    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-00!

    Re"ision: 0Date: J#ne $00%Pae: A''en(i) 3

    JOB SAFETY ANALYSIS WORKSHEETS

    JOB SAFETY ANALYSIS DATE : PERMIT NO:

    JOB Install Piping and valvesWORK TEAM Rigging Crew

    SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES

    1. Raise Cold Work Permit for the job. Conf lict with others activities.

    2. Inspect the site location. Wrong location. Refer to drawings.

    3. ransfer material to the site location. !and" finger inj#ries$ %inger pinched rip and fall. Wear rigger&s gloves. Coordinate lifting andmaterial handling.

    '. (ct#al installing work. Pinch point. )nocking against sensitive instr#ment.Congested area.

    Identif* potential of pinch point. +inimisedpersonnel working on same area. ,arrier off workarea and working sign.

    WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL

    EXPERIENCE YES NO YES NO

    !ave *o# done this job before- "(re *o# knowledgeable with the job to beperformed-

    "

    !ave *o# referred to technical drawing"vendorproced#re"P-

    " Is s#pervision"e/perienced assistance re0#ired- "

    PPE YES NO YES NO

    !ard hat- " Work vest- "

    afet* lasses- " (pron- "

    afet* shoes- " oggle- "

    ar pl#gs- " %ace shield- "

    Right t*pe of gloves- " Respirator* protection- "

    afet* harness- "

    POTENTIAL HAZARDS YES NO YES NOlipper* floor- " rapped press#re- "

    Congested area- " Press#ried e0#ipment"vessel haard- "

    ripping- " %ire"e/plosion haards- "

    4verhead work- " scape ro#te- "

    Working at height- " hock"electricit*"static- "

    caffolding- " ,reaker rack o#t- "

    TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0

  • 8/12/2019 Install Piping and Valves

    2/2

    Talisman Malaysia LimitedHS&E Section

    Job Safety Analysis

    Doc. No: PM3-HSE-GEN-PR-F-00!

    Re"ision: 0Date: J#ne $00%Pae: A''en(i) 3

    ec#re ladder- " 5alve isolation- "

    !eav* load- " #ard rotating e0#ipment- "

    !ammer strikes- " Power tools haards- "

    Pinch"trap finger$ hand- " !igh noise area$ do#ble ear protection- ",ack inj#r* haard- " park"hot slag- "

    winging object- " ,#rn 6heat"chemical7- "

    %alling object- " 8ear radioactive materials"so#rces- "

    4thers closeb*- " nvironmental spill- "

    harp object- " !ose connection- "

    *e inj#r*- " Wind*- "

    rating"deck opening- " 9#st*- "

    ,locked drains- "

    Prepared b*:;.......... ................. .... ;; Reviewed b*: ;;;;;;;;;;.. Closed o#t: