Installation and Commissioning Forms - Eclipse Node

12
Stratex Networks Eclipse Node Forms: V1.3 June06 Commercial-In-Confidence 1 Eclipse Node Installation and Commissioning Forms Rev 2 June 06 Introduction Purpose is to provide: A prompt for preparing data for installations. A datapack for installers. A data entry form to capture ad as-built data. An as-built record with sign-of Associated forms included in this Installation Inspection Form Customer Acceptance Form Remedial Action Form Navigation: The Master Site Data column li required. Click on a ‘+’ tab at left of the screen to open up r links and modules for the Node. tab to close. The Build / As-Built Data colu data entry. Build data is data entered at the planning (datap stage. As-built data is data to at site, mostly from Portal. The Portal column highlights th

Transcript of Installation and Commissioning Forms - Eclipse Node

Page 1: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse Node Forms: V1.3 June06 Commercial-In-Confidence 1

Eclipse Node Installation and Commissioning FormsRev 2 June 06

Introduction

Purpose is to provide: A prompt for preparing data for new installations. A datapack for installers. A data entry form to capture additional as-built data. An as-built record with sign-off.

Associated forms included in this file are: Installation Inspection Form Customer Acceptance Form Remedial Action Form

Navigation: The Master Site Data column lists entries required. Click on a

‘+’ tab at the far left of the screen to open up required links andmodules for the Node. Click ‘–’ tab to close.

The Build / As-Built Data column is for data entry. Build data is data to be entered at the planning (datapack prep) stage. As-built data is data to be entered at site, mostly from Portal.

The Portal column highlights the data to be entered and data to be entered from Portal.

The Comments column is to capture any additional data.

See the Example Form for additional guidance.

Forms can be printed.

Important! Please provide feedback on the use of these forms. Feedback is needed to provide guidance on what improvements should be made to assist the application and usability of these forms. Please send feedback to:

Page 2: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form: V1.3 June06 Commercial-In-Confidence 2

Eclipse Node Installation and Configuration Form For Site:

Installer: INUInstaller Contact Details:Scheduled Start Date:Scheduled Completion Date:New or Existing Site: INUeElectrical Supply OK yes/no:Site Grounding OK yes/no:Antenna Mounts OK yes/no:Site Security OK yes/no:Site Plans Included yes/no:

Master Site Data Comments

NodeNode Type INU or INUe ToNode Name ToSite Name ToSite Grid Reference ToTech Services contact details ToNOC contact detailsSite locationSite access See attached mapRack number/nameINU location in rackChassis serial number (All serial numbers begin with three letters)NCC serial numberFAN serial number(s)License serial number (Enter from NCC FlashCard label)Licensed capacityLicense capacity checked From-48Vdc power supply connection

NetworkingTerminal IP Address ToSubnet Mask ToStatic or dynamic routing ToStatic routing dataDHCP yes/no; address range ToTrap destinations To

Link 1

Link 2

Link 3

Link 4

DAC 16x

DAC 16x

DAC 4x

DAC 155o / 2x155o

DAC 2x155e

DAC ES

DAC GE

DAC 155oM

DAC 3xE3/DS3

DAC 3xE3/DS3M

Traffic CircuitsBus configuration ToCircuit connections ToCircuit naming To

AUX

NPC

Build / As-Built Data Portal Entry To /

Record

(Each circuit in a network should have a unique name, and that name should be entered at all Nodes that carry that circuit. Trib names should also relate to its circuit name to permit easy association of trib with circuit when setting a DAC BER test using the circuit loopback feature.)

General Instructions:

Slot Allocations1= 2= 3= 4= 5= 6= 7= 8= 9= 10=

To = Enter into Portal

From = Enter from Portal

A29
2 for INUe
Page 3: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form: V1.3 June06 Commercial-In-Confidence 3

Date/Time(Specify Date/Time setting) To

BER Circuit Checks From

Alarms exit check Active alarms yes/no From

Ground checksSingle point bldg ground y/nMaster Ground Bar resistanceRack to MGB resistance-48V PSU to MGB resistanceTower ground resistance(s)Other resistance readingsMeter used

Hardware Installation completed

Name:Signature:Date:

Name:Signature:Date:

Completion Comments

Trib-trib BER check(Specify the tri/cct[s] and period)

Site Inspection Report completed yes/no

Node Installation & Tests completed

Page 4: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form V1.3 June06 Commercial-In-Confidence 4

Eclipse Node Installation and Configuration Form

Installer: Joeseph Brown INUInstaller Contact Details: 021 362 700Scheduled Start Date: 10-Sep-05Scheduled Completion Date: 14-Sep-05New or Existing Site: Existing INUeElectrical Supply OK yes/no: YesSite Grounding OK yes/no: YesAntenna Mounts OK yes/no: YesSite Security OK yes/no: YesSite Plans Included yes/no: Yes

Master Site Data Comments

NodeNode Type INU or INUe INU ToTerminal Name E101 ToSite Name Lakeside ToSite Grid Reference Eastxxx Southxxx ToTech Services contact details 021 362 701 ToNOC contact details 021 362 702Site location 10km west of EkatahunaSite access Via Ridge road at first bridge See attached mapRack number/name 2BINU location in rack Directly under terminal E104Chassis serial number LES00934567 (All serial numbers begin with three letters)NCC serial number LEX00099997 FromFAN serial number(s) LER00094564License serial number SNI35435 FromLicensed capacity 40xE1 for slot 1, 40xE1 for slot 2.License capacity checked From

-48Vdc power supply connection

NetworkingTerminal IP Address 192.168.10.1 ToSubnet Mask 225.225.255.0. ToStatic or dynamic routing RIP 2 ToStatic routing data N/ADHCP yes/no; address range Yes, 192.168.10.2 to 192.168.10.10 ToTrap destinations N/A To

Link 1Link name/number Lakeside-Belmont ToRemote end site name Belmont ToRemote end node/terminal name E103 ToLocal antenna type(s) VHLP2-180-EXLocal antenna diameter(s) 0.6MAntenna serial number(s) AN35235Height on tower / pole mount ID 21M `Initial pointing (compass/map ref) 74 degreesPolarization VerticalProtected yes/no No ToProtection type N/A ToODU(s) direct mounting, yes/no YesODU type ODU 300hpODU serial number SNA7687988 FromODU cable length(s) required 35mLocation of RAC in INU Slot 1 ToRAC type RAC 30RAC serial number LEA00878770 FromTx frequency 17.85 GHz ToRx frequency 18.25 GHz ToT/R spacing 400 MHz ToTx power 17 dBm ToDetected forward power 17.1 dBm FromCapacity 32xE1 ToModulation 16QAM To

For Site: Lakeside

Build / As-Built Data Portal Entry To /

Record

40xE1 for slot 1, 40xE1 for slot 2.10xE1 for slots 3 & 4.

Provide and install 12A Cct Breaker on supply panel at top of rack

General Instructions: 4-wheel drive access only. This time of the year the track will be wet and slippery. Please do a battery check and run the back-up diesel generator for about 30 mins and check associated panel lights. Should all be green.

Slot Allocations1= RAC 302= RAC 303= Aux4= DAC 16x5= 6= 7= 8= 9= 10=

To = Enter into Portal

From = Enter from Portal

A29
2 for INUe
A51
Qty two for space diversity
A54
Two entries required for space diversity.
A57
Two ODUs/RACs for protected.
A60
e.g. ODU 300ep/hp/sp or ODU 100
Page 5: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form V1.3 June06 Commercial-In-Confidence 5

Master Site Data CommentsBuild / As-Built Data Portal Entry To /

Record

ATPC yes/no No ToATPC dataExpected RSL -51 dBmIndicated RSL -50 dBm FromExpected RSSI 1.25Indicated RSSI 1.27 FromExpected fade margin 35 dBMeasured fade margin 37 dB FromG.826 link check Zero errors over 14 hours FromAlarms check No active alarms from Link 1 FromPerformance check All indications normal FromLink 1

