PO NO. : PE-103-PPFP038
ATTACHMENT TO INSPECTION NOTIFICATION NO. 100
PO ITEM NO. MATERIAL TAG REQUIRED INSPECTION APPROX. QTY.
66 U BOLT UBF-2-CS FINAL 44 SETS63 U BOLT UBF-1-AS FINAL 535 SETS44 U BOLT UBG-1-AS FINAL 19 SETS48 U BOLT UBG-1.5-AS FINAL 176 SETS4 CLAMP S2-2-AS FINAL 10 SETS3 CLAMP S2-2-SS FINAL 1008 SETS
16 CLAMP S2-8-CS FINAL 6 SETS18 CLAMP S2-8-SS FINAL 48 SETS8 CLAMP S2-3-AS FINAL 850 SETS
NOT IN PO CLAMP SV8-16 FINAL 1 SETNOT IN PO CLAMP SV8-24 FINAL 1 SET
95 CLAMP S8-3 DIMENSION AND MPI 4 SETS231 CLAMP S8-4-400 DIMENSION AND MPI 6 SETS232 CLAMP S8-4-450 DIMENSION AND MPI 3 SETS166 CLAMP S8LS1-2-250 DIMENSION AND MPI 11 SETS159 CLAMP S8LS1-10-450 DIMENSION AND MPI 4 SETS174 CLAMP S8LS1-4-500 DIMENSION AND MPI 6 SETS
Other items may be added on the above list at the time of inspection.