INSPECTION AND TEST PLAN FOR DRY TYPE LIGHTING TRANSFORMER SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM OF CHECK RECORD ACCEPTANCE NORMS SCOPE OF INSPECTION SUB SUPPLIER SUPPLIER BARC 1.0 Procedures -- -- -- -- -- -- 2.0 Material Inspection 2.1 Incoming Raw Material like Copper Conductor, Lamination, Marshalling box, cables, fasteners and bolts, copper flexible, insulators, dials, Scanners and gauges etc. Dimensional and Operational checks Physical, Chemical, Electrical properties (as applicable) Calibration checks (as applicable ) 100% Material Test Certificates / Test records Should be from reputed supplier and grade as specified in job specification H H - 3.0 Inprocess Inspection 3.1 Transformer Assembly Visual, Dimensions, Bill of materials. 100% Test Records Should be as per approved drwgs/data sheet - H - 3.2 Visual ,healthiness of impregnation(resin) 100% Test record - - H W 4.0 Final Inspection 4.1 Transformer (Routine Tests) Physical and dimensional check. Measurement of winding resistance Measurement of voltage ratio and check of voltage vector relationship 100%- by purchaser Inspection test records As per approved drwgs IS 11171 CL 13.2 (a) / IS 2026 – 1, CL 16.2 IS 11171 CL 13.2 (b) / IS 2026 – 1, CL 16.3/Data sheet - H W

Transcript of inspection and test plan for dry type lighting transformer

Page 1: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

DRY TYPE LIGHTING TRANSFORMER

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- -- 2.0 Material Inspection

2.1

Incoming Raw Material like Copper Conductor, Lamination, Marshalling box, cables, fasteners and bolts, copper flexible, insulators, dials, Scanners and gauges etc.

• Dimensional and Operational checks • Physical, Chemical, Electrical

properties (as applicable) • Calibration checks (as applicable ) 100%

Material Test Certificates / Test records

Should be from reputed supplier

and grade as specified in job

specification H H -

3.0 Inprocess Inspection

3.1 Transformer Assembly Visual, Dimensions, Bill of materials. 100% Test Records Should be as per

approved drwgs/data sheet

- H -

3.2 Visual ,healthiness of impregnation(resin) 100% Test record -

- H W

4.0 Final Inspection

4.1 Transformer (Routine Tests)

• Physical and dimensional check. • Measurement of winding resistance

• Measurement of voltage ratio and check of voltage vector relationship

100%- by purchaser

Inspection test records

As per approved drwgs

IS 11171 CL 13.2 (a) / IS 2026 – 1, CL 16.2

IS 11171 CL 13.2 (b) / IS 2026 – 1, CL 16.3/Data sheet

- H W

Page 2: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

DRY TYPE LIGHTING TRANSFORMER

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Measurement of impedance voltage, short-circuit impedance and load loss.

• Measurement of no-load loss and

current • Separate –source voltage withstand test

(HV test) • Measurement of Insulation Resistance

before and after HV test.

• Induced over voltage withstand test

IS 11171 CL 13.2 (c) / IS 2026 – 1, CL 16.4/Data sheet

IS 11171 CL 13.2 (d) / IS 2026 – 1, CL 16.4/Data sheet

IS 11171 CL 14 /shall withstand

IS 11171

IS 11171 CL 14 shall withstand

4.2 Transformer (Special Test)

• Temperature rise

Noise Level Test

One sample from each type/rating

Inspection test records

IS 11171 CL 17 As per data

sheet

IS 11171 CL 19

/ AS PER NEMA chart according to

MVA/KV rating of transformer

- H H

Page 3: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

DRY TYPE LIGHTING TRANSFORMER

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

4.3 Transformer (Type Test)

• Short circuit test • Impulse Withstand Test.

• Partial Discharge Measurement ( Applicable for HV trafo )

• Degree of Protection of Enclosure.

One sample from each type/rating

Inspection test records

IS 11171 CL 20

IS 11171 CL 16

IS 11171 CL 18

IS 11171 CL 22 / IEC 60529

- H R

5.0 Painting

5.1 Painting and Packing • Visual, Packing list. • Proper packing to avoid any damage

during transportation. 100% Supplier’s

records

As per DS/Spec. - H -

6.0 Documentation and IC

6.1 Documentation and IC • Review of Internal Test Reports. • IC issuance 100%

Supplier’s Test Records / Inspection Certificate

(IC)

- H H

Page 4: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

DRY TYPE LIGHTING TRANSFORMER

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

6.2 Final Document submission

Compilation of Inspection reports ,drawings, etc as per VDR / PR 100%

Final data folder

/Completeness certificate

- H H

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may proceed after scheduled date).

NOTES :-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per latest version of relevant IS code/ Standards referred there in/ Job specifications /Approved documents

Page 5: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OIL FILED TRANSFORMERS/POWER TRANSFORMER

SL NO. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD ACCEPTANCE

NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- -- 2.0 Material Inspection

2.1

Incoming material like Copper conductor, Insulation material, laminations, Transformer Oil.

Check of Physical, Chemical and Electrical properties.

100%

Material Test Certificates / Test records

Should be from reputed supplier and grade as specified in job specification

H H

R

2.2

Bought out accessories like Marshalling box, Relays, Current Transformer, MOG, Bushings and Insulator, PRVs and OLTC.

Review of Manufacturer’s test certificates.

Functional check on accessories. Degree of protection, IR,HV for

Marshalling box

100% Material Test Certificates / Test records

Should be from reputed supplier and model as

specified in job specification/

data sheet

H H R

3.0 Inprocess Inspection

3.1 Tank and radiator fabrication (Before painting)

Dimensional Pressure test, one of each type Vacuum test, one of each type

100% Test Records

As per CBIP . Permanent deflection of flat plates after removal of pressure/vacuum shall not be more than values given in table 2 of EIL specification 6-51-0041 Rev5

H H R

4.0 Final Inspection

4.1 Transformer (Routine Tests)

• Physical Verification, Dimensional Check and verification of BoM

• Voltage ratio and Polarity

100% by purchaser

Inspection test records

As per approved drwgs

- H W

Page 6: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OIL FILED TRANSFORMERS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD ACCEPTANCE

NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Voltage vector relationship

• Winding resistance

• Insulation resistance before and After H.V

• Polarization Index

• No load loss and Current • Impedance voltage/Short circuit

impedance (Principal tapping) and load loss

IS 2026 – 1, CL 10.3/As per approved data sheet IS 2026 – 1, CL 10.2/As per approved data sheet IS 2026 – 1, CL 10.1.3 (i) IS 2026 – 1, CL 10.1.3 (i) (Min 1.5 ) IS 2026 – 1, CL 10.5( as per data sheet) IS 2026 – 1, CL 10.4 ( as per data sheet)

Page 7: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OIL FILED TRANSFORMERS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD ACCEPTANCE

NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Induced over voltage

• Separate Source Voltage Withstand Test

• Tests on On/off load Tap changer

/control panel (if applicable)

• HV, IR and Functional Test on Marshalling Box

• Oil Leakage(Pressure Test) • Break Down Voltage on transformer

oil • Measurement of Power taken by fans

and oil pumps. (On sample basis for one transformer)

• Noise Level.

IS 2026 – 3, CL 12 /shall withstand . IS 2026 – 3, CL 11/ shall withstand IS 2026 – 1, CL 10.8 IS 2026 and approved drwgs CBIP( No leakage) IS 335( 60 KV, average of 6 reading ) IS 2026 – 1, CL 10.1.3 (h) IS 2026 – 10/ NEMA chart according to

Page 8: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OIL FILED TRANSFORMERS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD ACCEPTANCE

NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

MVA/KV rating

4.2 Transformer (Type and Special Tests)

• Temperature rise. • Impulse withstand test • Short circuit level

a) Through fault b) Primary Terminals

• Degree of protection for Marshalling Box, Cable box , Transformer Adaptor Chamber etc.

100% by Purchaser

Inspection test records

IS 2026 – 2, CL 5.0 ( as per data sheet) IS 2026 – 3, CL 13.0

IS-2026(Part 1), CL 16.11(( as per data sheet)

As defined in data sheet/drwgs

- H W*

5.0 Painting

5.1

Painting and Packing • Visual • Suitable protection to prevent entry of

foreign material. • Proper packing to prevent any damage

during transportation and storage.-

100% Packing list /

Supplier’s Records

As per DS/Spec.-

- H -

6.0 Documentation and IC

6.1 Documentation and IC • Review of Internal Test Reports. • IC issuance 100%

Supplier’s Test Records / Inspection Certificate

(IC)

-

- H H

Page 9: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OIL FILED TRANSFORMERS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD ACCEPTANCE

NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

6.2 Final Document submission

Compilation of Inspection reports ,drawings, etc as per VDR / PR 100%

Final data folder

/Completeness certificate

-

- H H

* Only those Type/Special Tests as specified in the Specifications/ Data Sheet will be witnessed by BARC. Otherwise Supplier to submit Type Tested Reports for review by BARC.

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may proceed after scheduled date).

NOTES :-

3. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

4. Acceptance Norms for all the activities shall be as per latest version of relevant IS code/ standards referred there in/ Job specifications /Approved documents

Page 10: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OUTDOOR EHV CIRCUIT BREAKER

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- --

2.0 Material Inspection

2.1

Incoming Material like Busbars, Insulators, Cables, Relays, Control Cubicles Motors/Compressors, Pressure Switches/ Gauges, Density monitors, Breaker Compressor, Relays etc.

• Physical, Dimensional, Functional and Operational Checks

• Test certificates of each components

100%

TC’s/ Inspection & Test records /

Lab Test Records

As per approved drgs /datasheet/ specification H H R

3.0 In process Inspection

3.1 Breaker Assembly Visual, Dimensions, Bill of Materials 100% by Supplier

Supplier’s Test Records

-

- H R

4.0 Final Inspection

4.1 Outdoor EHV Circuit Breakers- Acceptance Tests

• Physical, Dimensional and BoM Verification

• Mechanical and electrical operation check.

• Measurement of the resistance of the main circuit.

• Compressor running time (in the

Test Records / Inspection

Witness Record

- H W

Page 11: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OUTDOOR EHV CIRCUIT BREAKER

case of pneumatic operated systems) or spring charging time in the case of spring operated systems have to be checked.

• Compressed air leakage test in closed and open conditions

• Air consumption measurements for each of the switching operations

• Power frequency test for the main and auxiliary circuits (DRY Insulation Test).

• Insulation resistance before and after HV.

• Mechanical and Electrical Interlocks and other safety features.

• Functional Checks on CB Operating Mechanism.

• Pressure Switch Operation for SF6 and gas leakage Test.

• Mechanical and electrical operation check at worst conditions of Auxiliary Supply Volatge.

• Trial Switching Operation shall be performed to check the blocking Pressure.

100% Supplier & Purchaser .

IEC:62271-100, 62271-1 &

IS 13118/As per approved

drwgs/data sheet/Job

specification

4.2 Submission of Certificates/ Documents

• Type tests as specified in Latest IS/IEC shall be conducted, as a minimum and certificates shall be furnished.

• Type Test Certificates for Insulators, Bushings and CBs

Witnessed by purchaser

Inspection test records

IEC:62271-100, 62271-1 &

IS 13118/As per job specification

/DS - H W

Page 12: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

OUTDOOR EHV CIRCUIT BREAKER

Legends: H- Hold (Do not proceed without approval), Random 10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

5. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

6. Acceptance Norms for all the activities shall be as per latest version of relevant IS code/ standards referred there in/ Job specifications /Approved documents

5.0 Painting and Packing

5.1 Painting and Packing

• Visual • Suitable protection to prevent

entry of foreign material. • Proper packing to prevent any

damage during transportation

100% Supplier test records

As per DS/Spec.

- H -

6.0 Documentation and IC

6.1 Documentation and IC • Review of Internal Test Reports • Issuing IC 100%

Supplier’s Test Records / Inspection Certificate

-

- - H

Page 13: inspection and test plan for dry type lighting transformer

SL

NO. STAGE/ ACTIVITY

1.0 Procedures

2.0 Material Inspection

Incoming Material like Insulators, Bus Bars,

Fabricated items, Bus Bar sleeves , Cable wire(FR),

2.1 instrument transformers , Relays, Indicating

Instruments, Switches, Breakers, Vacuum Bottles

etc

3.0 In process Inspection

INSPECTION AND TEST PLAN

FOR

HV SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK

-- --

Visual, Dimensional, Operational checks, Review of Manufacturer's Certificates etc. as 100%

applicable

RECORD

--

TC's/ Inspection &

Test records I Lab Test Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

-- -- --

H H R

Page 14: inspection and test plan for dry type lighting transformer

SL NO.

STAGE/ ACTIVITY

3 .1 Breaker Truck Assembly •

3.2 Wiring checks

4.0 Final Inspection

4.1 Switchgear Assembly

INSPECTION AND TEST PLAN

FOR

HV SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK

Mechanical Operation including spring charging mechanism, Breaker opening I

closing at normal and worst voltage 100% by conditions, Opening I closing time and Supplier and simultaneous closing of all poles, Contact random by resistance measurement, Gas leakage EIL/TPIA check (for SF6 breakers), Power Frequency Test.

Size, termination, ferruling, continuity 100%

ACCEPTANCE TESTS:

Visual check including layout, Tag plates, Paint shade, Bus marking and sleeving, Joint shrouding, Identification and location of components etc

Dimension check including operational height, Bus bar size, Clearances, Creepage distances, Compartmentalization, cable gland size, Paint thickness etc.

Verification of Bus bar support arrangement with respect to type tested panel drawings and provision for external 100%

cable termination.

Bill of material check .

RECORD

Test Records IInspection

Witness Record

Suppliers Test Records

Test Records IInspection

Witness Record

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H w

-- H R

- H H

Page 15: inspection and test plan for dry type lighting transformer

SL

NO.

4.2

STAGE/ ACTIVITY

Switchgear Assembly (Contd.)

Switchgear Assembly

INSPECTION AND TEST PLAN

FOR

HV SWITCHBOARDS

CHARACTERISTICS

• Rack-in and Rack-out of breakers.• Interchangeability of Truck assembly in

identical feeders.*• Pressure switches operation for SF6

breaker.• Operation check for auxiliary equipment

circuits and auxiliary contacts• Operation checks for all control

functions and interlocks as per schematicdiagrams in Test and Service positionincluding mechanical interlock check.

• Relay operation check through primary I

secondary injection.*• Measurement of resistance of main circuit.• Communication check between relays and

Data concentrator I HMI (if applicable)*• HMI operation and functional checks as

per separate agreedITP/FAT(if applicable)

• Insulation resistance of main, auxiliary andcontrol circuits before and after HighVoltage Test.

• Power Frequency voltage withstand test onmain, auxiliary and control circuits.

TYPE TESTS: • Short time current withstand test• Temperature Rise test.

QUANTUM

OF CHECK

100%

Sample Basis

RECORD

Test Records IInspection

Witness Record

Test Agency Reports

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

H H

R/W** R/W**

Page 16: inspection and test plan for dry type lighting transformer

SL NO.

ST AGE/ ACTIVITY

INSPECTION AND TEST PLAN

FOR

HV SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK RECORD

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC

• Internal Arc test.• Impulse and Power Frequency withstand

test• Short circuit test duties.

• Degree of protection for panels.

5.0 Painting

Painting and Packing • Visual• Suitable protection to prevent entry of Packing list I

5.1 foreign material. 100% Supplier's

• Proper packing to prevent any damage Records

during transportation and storage.

6.0 Documentation and IC

• Review of Internal Test Reports• Certification from supplier for complete

Supplier's Test Records I

6.1 Documentation and IC relay parameterization of numerical relays 100% Inspection

at worksCertificate

• IC issuance .

Compilation of Inspection reports ,drawings, Final data folder

6.2 Final Document submission 100% /Completeness etc as per VDR I PR

certificate

* Quantum of check is 100% by Supplier & random basis by EIL/TPIA** Witness if called for in job specifications. In such cases specified Type test will be considered as part of Acceptance Test.

- H -

- - H

- H H

Page 17: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN

FOR

HV SWITCHBOARDS

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each e), W- Witness (Give due notice, work ma roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents

Page 18: inspection and test plan for dry type lighting transformer

0 .Aad Ld-1000-00-9 ieWJOd pamasaJ sN6P IIV — 113 ABOdoo

suoDulnaiqqv

STANDARD SPECIFICATION NO.

puoil uogons anmsod 1.aN. uogon.ijsuoD Jo FepoluN OIUOIJIInD ][9InI.UN

._1 t

=i

C5

(") n

n co

0:1

›..

.,(:..)4R)

-cl

, -3

-rir

rir

rin

c,7

HH

H

ri-

1 >

cl)

c.

) r

-r1

o

rri

-t

Crl

n

Ti 444

• . CD

.

Po

• '--

--cl)

,..., Zr

p,,

GA

.. g

...

..

!lp-

:r

0c

'?2g:g

-1T4Y

nn

nn

17

:'›I

'''

.-,.

-.2.

-•0

C

CD

<•1)

0.-t.,.,..-,$:, 907,',-<

ccon.-1

,-.(7q

nco

n

,..,

:'"

`-t:

`<0

0,•-•-

A)o)C;)

C/)

Jic4)(7);0«-c

iOn

>c-

DP- '"

8'-

(:)"

',-.1 rl

5, ,

4

ri

c'-'

,• _

p.,

A

) ,-r

- C

D 0

CD

n„,

.,—.6

. n

CrA

H v

) .a

- cp C

cp )

A)

..

,--, H

n 9

.6

-9

,0

0-0

C

r4"

• <

SD■ n

cp

A)

n

5

"4

0.-

w,

crc

c)..,

t=.D

nc';

Cfc

? ,-

r r-

CD

.- •

CD

,-s

O

P'D

',,"

A)

g°9

!)

A.)

,:i"'

r11

C p

) (-)

—0

...,

• —

rir

::,,

0

A)

CD C

D n

Ei

cp

. eD

,,-

7::

t

-'

A)

<-)

-.

co,g

• A)

CT

1 n

0

Fi)F

Cl.

45-

0-

C.:1

Z

o

C...)

v)

C C

A)

p)

A)

cr

r-

r-

c)

7;

CD

cp

trl

0

n

H

«'-i'-3

,(:)'»Ci'.0'.1:"Z/

CIZ

Z

--(D

0c.cn:: 000

• A)0

"s '0C).

o

-.;.

-r-

CD

'-'•

CD

.-1 c

l) -'0"cpc)0-0

-t0,...,0.1:),.9 0

% ',-

- . <

c,, Q..

* (1)

g,'

,74

.._

,.-i• F.

• ,.?-

-•

.0

,- co

5

,

-, -t• o

$0 ("

DH

n, ...,c).n

,Ct71- tn

n

-t c

D5-

H2

-t-,

-.co.c

n,-4

- 5',2

1-"(Avt«HO,720A.)»0!"..L7

• C

l., C

D A

) •-■ •

,-ti

n—

OA

D.7)---

'<=)-

'F')*(1)

,..7;0-C)Cr0o

'-'1

00

(7

4n

4

,n.

,—;-

4.5

,7,

cc-"D'

,oC/Do

0

CFA

(D c

,-r-

co

4

.ti(4,

5 o

O' cn

::,

, 5.

c)

• co

n-

iii

.t.,

CD

■-■•

0

9-,'

2 '2'

;:,)

n

::-.

1A)

n

O

o 0

n,

-««.

-<

0

-t

-t

AD

cD

0..6

, n

'<

3-

A)

..t

Cf)

O

Hnnn

aa31

Page 19: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

1.0 Procedures

2.0 Material Inspection

Incoming material like panel fabrication, PCBs, Lamps, Push Buttons,

2.1 switches, Protective relays, Lockout relays,

Indicating Meters, Terminals, cable

wires(FR), PVC ducts, etc

3.0 Inprocess Inspection

INSPECTION AND TEST PLAN

FOR

RELAY & CONTROL PANEL/DESKS

QUANTUM CHARACTERISTICS RECORD

OF CHECK

--- --- ---

Visual, Physical, Finish, Dimensions, Make of components, Manufacturer's test

100% Test records certificates for model, accuracy etc. as per

relevant specifications

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

--- --- ---

H H R

Page 20: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

3.1 Wiring Checks

4.0 Final Inspection

4.1 Final Inspection

INSPECTION AND TEST PLAN

FOR

RELAY & CONTROL PANEL/DESKS

QUANTUM CHARACTERISTICS RECORD

OF CHECK

Size, termination, ferruling, Test

continuity 100% Records

Check for correctness of wiring

Acceptance Tests:-• Visual, Accessibility of operating

devices• Dimensional• Name Plate & Inscription details• Paint shade and surface finish• Mimic diagram and color codes• Cable entry, Cable lugs, Cable Glands

size, Lifting Hooks• Bill of material, Make of Components• Operation check of Alarm sequence/ 100% Inspection

Functional as per data sheet test record

requirement I drawings • Operation/Calibration check of all

relays, Meters and other components bycurrent injection

• Operation check for auxiliary contacts& auxiliary circuit

• Earthing• Accuracy of digital clock• High voltage test• IR test before and after High voltage

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

--- H R

H H

Page 21: inspection and test plan for dry type lighting transformer

SL NO.

5.0

5.1

6.0

6.1

6.2

STAGE/ ACTIVITY

Painting

Painting and Packing

Documentation and IC

Documentation and IC

Final Document submission

INSPECTION AND TEST PLAN

FOR

RELAY & CONTROL PANEL/DESKS

QUANTUM CHARACTERISTICS RECORD

OF CHECK

• Visual

• Suitable protection to prevent entry of Packing list foreign material. 100% I Supplier's

• Proper packing to prevent any damage Records

during transportation and storage.

Supplier's • Review of Internal Test Reports, Test Test

reports for degree of protection 100% Records I• IC issuance Inspection

Certificate

Final data Compilation of Inspection reports

100% folder

,drawings, etc as per VDR I PR /Completene ss certificate

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

- H -

- - H

- H H

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each ty e), W- Witness (Give due notice, work ma roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications I Approved documents

Page 22: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

1.0 Procedures

2.0 Material Inspection

Incoming material like panel

2.1 fabrication, PCBs, Lamps, Push

Buttons, Terminals, cable wires(FR), PVC ducts, etc

3.0 Inprocess Inspection

3.1 Wiring Checks

4.0 Final Inspection

INSPECTION AND TEST PLAN

FOR

ANNUNICA TION PANEL

CHARACTERISTICS

--

Visual, Physical Finish , ,

Dimensions, Make of components etc. as per relevant specifications

• Size, termination ferruling' ,

continuity• Check for correctness of wiring

QUANTUM OF

CHECK

--

100%

100%

RECORD

--

Material Test Certificates ITest records

Test records

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC

-- -- --

H H R

-- H -

Page 23: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

4.1 Annunciation Panel (Final Inspection)

5.0 Painting

INSPECTION AND TEST PLAN

FOR

ANNUNICATION PANEL

QUANTUM OF CHARACTERISTICS

CHECK RECORD

Acceptance Tests:-• isual• Dimensional• Name Plate & Alarm Inscription

details• Paint shade, Paint thickness• Cable entry, Cable lugs, Cable

Glands size, Lifting Hooks• Bill of material, Make of

Components• Interchangeability of PCBs with

identical logic design• Operation check of Alarm

100% Inspection test

sequence as per data sheet record requirement

• Operation check with ± 10%power supply variation

• Verification of Space heaterworking

• Auxiliary circuit/auxiliarycontact check

• Earthing• Accuracy of digital clock• High voltage test• IR test before and after High

voltage

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC

H H

Page 24: inspection and test plan for dry type lighting transformer

SL

NO.

5.1

6.0

6.1

STAGE/ ACTIVITY

Painting and Packing

Documentation and IC

Documentation and IC

INSPECTION AND TEST PLAN

FOR

ANNUNICATION PANEL

QUANTUM OF CHARACTERISTICS

CHECK

• Visual

• Suitable protection to prevententry of foreign material.

100% • Proper packing to prevent any

damage during transportation andstorage.

RECORD

Packing list ISupplier's Records

Supplier's • Review oflnternal Test Reports

100% Test Records I

IC issuance Inspection Certificate

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

- H

- -

Legends: H- Hold (Do not proceed without approval), Random - min 10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents

Page 25: inspection and test plan for dry type lighting transformer

0 •AG?:1 Ld-1000-00-8 'oN 3e ULIOJ

pamesai sv.16!J IIV —113 11160doo

Inspection Standards Committee

gl.dng .3.s

E-)" ()

" (-

)

uoissIwwo3 tenluq3ai 0.1],ma

luounuaii waH

vo

sumimitaigqii

Z 'Aall 6001-18-9 STANDARD SPECIFIC ATIO N NO .

"

inc")n

nt:

o

H

rri

7zi

()

()

O

' E .

<1 .- E' —.11 .

(7t c .-7 . 1)1 <

t 1 :' ''

c "

C P:

2 n

z.,, .;.

n s-h.

o> eD

,,z›vt t

'-c—

` j

:.

5 8

0

,3

- ,

c o

C

j :

a r

"i

:> .<p

:-"V

■- 0

r9

,,:

-. 5

rri .

r2

o

, ,

N-1.

, ,..4

. o_

94

,H 2

-:. —

• —•

(:)•

<D,--t

CM•

H

=

0

CD tZ

,7 CD

.-• •

CD

■-■ •

7

....,

Cfq

,-I

F>

C

A

0 cn

(1)

-.

0 —

• 0

CA

CD

.7-■'.

Cf4

,

cc/; '4

" •-

b ,-+

., P.,

ro

O

- C

rq

▪ c

t)

,_

a

'-t

et)

cn

Cfq

cn

Sn-

■-

r,

.-r. r"'

0 ,

..• •

0

1W

R° "

■•-t

CD

F.: C

r'

ril

'-r1 92

, c4

(I) E

7

■-t

ep

0

e)

■=7

CD

cnr

3.

SW

CD

§'

f2

ril

■-s

41

• (1

) CL

. 45 .

cp

'T1

izN.,

cr'

o

4.-1

`nr)

yH

1-3

-.<

'--1 i-

3 e

'..0

c)"

(:)

,..

'"t ?

94Z

c)

z _., ‘

--,

CA

.S

... •

r)

r)

• r)

--•

• '-' '

cp

-

-

0

i .:crD

9t-

<

(< D v

i -

CQ

1-1-

CD

■-., 0

..-1

- CD

'H

~_, C

) ,.<

,.,_ (-

) $.

CD

r0 r

il a.

,, {.D

, ec--4

D

2,

co t--

' ,

. 0

F,-

c■- o ,—

iP-s

7

. s ,w ... ..'"C j

2 CD

p■- " •

< ,..

...9 ..

.o c

r rp

cn

■-,

AL H

<1, •

-, •

,-t

,...

t 0

0 f3

C?

9,

g•

"4:

..,

co

ril

, C

D

c/D co

6

CrO

rD

Co

■-rL') e

l 4

,4

'td

-

o

ci

5.

;:r

c) •

,p_ (t

)

cn

Cr4

eih

cp

t-r,

1='

CD

0 'à

elt

ro .▪

- ■-•

• .-

- r)

e9

,A

).

0

1:D 'c-:

-;

(=Le

r

.c1 C

D

5

P cn"

=

N

>

■- ■L ° 3

« CD(4'''

("

) •--

. •

<1:'-4

Cl •

OICOIJI3.103 1S,L

Page 26: inspection and test plan for dry type lighting transformer

SL NO.

STAGE/ ACTIVITY

1.0 Procedures

2.0 Material Inspection

Incoming Material like Busbars, Insulators, Motors •

2.1 and reduction Gears, cables, Relays, Cables, Cable •

glands etc.

3.0 In process Inspection

3.1 Switch Assembly

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV ISOLATERS AND EARTHING SWITCHES

QUANTUM OF CHARACTERISTICS

CHECK RECORD

-- -- --

TC's/ Inspection Physical, dimensional and operational checks (as applicable) 100%

& Test records I

Test certificates of Suppliers Lab Test Records

Visual, Dimensions, Functional Checks 100% by Supplier's Test Supplier Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

-- -- --

H H R

- H R

Page 27: inspection and test plan for dry type lighting transformer

SL NO.

ST AGE/ ACTIVITY

4.0 Final Inspection

Outdoor EHV Isolators and •

Earthing Switches-4.1

Acceptance tests •

Outdoor EHV Isolators and •

Earthing Switches- Type •

4.2 Tests

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV ISOLATERS AND EARTHING SWITCHES

QUANTUM OF CHARACTERISTICS

CHECK RECORD

Physical, Dimensional and BOM Verification.

Millivolt Drop Test and Measurement of resistance of main circuit.

Mechanical and electrical operation check with Control Cubicle.

100% by Test Records ISupplier and on Inspection

Power Frequency voltage dry test on main Random basis by Witness Record

circuit . EIL/TPIA

High Voltage test on control and auxiliary circuits.

IR before and After HV .

Mechanical and Electrical Interlocks and other safety features checking.

Dielectric Tests as per relevant IS

Temperature Rise Test.

Short Circuit Making Capacity of Earthing One Type Test

Switches. Sample/Rating Records

Mechanical Endurance test.

Short Time withstand current and peak withstand current tests.

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

H H

- H R

Page 28: inspection and test plan for dry type lighting transformer

SL NO.

4.3

5.0

5.1

6.0

6.1

ST AGE/ ACTIVITY

Submission of certificates /documents

Painting and Packing

Painting and Packing

Documentation and IC

Documentation and IC

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV ISOLATERS AND EARTHING SWITCHES

QUANTUM OF CHARACTERISTICS

CHECK RECORD

• Degree of protection certificate as Statutory applicable.

Sample/ Approval

• Type test Certificates . Prototype Certificates I

Type Test Certificates

• Visual• Suitable protection to prevent entry of

Supplier test foreign material. 100%

records • Proper packing to prevent any damage

during transportation

Supplier's Test • Review of Internal Test Reports and MTCs.

100% Records I

• Issuing IC Inspection Certificate

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H R

- H -

- H H

Legends: H- Hold (Do not proceed without approval), Random 10%, R-Review, RW-Random witness, W- Witness (Give due notice, work may roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications I Approved documents

Page 29: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

1.0 Procedures

2.0 Material Inspection

Incoming Material like Porcelain housing, Pressure release devices, valves, Oil,

2.1 Cable Glands, Choke, Reactor, Bushings, Insulator etc

3.0 In process Inspection

3 .1 CT and VT assembly

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV CURRENT TRANSFORMERS AND VOLTAGE

TRANSFORMERS

CHARACTERISTICS QUANTUM

RECORD OF CHECK

-- -- --

• Physical, Dimensional, Functional andSupplier's TCs/

Inspection & Electrical Checks (as applicable) 100%

Test records I Lab Test Records

Visual, Dimensions, Bill of Materials 100% by Supplier's Test Supplier Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

-- -- --

H H R

- H R

Page 30: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

4.0 Final Inspection

Voltage Transformers- •

4.1 Acceptance Tests •

Current Transformer-4.2

Acceptance Tests •

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV CURRENT TRANSFORMERS AND VOLT AGE

TRANSFORMERS

CHARACTERISTICS QUANTUM

RECORD OF CHECK

Physical, Dimensional and BoM Verification

Overvoltage Inter turn Test 100% by Test Records I

Partial Discharge Test. Supplier and on Inspection

Power Frequency High Voltage test on Random basis Witness Record

Secondary and Primary windings by EIL/TPIA

Accuracy Test .

Capacitance check for Capacitor Voltage Transformer (CVT)

Physical, Dimensional and BoM Verification.

Overvoltage Inter turn Test

Capacitance, Tan Delta and partial discharge check for CTs of rating 132 KV

Test Records Iand above.

100% by Inspection Power Frequency High Voltage test on Supplier and on Witness Record Secondary and Primary windings

Random basis Extended Primary Current (120% of by EIL/TPIA primary current)

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

H H

- H H

Page 31: inspection and test plan for dry type lighting transformer

SL NO.

STAGE/ ACTIVITY

4.3 Type Tests

5.0 Painting and Packing

Painting and Packing

5.1

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV CURRENT TRANSFORMERS AND VOLT AGE

TRANSFORMERS

CHARACTERISTICS

Protection CTs • Knee Point Voltage and Exciting

Currents• Turns Ratio• Secondary Winding ResistanceMeasuring CTs• Accuracy Test

Temperature Rise Tests Lighting Impulse Test(applicable for use in Electrically Exposed Installation) Switching Impulse Test ( 420 KV and Above) High Voltage Power Frequency wet withstand voltage Test.(upto and including 245 KV) Measurement of Dielectric Dissipation factor for CTs.(as applicable) Short Circuit Withstand Capability test for VTs Instrument Security current test for measuring CTs.

• Visual

• Suitable protection to prevent entry offoreign material.

• Proper packing to prevent any damage

QUANTUM OF CHECK

RECORD

100% by Supplier and on Test Records IRandom basis Inspection by EIL/TPIA Witness Record

One Type Test sample/Rating Records

Packing list I100% Supplier's

Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H H

- H R

- H

Page 32: inspection and test plan for dry type lighting transformer

SL

NO.

6.0

6.1

ST AGE/ ACTIVITY

Documentation and IC

Documentation and IC •

INSPECTION AND TEST PLAN

FOR

OUTDOOR EHV CURRENT TRANSFORMERS AND VOLT AGE

TRANSFORMERS

QUANTUM CHARACTERISTICS

OF CHECK RECORD

during transportation and storage.

Supplier's Test Type test Certificates. Records I

100% IC issuance . Inspection

Certificate

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H

Legends: H- Hold (Do not proceed without approval), Random 10%, R-Review, RW-Random witness, W- Witness (Give due notice, work may roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents

Page 33: inspection and test plan for dry type lighting transformer

SL. STAGE/ACTIVITY

NO.

1.0 Procedure

2.0 Material Inspection

2.1 Incoming material like castings, Push Button, terminals, glass, ammeter, voltmeter, knob, switch, etc

3.0 Inprocess Inspection

3.1 Assembly

4.0 Final Inspection

4.1 Industrial type Control Station

INSPECTION AND TEST PLAN

FOR

INDUSTRIAL TYPE CONTROL STATIONS

CHARACTERISTICS QUANTUM RECORD

OF CHECK

- - -

Physical & Chemical Properties, Material Supplier's

Certificate, Accuracy, Make etc. Test Records/

100%/ Independent lab TC

Visual, Dimension, Bill of water 100%

Supplier's Test Records

Acceptance Tests:-

• Visual• Dimensions, Threads Inspection • Workmanship 100% witness Test • Paint Shade Records • Marking on each piece for Tag no. etc .• Terminal sizes, Lugs size(where required)• Cable Gland size

SCOPE OF INSPECTION

SUB SUPPLIER r-- ·---.

SUPPLIER BARC

- - -

H H R

- H -

- H RW

Page 34: inspection and test plan for dry type lighting transformer

SL. STAGE/ACTIVITY

NO.

4.2 Submission of Certificates •

5.0 Painting and Packing

5.1 Painting and Packing

INSPECTION AND TEST PLAN

FOR

INDUSTRIAL TYPE CONTROL STATIONS

CHARACTERISTICS QUANTUM RECORD

OF CHECK

Electrical Operation test & BOM High voltage test IR test before and after High voltage

Certificate of testing agency for Certificates suitability of degree of protection ( as from testing applicable) Samples agencies

• Visual.• Suitable protection to prevent entry of

foreign material. 100% Test records • Proper packing to prevent any

damage during transportation.

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H R

-

H --

6.0 Documentation and IC

Supplier's

Review of Internal Test Report Test Records

6.1 Documentation and IC •

100% I Inspection - H H • IC issuance

Certificate (IC)

Final data

6.2 Final Document Compilation of Inspection reports ,drawings,

100% folder

H H submission etc as per VDR I PR /Completenes -

s certificate

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work ma roceed after scheduled date).NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

? A rrPnt:mrP Nnrm<: fnr :i II thP :ir.tivitiP<: -:h:i II hP :i<: nPr Pn/PR I <;:t:inrforrk rPfPrrPrl thPrP in/ Tnh cnPf'ifif'<>tinnc I A nnrn"Prl rlnf'11mPntc

Page 35: inspection and test plan for dry type lighting transformer

SL NO.

ST AGE/ ACTIVITY

1.0 Procedures

2.0 Material Inspection

Incoming Material like Insulators, Bus Bars, Fabricated

items, Bus bar sleeves and 2.1 supports, Instrument

Transformers, Relays, Indicating Instruments, Switches, Breakers,

Contactors etc.

INSPECTION AND TEST PLAN

FOR

M.V.SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK

--

--

Visual, Dimensional, operational checks, Manufacturer's test 100% certificates etc. as applicable

RECORD

--

Material

Test Certificates

I Test Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

-- -- --

H H R

Page 36: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

3.0 Inprocess Inspection

3.1 Wiring checks

4.0 Final Inspection

4.1 Switchgear Assembly

INSPECTION AND TEST PLAN

FOR

M.V.SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK

Size, termination, ferruling, continuity 100%

• Visual check including layout,Tag plates. Paint shade, Busmarking and sleeving, jointshrouding, Identification andlocation of components etc.

• Dimension check includingoperational height, Bus size,Clearances, Creepage distances,paint thickness, gland size etc.

• Verification of Bus bar supportarrangement with respect to type 100%

tested panel drawings, provisionfor external cable termination andBus Duct flange Dimensions (ifapplicable).

• Bill of material I Make ofComponents check.

• Interchangeability of identicalmodules I feeders (if applicable).*

RECORD

Test Records

Supplier's Test

Records IInspection Witness Record

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC

-- H R

- H H

Page 37: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

Switchgear Assembly (contd.) •

INSPECTION AND TEST PLAN

FOR

M.V.SWITCHBOARDS

QUANTUM CHARACTERISTICS

OF CHECK

Operation check for control and auxiliary equipment circuits and auxiliary contacts.

Manual and electrical operation check of Breakers, Relays etc. under normal and worst voltage conditions.*

Operation checks for all control functions and interlocks as per schematic diagrams in Test and service position including mechanical interlock as applicable. 100% Relay operation check through primary/secondary injection.*

Communication check between relays and Data concentrator IHMI (if applicable).*

HMI operation and functional checks as per separate agreed ITP/F A T(if applicable).

Insulation resistance of main, auxiliary and control circuits before and after High Voltage tests.

RECORD

Test Records IInspection

Witness Record

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

- H H

Page 38: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN

FOR

M.V.SWITCHBOARDS

SL QUANTUM SCOPE OF INSPECTION

STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB NO. OF CHECK

SUPPLIER

• Power Frequency voltagewithstand test on main, auxiliaryand control circuits.

TYPE TESTS: • Short Circuit making and

breaking tests.Test

4.2 Switchgear Assembly Short time current withstand test.

Sample Basis Agency -

Reports • Temperature Rise test.• Degree of protection for panels .

5.0 Painting

Painting and Packing • Visual

• Suitable protection to prevent entryPacking list

5.1 of foreign material.

100% I Supplier's -

• Proper packing to prevent any Records damage during transportation andstorage.

6.0 Documentation and IC

• Review of Internal Test Reports Supplier's • Certification from supplier for Test

6.1 Documentation and IC Complete relay parameterization 100% Records I -

of numeral relays at works Inspection • IC issuance Certificate

* Quantum of check is 100% by Supplier & random basis by EIL/TPIA* * Witness if called for in job specifications. In such cases specified Type test will be considered as part of Acceptance Tests.

SUPPLIER BARC

R/H** R/W**

H

H H

Page 39: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN

FOR

M.V.SWITCHBOARDS

Legends: H- Hold (Do not proceed without approval), Random -10%, R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed after scheduled date).

NOTES:-

I. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications I Approved documents

Page 40: inspection and test plan for dry type lighting transformer

SL NO.

ST AGE/ ACTIVITY

1.0 Procedures

2.0 Material Inspection

Incoming Material like Fabricated items, Electronic

2.1 components, PCBs, Relays, Indicating Instruments, Power Supply Unit, IGBT/SCRs, etc.

3.0 In process Inspection

3.1 PCBs & Electronic components, Sub-assemblies

INSPECTION AND TEST PLAN

FOR

BATTERY CHARGERS

QUANTUM CHARACTERISTICS

OF CHECK

-- --

Visual, Dimensional, operational checks, etc. as applicable 100%

Burn-in Test for 96 hours at 50deg C 100%

RECORD

--

TC's/ Inspection &

Test records I Lab Test Records

Supplier's Test Records

SCOPE OF INSPECTION

SUB SUPPLIER BARC SUPPLIER

-- -- --

H H R

H H R

Page 41: inspection and test plan for dry type lighting transformer

SL NO.

ST AGE/ ACTIVITY

4.0 Final Inspection

4.1 Battery Charger Assembly (Acceptance Tests)

INSPECTION AND TEST PLAN

FOR

BATTERY CHARGERS

CHARACTERISTICS

• Visual check including layout, Tag plates,Paint shade, Bus marking, Identificationand location of components, etc.

• Check calibration status of all testingequipment.

• Dimension check including operationalheight, Bus size, Clearances, paintthickness, etc.

• Bill of material/ Make of Components.

• Full Load test for 16 hours with minimum8hrs for each Charger*. Temperature risefor critical components would be recordedduring this test.

• Charger testing at constant output voltage infloat and boost charge mode, includingmeasurement of AC phase voltage,frequency, current, power, DC outputvoltage, current and output voltage rippleat nominal AC input voltage at zero, 50%and 100% of rated output current.Measurement shall be repeated at I 00%full load current at 90% and 110% ofnominal AC supply

• Charger testing under constant outputcurrent limiting condition in float andboost mode, including measurement of DC

QUANTUM OF CHECK

100% by Supplier and on Random Basis by EIL/TPIA

RECORD

Test Records IInspection

Witness Record

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER

H

B.ARC

H

Page 42: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

Battery Charger Assembly (Acceptance Tests Contd.)

4.2 D.C Distribution Board

INSPECTION AND TEST PLAN

FOR

BATTERY CHARGERS

CHARACTERISTICS QUANTUM

OF CHECK

output voltage and current with DC output voltage varying between zero and set value corresponding to constant voltage operation.

• Proper functioning of all measuringinstruments, alarms, indications, protectionand controls as per requirement.

• Parallel operation of both chargersincluding load sharing and automaticisolation of faulty charger.

• Charger Efficiency and Voltage regulation 100% BY

test. Supplier and on

• Harmonic Measurement. Random Basis

• Dynamic Response test for step load as per by EIL/TPIA

PR/spec.

• Audible noise test.• Insulation resistance before and after HV

test for power, control and auxiliarycircuits.

• High voltage withstand test for power,control and main circuits.

• Check for protection against reverse batteryconnection.

100% by Visual, Dimensions, Feeder Tag plates, Supplier and Functional checks, IR and HV test. on Random

Basis ny EIL/TPIA

RECORD

Test Records IInspection

Witness Record

Supplier's Test Records I

Inspection Witness Record

SCOPE OF INSPECTION

SUB SUPPLIER BARC.

SUPPLIER

- H H

- H H

Page 43: inspection and test plan for dry type lighting transformer

SL NO.

STAGE/ ACTIVITY

4.3 Cell Booster

4.4 Battery

Submission of Certificates/ 4.5

Documents

5.0 Painting

Painting and Packing

5.1

6.0 Documentation and IC

6.1 Documentation and IC

INSPECTION AND TEST PLAN

FOR

BATTERY CHARGERS

QUANTUM CHARACTERISTICS

OF CHECK

• Visual and Functional checks 100% by • Full load capability test at 90%, 100% and Supplier and

110% of nominal AC supply on Random • IR and HV test Basis ny

EIL/TPIA

All test as per respective ITP, as a Sample

minimum

Type test report on radio frequency•

100% interference voltages on RFI filter.

• Visual

• Suitable protection to prevent entry offoreign material. 100%

• Proper packing to prevent any damageduring transportation and storage.

• Review oflnternal Test Reports100%

• IC issuance .

RECORD

Supplier's Test Records I

Inspection Witness Record

Supplier Test Record

Supplier's Test Records/

Statutory Body

Certificates

Packing list ISupplier's Records

Supplier's Test Records IInspection Certificate

SCOP

SUB SUPPLIER

SUPPLIER BARC·

- H H

- H H

- H R

- H -

- H H

Page 44: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN

FOR

BATTERY CHARGERS

* Tests shall be conducted on one charger of each rating (In case of dual Chargers, both chargers will be put on load separately)

Legends: H- Hold (Do not proceed without approval), Random 10%, R-Review, RW-Random witness, W- Witness (Give due notice, work may roceed after scheduled date).

NOTES:-

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications I Approved documents

Page 45: inspection and test plan for dry type lighting transformer

STANDARD SPECIFICATION NO.

.nalif Z£01-18-9

0 'AG)21 L3-6000-00-8 'oN 12111.103 pamasai say6u IIV —113 41160doo

uldno .3.s .ijAi

Inspection Standards Committee

'71'

ME

co>

-,,F

5r;4

(").

-1,1m5mn

c 7

>&

Hnnn

?z2g

,--3

r-4m o

rrj

r-'

t,D' '.=7..)

E 5

' 5.' '

E x -r

i ..,,'-i

i s-ii

tri t

z: n n n n o:i > ec, >

r,CD

,9-5

,7

87

. _o

-b: w

0c/)

$:''

fS, .

:, ,-t

- C

r -•

= 0

C

D C

D C

D ."

t

0

t=L C

D A

DC

) n

us

c)

0 C

D

sT1 "

"1 0

-1

• ,;

(1-,0

(3'=

0"T

h:S

Orp

-tg

)(3

:4",i

iii: -:1

90

1:4

'›C

-1

(i)

CD '-

7 .,,,.,§,"-~

g4g,

:j5g.!,—

n—

As

• n

-t

-t-(

1)

n=

=-b

■-■-2

_,

As =

" .

=

-t

c)rT

1

c)

= C

2-, (D

CH•

'--"eam

'-'

" •

,-

CL

l''D

cfc,

,..4

- ...

.

H‹,..5.

c)0

,'Jà

v)

0 v

) - '5'

. cp

,_,_

0

-•

(D

,-+

n

C4„ =‹

.-:)'

5 (..., .

• i.

■:.,

c)

C4

-

0

(

=co

2 4

C=

. A

. =

=

-

4) t•

-■ ac

).-,

u)

. ,,,

n c

) Cfc

? S7-

rAs

R. (th

) ,`-:,)

o

(:r-

n m

,-

.`ss't

'-11

:')

(i)

FD cs

'

0

AD

'a.

5

.--,

-,

n

(9)

rAs

7)*

-(5

. R)

..c

c)

--,-

eD

C=1.,

co P) c-

<

Z 44

n—

r"

4

m

4 • o

o z

o H

4 c.

)

o • ›

c.)

z

”- <-

t... n( $=')

000- v-c ), J •

: , o n

-.o

z .....z 0 =z 4 .-p

. ,-i

-44

.,n

n(,,

( -t 0

_.5,„„ "

n=

0.w

t

ocgs

c'2

'ar.E

..scs

,n

i:ss

o,

n -•

t::)

(-)o,..

.. ,..-:

,.

r--•

~t

.-1

0 '

-1 rD

'',

<A

DC

LC

TA

D

0

AD

n

.--u

3Cfc

s

,,.,,z 4

P,

.,2 C

pw

0v

sA

s•

nw

.A0=

.r.,t

-. v)

- ,p-

"'" e

D ..

. t AD

,•-•

,--"?.

.-cs

47:J

(pn'

—t1-1,-0

..,,.»,

(1)

"0

;in

(DH

(")

,..,n

1,4D

■.L., ~

t o

0 c

o

As

cp_

•-■., _., .-

-t

.--,

co A

s

n2/2

>=

1-g

o!-

• nr4

,L.....

,„,

,•tz ,

,, •-•

.-o

0-.

CD

CD

-, c ofpz 0

= C

D

. -t

e-p-

■-•

Cl.. >.

:..-. '

(.T) •

F:0) •-

-. •

rzi

o

til

nC

.4n, tw

o

Cfq

CD

,-+-

n

• v

) =

o .

- n

=-

• '-s

i 0

=

-.

t...)-

0 C

A

...

.-i-

o

vt

,--

v)

,-.

'-<

/On

n"

>

- •

= s

=

= C

rs:?

n =

n)

,•-b

0

=

0()

.

v)

Cfcs

'.:-.1

CL

Cfcs

, C

D .-

■ • r

) =

cs

cs

n ▪

,-,.

'-C

=

-t •

-•

51

As

r:j

Cs.

."

CM

ro

As

v)

-t

=

=

t'..

As

us

v)

a«.).

rt°

Sss

.-p-

- .

O

suogulnaicmy

Page 46: inspection and test plan for dry type lighting transformer

0 sAed Ld-1000-00-8 'oN lewiod pamasai slyBIJ IIV —113 ly60doo

INSPECTION AND TEST REQUIREMENTS

PO/PR & Standards referred there in /Job specifications / Approved documents.

SINWAII-13011 aDmallaiall o.z

This Inspection and Test Plan covers the minimum testing & inspection requirements of three phase medium voltage squirrel cage induction motors.

1:103S O'I

".> g

p m

m ti 'Aall Z£01-18-9

STANDARD SPECIFICATION NO. IN

) .-

. tt.

J t.:=

I-,

'7=,

CA

C)

Raw Material: Body(casting or

fabrication), Rotor shaft, Core

laminations, Copper, Insulation material,

Bearings, Terminals, cable boxes, Cable glands, etc.

Material Inspection

Procedures

STAGE/ ACTIVITY

Chemical, Physical properties , finish as per relevant standard

CHARACTERISTICS

1-,

CD

CD

■•;

1

QUANTUM OF CHECK

H n

4

CD

CD

tZtt

Chr'-

3.

(1)-,

r)—

.. ,

o

,--,-

'-t

CD (i)

CD

_,

'-

t: .

cn

, cA

0

SUB SUPPLIER

SCOPI

1 1

SUPPLIER

E OF INSPECTION

, .

EIL/TPIA

Page 47: inspection and test plan for dry type lighting transformer

0 •I\Gd Ld-1000-00-8 oN lewioj pamesai s;y6P IIV —113 41.16pAcloo

STANDARD SPECIFICATION NO.

t .nall t£01-18-9

.1=,

.--,

4:, 0

t...) —

t‘à 0

(/)

C

4

o (i',) o z

CD

H

co ,v)

cn

,-

..

Final Inspection

Motor Assembly

Inprocess Inspection

STAGE/ ACTIVITY

Visual check (Nameplate, Terminal box location, terminal type, clearances, size, entries, space adequacy & gland size, Direction of rotation etc.)

Dimensions check (shaft height etc.)

Cable Glands, cable lugs size and no. of entries in Terminal Box

• Winding Resistance • No load test and measurement of Voltage, Speed, Current, Power Input

Measurement of Starting Torque, Starting current , full Load Torque, Pull out torque by JEC (Logarithmic proportion Current method II).

Reduced voltage Starting and running

Insulation resistance Before & after High Voltage test

High Voltage

V ibration

Vacuum impregnation and bracing of winding, core assembly, Rotor bars and end rings assembly,

Rotor balancing, Terminal box mounting and clearances in between, Bearing setting, etc as per

supplier's internal standards

n :

›..

n

,..,

m

w

n'''

z

c,

c,

,...

c>

c,

QUANTUM OF CHECK

5 -,

.-Cj

CD

CD

o

o

. 0

-.

Q.

, cn

5-

cn

cDH

cn

,—#- '

0

,7.!

ct

n

o

g

t 1

SUB SUPPLIER

w

n

o

i-o

x

x

SUPPLIER

E OF INSPECTION

cD

t....)

CD

z

-1=. o

cp

i

EIL/TPIA

Page 48: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

4.2 Motor (Type Tests)

5.0 Painting

Painting and Packing

5.1

6.0 Documentation and IC

6.1 Documentation and IC

6.2 Final Document submission

INSPECTION AND TEST PLAN

FOR

MEDIUM VOLTAGE MOTORS

QUANTUM CHARACTERISTICS

OF CHECK

• Full load test and measurement of Voltage,Current, Power, Slip, Power factor, BearingNoise.

• Efficiency and Pf at 100%, 75% and 50% load• Temp Rise test One sample • Momentary overload test from each • Vibration type/rating

• Noise Level

• Over speed

• Measurement of Starting Torque, StartingCurrent, Full Load Torque*

• Visual

• Suitable protection to prevent entry of foreignmaterial. 100%

• Proper packing to prevent any damage duringtransportation and storage.

• Review of Internal Test Reports• Test certificate from recognized testing

laboratory for area classification.• BIS certificate for FLP motors and accessories

as applicable.

PESO approved certificates for motors and100%

accessories as applicable.• Degree of protection of enclosure• IC issuance•

Compilation of Inspection reports ,drawings, etc as 100%

RECORD

Inspection test records

Packing list ISupplier's Records

Supplier's Test Records I

Certificates from statutory

bodies IInspection

Certificate (IC)

Final data

STANDARD SPECIFICATION NO.

6-81-1032 Rev. 4

Page 5 of6

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER EIL/TPIA

See Note - H

3&4

- H -

- H H

- H H

Page 49: inspection and test plan for dry type lighting transformer

0 •Aed L3-1000-00-9 'oN 4eithod pemesei s41-16P IIV —113 41160doo

.A3H Z£01-18-9

'ONI NOI1V31.1133dS CDIVONVIS

2, 4

4 >

.9, ,

-,..

H

,..,

0,9+

{.-))-

c)

-••

o o

(1)

-9 (7

. H

f2.)

• •-,

-1 .z

:s a,

M

(.)

v, .

--

. o

- :,,,

c7)

(-

(2.., o .-

CD

>""

, "0

(-)

A,)

CD

...

' ,-

. , t-

,- C

D ::

''

'a

C '7

' 9)

p.

(1)

ln -

--'

0

0 C

L••

j, ,

..1 C

D

0 . - _ • ;-7

5

s'-c '

o

5 # '

0 "

6 0

3 x

0

_o

c c

(D

- o

c

A

c ;"

F C

.

5 C a .,61

) ::. ,. :

'"., •

c) ,-

•-•■

,..i. '<-1;

.-s

< c

p ,,,

c'-17

--• ....

_, c).

, ,

v)

.,

• tzi

cr

'-'

-,

S2

P.)

CD

■ -b ii) ,-

' -ct

cp

cp

CP

- r

-C

n d c

v) co , ,$:;,5

6-C

,.r:t

r) '''

-t 5

, ,..

.. n

5 .-

-, ci

p o-

co

n''-c.' r)

)+) •-t-

cy 0

~

ci)

cn

:6,

Po

:0

,--r-

.-t

C ) C

l..

•--r-

CD

CA

CD

CD

..,

cn

.--s

... „

, .-,-

'-C

c.11

,-b

7;J (

"t) -

-,-

-.

v) . c

p C

D

1:N)

4:,i)

■-•

5.

ci) c) cr

-. c

o C

D O

'Q "

(t)

r-t,' 5

' C4

5 4

1

0 s•

0

or :

D47

r)

'c, cn

Cr

.---

C)

`-<

■-, ,.

.zi.

co cr

i o

c) - .

IF,4 1W

< ,-/-

CD."':

CD

rD •

f=1.,

H

'-1

■-• • ,

:::: •

, . . 5

" - -.

- o

co t•

-- o

,,, .c

t p_

, u, '-

cs

g-

cr -

t 1:),

cz- •.,

<:)

c) ,-..

135 -1.- ...

-. o

-o

.5

' ,

C O

5 ,

: ';

' ,,.

, co

;),

" 0

-'

—.

'''t c

r 1:,)

■-■

• t<

er

57'

CrCi

QD 7

Cr o

ro •-••

• CD

IZO

o

C4

ii

''1Z

S '1:

1 rD

'11:

1 A)

-).

v) ..

. •

•--1, a

cr'

,--,

r-r

-,

ri) •-cs

'r-ir

co o

cf)

-,,

v)

z P STAGE/ ACTIVITY

per VDR / PR

CHARACTERISTICS QUANTUM OF CHECK

folder /Completeness

certificate

n o

g

SUB SUPPLIER

&)

r)

o

,-;

SUPPLIER

E OF INSPECTION

EIL/TPIA

*Measurements will be made in accordance with standard JEC (Logarithmic proportion method II)

Page 50: inspection and test plan for dry type lighting transformer

SL ST AGE/ ACTIVITY

NO.

1.0 Procedures

2.0 Material Inspection

Incoming Material like fabricated panels, IGBT/SCRs, relays,

2.1 Meters, CT/PT, transducers, transformer unit, rectifier unit, filter etc.

3.0 In process Inspection

INSPECTION AND TEST PLAN

FOR

MV VARIABLE FREQUENCY DRIVE SYSTEM

QUANTUM CHARACTERISTICS RECORD

OF CHECK

-- -- --

Material Identification Material Test Operational checks. 100% Certificates I

Test records

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC-

-- -- --

H H -

Page 51: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

3.1 VFD Assembly

4.0 Final Inspection

4.1 VFD (Acceptance Tests)**

INSPECTION AND TEST PLAN

FOR

MV VARIABLE FREQUENCY DRIVE SYSTEM

QUANTUM CHARACTERISTICS RECORD

OF CHECK

Visual ,Dimensional, Bill of material 100% Test Records

• Visual

• Dimensional

• Bill of Material check

Simulation check of control signals

• Check of Speed/rpm at different frequency atvarious mode as applicable

• Memory function check of fault diagnostics

• Insulation Test

• Light Load and Functional test 100% By • Load characteristics Supplier and Inspection test

• Load duty test on Random records

• Check Auxiliary Devices Basis by

• Check the properties of the control equipment TPIA/EIL

• Check the Protective Devices

• Check control and functional requirements

• High voltage test

• Leakage and pressure test for cooling systemwhere provided

• Automatic restart/re-acceleration

• Noise Level Measurement

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER BARC

- H -

- H H

Page 52: inspection and test plan for dry type lighting transformer

SL STAGE/ ACTIVITY

NO.

4.2 VFD (Type Tests)

INSPECTION AND TEST PLAN

FOR

MV VARIABLE FREQUENCY DRIVE SYSTEM

QUANTUM CHARACTERISTICS RECORD

OF CHECK

• Load current versus speed at different frequencyat constant torque/ Voltage/Power Mode asapplicable.

• Efficiency

• Temperature rise

• Voltage division

• Line side current distortion content

• Power factor

• Dynamic performance test

• Current limit and current loop test• Speed loop test capability to ride through One sample

Inspection test voltage dips upto 20% from each

records • Noise Level Measurement type/rating

• Capability to restart the system andresynchronize converter onto running motorafter a voltage interruption.

• Harmonic measurement at output of VFD forVoltage and Current

Integral Test is to be carried out along with job motor, as per PR/ EIL Standard Specification.

SCOPE OF INSPECTION

SUB SUPPLIER BARC

SUPPLIER

- H H

Page 53: inspection and test plan for dry type lighting transformer

SL NO.