Link 2Link name/number Lakeside to Pine Hill ToRemote end site name Pine Hill ToRemote end node/terminal name E102 ToLocal antenna type(s) VHLP2-180-EXLocal antenna diameter(s) 0.6MAntenna serial number(s) SN12495Height on tower / pole mount ID 21MInitial pointing (compass/map ref) 178 degreesPolarization VerticalProtected yes/no No ToProtection type N/A ToODU(s) direct mounting, yes/no YesODU type ODU 300hpODU serial number SNBO93859 FromODU cable length(s) required 38mLocation of RAC in INU Slot 2 ToRAC type RAC 30RAC serial number LEN00243551 FromTx frequency 17.95 GHz ToRx frequency 18.35 GHz ToT/R spacing 400 MHz ToTx power 22dBm ToDetected forward power 21.5 dBm FromCapacity 32xE1 ToModulation 16QAM ToATPC yes/no No ToATPC dataExpected RSL -53 dBmMeasured RSL -52 dBm FromExpected RSSI 1.3vIndicated RSSI 1.35v FromExpected fade margin 33 dBMeasured fade margin 32 dB FromG.826 link check Zero errors over 14 hours FromAlarms check No active alarms from Link 2 FromPerformance check All indications normal FromLink 2

Link 3

Link 4

DAC 16xDAC location in INU Slot 4 ToSerial number LEX00234567 FromE1 or DS-1 E1 ToBal or Unbal Unbal To DS1 encoding N/A To DS1 line length N/A ToPort / trib names Lak 1 to 8 ToConnect to Rack BNC panel: ports 1 to 8DAC 16x

DAC 16x

DAC 4x

DAC 155o / 2x155o

DAC 2x155e

A85
Check both Tx-Rx combinations for a protected link.
A86
Check to see that there are no active alarms.
A94
Qty two for space diversity
A97
Two entries required for space diversity.
A100
Two ODUs/RACs for protected.
A103
e.g. ODU 300ep/hp/sp or ODU 100
A128
Check both Tx-Rx combinations for a protected link.
Page 6: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form V1.3 June06 Commercial-In-Confidence 6

Master Site Data CommentsBuild / As-Built Data Portal Entry To /

Record

DAC ES

DAC GE

DAC 155oM

DAC 3xE3/DS3

DAC 3xE3/DS3M

Traffic CircuitsBus configuration E1 ToCircuit connections To

Circuit naming To

AUXAUX location in INU Slot 3 ToSerial number LEA05090295 FromAuxiliary ports

Data, sync, P1, default, Aux Bel/Lak To

To

To

Auxiliary portsAuxiliary circuitsPort 1: to/circuit name Port 1 to Link 1 port 1, Bel/Lak ToPort 1: to/circuit name ToPort 1: to/circuit name ToAuxiliary circuits ToAlarm I/OPort layout 4xin, 2xout ToPort 1, type, active condition Digital input, active high To

Port 2, type, active condition ToPort 3, type, active condition ToPort 4, type, active condition ToPort 5, type, active condition ToPort 6, type, active condition ToAlarm I/OAlarm actions

To

To

To

To

To

Alarm actionsAUX

NPC

Date/Time(Specify Date/Time setting) Sync to Portal PC Date/Time To

BER Circuit ChecksFrom

Alarms exit check Active alarms yes/no No active alarms From

Link 1 ports 1-8 to DAC 16x, slot 4, ports 1-8.Link 1 ports 9 to 32 to Link 2, slot 2, ports 1 to 24.

Link 1 ports 1-8: Bel/Lak 1 to Bel/Lak 8.Link 1 ports 9-24: Bel/Pin 1 to Bel/Pin 16.Link 1 ports 25-32: Bel/Wel 1 to Bel/Wel 8.

Port 1: function, type, port settings, name

Port 2: function, type, port settings, name

Port 3: function, type, port settings, name

Wire to intruder alarm: alarm is active when circuit is broken.

Destination IP address, slot, and output. Trigger(s).

192.168.2.1, slot 4, output 1.AUX alarm input 1.

At commissioning check that the destination output (bell) at Belmont activates when the intruder alarm is activated. Also check that the alarm event is raised at the NOC.

