INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Factory Name: Xin Chang Shoes (BD) Limited Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong Chittagong Bangladesh Assessor: Shaheedullah Date: 06 Mar 2017 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/23

Transcript of INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... ·...

Page 1: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

INITIAL FIRE SAFETY ASSESSMENT -EXPANSION

 

Factory Name: Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga ChittagongChittagong Chittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/23

Page 2: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/23

Page 3: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

GENERAL INFORMATION 

General Information

Factory Name: Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong Chittagong Bangladesh

Country: Bangladesh

Province: Chittagong

City: Chittagong

Zip Code:

Audit Duration: 4 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date: Mach-09,2017

Final Report Date: March 20, 2017

Are all Action ItemsFrom PreviousAssessmentCompleted?:

N/A

Buildings in Complex: There are 11 buildings in the complex, 2 main and 9 ancillary buildings.

Is the building(s) ownedor rented by the Factory:

Owned

Number of BuildingLevels (Stories):

1) Block A: 5-stories.

Approximate BuildingArea (SF):

Total Area surveyed: 334,096 SF. Block A: 209,895 SF.

Date of BuildingConstruction:

1) All buildings: 2009

Date of Last BuildingRenovation/Addition:

1) Undocumented canopies on Block A: 2016; 2) Shed attached to Canteen Building: 2017.

Ancillary Structures inComplex:

There are 9 ancillary buildings: 1) RC Office Building; 2) RC Restaurant Building (includes a shed); 3) RCPower Room; 4) RC Pump and Chemical Room (includes a metallic veranda); 5) Lamination Shed; 6)Wastage, Cutting Die and Cycle Stand Shed; 7) RC Guard Room 1; 8) RC Guard Room 2; 9) MaterialsWarehouse and Workshop Shed.

Approximate AncillaryStructures Area (SF):

Total SF of ancillary buildings: 124,201 SF. 1) RC Office Building: 46,500 SF; 2) RC Restaurant Building(includes a shed): 56,920 SF; 3) RC Power Room: 3,200 SF; 4) RC Pump and Chemical Room (includes a

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/23

Page 4: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

metallic veranda): 2,500 SF; 5) Lamination Shed: 2,900 SF; 6) Wastage, Cutting Die and Cycle Stand Shed:6,275 SF; 7) RC Guard Room 1: 465 SF; 8) RC Guard Room 2: 190 SF; 9) Materials Warehouse andWorkshop Shed: 5,251 SF.

Number of Occupants: Total occupants in surveyed buildings: 2,376. 1) Block-A: 2,249 (GF: 657, 1st: 90, 2nd: 750, 3rd: 750, 4th: 2);2) RC Office Building: 69 (GF: 40, 1st: 9, 2nd: 10, 3rd: 10); 3) RC Restaurant Building: (GF and 1st: AssemblyOccupancy for Dining (Two Shifts), 2nd: 0, 3rd: 0); 4) RC Power Room: 0; 5) RC Pump and Chemical Room:1; 6) Lamination Shed: 17; 7) Wastage, Cutting Die and Cycle stand Shed: 31; 8) RC Guard Room-1: 2; 9)Guard Room-2: 3; 10) Materials warehouse and workshop shed: 4.

Number of AncillaryLevels (Stories):

1) RC Office Building: 4-stories; 2) RC Restaurant Building: 4-stories; 3) All other ancillary buildings: 1-story.

Occupancy Type: 1) Block-A: G2, F1, J2, H2; 2) RC Office Building: F1, A; 3) RC Restaurant Building: E3, A; 4) RC PowerRoom: K; 5) RC Pump and Chemical Room: K; 6) Lamination Shed: G2, H2; 7) Wastage, Cutting Die andCycle stand Shed: H2; 8) RC Guard Room 1: K; 9) RC Guard Room 2: K; 10) Materials warehouse andworkshop shed: H2.

Construction Type: 1) Wastage, Cutting Die and Cycle stand Shed: Type-3; 2) All other buildings: Type-2.

Height of HighestOccupied Floor LevelAbove Grade:

1) Block-A: 18.6 m (61 ft); 2) RC Office Building: 12 m (39.5 ft); 3) RC Restaurant Building: 13.3 m (43.5 ft); 4)All other buildings: At grade.

 

 

 

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/23

Page 5: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

ASSESSMENT FINDINGS 

Expansion Details

Question: Are as-built drawings available for new fire safety features of the building?  

Priority Level: High

Non-Compliance Level: 3

Description: The as built drawings, including the scaled architectural documents for thebuildings and ancillary structures, assessed have not been found.

Source of Findings: Document Review: As built drawings have not been provided.