4.3

5.0

5.1

6.0

6.1

6.2

**

INSPECTION AND TEST PLAN

FOR

MV VARIABLE FREQUENCY DRIVE SYSTEM

QUANTUM ST AGE/ ACTIVITY CHARACTERISTICS RECORD

OF CHECK

• Degree of protection certificate as per latest

IS/IEC.• Type test certificates from recognized Statutory

Submission of certificates independent test house such as ERTL,

Sample/Proto Approval

/documents CIMFR,BASEEF A,FM/UL, PTB, A TEX etc Certificates Ifor rated current test, power loss

type Type Test

determination, temperature rise, EM Immunity Certificates and EM Emission

Painting

Painting ofVFD Panels Pre treatment, primer and final paint, shade,

100% Test records thickness

Documentation and IC

• Review oflnternal Test Reports and MTCs . Supplier's Test

Documentation and IC • IC issuance 100%

Records IInspection

Certificate (IC)

Final data

Final Document submission Compilation of Inspection reports ,drawings, etc as

100% folder

perVDR / PR /Completeness certificate

All the load tests/ Functional Checks are to be carried out either with the job motor or with Shop Motor

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER BARC

- H

- H R

- H H

- H H

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may roceed after scheduled date).

Page 54: inspection and test plan for dry type lighting transformer

NOTES:-

INSPECTION AND TEST PLAN

FOR

MV VARIABLE FREQUENCY DRIVE SYSTEM

1. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unlessotherwise agreed upon).

2. Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents

Page 55: inspection and test plan for dry type lighting transformer

pgaH uopons anlitsod laN

suo!julitaiqqy

STANDARD SPECIFICATION NO.

Z "Aail OP01-18-9

0 *A92:1 Ld-1,000-00-9 'oN leiwod

Copyright EIL All rights reserved

n ..,

ei,

© z

.

r.,;

"='rr

ic)n

..ci,.."('

)";r

jYP

I2P

IP.)

-1

:..")(:]

CID

C

r ro

n

Hn

nn

7

,-11-

H

,--3

'-'r

ric4

n

,

cl)

-T•I'

.1

o

.... o

t'71

(^

.-g

o

X

-'-t) rr

i

(")

0-11

444 4

7

n ›

4:'

ro.

w

ro,

tri

CD $-

A-

0.

P

n -

%

,.<

-,

,,,

.

=--

cA

-c:

-, :,

, aC

i ,r

E.

t.=-,

5 1--

- ,,,,,i'-.1

'-lrillzin

nn

eo

>w

›.

> ci -

94 CD

CD

■-■-

■-t

■—,

CD

,•-• •

co •

cl.

n

c),<

• -

4cn

no

'xo

w

n

'5•oo'-

co

ti-1.

..sz

-.,

•-•

,-,),...(

D ,-tj

cp

n—

‹,

$z,,

5+

coo-tc

nn

,-1.

.cc

• ,4

2g

- ,

n

•-•.

,,

'-

' • •

-,

o

` '' .1

on

oo

, o

.9-

—.~

- cA

o

-,C

r1"_,.

0.,

n

nn

• Z

tli-

9.

o

44

„,

< cp

o c-

cr 5

H

='0.,,,

--14n-

,-.r

n=

q

P

n

o

0-3:

1 H

5'g ▪

.91?

--no.

• CD

P

_

Crlo

,-,^. c

ro

(c2

'-h P

■-t

, C/D

•_

_,.

'"=-•

,

• cn

-s—

..,

4 CD

rr

i :=0

(1)

■-,

• '-k

:J "

• (I)

O P

=

QD

CD

• ,..,.

.,

P"

P-'

5 c.4

-.

_

E-> .-9

CD

AF. '

'''

n--7

Cf

Q cn

■—

t- C

fQ ,-t

-v)

f:L,

■—r,

CD

.' •

cn

0

7T'

■—t

■-.4.

P

oo

(...)

trl

o

'-t

FD-'' ,

g,

.194

ci,

5

=

. co

><7D

"- (-)

'"-5

o

,-,

-t.

n5

,.- X

92-

n

CD

7.

n

M

M

n,-

• ..o

44

=

n•-p

- o-.0

o.

-0.—•

c'o •

. CD

n

o

lo

5"

z-cm

C) )

• ,-

,.,

,,,.7'

.' g

5 P

pu

!w

'-6

cr'

o.

CD

n

.-+

.....,

›C c

: ,0

hz)

-0

4 4 4

r.

r- ~-

1 1,

0 t=

1 c)

o

:)( (5

? -1:5

,.(,)

<

H "

H

0 '"

Ci

'"CJ

'-l:i '

"..l '"C

J '"

, Z

Z

C)

CD

CD

CD

.:,-

P-'5

:2P

=0

00

CD

,c,

■•••■• .

--s

P P

., .-1

Pt

• '.'2

')-:$

=°,2

.-to

f:L f=

1-

CD

Q) C

i,

0

.-, O

r-,

, 5

o -

1 c

. ()°,<

"W

2.

,,,

, .

.v,

1 83

5 (-) = c

i, ,5,

-.=

,<4

(Too

• cnon

o

c.)

ncm

•:-,o-c—'

....)

o

2_ .4

,05'

r-(,)

H

o5.n

94ncti

l ,-_-t_

er)

ö

o5

o

n.0

0›<

o.n

,-

.0,2

27:

Jr-'4

,c4

5'H

E-looioo

.o _-•

O

5). co to -•-ci

o -- o W -- or

O• •

o

n-•• •-,

,

o

lo., 1

.-4

...

o

,,,, •

rfl C

D ,

,,,, ~

1 :Y

n..

• C

D :)

"' ,_

,, CD

'C

t 5,

2,

o

P+

ocn

•'''

o

--•

0

O'Q

CD

■-r C

D

e-1-

/D s

., (1

) ■-r

- ,_

,. .-r

- '-C

tO

o C

D ~

>

5

,-

„c,

c c'T'Oc).o

c. n

'a'

' co

—n

o

,

(-)k-

- n

o co o

n

5 o

o

n—

‘-<

,

o.:

oc

o o.'"

■—t-

CfQ

CD

• cn

=

t•-i •

>>

P0

cn

e-P-.

C/7

'C-.5

C) • • O

Page 56: inspection and test plan for dry type lighting transformer

0 'ned Ld-1000-00-2 'oN ;e1wod pamesai sw61.1 11V —113 446pAcloo

n

yb

o •

0

O

adops o.i

SIKahlfI30a 331■1311aiall o.z

INSPECTION AND TEST REQUIREMENTS

This Inspection and Test Plan covers the minimum testing & inspection requirements of Emergency Generator.

PO/PR & Standards referred there in /Job specifications / Approved documents.

STANDARD SPECIFICATION NO.

z .nall 01701-48-9

(...)

.,--

trà

0

t.)

;--

t•J

G'.5

■—■

C5

7 C

p

0 t

4

Emergency Generator Assembly

In process Inspection

Incoming Material like CTs, Auxiliary motors, Fuel Tank, other major Electrical items etc.

Material Inspection

Procedures

STAGE/ ACTIVITY

Visual, Dimensional, Bill of Material

• Manufacturer' s TC / Raw material Test Certificates.

CHARACTERISTICS

,--

0

0

,--,

0

0

c'

1 1

QUANTUM OF CHECK

Test Records

Material Test Certificates / Test records

n

0

g

z

SUB SUPPLIER

SCOPE OF INSPECTION

zz

. .

SUPPLIER

. ,

EIL/TPIA

Page 57: inspection and test plan for dry type lighting transformer

0 'Aed Ld-1.000-00-9 'oN 4euuod pamasai s3y6u 11V —113 346pAcloo

4).

0

<3)

Z *Aall Ot01-18-9

STANDARD SPECIFICATION NO. i■

.)

P'

: CZ)

Z c

4

O

Alternator (Type Tests)*

.i•-ii __,

q)

gt

0

t5r

co

0-3

cp

cn

--,-

cn

s....,

Final Inspection

STAGE/ ACTIVITY

The following tests shall be carried out as a minimum as per applicable IS/IEC

Temperature Rise Test.

Noise Measurement (No Load)

Measurement of Residual Voltage

Overspeed Test

Overload Test

Short Circuit withstand test and measurement of Reactance and time Constants (1000 KW and

• •

'ZI

s2,,

z

cp

cn

....

'a" c

' ) (1)

e-' 4

7zi

co

t..D

z,)

,,,,

c,,

li

0

-1

(1)

cn

1

<-1-1

Z

o

C2-•

°

< '-

..'

qo

'‘•-•

cn

c7

).

• •

.c,

co

cp

-•

q)

w)

›. F

l ,5 s

'-'.

cr

CD

CD

•-■ •

0/0

0

s-3

<

n)

ro

0-

<-,

,,,

• CD

••

.._,

--t-

-t

- (4

Crq

. --

"

.- •

-

0

CD

,...,

0

•-<=

rn."--

,n, '8

1'

< ;---

t n

•-<

0

,•-•

, jE

r. C

./)

zr_

; ,$,,-,

ty

t.,_

CD

•-+

a0

r'''

><

0

•-c

'c

r r)

-1

~c:-::

'<7.) .

Pt

....

frri-

,", s....., 0

;..."

1) ( ><

q>

c")

-:

• <

6-2

.-t

r — - ' '•

°

o

cp

c)

1:0 <

' 8',

■ -t

5

Q.

:'

o •

›"") >

Po

CA

•-•

cl..

6"

• • • • • • • • •

q)

H

o'-t

< 4

ci) o

t to <

5 c

o

,1 -,

i -• -

-• -

.„,

0

CD

•--,

0

rp

A

) •-

-.

(/)

'-I')

<

ed

•-

•-

s=0

-t

•-• 0

"

' (5h Cr

(?,

.5 t

(-) (-

) „,

-,

E

'8)—

■-

.-t

cl)

•-•

-•

CD

(i)

,.„

F)

i.) '''

,-,

P,)

R, - .

c

fn

,..•

cp

-

■-•-

,,

--

crq

.....

,....

CD

CD

ry 5

C

rq

(1)

t-r

' '-

'"

::-1.

-d.

7zi

C=2"'

{-,,, ..

.-4

c')

:7,,) °

=

co

''-<

:›

Zr.

'-.

1.) F.

..r -

-.4. , C

D ""

) Z

r.

X

.-t

(4

Cr4

. _

cn

o

CD

• c)

c;

t 't:

$

CD

cr,'

E.:

<-I

) F5

=

'-

.. ,-

-

(,)

.-t .

■-t .

1:))

;C-;)

9,

0

r'

D)

'-i)s,

i";

)

:57;

< n

c)

•••

Cfq

o

cn

cn

cp

(-) _

cp

- C

A

CD

v)

em

i.

r=1

O

$2

cn

CHARACTERISTICS

CI)

S=0 -C,

c)

Crqt

CD

----

-3 co

.....

c)

03

,.'"

QUANTUM OF CHECK

H

X ,.

0 »

0

tn

(..D

-t

■-3

cl-

cp

D,1)

(,)

4-/-

5"

.-t '6

') CD

CD

("

) o

'-

.

-1

0..

, <i

)

(/)

e-t-

r)

0

-

1 I

SUB SUPPLIER

SCOPE OF INSPECTION

Z

SUPPLIER M

0...4

t".

4 4

,..t

Page 58: inspection and test plan for dry type lighting transformer

aDZ

E r—

m

`D. g m

STANDARD SPECIFICATION NO.

t .AaN OP01-18-9

Cj■

iV

C7 \

.,--,

P. \

4=

th

th

0

-1=,

W

2

CD C

y

Final Document submission

Documentation and IC

Documentation and IC

Painting and Packing

Painting

Submission of certificates/documents

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Review of Internal Test Reports and MTCs.

• IC issuance

Visual

Suitable protection to prevent entry of foreign material.

Proper packing to prevent any damage during transportation and storage.

Type test certificates for all type tests as specified in relevant IS/IEC

Degree of Ingress protection certificate (IP) as applicable.

Above)

Measurement of leakage reactance and Potier Reactance

n

>

n

1-. t-1

,Z1

n

cA

c>

c>

c'

. ,::;

' c,

Sample/Proto type

QUANTUM OF CHECK

Final data folder

/Completeness certificate

Supplier's Test Records / Inspection

Certificate (IC)

Packing list / Supplier' s Records

Statutory Approval

Certificates / Type Test

Certificates

g

n

0

g

. .

SUB SUPPLIER

SCOPE OF INSPECTION

SUPPLIER

x

,

ril

gl 4 ',2.'

0 •tad L3-1000-00-9 'oN pamasai sp.iöp iiv — ii3 346p1(cloo

* Type Test Reports for a similar rating/Frame Size shall be provided for review of EIL/TPIA, in case of un availability manufacturer has to conduct type tests.

Page 59: inspection and test plan for dry type lighting transformer

0 •AGI LA-1000-00-8 '0N lewiod pamaseJ siy6u IIV —113 1-16!.,Aclo3

z >:J

z

o

STANDARD SPECIFICATION NO.

Z 'Aall 0170I-I8-9

t..)

2.

H

Z

c)

0

c)

eD

7.

CD

■-t

'"C/

ca-

til

r''-''

. Cp

C/)

= r

D

1

ra Z

c -=

2

o

R,

'-' c

L.,

co

sn...

5) o

...2.

;2 ":

-•-' C

D

cn

5.-

CD

CD

° (1

)

......

CD

.-t

("--D cn

co

cA

.1

co

..—

0

0-

CD

■:•1«

co

z)

› c.

) 10 2

ci)

s-C1

>

tn-

.-1

CIL.,

■-t

CD

~b

CD

CD

ci)

..

(t) ,....,

0

Cr

CD

C) ...

c)

r.n

`-<

1:0 01..

Cl-

,-4-

...

0

3:0

•-■. cn

•-r-

0

..1

.-,

V.

.6i)

c)

— .

0

V)

e>

0

t'.0 o

4,Ê;

(1)

,...

....

Page 60: inspection and test plan for dry type lighting transformer

0 •A9d Ld-1000-00-8 'oN 4eiwo3 pamasai spA6P IIV —113 446pAcloo

INSPECTION AND TEST REQUIREMENTS

PO/PR & Standards referred there in /Job specifications / Approved documents.

This Inspection and Test Plan covers the minimum testing & inspection requirements of Neutral Grounding Resistors.

adODS Cl'I

£ *Aall £170I-18-9

STANDARD SPECIFICATION NO. <-4

, O

t.)

.,

IN.> 0

1■

O

z c

A

0 C

y

Inprocess Inspection

Incoming Material like Stainless steel grids, Resistors, Insulators, Bus Bars, Bushings, Current Transformers, Isolators, Sheet metal, cable gland, etc.

Material Inspection

Procedures

STAGE/ ACTIVITY

Visual, Dimensional, Chemical, Physical, Dielectric properties, Review of Manufacturer's test certificates, etc. as applicable

CHARACTERISTICS

v)

■-■ •

("D

eD

~S

■-t

Cr

ei

QUANTUM OF CHECK

H ■-

3 H

ci)

, —

-1

e)

-s

-- —

-

cr' -

----- "

(/

)'

, .

SUB SUPPLIER

c. o

ic,

x

SUPPLIER

E OF INSPECTION

, .

EIL/TPIA

Page 61: inspection and test plan for dry type lighting transformer

0 lkad Ld-1.000-00-9 '0N WW.I0j paniasai sp46p —113 A60doo

STANDARD SPECIFICATION NO.

£ 'Aall £1701-18-9

-1=•

i,..)

-I=r .

4.

CZ

CA

C.)

Submission of certificates /documents

Z

C)

>

c•D

r)

co

"Er

=

=

o

CD

,-i

fo

cn

cn

‘...

Final Inspection

STAGE/ ACTIVITY

Degree of protection certificate as applicable.

• • • •

• •

.04 (-

D 'v,

:

':

C

2 ,-, - D

4 4

AD

■-t

{,1)

01

,.0

Fi

c 1

) >5 ›D :

,t .

—:

_. cr,

=

. eD

CD

a..

$D)

,--

(;)

Cl.,

■-cj

V)

cn

-r

t -

„4.

r,

c-D

-•

, ("

) .

t -0

0

■-s

p)

5

-.'

94 g

c,

•-!

,-1-

,-o

o=

g)

Oo

n=

CD

<

"

"

" •

arn

CD

„,•-'•

•-■•

CD

•••-'

•..•

s....,

,-r•

<1)

E '

C ». - t

,

C9

"-'

r"2-.

,..:° 9

•—

• =

t-•

< o

C"":

cn

0

N

CD

smi.

•-t

,-+ 0

<

'''''

(1)

..,

—•

c) ,

'r,

CD

•-•

v)

,-t•

(1)

'—'

•-s-

CD

0.,

,,,'"'

■-r-

(C)

Cj). t

rci

A•D

Cr

$20

AD

‘2

,. (.

...

,-

•-r-

c7

co

(I)

Crq

-r

,,-1

?••,

'-r),

c:)

CD

•-t

r)

.....

,_,

eD

E «

~

f ,•

•••■

'<

CD

CCD

<D

=

e,

o

cn

o

-t

Cfc?

n

C

.- •

cn

Pu

0

(1

) <—

'- C

fl •

=

— `

')

,..

,-

e—t-

,-+

0

:,

, C

D

.1

."

C)

o.. s-

--' cr

Q ,-,

o

''cit,

.-ct

(9-

tz,)

. o-

';''.

ceD

' ' . • :i

. Rr

<D

0

o

~!

Cf)

, '"C

$

g')

0

• A

D

~b

rz,+,

5

cc2 ,

cp

.., ,

,_,

1:,,

• o

E

CA

g—

t- o

,--t-

•-t-

= f

ia

'-'

=

E

CD

CD

w)

■-r-

(1)

cn

v,

•-t

- •

-•

= o

=

cn

-0

-r

- C

) o

(1

) cn

.-

t C

L =

' AD

=

CD

■7-

, ~

-......

" qQ

o

E,..>'

<

7, .

CL

, •

0

o

.—

.-•

cr!

O

0

o

7S-

cn

Cz-

Circlat

,5. , ,

.-

CrA

o

1-1-

,

Z

C)

"")

• •

< n

tJ

'z

cp

.--.

•-•■ •

q g

. - t

o

• A

D

v)

,n,

n

(I)

—.

o

,..,

. (.

) 19•2

O

0

•..r

C

A

1=

'<:;*

!='•-)

c)

-•

,-, •

(-D

0

,•,.,

CM

Ocn

= s

" (

) 0.

,

,--,,

k i

=.•

: (19

(19

" 7

-"<-9

°:

.,,,

><

-c3

. ,.,

'4,-'

""

o

o e

tQ

r)

•-t

a

,,,

AD

'E

'

:0

0.,

,

--

0.,

•—•

(7,, .

...•

,.,

r,

•-r

S

r)

c4.

t=

= c

rq

:z\D

›.1.

cr =

-r

CD

<-/

-)- {D

) C

li '

o

-, C

4 P

.-b

o

c4

(1), 9

=

(..)

-.."

'''''

• •

CD

E• •a

,' =

'5

' .6

7

c--. ''

= Z

cr o

eT

o

CHARACTERISTICS

C/3

AD

"Cf

(1)

co

-t

9r

0

tri

C)

--__

cn .

p.,

■-:

......

1-

1 (/

) 'Fc

■ 1

,... c

r " cr

> ,

,,

o

g.,

-

' 0.. `

QUANTUM OF CHECK

(-)

) H

rD

›. C

A

'' 'CD

"

"=R

(D

,':'•

-t

E

0

e,

H p

0 5

, 4:tJ

co

,-■

- '‹

,-4 ,

,, co

sà)

,..,

<--4,

CO')

cn . •L

S •-•

P''

5-1

V)

,•1 '

10

CD

CD

0

''''.

. s

0.,

rn

<—

n

-r

C

g

SUB SUPPLIER

cn

o

i-o

z

z

SUPPLIER

E OF INSPECTION

x

z

ril

,-,

t-,

,-o

,-,

›-

Page 62: inspection and test plan for dry type lighting transformer

Grc,

—•

(,) {;} x

< C1)

0

O

• 0

CD

'C1

6t

{)i)

O C

D o

eD

FL

). O

-s

`"-}

a• C

>c-r a.

0

■-r

CD

cp

(1)

ci)

0

o

fD

CD

r.f a.

• •

CD

O 0

o

CD

=-•

CM

s:,)

CD

c)

=

.--

<,-.

co ,--1

...i..

'-•

•t"-D

.—p-

C/3

CD

cn

cn

•-■-

AD

t'D

• ■-s

.--

. ,.C

1 C

r CD

::-

.1 •

CD

AD

V)

>10

CD

CD

,t-

■-t

v)

1-"d

C >

-__

AD

Cl.

C1.

5-44-

AD

■-t-

.....

0

C1.

AD

AD

,-t

1:1.

,-r-

cn

0

~s

cn

'—b

0

n

-I

0

ti) ,-..

CD ..

'7:$

5.,■.

ci)

• c)

.-s

.-

.. CD

0

..., .

cn

C>

0

0

cr'

C

"s D

CD

co CP

0 .Aed Ld-1,000-00-9 '0N 4ewiod P9M3Sal SP-161-1 iiV -113 41-160d00

2rrl

òDZ

1:Trl STANDARD SPECIFICATION NO.

£ 'Aa'a £17 I-I8-9

01

iv

C:N

.--

cr■

O

U)

•• th

O

Z

th

0

Final Document submission

Documentation and IC

Documentation and IC

Painting and Packing

Painting

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Review of Internal Test Reports and MTCs.

IC issuance

Visual.

Suitable protection to prevent entry of foreign material.

Proper packing to prevent any damage during transportation.

CHARACTERISTICS

.-- o

o

,

.

o

o

o

QUANTUM OF CHECK

Final data folder

/Completeness certificate

Supplier's Test Records / Inspection

Certificate (IC)

Test records

r)

0

g

. I

,

SUB SUPPLIER

c.)

(-5 o

,-t

z

z

z

SUPPLIER

E OF INSPECTION

z

x

i

EIL/TPIA

Page 63: inspection and test plan for dry type lighting transformer

0 •A9d Ld- 1,000-00-9 '0N eWJC:Ij pamasei sTLIBP IIV —113 1.160doo

simawaumöall J SIIZ amv Nomadsm

PO/PR & Standards referred there in /Job specifications / Approved documents.

O

This Inspection and Test Plan covers the minimum testing & inspection requirements of Dry Type Distribution Transformer.

adODS IT I

Z *itall 11701-18-9

STANDARD SPECIFICATION NO. 1,

) ■—

■ tià

,.:=

> I•J

;—

, IN

J <.:=

> -

■•:::)

7. &

) CD

Transformer assembly

Inprocess Inspection

Incoming Raw Material l ike Marshalling box, cables, fasteners and bolts, copper flexible, insulators, gauges, CTs, OLTC(if Applicable) etc

Material Inspection

Procedures

STAGE/ ACTIVITY

Visual, Dimensions, Bill of materials.

Material Identification

• Operational checks

• Physical and Dimensional tests (as applicable)

e

CHARACTERISTICS

.--,

CD

0

1--,

o

CD

CD

1 1

QUANTUM OF CHECK

Supplier's Test Records

Sub-Supplier' s TC / Supplier Test Records/ Third party lab

r)

o

, x

SUB SUPPLIER

SCOP1

x

. .

SUPPLIER

E OF INSPECTION

.

co

'rl R

CD

'''-

' (,it)

EIL/TPIA

Page 64: inspection and test plan for dry type lighting transformer

0 'nal{ L3-1000-00-8 '0N 4Bi.wo3 pamasaJ sly6!«1 IIV —113 1116pAcloo

<D

Ut

Z *Aall b1701-18-9

STANDARD SPECIFICATION NO. v)

■--

tl

i Z=

- L.

) -1=

, l•

-)

-1=,

,--.

4:,

CQ

2

w

0

Painting of Transformers

=

CfQ

Transformer (Type Tests)

Transformer (Special Tests)

cn

P)

cn

cn

0

.--à

rD

.-1

7:1

o

.5t-

cp

Final Inspection

STAGE/ ACTIVITY

Pre treatment, primer and final paint, shade, thickness

Impulse withstand test.

Short circuit test.

Partial Discharge test

Degree of Protection of Enclosure.

• Temperature Rise Test •

Physical and Dimensional check.

Verification of Bill of Material.

Measurement of winding resistance

Measurement of voltage ratio and check of voltage vector relationship

Measurement of impedance voltage, short-circuit impedance and load loss.

Measurement of no-load loss and current

Induced over voltage withstand test

Separate —source voltage withstand test (HV Test)

Measurement of Insulation Resistance before and after HV test.

Noise level check.

Tests on OLTC(if applicable).

ril cA ,—. r) z

— cp

c)

1 No. of Sample/Rating

1 No. of Sample/Rating

— c)

c>

QUANTUM OF CHECK

Test records

Inspection test records

Inspection test records

-, -ri

cp

o

o

o

o --. cp

v)

,-

-

r)

. i

.

SUB SUPPLIER

c4 o ,-c

l

z z

z z

SUPPLIER

E OF INSPECTION

. .

EIL/TPIA

Page 65: inspection and test plan for dry type lighting transformer

(-)

CD

'CS

O

1=1.,

o

zet,

. .

CD° $

20 cra

o

o

(9-

■-n o

cr

saa ‘

:•"""

cra rD

rD

c.)

c.)

CD"

cr'

sa)

cn

(1

(C)

■-zr

■-s

'"C1

(:)

a.

CL.

0

■-t

CD"

o

-t

QD

ca

co"

o

'-c)

o o

QD

~,

ro

cn

c=1.,

r.))

r))

•(;)'"

ta)

sa)

c7r cr

ta)

'ca

cr s),)

(17 QD QD

0 •Aed L3-1000-00-9 'oNle111.10j Pemosw st-16P IIV —113 11-16PAdo0

STANDARD SPECIFICATION NO.

Z "Aa2I 11701-18-9

cr■

i.)

5%" —

crN

o

Z v

) C

:)

Final Document submission

Documentation and IC

Documentation and IC

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Review of Internal Test Reports.

IC issuance

CHARACTERISTICS

'-c:'

c>

C-).

c>

QUANTUM OF CHECK

Final data folder

/Completeness certificate

Supplier's Test Records / Inspection

Certificate (IC)

n o g SUB

SUPPLIER

c.)

cn o ,-o

x x

SUPPLIER

E OF INSPECTION

x x

t.1

g,

i----1

:5', >

Page 66: inspection and test plan for dry type lighting transformer

'nal{ Ld-1000-00-9 'oN }eW.I0j

Copyright EIL All rights reserved

suoguInaiqcw

rQ

STANDARD SPECIFICATION NO.

Z "AaH 81701-I8-9

-n ^

o •,-',

, c

i, Cr4

(/)

.'"<

•-)•'

b-' '' '' 5

'7

1 '.1

1 rr

i (-.)

c-. )(-.“

-)w

,...,,ti

t:J>

_.

(.7'<

Q)

.

.1".

..,

Cl.

■-4-

=,.,

.

-f -

O

o =

,, -•

.H 7

o s:0 )^'

O A

) C

) ,C--

,-'. rn

g.

c2 (

1) '" f

- -,

" '-cr

'1 °

i-4

, ,,,

■,:j ,.

< . .

. 8

o (

)

s=0

(1)

C , ,,- -,: , c>7

0„1P21--

. ( H1 •c,

o '''- ''•)t ' - i 'z- --'. - - •. . E r2r 'D'

5 e. (

, o "?■ r 1 )

o ') .

o1 f

• >

c <

rr

i "

5”8

E

< r

-J 0

n s

-"C

c :CD

A

c

n

Ò. i'r-

zr71•

o2

0

C 0

C

n

'

o f

zo

-_, -

,•

r")

CD

0 ';

-.' •

o

r„

, cD

•-p-

-t

c)

CD

0.

. co

o (4

) — ,,

,t -,-

.4.,

ci)

-f CD T

. 8

AD

0

Rt > E

l E•u

g (1

) 4 C

D rr

i ...9

5,,-Cf) . T

.

..v, . o-

• ,.

., ,

<-)

(14

•-

t ><

.--

o

o „

o

4)

Crg

•-•

- cn

.-"

'-,)

CD ,-

, • e

n (-)

<-)

(rcr

',7" P

D g°

(D<

- 0

s 0

cr'

tri

(-)

,- o

CD

...t

• . 7-

',. A)

(1)

. .

5

o o

o

Cl

a"

O

o g'

CD

'-'

' 'F'‘)

. CD

{DD

.

`'. ro

=,)

'•0 $

:,)

c()

v)

r -'

p■)

c()

co 'z

' til

7G- cr

q O

n f:

, o

-: „o

, l'

C▪ .,

.6.

. `9

,- .0

CD

2,] p)

rQ

8.

-.

CD

-rj

CD

■-+

r)

s.-..,

5 ;) o-

<-17

ci)

o

„Q

G

C H

'--1

,c

) '- c

i 0 i-

ci '-t '.

-i '-

, Z

Z Z

4 4

4 4

CD

.--

' '-' C

D $

D)

0 0

;:

l c'.2,

5.

o cr,

ro

c)

CD

(1)

CL

, r-t

rzt-

./4 Q

. 1=

0 ',."‘

.4., .

cl (

Y) ,

--$

?) ..

., .

,-+ ••

••L'° •

-rL'''

1) a•-

••Er

. A

. co

$=',

Q.,

(-) (f

Q

c~:j .

..

,--

,-''.

•-• c•D

0

C, tzi '-

d ..,1

) ,nr°

. r..

,' 0 ,

., 5

. o -

=

o w) ,

..,,,

c) cr

, ,.:

---...

<

Q., .<

,[-, p

. o

,-,

..,

$,,, co

(I) •

-t

-, • c

o co

n P

CD

2 .

f:0

,-4-.

-• •

v) (

l'a

,_, z

p,)

(••-•.)

,__,

co

•-t

- <

D '-

'-' _

,C/,

C. '-6

. ■-0

,..ci

l.)

'1. E

.', '

A) .

-t. » C

S t<

':-,

''' C

D

rt)

o r

ri ■-

i '..-

• • 0

H

,..0

CD

■-t

o

Cl. .

-1-)

e-r-

cp

• •-

1 H

i__

, r)

,. P

,_ (

--)

=,?,..,

(I)

<C

-I

'èo-

g c

p n ,..D

CD

■-t

CD

1-0

><

Cl.

c) •

-is

'-ci .

.1C) a

r)

r'" (4

) cn

F'') H

o

... -t

. -ri

(I)

‹- —

V)

0

o

-- -

o

9,

— R

.,-7):

„-• '8-,

.--).

rD (•

) <•D

,-r-

■-■ •

.-4. .

-. ' c

f, cn

r)

,-.

Z •-t

0 (P

a (-

) -

• r-,

■-

■ ~

1 . 0

- •

,?_'

' , H

- •

g-

H c'

T

til C

) 41

• :

2•

FD- d

: ?. .

o p

D <

(:)

<•D

H--

• co

<1)

_,

. (1)

Cli

CD

cx

CD

■-t- C

D 4

(4),

' C

) ....

,'"'ià

'-' "1

d 5

o

o P.,.

C").

cn

f=0

-..

Z ,5,-,

-. 1:„)..

ci)

4'

e+

c --_1) • c

c".)

(> (i) cos i •

CD -:0

- 2

cm a

. cp

. OrQ

CD

,--,

• CD

e.r.

c)

C9

<-)

5"

o -,-

,-. '--

o -

-t

-t PD

o Q

. Cfcf

co

'8-•

f. .-

ui

?.5 .6• ' ;_

1

t:;■ (

-) (-)

n (-

) o:J

co >

,-.,

5;

4 r)

4-c,

H ,-

ri rr

i 5,

rri

> c

4

7zi

H H

H

ri

l cn

o

rri

-,

rrl

o

(-)

>

rri

Page 67: inspection and test plan for dry type lighting transformer

0 'Aed Ld-1000-00-8 'oN leutiod pamasei IIV —119 4460doo

INSPECTION AND TEST REQUIREMENTS O

PO/PR & Standards referred there in /Job specifications / Approved documents.

t•J O

This Inspection and Test Plan covers the minimum testing & inspection requirements of Stationary Valve Regulated Lead Acid Battery.

adODS O'I

O z r 0

t=f

Z *Aall 81701-18-9

STANDARD SPECIFICATION NO. toà

0

l•...)

,--.

Nfr

CZ

t•-■

O

z C

f) C

D t

'"

Inprocess Inspection

cn

■-,-(

(-) ■—

■ FQ

' t

D- 0

p

er) crq

.., -

0

CD

Cl.

CD

,,'

..1

AD

cn

" '''.

Q., r

n ''

' sw

CM

2

, (-1,

-, O'Q

yi.

(-D

.-t

,,L' ,

o

■-•

.-t

CD

,q

C9

.

cp ,P

- CD

'-'1

co =

cn

cn

0

cn

to

AD

.-

- ,-t

1:4.

5 -

(1)

,--,

ii

) .

(1)

r5:,

Material Inspection

Procedures

STAGE/ ACTIVITY

Checking the capability of components to withstand fire and flame etc, Oxygen Index TC for material of container, lid, cover and seal, Physical, Chemical and mechanical properties.

CHARACTERISTICS

•--

C0

C0

c:'

:

QUANTUM OF CHECK

H .--

3 ■.-3

C4

eD r)

Q..

-- ---

,..„

cl,

SDD

CD

''CS

c) -cs

-cs

,.- o

»cs

cn

CD,...

rz,--

CS'

---

-- '

, i r)

0

:

SUB SUPPLIER

SCOPE OF INSPECTION

SUPPLIER t'll

.1:1

...1

Page 68: inspection and test plan for dry type lighting transformer

0 'rad Ld-1000-00-9 'oN }ewiod pamasai spl6P IIV — 113 4Li6mitdoo

STANDARD SPECIFICATION NO.

Z *Aall 81701-18-9

CN

<=

U I

;--,

U

l

O

- 1.)

-t=,

i.)

-1=

;--,

.1.

O

t.....

)

»,--,

Cf)

0

Documentation and IC

Painting and Packing

Painting and Packing

Battery (Type Tests)

Battery Stand

Battery(Acceptance Tests)

Final Inspection

Battery assembly

STAGE/ ACTIVITY

Visual, Packing list.

Proper packing to avoid any damage during transportation.

Acid Retention Capability Test on Separators.

Test on Vent Seal Operation

Wicking Test on Separator. • Test for Oxygen Recombination

Efficiency. •

Ampere hour and Watt-hour Efficiency test

Test for charge retention/ Loss of capacity.

Life cycle test on similar model.

Dimension, Paint Shade/thickness

Visual

Dimension, mass and layout check.

Test for Ah Capacity.

Test for voltage during discharge.

Internal resistance test

Visual, Dimensions, Bill of Material

Charging and Discharging of cells

CHARACTERISTICS

,--,

C)

0

(D

■■,)

CA

•-

■ -

,--,

C)

C'

5

■-■

C,

C.)

■-■

C)

C)

QUANTUM OF CHECK

Supplier's records

■-3

:J ,-.

CD

'"C"

o

»-t

■-3

o.,

cp

u)

Inspection test records

Inspection test records

e")

Supplier's Test Records

0

I I

t ,

SUB SUPPLIER

w

o

ici

z

z

z

z

z

SUPPLIER

E OF INSPECTION

t.il

.... . i .—,

Page 69: inspection and test plan for dry type lighting transformer

r--)

—,

> ° H

0

0

(')

0 >

c-n" •

(1)

1-.

cn

• - cs°

cD

cs

,...

.,CIQ

,

co

s=3

cr)

c)

•-t

"

r=1.,

cs::-, ss

cn s

.- c

n

li c

s -1-

s o

o ---

--, (-D

9_,

• (,

) st,

,-,

0-

crs

co

CrA

AD

co

ö

,--

...

co

<

-c

''

c's '

()"-.

v)

F'D+

cn

cn

r-r

AD

CD

• r-s

sc

cr'

co

co

',z1"

szss

cn

hcS

co

r-t

cn

'"C)

O

>

,

t<

AD

S:D.,

rC-ii-

r-r.

AD

r-r-

0

Cl-

AD

AD

Q..

cn

CD

r-t

cn

•-,•)

0

co

-s

- .

co

ic".s

st„

co

cs

ro

-I

.

co

0

• V)

cs

, o

o

'ts

cr'

co

vs

,...4;

»cS

CD

,.,ccl

cs

-.

co

cs

-.

r-r

0...,.

CD

CL.

• r-.

- cn

-....;

ocs

'ts

cs"

AD

<

cs

--i-

co

sc-

CL.

c:-.1

o.,

cs

0 co

co

co

s-

cn

vs

vs

'-' sz,)

AD 5,-

o

cr'

cp

t ▪ s,s

AD

Cr

R7

CT.

co)

V)

0 •AGd Ld-1000-00-8 '0N 4ewio3 pemesai sp.I6P IIV —113 4116pAdo3

STANDARD SPECIFICATION NO.

Z 'Aall 8P0 I-I8-9

cr■

k)

cc■

:—

c4

0

Final Document submission

Documentation and IC

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Review of Internal Test Reports.

IC issuance

CHARACTERISTICS

,—

cs

--

.

QUANTUM OF CHECK

(Z)

CD

c

c='

Final data folder

/Completeness certificate

Supplier's Test Records / Inspection

Certificate (IC)

0

g

SUB SUPPLIER

SCOPI

x

SUPPLIER

E OF INSPECTION

EIL/TPIA

Page 70: inspection and test plan for dry type lighting transformer

STANDARD SPECIFICATION NO.

6-81-1054 Rev. 2

This Inspection and Test Plan covers the minimum testing requirements of HV and MV Busducts.

z

E-4 z

O

z

O

F.TA

rFO

44 O

O

c‘i

INSPECTION

Copyright EIL — All rights reserved Format No. 8-00-0001-F7 Rev. 0

SCOPE OF INSPECTION

EIL/TPIA

e i

i f24

SUPPLIER

x

x

Z

SUB SUPPLIER

1 w

i

i

R o C..) W.TA t:4

.

Manufacturer's TC/ Incoming

Inspection Records

Supplier's test records

0

0

,(,), (,)

Cl.) .- ■

C) ....

.. 3' Cll 1n. cn

QUANTUM OF CHECK

I 1 c:N.;N :' CD

OS':■ C

) o

CD

Ci"" CD o

CHARACTERISTICS

1

Physical, Dimensional, Mechanical and Electrical checks (as applicable).

Visual, Dimensional, Bill Of Material

Physical, Dimensional

Clearances and Creepage Distances

Paint Shade, Thickness and adhesion.

High Voltage Test

Insulation Resistance measurement before and after HV Test.

Measurement of Continuity.

Check for space heater circuit as applicable.

Temperature Rise Test

STAGE/ ACTIVITY

Procedures Material Inspection Incoming Material like CRCA Sheets, Bus Bars Insulators, FRP Sheets, Co • • er Flexibles etc

In process Inspection

Structure assembly

Final Inspection Final Inspection

■.4 C

5

Z

(=> ,4

c> c,i —

ci

rri t--;

,I: ,j:

Page 71: inspection and test plan for dry type lighting transformer

6-81-1054 Rev. 2

STANDARD SPECIFICATION NO. INSPECTION

z —

E

a.>

6) E

U)

E

ca

c>

o"

-cs

,9> •

E

f>

0.) r:4

8

2 ct.

>c

E

E

o

o

a.> (1.>

o

o

o

rn

(1)

an

Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All rights reserved

SCOPE OF INSPECTION

-‹

•-■ A

.

a w ,

Z

SUPPLIER x

x SUB

SUPPLIER

R o (..;

Type test certificates/

reports

Packing list / Supplier' s Records

Type Test Reports/

Certificates Final data folder /Completeness

certificate

QUANTUM OF CHECK

... 2

o

a.>

v)

c) o

c>

. .:' o

o

—.

CHARACTERISTICS

Impulse Voltage withstand test for HV Bus Duct only

• Short Circuit Test

• Weather-proof test/ Ingress Protection test as per the latest valid IS/IEC.

Visual

Protection against damage during transportation.

Review of Internal Test Reports and MTCs.

Issuance of IC

Compilation of Inspection reports ,drawings, etc as per VDR / PR

STAGE/ ACTIVITY

Final Inspection- Type Tests

Painting

Painting and Packing

Documentation and IC

Documentation and IC

Final Document submission

ci z z

(- , i 4

o

uri -

,r-

o

■r5 -

v5

r N1

Page 72: inspection and test plan for dry type lighting transformer

0 *A92:1 L3-1,000-00-9 '0N lew.1o3

pamesei s}tib!J IIV —113 4116pAcloo

3.0 INSPECTION AND TEST REQUIREMENTS

PO/PR/ Standards referred there in/Job specifications/Approved documents.

O

This Inspection and Test Plan covers the minimum testing requirements of Numerical Relays, Data Concentrator and MMI Systems.

3d03S O'I

Z *Aa215S01-18-9

Nind 1S11 UNV

STANDARD SPECIFICATION NO.

(....)

0

t,.> -

t.J

Z:::, ■—.

:::::,

Z

Uj

0

In process Inspection

o

. -zi

rri

,:i.

n .

--,

,.,

c, c-)

0

(I)

,,

CD

,-,

,-,.

rD

5"

!zi -

0 c-

) (1' -'.

. ,

,_ ,-

o 5

eD

-.-1. ■-

ci ,,,

;> 9...

'-'

c,

---- '

.- ---•

,-cs

crc?

--', FF,

ci) ._

.] 's•

(-) .

.— 0

:i o

o „-

, c4

, .

„ cp

-0

-.<

,,.,

(., a, ,

1,,, ,

AD

co r'

, c)■-

S=0

cf)

a

r) ..

P,.,

r.'

'•

'.

(1)

Material Inspection

Procedures

STAGE/ ACTIVITY

Manufacturers' TC / Compliance.

CHARACTERISTICS

,__,

cp

o

‹; , i

QUANTUM OF CHECK

c) 4

CD

94

(1)

—.—. .,_

-_,. —,

(-)

..-

94 ■-

3 CD

ep

•—

t-

. .

7:J M

r)

o

i i

SUB SUPPLIER

SCOPE OF INSPECTION

i i

SUPPLIER EIL/TPIA

Page 73: inspection and test plan for dry type lighting transformer

0 •Aad Ld-1000-00-8 oN eituoj

Copyright EIL — All rights reserved

STANDARD SPECIFICATION NO.

Z 'AaH SS01-18-9

.4. —

:,

cz

zci)

o r

,

Final Inspection-Numerical Relays

Final Inspection

STAGE/ ACTIVITY

Visual checks and model verification

Self Diagnostics and communication integrity including time synchronization check, as per applicable standard

A11 functional characteristics checks as per job requirement.

CHARACTERISTICS

c'T'D cp

QUANTUM OF CHECK

Supplier's Test Records and Inspection

Witness Record

o

g

SUB SUPPLIER

SCOPE OF INSPECTION

SUPPLIER ril 5, '4'

Page 74: inspection and test plan for dry type lighting transformer

0 •nal{ L3-1000-00-8 oN ieLwoj pamasai sp.16!.1 IIV —113 41-16pAdoo

Z 'Aall 5501-18-9

'ON NOI1VDLIDadS IDIVONVIS

L.,

i.)

z &

) o

r

Type Tests-Numerical Relays

(-)

c CD

;y

.-%

;,,)

,--•

r-r, 0

cn —

o t-.

o ,,

,, ,-,

r-t-

CD

QD

,..,)

,...

..,

STAGE/ ACTIVITY

Type test certificates as per relevant Indian /International standards. Type tests shall

Ci)

'-"'"

o ,

-, CD

t12''

) .-1

-----

•■-•

tr

i cp

CfC7

cn •

cp

CD

n CD

,,,-

.--s

o .-, ,-.., •

• • .

'<

1 5-

' CD

n C

D (D

O

,_,

~ "

0,- ,

_..,

"""

,-,.,

'-' "

,--,.

,r,

•-■ t

.-1

•-•■ t

•-• t

---...

"'''

'-t

9+,`" --

"'

p,Dr" 0

•-•

• ,__Th

i=•'•

i•-::

• ■-•

• Ii

i o

o 4.5

,' r,

. -,.

...,

v)

o

.--

0-•

°

H

.-1,

...., o

&D

CD

0-■ •

k. i

.+1

<",

(f)

0

Ci)

tw

E7-,

,.;

<,, co

r)

o

-%

x

,...

--

tn

»ct

•-,,,-4.;

> r

.) . =

>

0

- •

.0

P

CD

CD

,-1-

'—:

,,, •

o . ......,

- •

Cr

C

r (7

,......,

(1)

.- '0

=.

('-').

('' o

'-'''

• •

.

1-

3 (.-.)

zisc.

,- -

--co

"-•

.cp

r2

o

cp

,,,

.

-t

r)

r,,,,-

scL.,

,-

5

CL,

,..,..

,^"

“ CD

0

1-'"

CD

et

, '

'•-• t

.-t

5

(2 Z)

L-9-: c

0- •

..c.i

)

,,,,--,.

o

;))

'-',"

•-• •

o

cm cr

cr

,-,:i

cm

f.,

o

tw

,-.

0

'Ct

,...)

oo

c„ C

IO

,..,

0

■-t

.....,

«,

eD

.--, •

CA

C4

P')

(•-,

N

CD

r-•(

H ›

,- =

94

ct..

0

cn

6" 7

::,

cn

r)

o

'ci

co

(.,-)•

-t

< C

) "

,

CA

CD

CD

C/)

o

77'

:•)

ec,

5

"

..-,•,

,r_Dt

»C1

S:0

S))

,-•-

',..-

5-

- •

r-t• (5

. .-0

0

o

,--■

C7 ,p

-

o"

o

,-.<

o

o

cr

A) 4

-:::

‘, ,i)

CA

C)

•••• •

ro

rn

o

'-cJ

-• 5s

,+

.."

c.4

....

.

• .

x-;-.--A

nc/

D-i

z

-••-c

) e)

ro

cm

" `•

.--,-

CD

,__,:

CA

cl.

—. n

--,.

--

-

_,0

(-)<

")

--, .-

, $:,,

,. $.

0

'-" ,

7-,.

.-P- •

••--

›,- +' '.--

- (.

3-

CD

r, O

. "

.--r-

,-r1

,..,\-'.

cp

w,

CD

<-t-

C)

ro

,-,.,

$:„

cr

CD

0

cD

0

■-t

cn

cD

o •

sn-

t:)) =

Z'D

,1.

' '''

' o

-t

CIO

4

CHARACTERISTICS

Prototype for each model

cz,

o>

,::'

QUANTUM OF CHECK

Statutory Approval

■-1

cp

c.) -,_ CD

li

0

n

C

i I

SUB SUPPLIER

SCOPE OF INSPECTION

SUPPLIER

›:J

Z

EIL/TPIA

Page 75: inspection and test plan for dry type lighting transformer

0 'Aed Ld-1000-00-9 '0N TeWJOJ paivasa., sABLI IIV —113 4q60doo

STANDARD SPECIFICATION NO.

Z "Aa21 SS01-18-9

cr■

iN.)

cp..,

:--

Cs■

0

t."

....—

fi

0

0 r

'4

Final Document submission

Documentation and IC

Documentation and IC

Painting and Packing

Painting

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Issuance of IC

Visual

• Suitable protection to prevent entry of foreign material. •

Protection against damage during transportation.

include as minimum but not be limited to the following

Temperature withstand

Disturbance immunity

Electromagnetic compatibility (EMC)

HV withstands test for panel

Functional tests and Communication integrity

Relay characteristics verification

Degree of protection as per latest IS/IEC, for relays and Data Concentrator Panels (DCP).

Mechanical stress/ vibration test

CHARACTERISTICS

.—

0

0

,--

C)

QUANTUM OF CHECK

Final data folder /Completeness

certificate

Inspection Certificate

Format

Packing list / Supplier' s Records

,,

.4.

—•

'-''

a

r=h

'"c"-;

v)

...,.

n

1 '

1

SUB SUPPLIER

SCOPE OF INSPECTION

1 Z

SUPPLIER

Z

1

ril

■••

rd

id

14

Page 76: inspection and test plan for dry type lighting transformer

0 lked L3-1000-00-9 'oN lewiod pamasai slyBP IIV —113 1146pAclo9

)

STANDARD SPECIFICATION NO.

Z *Aall 5501-18-9

(....)

t..)

1-..+

(--)

▪ 2

•-•

(;)

'-d e

r, -mos(/''

1-3

t cl.

. CI

I

,E),- •

co =

,) 5

L,

- 'I

9-

:),

rp

cn

• cn

cn

t-r

.....'.0

r)

i., v)

o o

".

cn

0--

CD

=

CD

CfCi

CD A

D ro

•-•

-) -,

- O

-,

• rp

-s <

-1

1:1

ri)

cn •D"

cp<-4-

-

•-1

CD

,..0

C■I

,--r,

O

tp

■:"S .

cr

CD

cp

5

— -k

o

AD

ep

. cns.-

`- cn

'"C:t 0 >

'-<

P

0.

: 0

. AD

,(4-

r4:

0.:

0

4:0

32

CL

C/1

CD

t-t

cn

t-■-

(L)

CD

•-+)

o

.-1

.- .

co

IZI

.. 4/:

)

5,-

ro

C)

CD..-t

•-■

0.

v,

(-)

,

o

o

'0

0"

CD

'0

cn

..:-.4.;

n

r)

..ic:

,-■-

. co

O

Cl

.

cn

S'

....›.....

o

(-)

.os

o

.to

-,

o

sw

<

-t-

ro

ci..

c).,

0

0.,

o

o

r)

ro

ro

V)

,t-

(4,

cn

FD

Page 77: inspection and test plan for dry type lighting transformer

suo9uptaiciqv

STANDARD SPECIFICATION NO.

.nall 9L01-18-9

0 ikad L3-1000-00-8 '0N iewiod pamaseJ sw6P IIV —113 440doo

0 2 o

e

1 ':i'

-.,1 E

ll 'a-5

(--:.;

,;5 ',.

:1 x

x s-

ii '-

'1 ti

l c)

()

(-)

c) t

o tii

>.

<,,, cr

m .

.3 (..

) c.)

(-,

.,, (

.,,, ,H

5,-; Q

,_

9 -i

,-,1 tr

i 2

rri c

.) c7

›.

v)

...

-- r

l up

<1,

= -,-.

..

r.

-ri r

-' rii

z"

o O

7zi (I)

trl

1 C

A

c)

'-r1

>

n

= z, o

0.

rri

..1 r:l, ••

r)

o 4 4

4

2 •

„• .,•

2 '.r .6-"

': 5

" 5

■-•

c5 n" c

ro' g" E cn

`-C

ENF

'(

P4) n CD

n CD

nto

> r-1-

e '-o 1 ,> —

,

. •

A.)

,.,.

'7D. • "

5

.-4.

Er

5 5

- a' :

,(4>

,..0 -

- 0-

CD

.--■

.t

-1

1 o

..-

s C

i.; ■-•

.) p,

D 0

cn

'-.<

A) C

D

4 e

f)• P7

i -,

_.

a '-

o (?)

"•

AD

O'"

CO

°

~ c

y C

o

o C

)

...t.) (

i)) °

cp9

CD.,_i

C/)

,. ("

) 2)

CD

go'=

• • C

,1?-

• 'a'

o n (

:, 3

, ro

••■

cp C

C ,..r.

• (/)

>C"

'

`-<

"

CD

>8 ,

_--

— p

,, ,,,,

:=,, •

• —

• CA

nO C

rl ,,

,,B 2

r_.

(z"

o 9,

-, c

, -r

,-; -

,....4

..C)

CD

1

Zi) 5

'4

.• =

~

'.

CD

.ti e

D

)- ~

t •-

o •

-•

. ,..

.r. cp

A

) ."

' 0

5-'

-1.)

a

. ._

3 _-

2_,-'•

O c

l O

L-

. A) C

rQ

a")t •(4)

rri

"

.." ,),

Ct.

" «

<

92.

El

FD' 2

r-r n

..,-. •

-6-

,4 n

.' 'ci

' .(-5-

=

CD

• AD

C

CD°

cn 0

c.„

5*

rD

.,

-- 0

.-•

• 0

CD

•-• •

rD

CfCi

■-t

(„DH F

•D+ •-

-re) ,.

.,°•-t

,-t

Cl.

CD

C ,-

r, cr

q 1,'„'

,-h

.,..

, CA

cn

0

0 0

•-r

- •

C"'

cn ~

4 .,,

,, tr

i 10,

-1-

rD

,Q

4) $?-•

.

crq

<-7 r

)

o

co

'"<".

O

',14 t

-,

cp. ,

-,5-' °

- a

.i., o

g-

--, -.

n ()

• CrC

i O

A)

74

- AD

CD:<

,-t

4 4

:-

:-, ,

o (-)

= o

- cr)

5,

,-3

c)(7

'-.. 5

O'

gs

ci 2

. t'l

<1:,`j .

AD

,.....

'.-

'F)..

IDD

AD 2,

) cn

cn

<co

to.

ti

l

c,

,

--' o•

-• cp

, .a

.

AD

5.

'-1-1

r>

E

E

AD

4

Cr

CD

. .

CD•••

•' •

CD

Sw crQ

C

) (Ê•

• '13

L

1

„c)

cip

n

-o

›-

,-, $-

L -c

, ,-

,z ,

-, z

z

'-',

(1)

C A

D p

o

O (D

o .

.,- Q

. ;_

, ;•

• (.4

•,.-

- C

ll •

-1 0

•-,,..

, .-t

._=,

•-• •

c,

o. C

L. o

.. co

PD

ot.,

e'

s o

-' co °

O- '

o ..°

' e)

--

0 "

o' ,.

. z) (

") »

4' <

'- c' :

., =,

.. (7

r. -

- (::i

r-

-,

o

- •

rD c

n cn

■-

■ A

) a)

cfc?

n, '-

': s)

.) ''-'-

F' '-

)." ,9

- rz■-

; o `

.-. 4

a =

rr

l ri-,

CD

•-t

0

(D '-

'1 '.C-)

'''

(Dr -

IC t-

rl a

, cp

(-)

cp

CL

• C

D 1

2 i::'•

• »t:,

O

E)" ["

/") .

■-• •

C7

" C

rCi

41

C

7' C

n)

oo ,C

fc)',74

. c)

C

CD

.

■-t

•-r-

"' '..-

c•L,

■-•

,..

" o

•--

■ • CD

ell

o

:=t• r

,)

-.

n)

O. o t

),)

c

CD

•-+. (

,) , co

o- '.z.t

o 0

O

g

0 C

4

o

5.

,. „

c) , -

,

o $:,)

c)

("D

r-t,'"

>

. CfC

i .,=■

-à •

C

'1")')

o

•-■.,

---.''

CD .-

- • c

) o

r)

',:n

o

c) r1 )

0 0

E

c)

-,-

-

. ,.

;-- t

C)

"'' a

g ,_t

cp

8'.

A)

,-t

cn

C

C

N"

>

AD

,--r•

cn

o (-) o

r.-.

o o

pgaH

uopris

onmsod

Page 78: inspection and test plan for dry type lighting transformer

0 Aed Ld-1000-00-8 'oN paniesei sp.16p ily —113 41160doo

l,.>

. '-

'

It.)

.

C::,

1.0

7 V

) 0

ej

C-' cp

C

/3 C

4 !:1

., C

r n

k

.-- •

•-• ,.

,-.

CD

eD

c:'

'7'.

crt'

'. 'r

-'

c-) g

• ..,

( 2,

( 1

)6

) - '

- C i )

0" - . ,

i -

o

CD

i-ri ''

‘• C

,

AD

r..-!..,-

p,D „— •

Pz

;,,,

.-

co

cn

Au

..-,

CD

C/D

CD0

=1

.• 5

w 1

:Q

cit', ,_

p

o

-,-

-

•-■-

— '-o ,

cr

-:

c) --

p,__,

-: o

- —

..-

•- v)

-. ;v

,_

q '0

.,-

.1.

o -

cr v

, ,.

. (I

) 0 s

-G

,..s

r4.

.. AD

'-'

. ."'

=

GL.

r'-

'

CD

s,)

< -'

cr

r'

i-)1) '"

c)

:J~

- '

C3 ' - '.

1 :4

, V )

=,-Dr'.." •

›-,

,Y)

'..0

(c)

cra

,--,

. .-3

(;,

•,:,.'•

N

CD

CD

A)

94

(-D

50

5

")

'4.

,?..).

CD

,....

g-

,,CD

,..,

,-,

.-T1 y

) CD

',.-4

,,; •

u,

CD

AD

■-t

Material Inspection

Procedures

STAGE/ ACTIVITY

Visual, Dimensional, Operational checks as applicable, Matching of detectors with given specifications, Statutory body certification, Make of Items, etc.

CHARACTERISTICS

.--,

C

D

C)

c:D

1 a

QUANTUM OF CHECK

o o .2., C/

3 ch

'ZS

Cr

cn

rt'

...,

-, ,.)

-o

- , -F

L ',7,;

.

CD

..-1

c/D

cn'

,-r

. . n

0

g

1 1

SUB SUPPLIER

SCOPE OF INSPECTION

i i

SUPPLIER

1 1

EIL/TPIA

simawaffinÒ •INV Komadsm o.£

PO/PR/ Standards referred there in/Job specifications/Approved documents.

IN)

O

s-0

- •

• c/

3

• C"

)

• >

o"

trl

ro

H

o st

cp CD CD"

CD''.:; •

CD

AD

a.

ràD

cD

CD

cJ

o

<-9

-9

o3"

cra o.

co

CD

CD

o

"

CD

co

Gra

CD

1dOJS o•I

STANDARD SPECIFICATION NO.

Page 79: inspection and test plan for dry type lighting transformer

0 .Aed L3-1.000-00-8 'oN WWJOd

pamasei s;LIBP IIV —113 41160doo

STANDARD SPECIFICATION NO.

£ 'Aall 9L01-18-9

:i•

'-'

....._

01157

(..à.)

,-.

(#à

=

• Z

C/)

0

> N

v) (

...) , -

- o ,,

-. o

9

. o

cL)

,D,

ro <

g

g

cl--

o r)

o ,._,--.

'cn-'

CD

.-- •

$'')

'10

CD

1.

'-'• '-r1

AD

'—

' • ,—

, Ilg

CD

o

(-) >

CD

.--

■=1.

!,

,

CD

•-t

AD

Final Inspection

PCBs and other Electronic Components

In process Inspection

STAGE/ ACTIVITY

• • • • •

cD

,-t

•-•

,-1-

.0

,

r., :,)

0.0

p,-,;

,-,-

,-,« :

,) ~h

c,

■-r- »

i

0

,-+ (

1) , ,-

-,• cp

=

~ - o

0

.-•

0

AD

o

''cs

s:).) ,..

CD

=

0 cn

CD

0

,.,"

,-P)

0

-1') ::_','.

Po

:,.) t;

d5

,—

'EP

po

= ,i, ›.

. o

CD

:S)."

C coI: i ,1 ---

A c Cn DD

--,

CfCD

CD

CD

■-t

AD

AD

AD

cn

C4

o..

5"

V)

l i

u) po

CD

0:6

)

- ,-

.

• •

, c

p II.

CD

et,

CD "

<1)

9_,..) (.-

-,--

F4,

r:D-- l=

"),

r-," =

~'"

,--

/- 0 .ri

<Z1..

5

'E')

,..$:22,.

= po " 2

. crc

, '''-

' •

0

"

1=1..,

(•D

0

$'' o

r)

,:-/,r

1 o

'', ,-

, »-

t ••,

0

CD

o

r,

,,,:-.; „r'D

rD ,-I-)

0

-'0

o•

c, R

- r.,)

■-b

cn

7,

,-I

IDD

cr

'"t

,-,

(7C?

0

■-■

C ? AD ,- D, . .~.

.•, ) < CD

, r

rn A)

3:0

.-'

<D

CD

AD

AD

5 cl.

. c)

..., ,-,-

.

cl., ,,r

o

'

),) ;..,

-

f0...

• r-r

-

-. <D

CT

) . 4

rp

__-• -

• o

C4

CrCi

- o

■-,

'o

'-c-;

(1)

,-.., .

-t - •

AD

r-1

-

5

.c;

'-o

el) rD

c).•

-

cn

Ö

c).

-•

AD

■-•»)

."0

,—h c

n

cr

ro o

CD

:"

o

s"'""rD

("I

'. Sr

,-

-

r-t-

..

,-■• '-G

C ■-D r ., -

AD

....

• •

CO

A

D

'-''

n)

4 ,..

---'• ■-

bc) P"

" =

,.. ■•)

0

AD

.-

. ■.-

4.,

.--t•

'=.'.:

CD

OF

-:

,-s

f=0 .

::-','.

o

— -

o r

.)) c.)

art a

o 4

,..,

<:L.

CD

tr,

.„

CD

,-0-

,..

s'•

AD

''' ..0

CD

,- •

cp

'-' _,

k:;

'

CD

■-1,

Cfc:i

C

CD

0

o_

b-4. '5

+ H ."

. 1D

,a

o

v)

:)

-',

-''

r),

D

o

-. -

-' o

;-, (-)

„C

D ;--1-

.-

• P)

ot. o

Q

., o

.--

94

•— c

'-'

0,

C=

c, >

"

r-'2.

0

:y

r, ,

,..

(0.

5 cr

q

$2

..-•

,,,, .-

cs „,

o

,_«,

AD

'5' .

CfQ

CD

,--, •

cf

)

cn 5

..

0 ,

-- •

'-c)

•-■., o

;))

. P

-■-

Burn-In Test of PCBs for 96 hrs at 50 deg C

CHARACTERISTICS

Cil

rri

°

17;

C)

'ro . ,

=='

•-cj

cr

p,, cl.,

C1.

, ~t

C"

c>

QUANTUM OF CHECK

CD

,... •

-io

...1C)

C9

■-r

e)

Supplier' s Test Records

r)

O

, 1

SUB SUPPLIER

SCOPE OF INSPECTION

SUPPLIER

x

EIL/TPIA

Page 80: inspection and test plan for dry type lighting transformer

0 •A9d Ld-1000-00-8 '0N 4eLUJOd pamesai sA6P IIV —113 41160doo

STANDARD SPECIFICATION NO.

.nall 9L0I-18-9

i...)

0

C/3

,..

.t:

c..)

■-•

o

''-.1

'.Z.:;

...

CDCD

'-11 2

t) >

,-r

- >

-'• —

;.9

'"C

7 ct

%

P-1'

oO

•._, g

, ,-1

8 ;

:,-,•

-0 -

-•

• so

.. ci

) ),)

7.

c-.

CD

'11

co

o

t-.-*

r-'-

AD

co

■CI o

.9

;:o

:,)

■--h

s w

'- r1

$=,

$''

n >

CD

co

~_,

•--r-

.4

STAGE/ ACTIVITY

• • • • •

• •

(-) o

rp. (

) 1.1

>cl

) 'Ê

',-; o

- (-)

',,,--P

o rz

i < c

o .0

'''

$:. E-)

vp <

. -

, .no

-

o-

'-o

(--,

CD

,--.

••-. •

eD

""-'

CD

$:,D

c7, •

> 4

$'' CD

CD

0.

• •-•

-■ ■-1

- ..

,.,,

CD

CD

•-•

CD

.--.

."' -- " '-

' r)

.....

. AD

,-,

•.-

c„,

0

,.4

c=■/).)

. .

,.:

"

s't

p)

h.,

., cp

cr

t ,•

,~

-. o

A)

ott,

't;-)7 o

CD

9

(--)

) ,9_,. .

- o

■-

b ,

t-t -t

o

.-

c-)

c)".

;')

c).,

,-,)

,,,

t-t ,-

w

) ""

o

o

''O'

'':J

1">

'''

mr)

o

, 2

o

„„ l

1,

,,,,

,5 •

(/

) .

0

»ti

f-

f

(.,,

._

u)

(»5 '--P

> o

. .c

t -

• P

,-

,, •r •

o o

n, -=

o.. ,..

.. 1.0

-,•

,,,,,_

. (.,

cn

■-s

.) -.

. CD

0

"

'." o

cp

o

r)

'''''

rb."

' 5

CD<"4

8 r9

- (I

) A-

D.

CL O

~

-

- ,7--

t. P

go

CD

È-3

CD

n

cn

CD

CA

o

■-•

o

,-t

__,

'<.--,•

c& g

. (.9

't-5

' •

,.

cp

cp

P--

.-+)

'.---

o-')

cp.-

..,,a

p

g

.-$

■-t

r•-h

,;

,,,

...

0

AD

a5'

,v)

ci)-

;;;G

rc)

.—o

crzo

:-,

°7'-

' N

p., g

.0

0-:

vD

AD

cp

co

rn

" [''

' 6°

.Z.: "

''"?

, c.

c,

Cr

o

rf' ,,,

cfc?

co

•-t-

cn

CD

.-s

''' '-

' 0

°

ci)

CD

$2

CD

'-,)

co

Cf]

2.

.1•

'"'

C)

0

tl.

et, •

...t

(--)

.

5,-

5

ho

AD

''''

<-..)

O (D

'c-5

- o

cr

co

..-• •

(-D

Cl.•

--') AD"

•-t-

0'..'

fD.D •-s-

_•-t-

'-•

0

cn

pD

• ,..

< •-t

01

., —

,..

.. co

o

..

o

-,

:,)

■-t

cn

;.., '

"CJ

(.2 .

■-r-

o

r4

P, '''

CD

<

PO

C/

'

CD

cl •

,_,_

•■.,

A-s-D

0 (

7.C?

94

'-,-.

2 eD

-,,

5.

o.,

o

Er

2)

-----,

„,,•,...,

, co

--t

o

(.,

cfp

CD

•rD

(2 '

"0

'"-i

="

0

CD..

$?D

$,)

C)

R" .-

0 ,,,L

", ' 1.,7

0

■ -t

■-1-> .-b

1=1

CD

■-■ •

rl

CD

.<•jj

CD

o'q

■--1.)

CD

0

•-t-

-,

o

..

,..

c)

‹-t-

o

gt, -t

-t

-•

CD

crQ

r,,

-t,

•-• •

cn

•-- •

,...i.

10

°

t),)

Po

F;

c)

ag

o

cp

`- ,7-t

. • ■-•

• rn

a.,

Sn

,<1)

Cr

co 1:

$ AD

rw

f'D

coCD

o

0 s

a

SW

AD

CD

ES

~ •

-

CD

,...,.

o

,.......,

cr

,.

o

. ...

,-,,

,--,

CD

-t

-,

,.c

n C,2

,., 2

,, c,

..

Operation check on applicable accessories like Exit Signs, Beacon Lamps, Siren, Release and inhibit switches, Short circuit/fault isolator Provision of cable glands and earthing

CHARACTERISTICS

ril

°

(,)

-t

■H

. 6''

7D"

O.

QUANTUM OF CHECK

c,

CD

.•-• • '

'Cf

(-)

,--,

CD

0

o

...t

CD

•-r-.

n

0

SUB SUPPLIER

SCOPE OF INSPECTION

Z

SUPPLIER t'll

~

ICJ -

Page 81: inspection and test plan for dry type lighting transformer

0 'ned L3-1000-00-9 'oN pamesai s;(.161-1 11V —113 4460doo

111

CrJ

c.)

o

o

z z

z

STANDARD SPECIFICATION NO.

-nau 9L0I-18-9

CN

.--,

CN

p

t..n • ∎

■—,

fil

0

W

z C

4

0 r

°

Documentation and IC

Documentation and IC

Painting and Packing

Painting

Submission of certificates /documents

STAGE/ ACTIVITY

Review of Internal Test Reports and MTCs.

IC issuance

• Visual.

Suitable protection to prevent entry of foreign material.

Proper packing to prevent any damage during transportation.

Certificate from testing agency like ATEX, CIMFR BASEEFA, FM/UL , PTB etc. for suitability in specified hazardous area

A valid BIS license for indigenous supply

Statutory approval certificates from CCE/PESO for use in specified hazardous area.

De:_ree of .rotection certificate as a p plicable.

Changing Address of detectors

Verification of Battery type and Capacity

Calibration Check with standard calibrator, validity of calibrator check (if applicable)

Operation check on applicable accessories like Exit Signs, Beacon Lamps, Siren, Release and inhibit switches, Short circuit/fault isolator

CHARACTERISTICS

■—■

C)

C:)

C/D

AD

5o

(.1) 4-zi

o" o

QUANTUM OF CHECK

Supplier's Test Records / Inspection Certificate

(IC)

Test records

c)

n

-•

,.',i

rc-c:

, .,.

n, 7P

, E

C

) ■-s

- r2,)

cp

■-+

-,

Cn

--,

e()'

CA a

) :'L

r)

Z

0

1 i

I

SUB SUPPLIER

SCOPE OF INSPECTION

x

SUPPLIER EIL/TPIA

Page 82: inspection and test plan for dry type lighting transformer

0 'Aed Ld-1000-00-9 oN iewicu pamaseJ sp.IN iiv — -113 ;1160doo

uolss!uicins i.uotunooci teulj

AIIAII3V taDvis O

O

O

xz

0

llarlddaS

STANDARD SPECIFICATION NO.

£ 'Aall 9L0I-18-9

co

c)

-.

ro

A>

CD

,-■-

<

•-c .

ttg

r-r-

C

)

•FD •

• cn

c6

.).

.-1

A>

CD

cr'

-..

cc)

-I

CD

A>

cn

`t:S

co

CD

■-r.

.-t

cn

`t1

0 >

>

--......

`-. AD

CL.

C4

CL.

■-o.

AD

<-r-

.., . 0

Cl.,

AD

DL>

.-t

1:DL

cn

C•«-Li

-t

cn

• 0

CD

.-s

.....

CD

cn

CL, st

li

CD

c)

-s

-.

co

0

• cn

c)

c..

o

o

-c)

cr c

o

cn

-.

'-ct co

cn

r>

'cf

-.

n)

rit o

'Z'A

...

c)

Po

-i-

-.

cp

t::.,

o

c.)

....›..,

c)

o

-c) ,'ic

-c

o

t:N)

o

c) -,

a■ cl.,

t:..

Q..

c)

o

o

5

co

n)

C4

CI)

Cf)

F=0

,--,

AD

0ci

i•

Cr

CD

AD

li

li

lt:,)

cs-

Page 83: inspection and test plan for dry type lighting transformer

1.0 SCOPE:

INSPECTION AND TEST PLAN

FOR

DIESEL GENRA TING SET

This Inspection Test Plan covers the minimum testing requirements of Diesel Generating Set

2.0 REFERENCE DOCUMENTS:

PO/PR/ Standards referred there in/ Job specifications /Approved documents.

3.0 INSPECTION AND TEST REQUIREMENTS:

s. CHARACTERISTI

N STAGE/ACTIVITY cs

0

1.0 Procedures

l.lDG Set Load test I Performance test Documented

Procedure (As applicable) Procedures

1.2 WPS, PQR,WPQ Welding procedures,

Qualification

2.0 Material Inspection

QUANTUM

OF CHECK

100%

100%

RECORD

Procedures

WPS/PQR/ WPQ Records

STANDARD SPECIFICATION No.

6-81-0059 Rev.2

Page 3 of 5

SCOPE OF INSPECTION

SUB SUPPLIER EIL/TPIA

SUPPLIER

- H R

H W-New,

-

R - Existing

Page 84: inspection and test plan for dry type lighting transformer

s.

N STAGE/ACTIVITY 0

Incoming Material Diesel Engine, Alternator & Control

2.1 Panel (Supplier I Sub-Supplier to arrange

TPIA Certification)

Hard Ware items 2.2 Gaskets, Fasteners, Bearings & Gland

Packings etc.

Accessories

2.3 Air Receiver , Fuel Tank , Radiators OR Heat Exchanger (Coolers), Coupling etc.

3.0 In Process Inspection

3.1 Assembly of Alternator, Diesel Engine,

Control Panel, Radiators etc.

4.0 Final Inspection

4.1 Load test I Functional test of assembled

DG Set

4.2 Final Visual I Dimension of Skid

assembly

INSPECTION AND TEST PLAN

FOR

DIESEL GENRATING SET

CHARACTERISTI QUANTUM

cs OF CHECK RECORD

Functional IPerformance test 100%

Inspection ITest report

(as applicable)

Chemical I Physical 100%

Inspection properties Report

Visual I Dimension & Leak Check &

Manufacturer's

Dynamic balancing 100% Inspection and

for coupling Test Records

Manufacturer's Visual I Dimension 100% Inspection and

Test Records

Load I Functional test 100% Test Report

Visual I Dimensional Manufacturer's

check up 100% Inspection and

Test Records

STANDARD SPECIFICATION No.

6-81-0059 Rev.2

Page 4 of 5

SCOPE OF INSPECTION

SUB

SUPPLIER SUPPLIER EIL/TPIA

H H R

H R R

H w R

- H -

- H H

- H R

Page 85: inspection and test plan for dry type lighting transformer

s.

N STAGE/ACTIVITY

5.0 Painting

Painting of pump skid & associated 5.1

parts

6.0 Documentation

Stamping and review of inspection 6.1

documents, issue ofIC ( as applicable)

6.2 Review of final documentation of

supplier

INSPECTION AND TEST PLAN

FOR

DIESEL GENRATING SET

CHARACTERISTI QUANTUM cs OF CHECK

RECORD

Paint Scheme , Visual Inspection

& Paint thickness 100% check

Report

Review of documents for compliance as per 100% IC

PR. Compilation of

Dossier Idocuments as per

100% Completeness V DR attached with

PR. certificate

STANDARD SPECIFICATION No.

6-81-0059 Rev.2

Page 5 of 5

SCOPE OF INSPECTION

SUB SUPPLIER

SUPPLIER EIL/TPIA

- H R

- - H

- H H

Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or I 0% (min.I no. of each size and type of Bulk item)), R-Review, W-Witness (Give due notice, work may proceed after scheduled date).

NOTES (As applicable):

1. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also beapplicable.(Unless otherwise agreed upon)

2. Acceptance Norms for all the activities shall be as per PO/PR/ST AN D AR DS referred there in /Job Specification I Approved Documents.

Page 86: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY (UPS) SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- -- 2.0 Material Inspection

2.1

Incoming Material like Fabricated items, Thyristors/IGBTs, Battery, meters, Voltage Stabilizers, Filters, Invertors, PCBs, Relays, Transformers, Annunciators etc

Visual, Dimensional, operational checks, Manufacturer’s Test Certificates etc. as applicable

100%

TC’s/ Inspection & Test records /

Lab Test Records

As per approved drwgs/data sheet H H R

3.0 In process Inspection

3.1 PCBs & Electronic components sub assemblies

Burn-in Test for 96 hours at 50 deg C 100% Supplier’s

Test Records

- - H R

4.0 Final Inspection

4.1

UPS Assembly-Acceptance Tests

• Visual check including GA layout, Tag plates, Paint shade, Paint thickness , Bus Bar marking, Identification and location of components, Semi graphic scheme etc. Dimension check including Operational height, Bus Bar size, Termination arrangement, Clearances etc.

• Bill of material /Make of Components check.

100% acceptance

tests shall be

Test Records / Inspection

Witness

As per approved drwgs/data sheet

As per approved documents

-

H

W

Page 87: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

UPS Assembly- Acceptance Tests

(Contd.)

• Interconnection Cable check

• AC Input failure test

• AC Input return test • Simulation of parallel redundant

UPS fault • Auto-Manual Transfer of loads ,

bypass in synchronous & asynchronous modes with recording of transfer time and recovery time ( as applicable)

• Regulation test, Ripple Current

Measurement, Output Voltage waveform check.

• UPS Efficiency

witnessed by purchaser

100% by supplier and on random

basis by EIL/TPIA

Record

Test Records / Inspection

Witness Record

IEC62040-3 , Cl 6.6.1

IEC62040-3 ,

Cl 6.6.6

IEC62040-3 , Cl 6.6.7

IEC62040-3 , Cl 6.6.8

IEC62040-3 ,

Cl 6.6.9

IEC62040-3 , Cl 6.3.2.1/as per

Data sheet

IEC62040-3 , Cl 6.6.11/ as per

-

H

H

Page 88: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Light load test, Unbalanced Load

Test. • Fault Diagnostics- Functionality

Checks (if Applicable) • Operation of cooling fan and

control circuit tests/ Redundancy of Cooling fans.

• Synchronization test • Overload capability test • Short circuit current capability test • Short circuit fuse test

Data sheet

IEC62040-3 , Cl 6.6.12 & 13

As per data sheet

As per schematics

IEC62040-3 , Cl 6.6.5/ As per

data sheet

IEC62040-3 , Cl 6.6.18 /As per

data sheet

IEC62040-3 , Cl 6.6.19 /As per

data sheet

IEC62040-3 ,

Page 89: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Manual Restart • Output over voltage Protection • Dynamic Response in respect of

percentage dip/overshoot at output for loads throw in/off on individual invertors and bypass system.

• Check for Harmonics • Earth fault test • Audible noise test

Cl 6.6.20

IEC62040-3 , Cl 6.6.21

IEC62040-3 , Cl 6.6.22

IEC62040-3 , Cl 6.3.7.1/ As per data sheet

IEC62040-3 , Cl 6.6.26/ As per

data sheet

IEC62040-3 , Cl 6.6.27/ As per

data sheet

IEC62040-3 , Cl

Page 90: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Insulation resistance of main

circuits • High voltage test for power

circuits as applicable. • Hot Stand-by/Redundancy Checks

(as Applicable) • Check for

Redundancy/Changeover (as Applicable).

• Parallel Operation and load Sharing Verification (as Applicable).

• Check for protection against reverse trolley connection.

6.7.11/Maximum 75 DBA at one meter distance

- - - - - - -

4.2 UPS Assembly – Type Tests

Continuous full load Test for 32 hours at 0.8 pf with temp. rise measurement(8 hours each inverter on full load, 8 hours in parallel mode and 8 hours in bypass mode)

1 sample/type

Supplier’s Test Records

IEC62040-3/ As per data sheet

- H H

4.3 Submission of certificates /documents

• RFI Test . Sample/Prototype

Test Agency Reports

IEC62040-3 , Cl 6.6.25 - R R

4.4 Batteries, ACDB, Cell Booster

Visual, rating details, Acceptance test, Type test etc. (as per separately approved ITP)

As per ITP

Supplier’s Test Records /Inspection

witness

As per approved schematics/spec. H H H

Page 91: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

UNINTERRUPTED POWER SUPPLY SYSTEM

SL NO

. STAGE/ ACTIVITY CHARACTERISTICS

QUANTUM OF

CHECK RECORD

ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

record 5.0 Painting

5.1

Painting and Packing • Visual • Suitable protection to prevent entry

of foreign material. • Proper packing to prevent any

damage during transportation and storage.

100% Packing list /

Supplier’s Records

-As per DS/Spec.

- H -

6.0 Documentation and IC

6.1 Documentation and IC

• Review of Internal and Type Test Reports and MTCs

• IC issuance. 100%

Supplier’s Test Records / Inspection Certificate

- H H

Legends: H- Hold (Do not proceed without approval), Random 10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

7. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

8. Acceptance Norms for all the activities shall be as per latest version of relevant IS codes / Standards referred there in/ Job specifications /Approved documents

Page 92: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

STATIONARY NICKEL CADMIUM BATTERY

SL NO

.

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- --

-- -- --

2.0 Material Inspection

2.1

Incoming Material like Flame arrester, Electrodes used, Electrolyte , containers, Insulators, Battery stand and other accessories

Physical and Dimensional checks(as applicable),

Mechanical properties, Chemical properties of the electrolyte and

containers

100%

Sub-Supplier’s

TC / Supplier

Test Records/

Third party lab

As per Job spec./approved

drwgs/data sheet H H -

3.0 Inprocess Inspection

3.1 Battery assembly Visual, Dimensions, Bill of Material 100% Supplier’s

Test Records

- - H R

4.0 Final Inspection

Page 93: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

STATIONARY NICKEL CADMIUM BATTERY

SL NO

.

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

4.1 Battery(Acceptance Tests)

• Visual

• Dimension, mass and layout check • Polarity and absence of short circuit • Test For Ah capacity • Test For voltage during discharge.

• Internal resistance test

• Dimension, Paint Shade and Paint Thickness of Battery Stands

100% witness by purchaser

Inspection test records

IS 10918-1984,

Cl 10.2,

Cl 10.3.10.4/as per drwgs

Cl 10.5/as per

drwgs

Cl 10.7/as per Data sheet

Cl 10.11

Cl 10.3/as per data sheet

- H W

4.2 Battery Stand • Dimension, Paint Shade/thickness 100% Inspection

test records As per approved

drwgs - H R

4.3 Battery (Type Tests) • Air Pressure Test

One Sample/ Rating

Type Test Report

IS 10918-1984, - H R

Page 94: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

STATIONARY NICKEL CADMIUM BATTERY

SL NO

.

STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK RECORD ACCEPTANCE NORMS

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Test for charge retention/ loss of

capacity. • Ampere hour and Watt-hour

efficiency test.

Cl 10.6/no leakage

Cl 10.8/As per data sheet

Cl 10.7/as per data sheet

5.0 Painting and Packing

5.1 Painting and Packing • Visual, Packing list. • Proper packing to avoid any damage

during transportation. 100% Supplier’s

records

As per DS/spec. - H -

6.0 Documentation and IC

6.1 Documentation and IC

• Review of Internal Test Reports. • IC issuance 100%

Supplier’s Test

Records / Inspection Certificate

(IC)

-

- H H

6.2 Final Document submission

Compilation of Inspection reports ,drawings, etc as per VDR / PR 100%

Final data folder

/Completeness

certificate

-

- H H

Page 95: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

STATIONARY NICKEL CADMIUM BATTERY

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may proceed after scheduled date).

NOTES :-

9. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

10. Acceptance Norms for all the activities shall be as per LATEST VERSION OF RELEVENT IS CODE/ Standards referred there in/ Job specifications /Approved documents

Page 96: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- --

2.0 Material Inspection

2.1

Incoming material like dielectric material polypropylene, Non PCB Impregnation material, Aluminum Plates and bus bars, Copper, Laminations, Paper Insulation, and major bought outs like Insulators, Bushings, Circuit Breaker, Relays Lightening Arrestor, Isolator, Discharge resistors, etc.

Physical Chemical, Dielectric properties, Purity, Review of Manufacturer's test

certificates, etc. as per relevant specifications

100%

Should be within specified

tolerance as per respective approved

documents/ PR spec./data sheet and drawings

TC’s/ Inspection

& Test

records / Lab Test Records

H H R

3.0 In process Inspection 3.1 Fabrication of Tanks for

series reactor and RVT, fabrication of Relay& Control Panels/Desk, Cable boxes

• Visual • Dimensional • Paint shade and surface finish • Cable entry, Cable lugs, Cable

Glands size, Lifting Hooks

100%

As per approved drawings/Spec. Suppliers

Test Records

-- H R

4.0 Final Inspection

Page 97: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

4.1

Capacitor Units (AcceptanceTests)

• Visual arrangement/rating plate

details • Sealing test • Test for capacitance measurement

• Insulation resistance

• DC Voltage test between terminals • AC Voltage test between terminals

and container for capacitor unit and banks.

• Test for efficacy of discharge device • Measurement of tangent of dielectric

loss angle (tan δ) • Checks for Control panel/desk

housing Circuit breaker, relays • Verify for make/ model of Relays,

Circuit breaker.

100% acceptance test shall be witnessed by supplier & purchaser

As per IS-13925 (Part-1): 1998 • As per appd

drawings • No Leak • As per Data

sht • As per

suppliers stds • Shall

withstand voltage.

• --do—

• As per data sht./drg

• --do— • As per data

sht./drg • --do--

Test Records / Inspection Witness Record

- H W

4.2 Series Reactor, RVT

• Visual

• Dimensional • Paint Shade/surface finish • Oil leakage

100% acceptable

test shall be witnessed by supplier &

IS5553 (Part3) 1990 for Series Reactor and IS3156 -1992 for RVT • As per data

sht./drg • --do— • --do— • No Leakage

Test Records / Inspection Witness Record

H H W

Page 98: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Measurement of Inductance, conductor resistance

• Inter turn Voltage withstand test

• Ratio check for RVT

• Dielectric tests for Reactor/RVT

purchaser • As per data sht./drg

• Shall withstand

• As per data sht./drg

• Shall withstand

4.3 Structural steel /Panel • Dimensional • Galvanizing check • Paint thickness ( in panel)

100% by supplier and on random

basis by EIL/TPIA

As per approved drawings/spec.

Test Records / Inspection Witness Record

H H H

4.4 Type Tests

Capacitor Units: • Thermal stability tests • Capacitor loss tangent (tan δ) at

elevated temperature • Lightning impulse voltage test

between terminals and container • Short circuit discharge test

Reactors/RVT:

• Temperature rise • Lightening impulse test • Q factor measurement • Determination of errors as per

accuracy

1 Sample / Rating

As per IS-13925 (Part-1): 1998 for Capacitor Units.

IS5553 (Part3) 1990 for Series Reactor and IS3156 -1992 for RVT

Inspection witness

record/Test certificates from Test agencies

- H H/R**

5.0 Painting

Page 99: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

5.1

Painting and Packing • Visual • Suitable protection to prevent entry of

foreign material. • Proper packing to prevent any damage

during transportation and storage.

100%

As per approved drawings/Spec.

Packing list /

Supplier’s Records

- H -

6.0 Documentation and IC

6.1 Documentation and IC • Review of Internal Test Reports &

MTCs • IC issuance.

100%

--

Supplier’s Test

Records / Inspection Certificate

- H H

** Witness if called for in job specifications. In such cases specified Type test will be considered as part of Acceptance Test.

Legends: H- Hold (Do not proceed without approval), Random 10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

11. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

12. Acceptance Norms for all the activities shall be as per latest relevant IS codes/ Standards referred there in/ Job specifications /Approved documents.

Page 100: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR MEDIUM AND HIGH

VOLTAGE CABLES & ACCESSORIES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK ACCEPTANCE NORMS RECORD SCOPE OF INSPECTION

SUB SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- --

2.0 Material Inspection

2.1

Incoming raw material like Copper,

Aluminum, PVC, XLPE, Galvanized

Armour.

Purity, Dimensions, Physical and Chemical Properties. 100%

Job spec./

IS-5831 for Insulation & Sheathing compound/,

IS8130 for Copper/Aluminum/wires

IS-3975 for GI wire Armour.

Material Test Certificate/Test Records/ Third

Party Lab certificate

H H R

3.0 Inprocess Inspection

3.1 Inspection during

insulation, sheathing

Spark test, thickness of insulation, Conductor Resistance 100%

As per approved drawings/data sheet/Job

spec./ IS1554

Test Records -- H

R

4.0 Final Inspection

4.1 Finished Cable

Visual, Drum details, Size, Ends Capping, Marking on outer sheath

(such as Incremental Length, Voltage grade, manufacturer’s

name), Colour coding, etc.

100% for Drum details and Sample drums for balance details

As per approved drawings/data sheet/Job

spec./ IS1554 Test Records - H H/R**

4.2 Finished Cable(Routine Tests)

• Conductor Resistance. • High Voltage • Partial Discharge (for XLPE

only)

100% witness by purchaser

As per approved drawings/data sheet/Job

spec./ IS8130/IS1554

Supplier’s Test Records - H W**

Page 101: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

4.3 Finished Cable (Acceptance tests)

• Check calibration status of all testing equipment.

• Dimension checks – overall dia, over/under armour, thickness of insulation, sheath, copper screen dimension, etc.

• Conductor Resistance • Insulation resistance /Volume

resistivity • High Voltage tests • Partial Discharge(for XLPE) • Hot Set (for XLPE insulation) • Tests on Conductor as

applicable • Tests on PVC/XLPE

Insulation & Sheath * • Armour Galvanization - dip

test • Volume resistivity, Insulation

resistance • Tensile and elongation

(without ageing )

100% witness by purchaser

As per approved drawings/data sheet/Job spec./IS 5831/IS8130/

IS3795 IS1554 /IS10810

Inspection Test Records

- H W**

4.4 Finished Cable (Special tests)

• Flammability test as per applicable specification.

• Accelerated water absorption test as per NEMA(Electrical method ) #

• Test for resistance to Ultra Violet Radiation #

• Oxygen Index test as per IS /IEC

Witness by purchaser on samples

As per approved drawings/data sheet/Job spec./IS 5831/ IS8130/

IS3795 IS1554 / IS10810 ASTM-D2863 for

Oxygen Index/Temp. Index

IEC-754 for Acid Gas

Inspection test records H W**

Page 102: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

• Rodent & Termite repulsion check

• Drum length /surface finish check by re-winding

• Test for circuit integrity for fire survival cables as per IEC(If applicable )

4.5. Finished Cable (Type tests **)

• Dielectric Retention. • Type tests on PVC insulation

and Sheath • High Voltage test (Water

Immersion) • Dielectric power factor tests

as function of voltage, temperature. (XLPE cables)

• Heating cycle test (XLPE Cables)

• Impulse withstand test (XLPE cables

Witness by purchaser on samples

As per approved drawings/data sheet/Job spec./IS 5831/IS8130/

IS1554

Test Records H W

4.6 Cable accessories • Visual • Dimensions • Type tests** as per IS/IEC

Sample As per approved

drawings/data sheet Test Records H R

5.0 Painting -- -- -- -- -- -- --

6.0 Documentation and IC

6.1 Documentation and IC • Review of Routine,

Acceptance, Type test reports. • IC issuance

100%

-- Supplier TC & IC - - H

6.2 Final Document submission

Compilation of Inspection reports ,drawings, etc as per VDR / PR 100%

--

Final data folder

/Completeness certificate

- H H

# In case TC (not older than one year) from independent test lab is available & type of compound used is same then the same may be accepted. * Hot deformation, Heat shock and Shrinkage tests on insulation & sheath (One sample/Lot) shall be witnessed by BARC, all other tests as per IS/IEC shall be carried out by supplier and test reports shall be reviewed by BARC.

Page 103: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

HIGH VOLTAGE CAPACITOR BANKS

** BARC will witness for HT cables only

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

13. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

14. Acceptance Norms for all the activities shall be as per latest version of IS codes/ Standards referred there in/ Job specifications /Approved documents

Page 104: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- --

2.0 Material Inspection

2.1

Incoming raw material like Copper Aluminium, PVC, PE, Jelly Compound, Armour material, etc.

Dimensional, Purity, Physical, Chemical Properties, Tests on jelly compound as per DOT spec.

Sample

DOT spec./ Job spec./

IS-5831 for Insulation &

Sheathing compound/, IS8130 for

Copper/Aluminum/wires

IS-3975 for GI wire Armour.

Sub supplier

TC/Supplier’s Test

Records/ Third party

Lab

H H -

3.0 In process Inspection

3.1 Manufacturing Stage Dimensions at various stages, Spark test, Stage Inspection 100%

As per approved drawings/data sheet/DOT spec./Job spec.

Supplier’s Test

Records - H -

4.0 Final Inspection

4.1 Final Inspection on completed cable

Visual, Drum details, Size, Ends Capping, Drums Condition, Marking on outer sheath (such as incremental length, voltage grade, manufacturer’s name and for

100%

As per approved drawings/data

sheet/DOT spec./Job spec.

Inspection Witness Record

- H RW

Page 105: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

jelly filled cables marking as per DOT spec), Colour coding of cores, etc.

4.2

Final Inspection on completed Cable(Jelly Filled Cables) Acceptance Test

• Dimension checks. • Test for insulation and

sheath. • Continuity of

conductors, absence of crossed pairs and absence of contact with poly-al tape

• Continuity in poly-al tape

• Colour coding • Conductor Resistance,

Resistance Unbalance in pair.

• Mutual capacitance (pair/average), Capacitance Unbalance (pair to ground and pair to pair)

• Cross talk • Attenuation • Drip test

Witness by purchaser

DOT spec./ approved

drawings/data sheet/Job spec./IS

5831/ IS8130/ IS3795

BS EN:50288(Pt7) / IS10810

Inspection Witness Record

- H W

Page 106: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

• Dielectric Strength • Insulation Resistance • Conductor Annealing • Armour Galvanization • Overall finish and Drum

length by re-winding

4.3

Final Inspection on completed Cable(Jelly Filled Cables) Type Tests

• Type tests on insulated conductors, compatibility of Insulation and filling compound as per DOT spec.

• Type tests on Composite sheath and Jacket as per DOT spec

• Oxygen index test • Water Penetration test • Cable bend test.

One Sample Witness by purchaser

DOT spec./ approved

drawings/data sheet/Job spec./IS

5831/ IS8130/ IS3795

BS EN:50288(Pt7) ASTM-D2863 for

Oxygen Index/Temp.

Index

Supplier’s Test

Records - H W

4.4

Final Inspection on completed Cable( Non Jelly Filled Cables ) Acceptance Test

• Dimension checks • Continuity of conductors • Colour code • Overlap in poly-al tape

and drain wire resistance (if shielding specified)

• Conductor Resistance. • Mutual capacitance

(pair/average), Capacitance Unbalance

Witness by purchaser

Inspection Witness Record

- H W

Page 107: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

(pair to ground and pair to pair) for communication cables

• Dielectric Strength • Insulation Resistance /

Volume Resistivity. • Tensile and Elongation

(without ageing) • Conductor Annealing • Armour Galvanization • Tests on Insulation and

sheath as per IS/IEC

DOT spec./ As per approved

drawings/data sheet/Job spec./IS

5831/ IS8130/ IS3795

BS EN:50288(Pt7)

4.5

Final Inspection on completed Cable( Non Jelly Filled Cables ) Special Test

• Oxygen Index Test • Flammability test as per

applicable specification • Test for Rodent &

termite repulsion • Surface finish and drum

length check by wiring

Witness by purchaser

DOT spec./ As per approved

drawings/data sheet/Job spec./

BS EN:50288(Pt7) / IS10810 Part 61

& 62 or IEC60332-3 Cat-

A for Flammability test. ASTM-D2863 for

Oxygen Index/Temp.

Index

Inspection Witness Record

- H W

Page 108: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

4.6

Final Inspection on completed Cable( Non Jelly Filled Cables ) Type Tests

• Type test on conductor as per spec

• Type tests on insulation and Sheath as per spec

Witness by purchaser

As per approved drawings/data

sheet/DOT spec./Job spec./IS

5831/IS8130/ BS EN:50288(Pt7)

Supplier’s Test

Records - H W

5.0 Painting

6.0 Documentation and IC

6.1 Documentation and IC

• Review of Internal Test Reports and MTCs.

• IC issuance -

-

Supplier’s Test

Records / Inspection Certificate

(IC)

- H H

6.2 Final Document submission Compilation of Inspection

reports ,drawings, etc as per VDR / PR

100%

-

Final data folder

/Completeness

certificate

- H H

* - Thermal Stability, Hot deformation, Heat shock and Shrinkage tests on insulation and sheath shall be witnessed by BARC (One Sample/Lot), all other tests as per IS-5831 shall be carried out by supplier and test reports shall be reviewed by BARC

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of

Page 109: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR COMMUNICTION &

FIRE ALARM CABLES

each type), W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

15. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

16. Acceptance Norms for all the activities shall be as per latest version of IS code/ Standards referred there in/ Job specifications /Approved documents

Page 110: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

LIGHTNING ARRESTORS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

1.0 Procedures -- -- -- -- -- --

2.0 Material Inspection

2.1

Incoming Material like Porcelain bushings, aluminium castings, gaskets, O-rings, springs, pressure release diaphragm, grading rings, bumpers, sheet metal pressed components, etc.

• Operational check • Tensile, compressive, flextural and

bonding strength of materials, wherever applicable.

• Electrical acceptance tests for electrical components.

100% by Supplier

As per drawings

/data sheet /IEC-62305-5; IS 4004-1985;

IEC-15086

Material Test Certificates H H R

3.0 In process Inspection

3.1 Lightning Arrestor assembly • Visual, Dimensional and Bill of

material 100% by supplier

IEC-99-4 Supplier’s test records - H -

4.0 Final Inspection

As per approved

drawings/data sheet

Page 111: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

LIGHTNING ARRESTORS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

4.1 Final Inspection

• Visual and Dimensional checks. • Check calibration status of all

testing equipment. • Bill of Material • Lightning impulse residual voltage. • Reference voltage test • PD test • Sealing test • Galvanizing test • Uniformity and weight of Zinc coating • Counter operation check and meter operation check of Surge monitors, wherever applicable. • Current distribution test for multi colum arrester.

100% by supplier and

100%-witness by purchaser

IEC-62305-1 IEC-62305-3 IEC-62305-5

IEC-15086-5:2001 &

IEC-99-4

Supplier’s Test Records and

Inspection Witness Record

- H W

4.2 Type Test

• Type test certificates • Housed Arresters

a)Temperature cycle test b) Porosity test

● Operating Duty Test ● Long duration current Impulse withstand test. ● Partial discharge test Insulation Coordination. ● Pf Voltage Vs Time characteristics • Certificate for fireproof rating.

Prototype for each model

IEC-99-4

IS-3070 IS-2165 Type Test

Certificates - H R

Page 112: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

LIGHTNING ARRESTORS

SL NO. STAGE/ ACTIVITY CHARACTERISTICS QUANTUM

OF CHECK

ACCEPTANCE

NORMS RECORD

SCOPE OF INSPECTION SUB

SUPPLIER SUPPLIER BARC

5.0 Painting

5.1 Painting and Packing • Visual. • Suitable protection to prevent

entry of foreign material. • Proper packing to prevent any

damage during transportation.

100%

As per approved drawings/data

sheet Test records

-

H --

6.0 Documentation and IC

6.1 Documentation and IC

• Internal test records • Issuance of IC

100%

--

Internal test reports & Inspection Certificate

- H H

6.2 Final Document submission Compilation of Inspection reports ,drawings, etc as per VDR / PR 100%

--

Final data folder

/Completeness certificate

- H H

- Supplier to submit internal test reports, type test reports before offering items for Inspection to BARC.

Legends: H- Hold (Do not proceed without approval, R-Review, RW-Random witness (As specified or 10 % - Samples must include min 1 No of each type), W- Witness (Give due notice, work may proceed after scheduled date). NOTES :-

Page 113: inspection and test plan for dry type lighting transformer

INSPECTION AND TEST PLAN FOR

LIGHTNING ARRESTORS

17. This document describes the generic test requirements. Any additional test or inspection scope if specified in contract documents shall also be applicable. (Unless otherwise agreed upon).

18. Acceptance Norms for all the activities shall be as per LATEST VERSION of IS codes/ Standards referred there in/ Job specifications /Approved documents