/blind flange RF weldneck w/blind flange n/a n/a▲U Side/side for interface RF slip-on w/blind flange RF weldneck w/blind flange n/a n/a

25 46-638 Magnetic Liquid Level Indicators

2.8 Model Numbers

2.8.1 Magnetic Level Indicator

• = Atlas only ■ = Atlas or Gemini only✱ = Gemini only ▲ = Aurora only

LEVEL INDICATOR CHAMBER MOUNTING CONFIGURATION (CONSULT FACTORY FOR SPECIAL CONFIGURATIONS)

A 150# ANSI class

B 300# ANSI class

C 600# ANSI class

D 900# ANSI class

E 1500# ANSI class

F 2500# ANSI class

M PN 16 DIN class

N PN 25/40 DIN class

P PN 64 DIN class

Q PN 100 DIN class

R PN 160 DIN class

S PN 250 DIN class

T PN 320 DIN class

CHAMBER PRESSURE RATING

A 316/316L SS

B 316/316L SS w/CS flanges

C 304/304L SS

D 304/304L SS w/CS flanges

F 321 SS

G Titanium

H Monel

J Hastelloy B

K Hastelloy C-276

L Inconel 625

• = Atlas Only

CHAMBER MATERIAL OF CONSTRUCTION

Standard vent & drain connections are1⁄2" plugged NPT. Consult factory for options.

IMPORTANT: Operating specific gravity, maximum pressure, and maximum temperature must be provided upon placementof order.

Providing information on the liquid, operating pressure, operating temperature, minimum specific gravity, and thequotation number will expedite the processing of your order.

• •• For requirements not specified in the model number selection, add the

prefix "X" to the model and describe the special modifications required.

Example: X1AC-3CB3-AAA/060X = 3⁄4" NPT vent 180° from upper process connection

1 A Atlas

2 BAurora(Eclipse internal mount, single 3" or 4" chamber)

3 CGemini (Eclipse internal mount, dual chambers, 2" or 3")

Inches cm CHAMBER TYPE

•M Incoloy 825

N Alloy 20

P Electropolished 316 SS

Q 904L SS

R 347 SS

• 1 Fiberglass

• 2 PVC

• 3 CPVC

• 4 Kynar

• 5 Polypropylene

Page 29: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

2646-638 Magnetic Liquid Level Indicators

A 1⁄2"

B 3⁄4"

C 1"

D 11⁄2"

E 2"

F 21⁄2"

G 3"

H 4"

J 6"

K 8"

L DN 20

M DN 25

N DN 40

P DN 50

Q DN 80

R DN 100

S DN 150

A Threaded nipple

B Threaded coupling

C Plain-end nipple

D Socketweld coupling

E Buttweld nipple

F WeldoletTM

G SockoletTM

T ThreadoletTM

H Slip-on FF flange

J Slip-on RF flange

K Slip-on RTJ flange

L Weld neck RF flange

M Weld neck RTJ flange

N Lap joint flange

P Tri-clamp fitting

QVan Stone flange(plastic only)

PROCESS CONNECTION TYPESIZE OF PROCESS

CONNECTION

1 Black/orange flags No scale

2 Black/orange flags Height in cm

3 Black/orange flags Height in feet/inches

4 Black/orange flags Height in % of span

5 Black/orange flags Volume in gallons

6 Black/orange flags Volume in liters

7 Black/orange flags Height in running inches

H Black/yellow flags No scale

J Black/yellow flags Height in cm

K Black/yellow flags Height in inches

L Black/yellow flags Height in % of span

M Black/yellow flags Volume in gallons

N Black/yellow flags Volume in liters

P Black/yellow flags Height in running inches

Q Red/white flags No scale

R Red/white flags Height in cm

S Red/white flags Height in inches

T Red/white flags Height in % of span

V Red/white flags Volume in gallons

W Red/white flags Volume in liters

Y Red/white flags Height in running inches

A Orange shuttle No scale

B Orange shuttle Height in cm

C Orange shuttle Height in inches

D Orange shuttle Height in % of span

E Orange shuttle Volume in gallons

F Orange shuttle Volume in liters

G Orange shuttle Height in running inches

INDICATOR TYPE & SCALE UNITS

• •••

•Specify length inInches when firstdigit is numericLengths from 12 to 600 inches

Inch CodeExample:24 inches = Code 024

Specify length inCentimeters whenfirst digit is alphaLengths from 30 to 1524 cm

Centimeter CodeExample:60 cm = Code 060

CHAMBER LENGTH

■ Y HT insulation blanket at +375° F

• A HT insulation blanket to +500° F

• B HT insulation blanket to +1000° F

■ C HT insulation blanket to +500° F

■ D HT insulation blanket to +1000° F

• N Cryogenic insulation to -100° F

• P Cryogenic insulation to -200° F

• Q Cryogenic insulation to -320° F

R Steam tracing

S Steam tracing with blanket

TElectric heat tracing +40° F & belowwith insulation blanket

UElectric heat tracing +40° to +200° Fwith insulation blanket

VElectric heat tracing +200° to +500° Fwith insulation blanket

WElectric heat tracing +500° to +800° Fwith insulation blanket

0 None

TEMPERATURE OPTIONS

■ = On chamber only• = On chamber and flanges

Consult factoryfor longer orshorter lengths.

NINTH DIGIT CODE

A B H K

2 200 / 0.75 200 / 0.64 200 / 0.49 —

3 300 / 0.75 300 / 0.64 300 / 0.49 —

4 400 / 0.88 400 / 0.64 400 / 0.49 —

5 500 / 0.88 500 / 0.64 500 / 0.49 500 / 0.49

6 — 600 / 0.64 600 / 0.49 600 / 0.49

7 — 700 / 0.64 700 / 0.49 700 / 0.49

8 — 800 / 0.64 800 / 0.49 775 / 0.49

9 — 900 / 0.64 — 900 / 0.57

MAXIMUM PRESSURE RATING (PSI) / MINIMUM SPECIFIC GRAVITY

➀ 5H on Aurora is 450 / 0.49.➁ 6B on Aurora is 550 / 0.64.

EIG

HT

HD

IGIT

CO

DE

Page 30: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

27 46-638 Magnetic Liquid Level Indicators

2.8 Model Numbers (cont.)

2.8.2 Eclipse Guided Wave Radar Transmitter

57 0

0 4–20 mA

1 4–20 mA with HART®

OUTPUT

1 English

2 Spanish

3 French

4 German

MENU LANGUAGE

0 None

A Digital display and keypad

DISPLAY / KEYPAD

1 Integral, GP, IS & NI, FM/CSA

2 Remote, GP, IS & NI, FM/CSA

3 Integral, EP, IS & NI, FM/CSA

4 Remote, EP, IS & NI, FM/CSA

A Integral, GP & IS, CENELEC/ATEX Exia

B Remote, GP & IS, CENELEC/ATEX Exia

C Integral, EP, CENELEC/ATEX Exd

D Remote, EP, CENELEC/ATEX Exd

E Integral, NI, CENELEC/ATEX Exn

F Remote, NI, CENELEC/ATEX Exn

TRANSMITTER MOUNTING / APPROVALS

1 Cast aluminum

2 316 SS

HOUSING MATERIAL

0 3⁄4" NPT

1 M20

2 PG 13.5

3 PG 16

CONDUIT ENTRY

• • • • ••

7

E English unit of measure

M Metric unit of measure

UNIT OF MEASURE

A Coaxial

B Twin rod

D HTHP coaxial

P HP coaxial

R Overfill coaxial

S Steam coaxial

PROBE TYPE

A 316/316L SS flange & probe All Gemini

B Hastelloy C flange & probe A, B, P, R Gemini

C Monel flange & probe A, B, P, R Gemini

K 316/316L SS flange & probeS Gemini(Built to ASME B31.1)

T Hastelloy C flange & probe A, R Aurora

U Monel flange & probe A, R Aurora

Y 316/316L SS flange & probe A, D, P, R, S Aurora

ZCarbon steel flange &

A, D, P, R, S Aurora316/316L SS probe

USED WITH USED

PROBE & FLANGE MATERIAL PROBE TYPE WITH MLI

11 3⁄4" NPT thread ➀

42 2" NPT thread ➁

43 2" 150 lb. RF ANSI flange

44 2" 300 lb. RF ANSI flange

45 2" 600 lb. RF ANSI flange ➂

46 2" 900/1500 lb. RF ANSI flange ➂

48 2" 2500 lb. RF ANSI flange ➂

53 3" 150 lb. RF ANSI flange

54 3" 300 lb. RF ANSI flange

55 3" 600 lb. RF ANSI flange ➂

56 3" 900 lb. RF ANSI flange ➂

57 3" 1500 lb. RF ANSI flange ➂

58 3" 2500 lb. RF ANSI flange ➂

63 4" 150 lb. RF ANSI flange

64 4" 300 lb. RF ANSI flange

65 4" 600 lb. RF ANSI flange ➂

66 4" 900 lb. RF ANSI flange ➂

67 4" 1500 lb. RF ANSI flange ➂

68 4" 2500 lb. RF ANSI flange ➂

PROBE MOUNTING CONNECTION

0 Viton®

1 EPDM

2 Kalrez

8 Aegis PF128

N None

O-RING MATERIAL

with Eclipse Guided Wave Radar Probe

Specify length in:Inches with second digit 'E',Lengths from 24 to 240 inches

Probe length specified should bemeasuring range of MLI plus 13 inches

Inch Code Example: 24 inches = Code 024

Specify length in:Centimeters with second digit 'M'Lengths from 60 to 610 cm

Probe length specified should bemeasuring range of MLI plus 33 cm

Centimeter CodeExample: 60 cm = Code 060

PROBE LENGTH

• • •

•• •••

5

➀ Probe types A, D, P, R, and S only.➁ Probe type B only.➂ Probe types D, P, and S only.

Page 31: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

2846-638 Magnetic Liquid Level Indicators

2.8 Model Numbers (cont.)

2.8.3 Jupiter Magnetostrictive Transmitter

0 0 E O O 1• •

12 0

2 4–20 mA with LCD

4 4–20 mA with HART & LCD

OUTPUT

1 Top mount, length in inches

2 Top mount offset, length in inches*

3 Bottom mount offset, length in inches

A Top mount, length in centimeters

B Top mount offset, length in centimeters*

C Bottom mount offset, length in centimeters

CONFIGURATION / UNITS OF MEASURE

• 0

Specify measuring range in:Inches when third digit is numeric,Lengths from 6 to 410 inches

Inch Code Example: 24 inches = Code 024

Specify measuring range in:Centimeters when third digit is alphaLengths from 15 to 999 cm

Centimeter CodeExample: 60 cm = Code 060

PROBE LENGTH

• ••*Must be used for temperatures above +250° For if the top of the MLI is flanged.

1Cast aluminum with 3⁄4" NPTconduit entry, FM/CSA, EP, NI

2Cast aluminum with M20conduit entry, FM/CSA, EP, NI

3316 SS with 3⁄4" NPT conduitentry, FM/CSA, EP, NI

4316 SS with M20 conduit entry,FM/CSA, EP, NI

HOUSING MATL / MOUNTING / CONDUIT ENTRY

• •

2.8.4 Reed Chain Transmitter

2.8.5 Electric Switches

4O

Specify active length in:Inches when seventh digit 'E',Active lengths from 6 to 198"

Inch Code Example: 24 inches = Code 024

Specify active length in:Centimeters when seventh digit 'M',Active lengths from 15 to 503 cm

Centimeter Code Example: 50 cm = Code 050

NOTE: Finished probe length equalsactive length plus 8" (20 cm)

