Inspection and Test Plan for Switchgear
No. Inspection and Test Plan Reference Document
Pre Inspection Meeting‐ Spec.
Before Manufacturing DWG, Design, Calculation Document IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Switchgear Resistance Test Procedure IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Switchgear Withstand Voltage Test (Dielectric Test) Procedure IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Switchgear Sequence Test Procedure IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Switchgear Characteristics Test of Protection Relays Procedure IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Switchgear Mechanical Operation Test Procedure IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA
Raw Material Inspection ASTMReview of Certificates ASTMMaterial Identification ASTM
During FabricationFabrication Inspection DWG/SpecOutline Dimensions, Interface Dimensions, Busbar Dimensions and Clearances and other Specified Dimensions Inspections
DWG/Spec
Tightness / Torque, Inspection of Terminals DWG/SpecControl for Degree of Protection DWG/Spec
Inspection to Confirm that Instruments, Compartments, Control Switches, protective relays uses and etc. are Correctly Rated and are Correctly Located, with Specified Labeling
Inspection to Confirm Earthling Arrangements for Continuity in Circuit
DWG/Spec
Checking to Confirm Wiring Correct Grade and Size, Wiring Tightness in Terminations.
DWG/Spec
Checking for Incoming and Outgoing Cable Boxes and Glands
DWG/Spec
19 Checking all Circuit Breakers for Fit up and Fitting Ease of Operation
Range and Setting of Meters and Relays, Correct Fitting of Doors, Circuit Labels and Dimensions
DWG/Spec
Checking Complete Boards for Finish, Lines Out of Units
DWG/Spec
Checking all Shutters and Interlock Operation DWG/Spec
Welding Inspection on Welded ComponentSwitchgear Resistance Test Procedure
Switchgear Withstand Voltage Test (Dielectric Test) Procedure
Switchgear Sequence Test Procedure
Switchgear Characteristics Test of Protection Relays Procedure
Switchgear Mechanical Operation Test Procedure
Final InspectionFinal Visual & Dimensional Check DWG
30
Documentation31 32 33
34 35 36 37
Check of Final Book Spec.
Inspection Reports Spec./DWGNCR Spec./DWGReview Final Data Report Spec./DWG
Pre Shipment Inspection‐Preservation and Packing Spec.Marking Spec.Loading Inspection Spec.Shipping Document Control Procedure
Abbreviations:
H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;Client can waive this inspection based on his discretion and informs TPI Inspector accordingly.
R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
A: Approval
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring; For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting.
MOM: Minute of Meeting P.O: Purchase Order
R & AR & AR & AR & AR & AR & A
Materials
W
Inspection and Test Plan for Switchgear
Acceptance Criteria Verifying DocumentActivity By
RemarkManuf. Client
Spec. MOM H H ‐
Before Manufacturing IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA DWG, Calculation book H ‐IEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Procedure HIEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Procedure HIEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Procedure HIEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Procedure HIEC,NEC, NEMA, FDF, ISO ANSI, CI, IPCEA Procedure H
ASTM Original Material Certificates H H ‐ASTM Certificates H H ‐ASTM Report H H ‐
During FabricationDWG/Spec Report H SW ‐DWG/Spec Report
H
DWG/Spec Report H SW ‐DWG/Spec Report H H ‐
DWG/Spec DWG/Spec H H ‐
DWG/Spec ReportH SW ‐
DWG/Spec ReportH SW ‐
DWG/Spec ReportH SW ‐
DWG/Spec ReportH SW ‐
DWG/Spec ReportH SW ‐
DWG/Spec ReportH SW ‐
DWG/Spec Report H SW ‐WPS Report H SW ‐Procedure Report H H ‐Procedure Report H H ‐Procedure Report H H ‐Procedure Report H H ‐Procedure Report H H ‐
Final InspectionDWG Report H H ‐
DocumentationSpec. DWG/ P.O H R ‐
Spec./DWG Report H R ‐Spec./DWG Report H R ‐Spec./DWG Report H R ‐
Pre Shipment Inspection‐Spec. Report H H ‐Spec. Report H H ‐Spec. Report H H ‐Spec. Packing List H H ‐
R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting.