    INNOVATION & IMPROVEMENT

    BY

    BIKANER DIVISION

  • 8/3/2019 Innovations of BKN Div[1].

    2/34

    ENGINEERING

  • 8/3/2019 Innovations of BKN Div[1].

    3/34

    Modified ballast rake has

    been developed at

    ADEN/Bhiwani Sub -

    division to enable better

    ballast dressing with

    lesser number of gang

    men.

    INNOVATION IN P.WAY MAINTENANCE

  • 8/3/2019 Innovations of BKN Div[1].

    4/34

    Safety chain at LC gates has to be provided in

    case of damage/defective lifting barrier and stop

    boards are used to be held up by inserting holding

    pipe into hole (on road surface). Now a triangular

    stand has been developed to hold stop board,

    which enables to provide safety chain quicklywithout problem.

    INNOVATION IN P.WAY MAINTENANCE

  • 8/3/2019 Innovations of BKN Div[1].

    5/34

    Trespassing is a major problem of Bikaner

    division. There are 55 such locations identified

    over BKN Division.

    A new initiative has been taken and RUB is being

    proposed to construct at these locations under

    NREGA scheme by state PWD.

    RUB at Trespassing Locations

  • 8/3/2019 Innovations of BKN Div[1].

    6/34

    Tress passing locations

  • 8/3/2019 Innovations of BKN Div[1].

    7/34

    Total 49 locations are being identified and

    technical sanction has been given by concerned

    District Collectors.

    Work is in advance stage at eight locations

    between BKN-RTGH-CUR section. RCC boxes has

    already been casted and launching is planned to

    complete in next month.

    RUB at Trespassing Locations

  • 8/3/2019 Innovations of BKN Div[1].

    8/34

    Casted RCC BOX under NREGA scheme

  • 8/3/2019 Innovations of BKN Div[1].

    9/34

    ACCOUNTS

  • 8/3/2019 Innovations of BKN Div[1].

    10/34

    Outstation cheque stopped. Payment to Govt.Deptt. by draft directly issued from bank on thebasis of single cheque used. Total no. of chequesissued has reduced drastically.

    Single cheque for multiple payments

    Misc. payment to Govt. Deptt. at various placesi.e. Elect. & water bills were made through cheque

  • 8/3/2019 Innovations of BKN Div[1].

    11/34

    Use of RTGS for settlementand PF cases

    Previously payment for settlement cases & PF

    withdrawal were through individual cheque, whichused to take approx. 15 to 20 days for remittance in

    the account of staff

    Payment for settlement & PF cases are now donethrough RTGS, which takes approx. 2 days only

  • 8/3/2019 Innovations of BKN Div[1].

    12/34

    Blank cheques inventory system

    Un-used and blank cheques under singleresponsibility were threat to misuse/fraud

    Blank & un-used cheques stationery are kept

    under III tear system. Main stock are kept underdouble lock and key, with two different officers.

  • 8/3/2019 Innovations of BKN Div[1].

    13/34

    Supplementary Bills are being pre-checked & vetted, prior to charging

    in the regular salary bills

    Previously separate bills for supplementarypayment to staff i.e. MACP, Leave encashment ,

    OT, Medical reimbursement at different periodswere causing difficulty to staff and to bring entirepayment for tax calculation

    All payments of supplementary bills are beingmade with salary. Thus, problem of staff inreceiving payment as well as office sorted out.

  • 8/3/2019 Innovations of BKN Div[1].

    14/34

    Settlement of abnormal pension caseswithin one month

    Settlement cases for abnormal pension viz. V.R.,Invalid pension, Compulsory, family pension etc.were taking more time in settlement.

    A JPO (Account & personnel) issued to ensuretime bound dealing at different stage resultantlysettlement payment of cases received up to 10th ofmonth are being made in the same month

  • 8/3/2019 Innovations of BKN Div[1].

    15/34

    Betterment for PF annualReconciliation

    PF annual reconciliation due date is end of Sept.Last year it was done in Oct. but during currentyear PF reconciliation was done on 02.08.11 for theyear 2010-11

    Debit & Credit adjustment of PF TCs

    Linking of unlinked PF items.

    Quarterly reconciliation is started this year.

  • 8/3/2019 Innovations of BKN Div[1].

    16/34

    Record keeping system

    Old records were creating space problem. Dustyand shabby records occupied all spaces

    Old records weeded out, which brought

    cleanliness with segregation and tagging

  • 8/3/2019 Innovations of BKN Div[1].

    17/34

    Staffs working condition

    Setting arrangement of staff was in very oldbuilding in dilapidated & shabby condition

    Rooms have been renovated with tiles flooring

    and POP walls & new furniture provided to staff

  • 8/3/2019 Innovations of BKN Div[1].

    18/34

    S & T

  • 8/3/2019 Innovations of BKN Div[1].

    19/34

    Innovations

    One touch dialing facility on BSNL connectionshas been provided for 2 section controls which areon BSNL owned overhead alignment to enhanceavailability of control communication.

    To enhance safety and to monitor relay roomopening/closing micro-switches have beeninstalled at 8 stations in LGH-PLC section

  • 8/3/2019 Innovations of BKN Div[1].

    20/34

    Innovations

    5 LC gates have been interlocked out which 4 arewith Electric lifting barriers to enhance safety atlevel crossing gates.

    LGH-PLC section has been provided with RailwayTelephone of BKN exchange on OFC network.

  • 8/3/2019 Innovations of BKN Div[1].

    21/34

    Innovations

    In house repair center has been developed atBKN for repair of power supply unit, track feedcharger etc. This has resulted into saving ofrailway revenue.

  • 8/3/2019 Innovations of BKN Div[1].

    22/34

    MEDICAL

  • 8/3/2019 Innovations of BKN Div[1].

    23/34

    Screaning Camp On 30.05.2011 for "Glaucomadetection" was held in Divl/Hospital /Bikaner. A

    total of 42 patients screaned and 5 new Glaucomapateints were detected. All pateints were taughtabout Glaucoma and its implications throughposter , pamphlets and audiovisual presentation

    by Dr. L.S.Nainwal to aviod Glaucoma relatedblindness

  • 8/3/2019 Innovations of BKN Div[1].

    24/34

    HB AIC test camp of diabetes case at Divisional

    Hospital, Bikaner, LGH on 06.06.11. Total 26

    patients were checked.

    Clinical meeting/case study done in CMS/BKNsChamber on 18.06.2011 in which Dr. Arun Gupta,

    Sr.DMO/DH/BKN/LGH presented a case study ofallergic broncho-pulmonary aspergillosis. Allavailable Doctors of Divisional Hospital, Bikanerattended the meeting.

  • 8/3/2019 Innovations of BKN Div[1].

    25/34

    A camp with the contribution of NWRWWO/BKN wasconducted on 1st July 2011 on Diabetic,

    Hypertension and Neuropathy about 155 patientswere examined. An educational talk was conductedby Dr. Pramod Soni, Non invasive cardiologist anddiabetic dietician, Ms. Vrinida. DRM/BKN presided

    over the function.

    School Health Check up programme was organized

    at School run by NWRWWO on 23.07.2011

  • 8/3/2019 Innovations of BKN Div[1].

    26/34

    A lecture on breast feeding and neonatal care wasorganized on 02.08.11 for pregnant and lactating

    mothers and nursing staff where advantages of breastfeeding for baby as well as mother were emphasized.

    Importance of weaning and handling of New Born wastaught to the mothers.

  • 8/3/2019 Innovations of BKN Div[1].

    27/34

    An awareness deliberations was conducted for RPFpersonnel at Barrack of RPF personnel, Rani Bazar,Bikaner on 10.08.11 presided by Sr.DSC/RPF/BKN onortho dental awareness with more emphasis on causesand spread of oral cancers. Speech given by Dr. AshuMalik, DDS/DH/BKN, CMS/BKN was also there. About 40-

    45 RPF personnel came for check up.

  • 8/3/2019 Innovations of BKN Div[1].

    28/34

    An inhouse deliberation was conducted on BioMedical Waste collection at Conference Hall,

    DH/BKN for the medical staffs for properimplication of bio medical waste collection,storage and disposal of bio medical waste. About28-30 medical staffs participated in this

    deliberation and their queries were satisfied.

  • 8/3/2019 Innovations of BKN Div[1].

    29/34

    RAJBHASHA

  • 8/3/2019 Innovations of BKN Div[1].

    30/34

    ''

  • 8/3/2019 Innovations of BKN Div[1].

    31/34

    , ,

    3 9

  • 8/3/2019 Innovations of BKN Div[1].

    32/34

    8 3 :

  • 8/3/2019 Innovations of BKN Div[1].

    33/34

    - ,, ,

  • 8/3/2019 Innovations of BKN Div[1].

    34/34