PROBE LENGTH

• ••

C T

E English unit of measure

M Metric unit of measure

UNIT OF MEASURE

•0 Stainless steel

1 Aluminum

ENCLOSURE

0 Top mount

1 Bottom mount

MOUNTING

0 Standard enclosure

2 Standard enclosure with cast aluminum junction box (ORS-3 only)

3 Standard enclosure with stainless steel junction box (ORS-3 only)

ENCLOSURE

O E S - 1 Electric 10 amp DPDT snap switch in cast aluminum clamp-mounted housing, NEMA 4X/7/9

O P S - 2 Pneumatic non-bleed 200 psig maximum switch in stainless steel clamp-mounted housing, NEMA 4X

O R S - 3 Electric bi-stable 1 amp SPDT reed switch in stainless steel clamp-mounted housing, NEMA 4X/7/9

SWITCH TYPE

Probe length should be indicationrange of MLI plus 6" (152 mm).

Page 32: Installation and Operating Manualrekordsa.com/com/pdf/MII/00241_46-638.pdf · Magnetic Liquid Level Indicators A Magnetrol Company. Read this Manual Before Installing This manual

BULLETIN: 46-638.4EFFECTIVE: August 2004SUPERSEDES: February 2004

Service Policy

Owners of Magnetrol/Orion Instruments controls mayrequest the return of a or any part of an instrument forcomplete rebuilding or replacement. They will be rebuiltor replaced promptly. Instruments returned under ourservice policy must be returned by prepaid transporta-tion. Magnetrol will repair or replace the control at nocost to the purchaser (or owner) other than transporta-tion if:

1. Returned within the warranty period; and2. The factory inspection finds the cause of the claim

to be covered under the warranty.

If the trouble is the result of conditions beyond ourcontrol; or, is NOT covered by the warranty, there willbe charges for labor and the parts required to rebuild orreplace the equipment.

In some cases it may be expedient to ship replacementparts; or, in extreme cases a complete new instrument,to replace the original equipment before it is returned. Ifthis is desired, notify the factory of both the model andserial numbers of the instrument to be replaced. In suchcases, credit for the materials returned will be deter-mined on the basis of the applicability of our warranty.

No claims for misapplication, labor, direct or conse-quential damage will be allowed.

Return Material Procedure

So that we may efficiently process any materials that arereturned, it is essential that a “Return MaterialAuthorization” (RMA) number be obtained from thefactory, prior to the material's return. This is availablethrough Magnetrol’s local representative or by contact-ing the factory. Please supply the following information:

1. Company Name2. Description of Material3. Serial Number4. Reason for Return5. Application

Any unit that was used in a process must be properlycleaned in accordance with OSHA standards, before it isreturned to the factory.

A Material Safety Data Sheet (MSDS) must accompanymaterial that was used in any media.

All shipments returned to the factory must be by pre-paid transportation.

All replacements will be shipped F.O.B. factory.

ASSURED QUALITY & SERVICE COST LESS

5300 Belmont Road • Downers Grove, Illinois 60515-4499 • 630-969-4000 • Fax 630-969-9489 • www.magnetrol.com145 Jardin Drive, Units 1 & 2 • Concord, Ontario Canada L4K 1X7 • 905-738-9600 • Fax 905-738-1306Heikensstraat 6 • B 9240 Zele, Belgium • 052 45.11.11 • Fax 052 45.09.93Regent Business Ctr., Jubilee Rd. • Burgess Hill, Sussex RH15 9TL U.K. • 01444-871313 • Fax 01444-871317

6646 Complex Drive • Baton Rouge, Louisiana 70809 • 225-906-2343 • Fax 225-906-2344 • www.orioninstruments.com

Copyright © 2006 Magnetrol International, Incorporated. All rights reserved. Printed in the USA.Magnetrol and Magnetrol logotype are registered trademarks of Magnetrol International.

Performance specifications are effective with date of issue and are subject to change without notice.The brand and product names contained within this document are trademarks or registered trademarks of their respective holders.Viton® is a registered trademark of DuPont Performance Elastomers.