IT @ VIRAJ INDUSTRIES
![Page 2: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/2.jpg)
Acknowledgement
This IT project has been possible with the direct and indirect help of a number of people. It would be
failing in my duties if I do not express our gratitude to all of them.
I would wish to thank FORE School of Management for giving me this opportunity of taking this course
whereby I could make a project which has enhanced my knowledge and given me a concrete path to
work on. My heartiest thanks are to our faculty, Prof. Devendra Punia for his continuous facilitation and
guidance. He guided me on every step which helped me thoroughly to prepare this project.
My sincere thanks are to Ms. Sushmita Chakroborty, a part of the IT department of 3i-Infotech Ltd. for
providing valuable information about various workings of the ERP system implemented in Viraj. Her
specialized knowledge and valuable suggestions helped me a lot of in designing the
project. I would also like to thank Mr. Parekh of Viraj as he has been a great support and help
throughout the planning and development of the project.
![Page 3: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/3.jpg)
CONTENTS
S.NO. TOPIC PAGE NO.
1 Introduction 4
2 Information Systems Function & Components 5
3 Information System Management and Governance 5
3.1 Internet Policy 5
3.2 Auditing policy 7
3.3 Disaster recovery planning/ Business continuity plans 7
4 Enterprise Systems and other Software 9
4.1 Orion Enterprise solution
4.1.1 Implementation
4.1.2 Benefits derived by ERP Implementation
10
4.2 Time card system for Attendance 16
4.3 Document Management 16
5 References 17
![Page 4: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/4.jpg)
1. Introduction
Viraj is a global player in the stainless steel industry. High quality stainless steel products, timely
delivery and a broad customer base with exports to around 80 countries across the world, has gained
Viraj a wide acclaim. In the last 15 years, the company has grown in size and product ranges, keeping in
mind its customer centric approach, timely delivery and quality products. Today, Viraj’s operations are
spread over four continents with above 9000 employees working for the brand and has an annual
turnover of USD 1 billion.
The products manufactured at Viraj are of a high quality and value which is a direct reflection of the
organization’s beliefs and values in operating the business as a global leader in steel production. Viraj’s
products are increasing their respective market share. It is the largest producer of stainless steel flanges
in the world. With more than 95% of the production going towards exports, Viraj has operations and
agents in active hubs of the world, to cater to the local market.
Viraj produces Austenitic, Ferritic, Martensitic, Austenitic-Ferritic (Duplex) stainless steel grades while
supplying special grade stainless steel of Precipitation hardening, Cold heading & Electrode quality.
Viraj’s products have wide applications across diverse industries including Petrochemical Plants, Oil
Pipelines, Ships, Structural design, High tensile springs & cables, Boilers, Pressure vessels, Liquid
storage terminals, Liquid cargo ships and Surgical instruments to name a few.
Viraj group of companies has 6 companies into it:
1. Viraj profiles Ltd
![Page 5: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/5.jpg)
2. Viraj Steel Ltd
3. VSL Wires
4. Viraj Flanges Ltd
5. Viraj Alloys Ltd
6. Viraj Impo Expo Ltd
Viraj group of companies is situated in the interiors of Tarapur, Boisar, Mumbai. The head office is also
located at Tarapur. Viraj runs its business through the value contract system. They agree with the
customer or draw a contract for a fixed period of time to sell their products for a fixed price. Their end
products are wire, steel, billets, rods, bars, flanges. These products basically contain nickel in their main
composition and the price of the nickel is not fixed rather it is forecasted to appreciate in the future
period.
2. Information Systems Function & Components
Viraj profiles has got 16 people under their IT department. The main head of the IT department is the
COO of the company as well.
Components of Information System
IS components used by the organization are:
1. Hardware platforms : HP Systems
2. OS: Windows 2000
3. Enterprise software applications: Orion 10.4.0.004 (3i-Infotech)
a. Front End: D2K
b. Back End: Oracle 9i
3. Information System Management and Governance
Viraj’s profiles emphasizes on IT to drive their business needs. All kind of operations of their Business
flows starting from creation of Purchase order till making Sales to end customer is captured in the
system. Though the manual entries are still maintained but the records in the system are as well stored.
![Page 6: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/6.jpg)
PWC (Price water cooper ) is the main auditing firm for five of their division. It does financial auditing
on the basis of records available in the ERP. Hence management forces the employees to capture their
day to day transaction in the system.
3.1 Internet Policy:
The use of the Internet by company employees is permitted and encouraged where such use is suitable
for business purposes and supports the goals and objectives of the company and its business units. The
Internet is to be used in a manner that is consistent with the company’s standards of business conduct
and as a part of the normal execution of an employee’s job responsibilities.
Viraj Profiles Ltd considers the following as un-acceptable use of company provided Internet access and
Viraj employees are required to use Internet appropriately
General prohibitions:
Visit sites that contain obscene, hateful or other objectionable materials.
Make or post indecent remarks, proposals, or materials on the Internet.
Download or upload of any obscene, political, racist or religious material.
download of music and video files from internet
Users are discouraged from subscribing to unnecessary and irrelevant newsgroup subscriptions.
Waste time on non-company business activities
Any use of the network for personal, private, commercial or for-profit purpose
Personal use of Viraj Profiles Ltd network resources to host personal home pages, FTP sites,
Gopher servers, etc
Any use of the network for product advertisement, political lobbying, or political purposes
whatsoever
One of the imperatives of Viraj vision is assurance of the security of information assets belonging to
Viraj, and also the information that is entrusted by employees, customers, vendors, investors and the
public at large.
Information security translates to the preservation of the following three goals:
![Page 7: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/7.jpg)
a) Confidentiality: assurance that information is accessible only to those authorized to have access.
b) Integrity: assurance of the completeness and accuracy of information and its processing methods.
c) Availability: assurance that authorized users have access to information and associated assets when
required.
Information can be stored, processed or transmitted in many different ways. Viraj makes extensive use
of Information Technology (computers, high speed storage, communication devices etc.) for these
purposes. They use traditional means of storing, processing and transmitting information – for example,
by writing or printing it on paper, or communicating it over phone, fax or in face to face conversations.
Information must always be appropriately protected, regardless of the manner in which it is stored,
processed or transmitted.
Inadequate protection of information and information assets can severely impact their capability to
achieve and sustain their vision. For example:
A virus attack on a single computer in a network could result in the virus spreading to all other machines
in the network, and impact all work.
Unauthorized alteration of the contents of Viraj’s home page on the Internet can seriously affect their
brand image.
Inappropriate disclosure of confidential customer information, whether it is revealed to unauthorized
users on a computer system or it is told to them in a conversation, can lead to violation of contractual
agreements with a customer, financial loss, and loss of trust.
3.2 Auditing policy:
Viraj’ security framework is aligned with the ISO27001 standard. The external surveillance audits for
the same happen twice a year.
3.3 Disaster recovery planning/ Business continuity plans:
![Page 8: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/8.jpg)
Viraj has adopted the best practices towards Business continuity management. This includes aligning
their practices to global frameworks including
a) TR 19 (Spring Singapore standard)
b) BS25999
c) ISO 27001/2005
d) eSCM
The company has categorized the Business continuity plans that it can offer to its clients into three
distinct levels. The information about these is summarized as below:
Level 1: Minor Technical and Telecom Problems such as Server Connectivity failure, LAN/LAN
Component Failure, Desk Top Failure, Power supply failure etc. Viraj will ensure redundancies
with respect to the above issues during the technology design phase & ensure connectivity in
case of primary link failure.
Level 2: Major Technical or Telecom Problems or building / city are out of bounds at the
primary site.
Site temporarily unavailable for a period in excess of 24 Hours (Long run public
disturbance/strike etc) or unavailable for a period in excess of 24 hours due to limited damage to
the building.
Site temporarily unavailable due to Failure of the Telecom connectivity on both the Primary and
the Secondary lines.
Viraj resources operate from an alternate recovery site in Level 2 Disaster, within the same city
and/or country.
Level 3: Major Technical Problem and Both Primary and Secondary Sites are not available.
Non availability of the primary and secondary site due to country level disaster.
![Page 9: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/9.jpg)
Viraj resources operate from an alternate recovery site, outside the country, in Level 3 Disaster,
within the same city and/or country.
One of the basic tenets of the company’s BCP/DR strategy is proactive readiness and not just
reaction to the BCP/DR when it strikes. To that end, they have ample readiness in terms of
Infrastructure, Security, BCP & Risk Education, Floods, Cyclones & Lightning, Transport
Disruptions, Mass Sickness, General Strike, Electricity Redundancy, Technology & Telecom
redundancy.
Viraj has a detailed Disaster Recovery & Business Continuity plan called the Phoenix plan at the
Corporate Level. There is a comprehensive Disaster Recovery Plan (DRP) in place that takes into
consideration eventualities from a Partial Disaster and a Total Disaster.
The Business Continuity and Disaster Recovery (BC&DR) plan is done at Organization level,
development centre level (location specific) and client account level (applicable for large
relationships). The disaster recovery plan is documented, communicated and tested to ensure the
continuity of operations and availability of critical resources after a disaster.
4. Enterprise Systems and other Software
Before we dwell on how Viraj implemented an ERP system for integrating their various departments, let
us try to understand what exactly an ERP system is. ERP is an industry term for integrated, multi-
module application software packages that are designed to serve and support multiple business
functions. An ERP system can include software for manufacturing, order entry, accounts receivable and
payable, general ledger, purchasing, warehousing, transportation and human resources. Evolving out of
the manufacturing industry, ERP implies the use of packaged software rather than proprietary software
written by or for one customer. ERP modules may be able to interface with an organization's own
software with varying degrees of effort, and, depending on the software, ERP modules may be alterable
via the vendor's proprietary tools as well as proprietary or standard programming languages.
By becoming the integrated information solution across the entire organization, ERP systems allow
companies to better understand their business. With ERP software, companies can standardize business
processes and more easily enact best practices. By creating more efficient processes, companies can
concentrate their efforts on serving their customers and maximizing profit.
![Page 10: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/10.jpg)
Key Points of the System
System should be flexible, expandable and easy to manage
Reduce complexities of the IT environment
Reduce the reliance on certain people to maintain the systems
Better control over various department functions.
A Standard system which can be easily scaled for rapid expansion of business
4.1 Orion Enterprise solution
ORION , an enterprise solution from 3i-Infotech Ltd. is functionally rich, highly configurable, scalable,
robust integrated enterprise class solution that can be deployed on Windows, Unix and Linux platforms.
It supports centralized, distributed and web based computing architecture. Orion has been developed on
Oracle environment utilizing its robust, reliable open systems architecture.
A highly scalable ORION enables one to integrate all areas of businesses such as Operations,
Manufacturing, Warehouse Management, Web Portals, Sales Route Accounting to increase operational
efficiencies across the enterprise. It helps to boost customer satisfaction through effective control over
costs and enhanced profitability.
ORION’s flexible design and extensive parameterization allows it to cater to dynamic, vast business
requirements. In addition, its high scalability ensures to sustain business growth.
![Page 11: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/11.jpg)
In order to secure investments, business continuity risks and to reduce total cost of ownership, Orion is
offered on Software as a Service model.
Orion focuses on the unique and specialized requirements of midsize to large process manufacturers and
distributors in food and beverage, chemicals, life sciences, pharmaceuticals, medical devices, cosmetics,
warehousing-logistics and, related industries.
ORION is an end-to-end integrated software application and deployment platform, is a seamless, open
product that includes full-featured ERP expertise coupled with CRM (Customer Relationship
Management) and SCM (Supply Chain Management) features. Implementing the ORION platform gives
the power to combine individualized customer and supplier management, transactional fluidity, incisive
strategic analysis and Internet procurement and sales, with strong financial and production operations. It
allows you to monitor order status, and concurrently coordinate manufacturing, inventory and dispatch
of finished goods - across multiple locations.
ORION supports multi-company, multi-division/profit centers and other multi-department/cost-center
kind of organization structures. It has 9 levels of Accounting hierarchy
Viraj has implemented Orion Enterprise solution to capture their day to day transaction start from
procure to pay till order to cash cycle. The suppliers, customer and material information is stored at
master data level. Day to day processes are captured at transactions level.
The customer orders for material. The sales order for the customer is created in the system.
The system then checks the availability of the material. If it’s not there it gives a request to shop
floor for the production of the same. This is called as make to order production.
Once the shop floor receives the request it will estimate by which date the material will be
delivered to the end customer based on the raw material availability. The raw material can be
stored at storage location or can be procured externally.
If it has to be externally procured then they will generate a material requisition request through
the system. The requisition will be approved by the store manager.
Once the request is approved a purchase order for the same would be created in the system.
Once order is created supplier would deliver the raw material.
The system will capture the goods receipt i.e material inward data. Now the raw material is
available for the production of finished goods.
![Page 12: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/12.jpg)
Generally they use material requirement planning which triggers the system to create the
requisition as soon as a sales order is created in the system.
Once the finished good is manufactured the sales invoice is created where in they will add all
necessary excise duties and VAT to come up with the total Sales amount. The goods are then
shipped to customer at their address.
Currently in Viraj the shipment to the customer is not captured through the system. But in future they
are planning for Fleet management system to be integrated with Orion enterprise solutions.
All financials impacts are created when the sales invoice is posted in the system. It actually internally
passes a voucher through which the customer account is debited and their sales account is credited.
Orion Enterprise
Chart of accounts is also maintained in the system. Every quarter they generate their balance sheet
through Orion Enterprise.
Orion HRMS and Payroll module
HR operations are also captured through Orion HRMS and Payroll module which is actually an Add
in into the Orion enterprise. The Purchase order for this module is created separately. All leave and
attendance, Salary processing, transport, deductions, performance management is captured through this
module.
4.1.1 Implementation:
The implementation for various processes in ORION Enterprise solution has been done in the following
way:
Sl
.
Processes Sub Processes / details Product Mapping
1 Goods
Receipt Note
(GRN)
GRN is prepared for accepted
quantity only. Rejected quantity is
mentioned in the challan & it is sent
back to the supplier. Stock is
In Orion, this is mapped through Goods Receipt Note
entry referring Inspection note. Accepted quantity to be
entered as received quantity. Stock is updated for
received quantity.
![Page 13: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/13.jpg)
updating for accepted quantity only.
Excess quantity is accepted in
certain cases.
Accepted quantity is taken in the
stock at respective location and
payment is made for accepted
quantity only.
Currently at site / location, for cash
purchases below 500, there is direct
GRN, i.e. No PO.
During Inspection entry, quantity in excess of PO
quantity can be accepted within set Tolerance limit for
each item as per item master definition. Negative
tolerance as well as positive tolerance can be defined in
this case for individual item.
During GRN entry, stock for entered Location will be
updated for received quantity. Bills to be registered for
received quantity only and payment also to be
accordingly.
Each site store is mapped as separate location-code
through Orion Location master.
Separate transaction codes to be configured for
Purchases below Rs. 500 for each site and GRN to be
entered directly without PO reference.
2 Goods
Receipt Item
Costing
Accounts department does GRN
Costing.
Cost calculation: Costing is done
after receipt of the goods. