    Inspection of Static & rotating equipment

    Preparation, review and approval of documents about InspectionTest Plan of the project

    to ensure inspection shall be in accordance with the requiredQuality Standard and

    Procedures

    !"ecute and develop quality audit of Sub#contractorsinspection documentation wor$s for

    Static and %otating !quipments to assurethat the required forms used in testing submitted

    are approved by clientrepresentative as per ITP such as

    # Installation chec$list for static'rotatingequipments

    # (eveling ' alignment recording forms forhori)ontal, vertical, pac$age type

    # *"ial'radial, soft foot, parallelism forms forpumps and compressors

    %egular surveillance chec$ing at site to ensure thatall comments had appropriate

    corrective action such as

    # +erify the preservation requirements foranchor bolts during construction stage

    # hec$ the physical condition of anchor boltsand leveling of foundations beforeerection of equipments

    # hec$ preservation status of equipments atsite and storage area to ensure the

    requirements of client and vendor are donesuch as rust prevention to equipment

    especially offshore area, monitor thenitrogen purging requirements for vessels and

    compressors, rotation ofshafting, oil filling and cleaning of equipments

    # +erify all materials which required for indoorand outdoor storage

    # !nsure to have a preservation log for all theequipments chec$ed and monitor daily 'wee$ly for easily trac$ing the status

    # onfirm that all instruments used foralignment and leveling by subcontractor are

    calibrated with stic$ers indicatedthe date of calibration and re#calibration

  • 8/19/2019 Inspection Document

    2/3

    # +erify the erection of equipments such ascompressors, drivers, diesel equipments,

    vessels and other equipment if theyfollow the -ethod of Statement

    # hec$ the shimming requirements forstatic'rotating equipments

    # hec$ and monitor the grouting preparation ofall equipments ready for groutingand verify the preparation requirements suchas pre#watering of foundation, chipping,

    cleaning and form wor$s requirements

    # !nsure that inspection areas are safe forwor$ing with required level of safety

    # +erify condition of a"ial'radial withoutpiping prior for preparation for piping

    installation

    # +erify piping support and test acceptanceprior for final alignment

    .ollow up implementation of corrective actionregarding quality issues on the project

    Settle effective procedures for the satisfactoryperformance of the wor$ in accordance

    with quality control and inspection testplan

    %outine inspection of construction activities ofStatic ' %otating equipment and /+*

    wor$s step by step to ensure that therequirements in the drawing and specification are

    met and that all the wor$sare carried out in good wor$manship

    Perform inspection with the vendor and clientrepresentative to demonstrate or showncompliance with the requirements duringfabrication and construction stage such as

    # hec$ Static ' %otating and /+* equipmentarrive at site shall have each

    equipment tag number and name plate +isualinspection for any damage cause during

    transportation 0imensional inspectionas per design order

    # +erify the release note of civil about foundationready preparation for alignment and

    leveling hec$ed setting of padding plates,sole plates or mounting plates and verify the

    elevation and coordinates for 1 23 a"is preparation for erection hec$ed anchor bolt

     projection and anchor boltcentering as per equipment requirements

    # hec$ equipment orientation before and aftererection

    # 4itness the leveling ' verticality chec$ing ofhori)ontal and vertical equipment prior 

    for grouting and for piping erection+erification of anchor bolt tightening prior for

  • 8/19/2019 Inspection Document

    3/3

    grouting Issue a release noteto civil and piping respectively after alignment ' leveling

    and verify againthe anchor bolt final tightening

    # Preliminary alignment of rotating equipmentssuch as pumps, compressors, gear

     bo", turbine, blowers, diesel engine andothers hec$ the soft foot of motors shimming

    condition hec$ the a"ial 'radial alignment 5angular alignment6 or shaft alignment 7

    cold condition usingdial gauge or laser equipment hec$ the distance shaft ends 508S!6

    7 coldcondition and pre stretch especially for rotating equipments with gearbo"

    hec$the s$id leveling in regards to base of motors and pumps hec$ the anchor

     bolttightening of s$id prior for grouting, piping installation to suction anddischarge

    # +erify the parallelism on suction ' discharge pipingconnection if stress free

    condition hec$ed before and after suction anddischarge pipe are assembled to pump or

    compressor

    # Internal inspection of vessels hori)ontal ' verticalequipments and chec$ the internal

    attachment required such as demister, trays5odd ' even trays6 valve caps, down comer

     plate, filter cartridge, distributorsand others hec$ internal cleanliness of vertical and

    hori)ontal vessel priorfor equipment temporary or final bo"#up +erify the final gas$et to

     beinstalled during final bo"#up

    # hec$ed e"ternal attachment such as platforms,ladders, support and instruments are

    installed and inspected

    %eviewed -ethod of Statement prepared bysubcontractors regarding construction

    activities that will guide them to onstruction*ctivities

    Provide early warning of potential quality problemof Static'%otating and /+*

    equipments during fabrication and installation

    Support contractor to ma"imum e"tent, possible toma$e contractor successful

    Input contractor9s daily accomplishment aboutconstruction and inspection activities of

    Static'%otating and /+* equipments

    oordinate and engage the support services ofengineering and vendors for some cases

    encountered at fabrication ' site whichrequired their immediate decision and action