Content

• Status by machine• Follow-up on Booster• Decision making on partial/full removal in Booster• YETS organization• Conclusions

Status by machineMachine/area Total number of signal and

control cables(Excluding DC and not known cables)

Identified obsolete cables(with or without purple tape)

Last talk

Booster 12’000 2’694 (23%) 25 %

SPS – BA5 ~ 6’500 3’250 (50%) 50 %

SPS – BA3 ~ 8’000 0 0 %

PS – CENTRE RING ~7’000 963 (14%) 14 %

TT2 ~3’000 72 (2.5%) 2 %

Reminder: cables which are in use now and are targeted to be replaced for future projects are not considered today as obsolete cables. They are out of the scope of this project and must be treated by the future project teams.

EN-EL

~500 cables analysés

1-Câbles signaux et contrôles :

Cablothèque papier :

112.501 112.700 Emergency stop 96 being investigated by H. de Maynard https://edms.cern.ch/file/1220061/1/112501-112700.pdf

112.801 113.000 General 20 being investigated by S. Delarue https://edms.cern.ch/file/1220080/1/112801-113000.pdf

 Câblothèque Gesmar: voir fichier EN-EL attaché 212 cables (TE-EPC) tous en utilisation

2-câbles BT : voir fichier EN-EL_BT   Analyse par S. Delarue : 3 câbles obsolètes, le reste en utilisation

BE-BI

• La DEC BI comporte maintenant 349 câbles

• Pour ce qui est des câbles utilisés, je n’ai pas de liste de Franck Guy Guillot-Vignot , Jocelyn Tan , Jeroen Belleman , Marek Gasior , Franco Lenardon , qui sont tous responsables de racks au Booster.

• Le point positif c’est que actuellement j’ai les listes de câbles utilisés de 5 personnes sur 10

TE-VSC

• DEC completed, will not evolve

• Used cable list under investigation. Some TE-VSC cables are not listed in EN-EL database

EN-STI

• DEC with 7 cables.

• Gesmar list analysed : green = EN-STI and in use, yellow = other group (50 cables).

• Paper list : analysis in progress.

TE-ABT

• 553 cables were announced obsolete but only 222 are really obsolete, the remaining is still in use till LS2 (Current BI.DIS)

• A DEC must be edited with these 222 cables

• The case of the former BI.DIS is not yet defined: can we consider it as an obsolete system ?

IT-CS

• T+T boxes 1 18045 0361 ASC-012 74931 0037 R-0093 78034 0037 R-0214 78200 0037 R-0035 75311 0037 R-0016 72064 0037 R-0197 75779 0037 R-0088 78601 0037 R-0239 78609 0037 R-006

10 72490 0037 R-02511 72493 0037 R-02712 72607 0037 R-01013 78869 0037 R-01114 76182 0037 R-02215 73249 0037 R-00216 76456 0037 R-00317 70382 0361 1-EXT18 76871 0364 2-01419 77089 0361 1-00020 77090 0361 1-00021 77397 0037 R-00522 74090 0037 R-01623 77425 0037 R-02024 74506 0361 S-00025 74507 0361 S-00026 74508 0361 S-00027 74509 0361 S-00028 74510 0361 S-00029 74512 0361 1-00030 74513 0364 2-01431 74514 0361 1-00032 74515 0271 1-001

Dashboard 04/09/15Localised Unlocalised

PS BOOSTER(12397)

SPS-BA3(8000)

SPS-BA5(6500)

PS-ring centre(7000)

Group IDENTIFIED DECIDENTIFIE

DDEC

IDENTIFIED

DECIDENTIFIE

DDEC

EN/ELEN/CV 78EN/MEF 96 96EN/STI 7 7 7TE/MSC 272 272TE/EPC 155 155 56TE/VSC 102 102 277TE/MPE 63 63TE/ABT 47 414 47 78 55 55BE/RF 129 129 5BE/BI 451 451 42BE/CO 597 597 251 230 230IT/CS

GS/ASE 47 47 16 600 600DGS/RP

PH 23 23OTHER 480TOTA

L2883 1989 3250 732 963 885

% 23% 16% 50% 11% 14% 13 %

Dashboard 17/09/15Localised Unlocalised

PS BOOSTER(11943)

SPS-BA3(8000)

SPS-BA5(6500)

PS-ring centre(7000)

Group IDENTIFIED DEC IR%IDENTIFIE

DDEC

IDENTIFIED

DECIDENTIFIE

DDEC

EN/EL 3 80EN/CV 0 0 100 78EN/MEF 96 96 100EN/STI 7 7 100 7TE/MSC 272 272 100TE/EPC 155 155 95 56TE/VSC 102 102 50 277TE/MPE 63 63 100TE/ABT 47 222 47 90 78 55 55BE/RF 129 129 100 5BE/BI 451(TBC) 451(TBC) 40 42BE/CO 597 597 100 251 230 230IT/CS 0 0 100

GS/ASE 47 47 90 16 600 600DGS/RP 0 0 100

PH 23 23 100OTHER 480 ?TOTA

L2694 1989 3250 732 963 885

% 23% 17% 50% 11% 14% 13 %

Partial/full removalCriteria Partial removal Full removal + re-

installation

Cost - --

Feasibility -- 0

Resources - --

Standard waste 0 -

Activated waste - --

Schedule - --

Risk (damage) -- -

Outcome - --

 Prix

[MCHF]Temps [W], work in

2shifts

Depose total 1.5 12Repose 4.2 50

     Depose partial 0.8 23

Preliminary study

YETS organization

• Lock-out of all services during identification and cable disconnection in conflict with some systemsIdentification and cable disconnection (YETS

2015) under the responsibility of the equipment group Up to the equipment group to decide for the lock-out of its equipmentWorking teams will need the adequate electrical

accreditationRemoval of the obsolete cables (EYETS 2016-

2017) under the responsibility of EN-EL general lock-out is mandatory.

YETS organization

• Re-commissioning after disconnection/removal – Common procedure a dedicated sub-WG will be launched soon.

• Will address the following topics:

• Procedure for already disconnected cable

• Procedure for not yet disconnected cable

• Procedure for orphan cable

• List of tests to be achieved after disconnection

YETS organizationYETS 2015/2016 Booster = 9 weeks available / SPS = 7 weeks available :

• Circuit lockout• Cable identification• Cable disconnection• System tests

YETS organization

• Current proposal:• Circuit lockout: 1-2 days

• Cable identification and disconnection for separate systems . 2 weeks in 2 shifts

• Check of separate systems: 2 weeks in 2 shifts

• Cable identification and disconnection for communication system: 2 weeks in 2 shifts

• Check communication system : 1 week in 2 shifts

• Co-activities during YETS and EYETS > Schedule to be prepared

• Tight schedule for BA3 & BA5

• Operators might help.

Project Information Sharing

E-groups• InjectorDe-CablingProjectMembers (members of the Injector De-Cabling Project

(equipment group))

• InjectorDe-cablingProjectTeam (Project team for de-cabling activities in the injectors)

Indico https://indico.cern.ch/category/6591/

Sharepoint sitehttps://espace2013.cern.ch/Injector-De-Cabling-Project/_layouts/15/start.aspx#/

Conclusions

• Booster: an exhaustive approach is followed. Each listed cable is being analyzed by group owner/user ( Obsolete cables + Used cables). Almost complete!

• Results:

• Paper listings contain more obsolete cables than Gesmar

• A lot of cables seems already removed, although they are still listed in DB.

• Used/unused ratio varies very much, depending on the equipment groups considered

• Only 25 % obsolete cables were identified up to now, this result will not evolve any longer and should be considered as final.

• The same methodology will be applied on SPS and PS.