Suggested Plan ofAction:

Credible as built drawings for the new fire safety features of the building andancillary structures under the present assessment shall be prepared inaccordance with the Alliance Standards.

Suggested DeadlineDate:

12 Jun 2017

Standard: Alliance Standard reference 8.20

Fire Protection Construction

Question: Are openings and penetrations through rated walls and/or assembliesprotected?

  

 

Priority Level: High

Non-Compliance Level: 3

Description: Wall penetrations exist between a shaft and the compressor room on the 4thfloor Block-A. Floor penetrations exist from a PVC soil pipe in the productionarea of each floor of Block-A and the Restaurant Building. Openings havebeen found between the chemical storage and the production area on theground floor of Block-A.

Source of Findings: Visual Assessment: 1) Opening between chemical storage & production floor;2) Penetration between shaft & compressor; 3) PVC pipe penetration atRestaurant building; 4) PVC pipe penetration at Block-A.

Suggested Plan of Fire-resistive rated opening or penetration protection for rated walls and

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/23

Page 6: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Action: assemblies shall be provided in accordance with Alliance Standard Sections4.6 and 4.7. A qualified fire protection engineer shall be engaged to design therequired opening or penetration protection systems.

 

 

Suggested DeadlineDate:

03 Jun 2017

Standard: Includes doors, windows, ducts, piping, etc. Reference Alliance Standards Part4 Section 4.6 Opening Protectives and Section 4.7 Penetrations

Question: Is each floor separated with a fire-resistive rated construction barrier?   

 

Priority Level: High

Non-Compliance Level: 3

Description: Each floor is separated by 7 in. thick RC floor slab, including floor tiles, inBlock-A and Restaurant Building. Unprotected penetrations were observedthrough the floors.

Source of Findings: Photograph: 1)PVC pipe penetration at production building-A; 2)PVC pipepenetration at restaurant building, Visual Assessment: 1) PVC pipe penetrationat Block-A; 2) PVC pipe penetration at restaurant building.

Suggested Plan ofAction:

Provide fire-resistive rated opening or penetration protection for rated wallsand assemblies in accordance with Alliance Standard Sections 4.6 and 4.7.Consult a qualified fire protection engineer to design the required opening orpenetration protection systems.

Suggested DeadlineDate:

26 Aug 2017

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Are exit enclosures provided with fire-resistive rated construction barriers?   

Priority Level: High

Non-Compliance Level: 3

Description: Exit enclosures are not fire separated from office area at each floor of theOffice Building. The Restaurant area is open to Exit enclosures (S-E,S-W) atthe ground floor of the Restaurant Building.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/23

Page 7: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Source of Findings: Photograph: 1) Exit enclosure open to office area; 2) S-E, S-W Exit enclosuresopen to Restaurant area.

 

Suggested Plan ofAction:

Fire-resistive rated construction barriers and associated opening protection forexit enclosures shall be provided in accordance with Alliance StandardSections 4.5, 4.6, and 6.3.1.2. A qualified fire protection engineer shall beengaged to design the required rated construction barrier and openingprotection.

Suggested DeadlineDate:

03 Jun 2017

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Are shafts provided with the minimum fire-resistance rating?  

Priority Level: High

Non-Compliance Level: 3

Description: There are 2 cargo lifts installed in Block-A and one cargo lift installed in theRestaurant Building. The lift shafts are enclosed with 5 in. thick masonry at theperiphery. This provides a fire resistance rating of 1.5 hrs, which is less thanthe minimum required rating of 2 hrs.

Source of Findings: Photograph: Shaft enclosure

Suggested Plan ofAction:

Provide fire-resistive rated construction barriers for shafts in accordance withAlliance Standard Section 4.5.7. Consult a qualified fire protection engineer todesign the required rated construction barrier.

Suggested DeadlineDate:

30 Oct 2017

Standard: Reference Alliance Standards Part 4 Section 4.5.7.1 through 4.5.7.3

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/23

Page 8: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Question: Are separations between hazards provided with fire-resistive ratedconstruction barriers.

 

 

 

 

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Required fire resistance rated construction barriers have not been provided inthe following locations: 1) Finishing section and finish goods warehouse on 1stfloor of Block-A; 2) 3D room and shaft enclosure on 4th floor of Block-A; 3)Power Room and Maintenance Warehouse, where non-rated windows, doorsand other openings exist in the fire-resistive rated barriers, additionally, thespatial separation distance at grade is less than the minimum required 10 ft; 4)Restaurant area not properly fire from staircase (N-E) at ground floor ofRestaurant Building; 5) The Restaurant area is open to staircase (S-E,S-W) atground floor of Restaurant Building; 6) Shaft is open to dinning hall without fireseparation at ground floor of Restaurant Building.

Source of Findings: Photograph: 1) 3D & lift shaft unprotected; 2) Finished goods & finishingsection unprotected; 3) less than 10 ft; 4) N-W staircase unprotected withrestaurant area; 5) S-E, S-W staircase open to restaurant area; 6) Shaft opento dining area at GF of restaurant building.

Suggested Plan ofAction:

Provide fire-resistive rated construction barriers (with associated openingprotection) between hazard types in accordance with Alliance StandardSections 3.4 and 4.5. Consult a qualified fire protection engineer to design therequired rated construction barrier.

Suggested DeadlineDate:

24 Jun 2017

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Certificates of Occupancy for each building have been issued and are on file.  

Priority Level: Low

Non-Compliance Level: 1

Description: No Certificates of Occupancy for any building were provided for review.

Source of Findings: Document Review: The certificates of occupancy have not been found

Suggested Plan ofAction:

Apply to appropriate authority in an expeditious manner for issuance of theCertificates of Occupancy for each building and ancillary structure according tobuilding use.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/23

Page 9: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Suggested DeadlineDate:

15 Apr 2017

Standard: Are certificates of occupancy provided for each building or ancillary structure?

Fire Protection Systems

Question: Is the building protected by an automatic sprinkler system?   

 

Priority Level: High

Non-Compliance Level: 3

Description: The occupiable floor height of Block-A is 61 feet. The building is 5-stories andconstructed with prefabricated steel. The per floor area is approximate 41,979SF. Therefore, an automatic Sprinkler System is required. The required designdocument for installation of the Sprinkler System has been reviewed by theAlliance via their email dated Nov-24, 2016. It has been reported by the factorythat the equipment is currently being procured.

Source of Findings: Document Review: The design document of the combined system has beenreviewed by the Alliance

Suggested Plan ofAction:

The required combined (Sprinkler and Standpipe) system in Block-A shall beinstalled following the design document reviewed by the Alliance, and inaccordance with the Alliance Standard and NFPA 13.

Suggested DeadlineDate:

30 Jun 2017

Standard: Reference Alliance Standards Part 3 Section 3.5.3 Existing Buildings, Part 5Section 5.3 Automatic Sprinkler Systems and Section 6.13 Travel Distance

Question: Does the building have a Standpipe System?  

 

Priority Level: High

Non-Compliance Level: 3

Description: The design document for the installation of a combined (Sprinkler andStandpipe) system has been reviewed by the Alliance via their email datedNov-24, 2016. Class I Standpipe System including 1 inch hose connectionsonly in production building-A and Siamese connection & Fire departmentconnections are available in Factory premises.

Source of Findings: Document Review: The design document of the combined system has beenreviewed by the Alliance, Photograph: Hose Connection

Suggested Plan ofAction:

The required combined (Sprinkler and Standpipe) system shall be installed inproduction Building-A, Restaurant building, Office building following the designdocument reviewed by the Alliance, and in accordance with the AllianceStandard and NFPA 13. Prior to installation, the design documents shall besubmitted to the Alliance for Review.

Suggested DeadlineDate:

03 Jun 2017

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/23

Page 10: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Standard: Does the building have a standpipe system installed where required. AllianceStandard Part 5 Section 5.4.2

Question: Does the building have a fire pump?  

 

Priority Level: High

Non-Compliance Level: 3

Description: A fire pump (an electric, a jockey pump and a standby diesel operated pump)was found installed in the fire pump station, but does not appear to have beenreviewed by the Alliance. It is to be noted that a 1000 gpm fire pump with arated pressure of 10 bar has been selected for the combined (Sprinkler andStandpipe) system and will be installed in the facility. The design document ofthe sprinkler and hydrant system has been reviewed by the Alliance on datedNov-24, 2016 and that currently being installed.

Source of Findings: Document Review: The documents of combined (Sprinkler and Standpipe)system, Photograph: Existing Fire Pump

Suggested Plan ofAction:

A fire pump having the required capacity and head for the water supply of thecombined (Sprinkler and Standpipe) system shall be installed in the facility inaccordance with the Alliance Standards.

Suggested DeadlineDate:

27 May 2017

Standard: Alliance Standard Part 5 Fire Protection Systems

Question: Trouble or alarm notifications were not indicated on the fire alarm controlpanel.

 

Priority Level: High

Non-Compliance Level: 3

Description: There is no automatic fire alarm control panel. It is required throughout theproduction facility. The design document of the automatic fire alarm andsystem has been reviewed by the Alliance via email June-15, 2016. Installationis in progress.

Source of Findings: Visual Assessment: The facility survey.

Suggested Plan ofAction:

Install an automatic fire alarm and detection system for the facility. Systemshall comply with the Alliance Standard and NFPA 72. Consult a qualified fireprotection engineer and/or authorized fire alarm company to design and installthe system.

Suggested DeadlineDate:

20 Sep 2017

Standard: Alliance Standard Part 13 Section 13.10 Maintenance of Fire ProtectionEquipment

Question: Are notification and initiation devices for the fire alarm system installed atrequired locations based on occupancy type?

 

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/23

Page 11: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Priority Level: High

Non-Compliance Level: 3

Description: The design document of the automatic fire alarm and detection system hasbeen reviewed by the Alliance via email June-15, 2016. Automatic fire alarm,detection and central station monitoring(Control panel) installation is inprogress.

Source of Findings: Visual Assessment: The Facility Survey.

Suggested Plan ofAction:

Install initiating devices and notification appliances as required by the AllianceStandard and NFPA 72. This includes electrical supervision of all valvescontrolling fire protection systems (sprinklers, fire pumps, water supplies, etc.).Connect devices to an automatic fire alarm and detection system for thefacility. All fire alarm installations or modifications shall be documented withshop drawings and submitted for review by the Alliance prior tocommencement of installation.

Suggested DeadlineDate:

20 Sep 2017

Standard: Pull stations at egress points, smoke detectors in air handling equipment,visual and audible devices spaced appropriately based on occupancy type.Reference NFPA 72

Question: Is the fire alarm and detection system monitored by a central stationmonitoring service or directly connected to the Fire Service and Civil Defense?

 

 

Priority Level: Medium

Non-Compliance Level: 3

Description: The design document of the automatic fire alarm and detection system hasbeen reviewed by the Alliance via email on dated June-15, 2016. Automaticfire alarm and detection installation is on-going.

Source of Findings: Document Review: Document Review of the facility survey.

Suggested Plan ofAction:

Upon completion of installation of the fire alarm control panel, arrange fordirect connection of the fire alarm and detection system to a central stationmonitoring service or the Fire Service and Civil Defense as per AllianceStandard Section 5.7.5. Until that time, a person trained to contact the FireService and Civil Defense in the event of fire alarm activation shall beprovided. An annunciator shall be located in a constantly attended location(such as a fire control room) to alert this person.

Suggested DeadlineDate:

30 Jun 2017

Standard: Alliance Standard Part 5 Section 5.7.5 Monitoring

Question: Fire extinguishers are inspected, tested, and maintained as required.  

Priority Level: Medium

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/23

Page 12: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Non-Compliance Level: 2

Description: A monthly fire extinguisher checklist has been provided towards initialinspection, but it does not comply with NFPA 10 Chapter 10, and no recordstowards testing and maintenance have been provided.

Source of Findings: Document Review: The provided document has been reviewed.

Suggested Plan ofAction:

An inspection, testing, and maintenance program shall be established for allfire extinguishers and prepare proper documentation. Program must complywith NFPA 10.

Suggested DeadlineDate:

29 Jul 2017

Standard: NFPA 10 Chapter 7

Means of Egress

Question: The path of egress along the means of egress is not reduced at any pointalong the path of travel and is sufficient for the occupant load.

 

 

Priority Level: High

Non-Compliance Level: 3

Description: Aisle distance was measured to be more than 36 inches throughout the facilityexcept on Level 2 of finished goods area of Block A.

Source of Findings: Photograph: There are no aisles on level 2 of finished goods area ofproduction building.

Suggested Plan ofAction:

Aisles with the minimum unobstructed clear width of 0.9 m (36 in) based onoccupant load shall be provided following Alliance Standards

Suggested DeadlineDate:

15 Jun 2017

Standard: Alliance Standard Part 6 Section 6.5 Egress Width and BNBC Table 4.3.2

Question: Means of egress are free from impediments, obstructions, and storedmaterials.

 

Priority Level: High

Non-Compliance Level: 3

Description: Means of egress was found obstructed due to stand pipe system pipe line at4th floor of Block A.

Source of Findings: Photograph: Means of egress are obstructed.

Suggested Plan ofAction:

Relocate the standpipe system pipe line from the noted location, and thestairwells shall be maintained free of impediments, obstructions, and storedmaterials in accordance with the Alliance Standards.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/23

Page 13: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Suggested DeadlineDate:

04 Jun 2017

Standard: Alliance Standard Part 6 Section 6.3.8 Impediments to means of egress andSection 6.3.9 Reliability

Question: Doors are not locked in the direction of egress under any conditions. All hasps,locks, slide bolts, and other locking devices have been removed whererequired.

 

 

Priority Level: High

Non-Compliance Level: 3

Description: Fire doors (UL Certified) have been provided in Block-A and the RestaurantBuilding. Office Building and others buildings have been observed withLocking features, including hasps, locks, slide bolts, etc.

Source of Findings: Photograph: Locking features

Suggested Plan ofAction:

Remove all locking devices from all egress doors and means of egresscomponents in accordance with Alliance Standard Section 6.8. If locks arerequired for security reasons, utilize special door locking features complyingwith NFPA 101.

Suggested DeadlineDate:

27 May 2017

Standard: Alliance Standards Part 6 Section 6.8 Doors and Gates

Question: Doors along the path of egress have a minimum width of 0.8 m (32 in) andhave required ratings.

 

Priority Level: High

Non-Compliance Level: 3

Description: Doors were found compliant in Block-A, the Restaurant Building, and theOffice Building. Side-hinged swing type doors have been found all otherancillary structures in the facility.

Source of Findings: Visual Assessment: The facility survey.

Suggested Plan ofAction:

Non-compliant doors and frames shall be replaced in the means of egress withside-swinging doors. Door swing must be in the direction of travel.Replacement doors shall be a minimum width of 0.8 m (32 in), and are listed,approved, self-closing, fire rated door assemblies (door and frame) withlatching panic hardware.

Suggested DeadlineDate:

28 Oct 2017

Standard: Alliance Standard Part 6 Section 6.5.6 Minimum Widths. Increased occupantloads will require a door width greater than 0.8 m.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/23

Page 14: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Question: Aisles are provided with the minimum unobstructed clear width of 0.9 m (36 in)based on occupant loads.

 

 

 

Priority Level: High

Non-Compliance Level: 2

Description: Aisles were not noticed on level 5 and few places of the production areas onlevels 3 & 4 in the production building and on level 2 of the Restaurantbuilding. Aisles were found obstructed on level 2 (Finished goods area) of theproduction building, chemical room of RC pump and chemical room andWastage unit-1 & unit-2 of Wastage, cutting die and cycle stand shed.

Source of Findings: Photograph: No aisles mark in Restaurant 1st floor. Aisles obstructed atfinished goods areas of production building. Aisles obstruction in production.

Suggested Plan ofAction:

Provide proper aisle clear width minimum of 0.9 m (36 in) and providemarking. Keep aisles free of storage. Relocate equipment if necessary toprovide proper width. The path of egress travel along a means of egress shallnot be interrupted by any obstruction. The capacity of the means of egressshall not be reduced along the path of travel.

Suggested DeadlineDate:

03 Jun 2017

Standard: Higher occupancy loads will require a greater width to accommodate theincreased load. Alliance Standard Part 6 Section 6.5 Egress Width

Question: Exit discharge is directly to the exterior of the building, unless the requirementsof 6.17.2 are met, at grade or provides direct access to grade. Exit dischargeshall not reenter a building.

 

 

Priority Level: High

Non-Compliance Level: 2

Description: In Block A, there are four exits and all exits are directly to the exterior of thebuilding. In office building there are two exits and both exits are not directly tothe exterior of the building. In the Restaurant Building, there are three exitswhere two of them (S-W, S-E) are not directly to the exterior of the building.

Source of Findings: Photograph: Direct exit of production building. Exit not direct in Restaurantbuilding.

Suggested Plan ofAction:

Provide an Egress Court in accordance with Alliance Standard Section 6.17.2for non-compliant arrangements. Consult a qualified fire protection engineer todesign and/or approve the required egress court.

Suggested DeadlineDate:

30 Jun 2017

Standard: Alliance Standard Part 6 Section 6.17 Exit Discharge. See Section 16.7.2 and16.7.3 for exceptions.

Question: Landings are provided on both sides of doors used along the path of egress.Doors do not swing out over stairs.

 

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/23

Page 15: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Priority Level: High

Non-Compliance Level: 2

Description: Landing has not been provided on the outside of the exit door of stair # 1 & 2at all the floors of Block-A.

Source of Findings: Photograph: Landing obstructed by the fire door at all the floor of staircase 1 &2.

Suggested Plan ofAction:

Landings in the noted locations and in the similar other locations shall beprovided in accordance with the Alliance Standards. A qualified fire protectionengineer shall be engaged to solve this issue.

Suggested DeadlineDate:

10 Jun 2017

Standard: Alliance Standards Part 6 Section 6.8 Doors and Gates

Question: Exterior exit stairs are separated from the building with the required rating. Therating of the exterior wall shall extend 3.05 m (10 ft) beyond the ends of thestair structure.

 

Priority Level: High

Non-Compliance Level: 2

Description: There is an open window inside emergency staircase-1 on the 4th floor ofBlock-A.

Source of Findings: Photograph: Opening at 4th floor of emergency staircase-1.

Suggested Plan ofAction:

Provide a fire-resistive rated assembly between the exterior exit stairs (and10ft beyond the ends of the stairs) and the building to achieve the requiredseparation. Enclose any openings (windows, etc.) with required fire ratedconstruction within that 10 ft wall section. The rated assembly should bedesigned and/or approved by a qualified fire protection engineer.

Suggested DeadlineDate:

04 Jun 2017

Standard: Alliance Standard Part 6 Section 6.3.1.2. Three stories or less 1-hr rating. Fourstories of more 2-hr rating

Question: Interior exit stairways and ramps terminate at an exit discharge except whereterminating at a rated exit passageway.

 

Priority Level: High

Non-Compliance Level: 2

Description: Stairs (S-E, S-W) at the ground floor of Restaurant Building do not terminate atan exit discharge directly outside the respective buildings. Stair-1 & 2 of officebuilding do not terminate at an exit discharge directly outside the respectivebuildings.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/23

Page 16: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Source of Findings: Photograph: Exit discharge do not terminate directly.

Suggested Plan ofAction:

Exits shall discharge directly to the exterior of the building unless meeting therequirements of Alliance Standard Section 6.17.2 or 6.17.3. If requirementsare not met, route exits directly to the exterior or provide an exit passagewayin accordance with Alliance Standard Section 6.15 for non-compliantarrangements. Consult a qualified fire protection engineer to design and/orapprove the required exit passageway.

Suggested DeadlineDate:

04 Jun 2017

Standard: Alliance Standard Part 6 Section 6.14 Exit Enclosures

Question: Occupant loads are posted for every assembly and production floor in aconspicuous space near the main point of egress.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Occupant loads have been found posted in a few locations at the floor levelnear the doors at the entrance to stair enclosures of Block A, the RestaurantBuilding and the Office Building. No occupant loads have been found posted inthe assembly points of the facilities.

Source of Findings: Visual Assessment: The Facility Survey.

Suggested Plan ofAction:

Post the occupant load for all assembly and production floor areas in aconspicuous space near the main exit or exit access doorway for the space inaccordance with Alliance Standard Section 6.4.4.

Suggested DeadlineDate:

27 May 2017

Standard: Alliance Standards Part 6 Section 6.4.4 Posting of Occupant Load

Question: Emergency power for means of egress illumination is verified at least once peryear. If battery operated lights are used, these lights are tested on a monthlybasis. Functional testing of battery powered lights is provided for a minimum90 min once per year.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No document was provided towards monthly testing or annual functionaltesting of battery (IPS) powered Fog lights.

Source of Findings: Document Review: No document has been provided.

Suggested Plan ofAction:

Develop a testing and maintenance program that ensures the emergencypower for all egress lighting is verified at least once per year. If battery-operated lights are used, these lights shall be tested on a monthly basis.Functional testing of battery powered lights shall be provided for a minimum 30min once per year.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/23

Page 17: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Suggested DeadlineDate:

31 May 2017

Standard: Alliance Standards Part 10 Section 10.12 Illumination of Exit Signs and MeansOf Escape Lighting

Question: Illuminated exit signs are placed at entrances to exits and along the path ofegress anywhere the continuation of egress is not obvious or there is a changein the direction of the path of travel.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Illuminated exit signs have been placed at the entrances to the exit stairs andto the exit doors, but the directional signs are not appropriately located wherethere is a change in the path of egress, specifically the floor area of Block-A.

Source of Findings: Visual Assessment: The Facility Survey

Suggested Plan ofAction:

Provide continuously illuminated exit signs per Alliance Standard Section 6.11.Signs shall be placed at all required exits and along egress paths, especiallywhere there is a change in direction for the path of travel.

Suggested DeadlineDate:

31 May 2017

Standard: Alliance Standard Part 6 Section 6.11 Exit Signs

Question: Changes in elevation of walking surfaces do not exceed 6.35 mm (1/4 in)unless provided with a beveled slope of 1 in 2 that does not exceed 12.7 mm(1/2 in).

 

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Changes in the elevation of the walking surfaces have been found to begreater than ½ inch at all the exit stairs in Block-A.

Source of Findings: Photograph: Changes in elevation at emergency stair exit

Suggested Plan ofAction:

Limit abrupt changes in elevation for walking surfaces to 1/4 in. or less unlessprovided with a beveled slope of 1 in 2 that do not exceed 1/2 in. inaccordance with Alliance Standard Section 6.3.4.

Suggested DeadlineDate:

30 Jun 2017

Standard: Alliance Standard Part 6 Section 6.3.4 Walking Surfaces

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/23

Page 18: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Question: Illuminated exit signs are provided with battery backup or emergency powerand are continuously illuminated.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: All exit signs in the buildings and structures assessed are internally illuminatedby a rechargeable 6V built-in battery, but they are not capable of providingpower for 90 minutes duration in accordance with the Alliance Standards.

Source of Findings: Photograph: Emergency illumination of exit sign

Suggested Plan ofAction:

Provide an emergency power source (battery back-up or connection toemergency power system) to provide compliant illumination of exit signs.

Suggested DeadlineDate:

04 Jun 2017

Standard: Alliance Standards Part 6 Section 6.11 Exit Signs and Part 10 Section 10.12Illumination of Exit Signs and Means of Escape

Question: Emergency power for exit signs is tested at least once per year. If batteryoperated, these lights are tested on a monthly basis. Functional testing ofbattery powered signs is provided for a minimum 90 min once per year.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No Records regarding monthly, as well as once per year, functional testing ofbattery (IPS) back up lights for exit signs were found.

Source of Findings: Document Review: Document review have not found during audit.

Suggested Plan ofAction:

Develop a testing and maintenance program that ensures the emergencypower for exit signs is tested at least once per year. If battery operated signsare used, these lights are tested on a monthly basis. Functional testing ofbattery powered signs is provided for a minimum 90 min once per year.

Suggested DeadlineDate:

04 Jun 2017

Standard: Alliance Standard Part 10 Section 10.12 Illumination of Exit Signs and MeansOf Escape.

Question: Handrails are provided on both sides of each stairway. Intermediate handrailsare provided when the stair width exceeds 2.2 m (87 in.). Handrails are notmounted lower than 760 mm (30 in.) or higher than 1100 mm (44 in.).

 

Priority Level: Medium

Non-Compliance Level: 2

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/23

Page 19: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Description: Handrails are not provided on both sides of the stairways at all floors of officebuilding and 2nd floor to 3rd floor at (S-W)staircase of Restaurant building.The open guard pattern spacing was measured to be 14 inches at all floors ofRestaurant building (N-W, N-E) staircase.

 

 

Source of Findings: Photograph: No handrail at all staircase of office building. No handrail at 2nd to3rd floor of (S-W) staircase of Restaurant building. Open guard patternspacing more than 8 in.

Suggested Plan ofAction:

Provide handrails on both sides of each stairway. Intermediate handrails shallbe provided when the stair width exceeds 2.2 m (87 in.). Mount new handrailat a height consistent with existing height (between 30 in. and 44 in). Thespacing between vertical members will not exceed 200 mm (8 inch).

Suggested DeadlineDate:

30 Jun 2017

Standard: Alliance Standard Part 6 Section 6.9 Stairs and 6.12 Handrails and Guards

Question: Stair designation signs are provided at each floor entrance from the stair to thefloor in English and Bengali. Signs indicate the name of the stair and the floorlevel. Signs are posted adjacent to the door.

 

 

Priority Level: Low

Non-Compliance Level: 1

Description: The stair designation signs have been found in a few places of stair-1 & 2 ofBlock-A, but were not found at each floor entrance from the stair to the floorboth in English and Bengali in all the factory premises.

Source of Findings: Photograph: Designation found Designation not found

Suggested Plan ofAction:

Install signage adjacent to each stair door at the entrance from the stair to thefloor indicating the stair name and the floor level in both English and Bengali.

Suggested DeadlineDate:

13 Apr 2017

Standard: Alliance Standard Part 6 Section 6.9 Stairs

Fire Safety Programs

Question: Are the required number of people trained and certified in fire fighting, first aid,and rescue training by the appropriate authority.

 

Priority Level: High

Non-Compliance Level: 3

Description: No record was found of people being trained and certified in fire fighting, firstaid, and rescue training by the appropriate authority.

Source of Findings: Document Review: No document was found during assessment

Suggested Plan of Provide training and certification for the required number of people (18% of

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/23

Page 20: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Action: total workers) in fire fighting, first aid, and rescue training by an appropriateauthority in accordance with the Alliance Safety Training Curriculum.

Suggested DeadlineDate:

31 Oct 2017

Standard: Alliance Standard Part 13 Human Element Programs

Question: An emergency evacuation plan has been developed and communicated to allemployees.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: The evacuation plan provided for review does not appear to include allcomponents required by the Alliance Standards. The plan was also not foundto be communicated to all employees.

Source of Findings: Document Review: The document provided has been reviewed.

Suggested Plan ofAction:

Develop an emergency evacuation plan including all components required bythe Alliance Standards and communicate the plan to all employees as perAlliance Standard Section 13.1.

Suggested DeadlineDate:

13 Apr 2017

Standard: Alliance Standards Part 13 Section 13.1 Fire Safety Director

Question: Emergency egress maps are posted at the entrance to each exit stair or mainpoint of egress.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No emergency egress maps were noticed posted at the entrance to each exitstair or main point of egress in Block-A, the Restaurant Building or the OfficeBuilding.

Source of Findings: Document Review: Documents have not been provided.

Suggested Plan ofAction:

Develop an emergency evacuation plan incorporating all components requiredby the Alliance Standards and communicate the plan to all employees as perAlliance Standard Section 13.1.

Suggested DeadlineDate:

13 Apr 2017

Standard: Alliance Standards Part 13 Section 13.4 Evacuation Plan

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/23

Page 21: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Question: Fire Drills are conducted at required intervals based on building use type.   

 

Priority Level: Medium

Non-Compliance Level: 2

Description: According to the documents provided, the last Fire Drill was conducted onSept 06 2016, but only conducted twice a year.

Source of Findings: Document Review: The documents provided have been reviewed.

Suggested Plan ofAction:

Conduct fire drills on a quarterly basis as outlined in BNBC Part 4 Appendix A.Fire drills shall be conducted under the direction of a Fire Safety Director.

Suggested DeadlineDate:

30 Apr 2017

Standard: Alliance Standards Part 13 Section 13.3 Fire Drills

Question: Training programs are implemented and documented in accordance with theAlliance Safety Training Curriculum.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No documents were found during assessment for training programsimplementation and documentation in accordance with the Alliance SafetyTraining Curriculum

Source of Findings: Document Review: The documents have not been provided duringassessment.

Suggested Plan ofAction:

Implement training programs and document in accordance with the AllianceSafety Training Curriculum.

Suggested DeadlineDate:

16 Apr 2017

Standard: Alliance Standards Part 13

Question: Fire Department pre-planning has been completed.  

Priority Level: Low

Non-Compliance Level: 1

Description: No document has been provided for fire department pre-planning.

Source of Findings: Document Review: NO document shown during the audit.

Suggested Plan ofAction:

Complete Fire Department pre-planning activities with the local Fire Serviceand Civil Defence in accordance with Alliance Standard Section 13.1.1(2).

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/23

Page 22: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Suggested DeadlineDate:

30 Apr 2017

Standard: Alliance Standards Part 13 Section 13.1 Fire Safety Director

Question: A written housekeeping policy is established and enforced.  

Priority Level: Low

Non-Compliance Level: 1

Description: The written housekeeping policy for the facility is established and enforced, butit does not appear to be in compliance with the Alliance Standard.

Source of Findings: Document Review: The Documents review during assessment.

Suggested Plan ofAction:

Establish written corporate and plant policies on housekeeping to ensurescheduled cleaning for floor, wall, ceiling, supply and return air ventilationsystems. Promptly reschedule skipped cleanings. Provide a documented lineof authority for authorizing a cleaning delay and rescheduling.

Suggested DeadlineDate:

31 Oct 2017

Standard: Alliance Standards Part 13 Section 13.6 Housekeeping

Question: A hot-work permit program has been established.  

Priority Level: Low

Non-Compliance Level: 1

Description: The document provided towards a hot work permit program does appear to bein accordance with the Alliance Standards and NFPA 51B. The provideddocument is a policy where the permit part is absent.

Source of Findings: Document Review: The document provided has been reviewed.

Suggested Plan ofAction:

Develop a hot work permit program. The program must comply with therequirements of NFPA 51B.

Suggested DeadlineDate:

19 Aug 2017

Standard: Alliance Standards Part 13 Section 13.4 Hot Work Permit and NFPA 51B

Question: Smoking is only allowed at designated areas.  

Priority Level: Low

Non-Compliance Level: 1

Description: The factory has a “No Smoking Policy” with the strict prohibition of smoking inthe factory complex. However, no designated area, including, the requiredsigns throughout the factory complex assessed have been noticed to thiseffect during the inspection.

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/23

Page 23: INITIAL FIRE SAFETY ASSESSMENT -sfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Xin... · 2017-06-29 · requirements by which Bangladeshi Ready Made ... technical assistance, training,

Source of Findings: Document Review: The documents provided have been reviewed., VisualAssessment: The facility survey.

Suggested Plan ofAction:

Smoking is prohibited in garment factory buildings or similar uses. Post "NoSmoking" signs in English and Bengali at all building entrances. If the Ownerdesignates a smoking area outside the building, information on the location ofthese areas shall be posted on the "No Smoking" signs.

Suggested DeadlineDate:

08 Apr 2017

Standard: Alliance Standards Part 13 Section 13.5 Smoking

 

 

FactoryName:

Xin Chang Shoes (BD) Limited

Address: Plot 47-52 & 68-73, KEPZ North Patenga Chittagong ChittagongChittagong Bangladesh

Assessor: Shaheedullah

Date: 06 Mar 2017