Destination IP address, slot, and output. Trigger(s).

Destination IP address, slot, and output. Trigger(s).

Destination IP address, slot, and output. Trigger(s).

Destination IP address, slot, and output. Trigger(s).

Trib-trib BER check(Specify the trib/cct[s] and period)

BER check completed on trib 1 Lakeside to Belmont.

Tribs from Belmont through to Pine Hill will be checked during Pine Hill commissioning.

Page 7: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Eclipse I+C Form V1.3 June06 Commercial-In-Confidence 7

Master Site Data CommentsBuild / As-Built Data Portal Entry To /

Record

Ground checksSingle point bldg ground y/n YesMaster Ground Bar resistance 0.62 ohmsRack to MGB resistance 0.15 ohms-48V PSU to MGB resistance 0.27 ohmsTower ground resistance(s)

Other resistance readingsMeter used Prova clamp-on, model DX Serial number 00458

Yes. Attached.

Hardware Installation completed

Name: Joe BrownSignature:Date: 14 September 2005

Name: Joesphine BrownSignature:Date: 14 September 2005

Completion Comments The second farm gate is almost off its hinges.One of the two tower-top warning lights is out.Diesel generator checked out OK

Not possible to measure. Cannot get meter jaws around the ground straps.

Site Inspection Report completed yes/no

Node Installation & Tests completed

Page 8: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Inst. Insp. Report: V1.2 Mar04 Commercial-In-Confidence 8

Eclipse Node Installation Inspection Report For Site:

Check for correct and complete installation of:

Item Pass Fail Comments

Antenna Mounting

Antenna side support (if used)

ODU fastening

ODU grounding

ODU connector weatherproofing

ODU cable fastening

ODU cable grounding

Lightning surge suppressor(s)

RAC to surge suppressor jumper cable

INU location in rack

INU is labelled (if required)

INU grounding

INU power supply wiring

INU cards are correctly secured

Unused slots have blank plates fitted

Trib cables are correctly and neatly installed

Trib cables are numbered (if required)

Alarms all-clear

Site left clean and tidy

Site photos taken (if required)

Site ground measurements (if required)

Checked by:

Name:

Signature:

Date:

Additional Comments:

A6
Check antenna fastening onto the pole-mount and the pole-mount fastening onto the structure.
A8
Check that collar nuts are secure.
A11
Ensure there are no unsupported sections of cable, which may flex in the wind.
A13
Check for correct location weatherproofing and grounding.
A17
Check grounding integrity all the way to the master ground - not just to an existing rack ground bar.
A18
Check power supply load capacity and the integrity of the cabling from the power supply to the INU. Do not rely on a check just to a power pick-up point in the rack. Ensure there is no disconnect device (switch etc) in the ground (+ve) wire.
A23
Check to see that no front panel alarms are present. And if Portal connected, that no active alarms are indicated.
A26
Measurement of shelter and tower ground resistance.
Page 9: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Acceptance Form V.1.2 Mar04 Commercial-In-Confidence 9

Eclipse Node Customer Acceptance Form

Site Name:

Eclipse Node Name:

Related documents Received Yes/No

Eclipse Installation and Commissioning Form:

Eclipse Installation Inspection Report:

Acceptance Category* Category

Accepted / Conditionally Accepted / Not Accepted:

Signed By:

Customer

Name:

Signature:

Title:

Date:

Stratex Networks

Name:

Signature:

Title:

Date:

*If conditionally accepted or not accepted, the action required to achieve acceptance must be detailed in a Remedial Action Form

Page 10: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Acceptance Form V.1.2 Mar04 Commercial-In-Confidence 10

Page 11: Installation and Commissioning Forms - Eclipse Node

Stratex Networks

Remedial Action Form V1.2 Mar04 Commercial-In-Confidence 11

Eclipse Node Remedial Action Form

Site Name:

Eclipse Node Name:

Item No. Description of Remedial Action Required Responsibility

Signed As Completed

Customer

Name:

Signature:

Title:

Date:

Stratex Networks

Name:

Signature:

Title:

Date: