INFSO-RI-223782
ENG Exploitation Plan
ETICS2 third AHM Isabel MatrangaEngineering Ingegneria Informatica SpA
Budapest, 22-24 June 2009
INFSO-RI-223782
2
Budapest, 22-24 June 2009ENG Exploitation Plan
Contents
• ENG Exploitation Plan
• ENG Potential Internal Customers
• Requirements for ENG Internal Customers
• ENG Adption Plan
• ENG from Research to Production
• Activities Performed
INFSO-RI-223782
4
Budapest, 22-24 June 2009ENG Exploitation Plan
ENG Exploitation Plan
Integration of ETICS system in Spago4Q and adoptionof the ETICS software for internal use
• Reduce costs and improve quality of the software• a company-owned infrastructure for building, testing and
quality verification would bring a total reduction of 50% of initial testing costs and an increase of the overall quality of the projects
• as an ISO and CMMI level 3 certified firm ENG is highly interested in the quality assurance monitoring aspects
• The integration ETICS/Spago4Q would contribute to the consolidation of Spago4Q one of Engineering open source products for the quality verification of processes and products
INFSO-RI-223782
5
Budapest, 22-24 June 2009ENG Exploitation Plan
Why Continuous IntegrationSoftware integration today …
INFSO-RI-223782
7
Budapest, 22-24 June 2009ENG Exploitation Plan
ENG Potential Internal Customers
• Directors and Head of production unitsThey are interested in:
• Having a satisfied customer• Delivering a high quality product• Access high level info
(Not interested in what kind of tool but in data)• Project Managers
They are interested in:• Simplifying their work • Monitoring costs (hardware, personnel etc.)
(Reluctant in using a tool they haven’t chosen)• Developers
They are interested in:• Performance• An easy to use tool
(Reluctant in changing the old tools for new ones)
INFSO-RI-223782
8
Budapest, 22-24 June 2009ENG Exploitation Plan
ETICS for Directors
• Monitor the quality of the product according to company quality standards (ISO, CMMI, ITIL)
• Quality metrics• A-QCM
• Gather homogeneous info from projects• Build and test reports
• Having a satisfied customer• Delivering a high quality product• Access high level info
•(Not interested in what kind of tool but in data)
INFSO-RI-223782
9
Budapest, 22-24 June 2009ENG Exploitation Plan
ETICS for Project Managers
• Real-time insight into Progress• Build status - Test status -Trend analysis
• Easy integration with the existing tool set• Support for different build tools, Support for different VCS, Plug-in architecture
• Traceability and auditability of the work performed • unique identification of source code used for each build• tracebility from the build artifact back to the originating source code
• Role based mechanism • Increased productivity
• continuous integration and automation• automation of Test execution
• Simplifying their work• Monitoring costs
•(Reluctant in using a tool they haven’t chosen)
INFSO-RI-223782
10
Budapest, 22-24 June 2009ENG Exploitation Plan
ETICS for Developers
• Not obstrusive• Support for different languages and tools• Support for different VCS• Plug-in architecture
• Simplifies reuse existing work• single place to find available projects
• Easy to install• Linux• Windows
• Easy to use• Performance
• Time spent on building, testing, in opening the webinterface etc.???
Performance An easy to use tool
(Reluctant in changing the old tools for new ones)
INFSO-RI-223782
11
Budapest, 22-24 June 2009ENG Exploitation Plan
Requirements for ENG Internal Customers
• Possibility to have insight into project activities (Trend analysis, graphs)
• Role based mechanism• Easy to Install (Windows)• Easy to use• Performance
• Time spent on building, testing, in opening the webinterface etc.
INFSO-RI-223782
13
Budapest, 22-24 June 2009ENG Exploitation Plan
ENG Adoption Strategy
Short Term ETICS part of the API portal; localinstallation
Medium Term Integration of ETICS in Spago4Q
Long Term ETICS as a service (Pont S. Martin)
INFSO-RI-223782
15
Budapest, 22-24 June 2009ENG Exploitation Plan
ENG from Research to Production
Research Innovation Production
Ideas for research projects Technological experimentation
Risults from research projects Verification of architectural and technological solutions
INFSO-RI-223782
17
Budapest, 22-24 June 2009ENG Exploitation Plan
ETICS software for internal use
• ENG project managers in the research area (CASPAR, Pharos, Qualipso)
• Representatives of companies part of Engineering group (Neta, Engiweb Security S.p.A)
• R&I department Head and PMs
• Meetings with Spago4Q representatives PM and technical personnel
• High level integration study
• Stage to finalize the integration study and to perform integration (September/October)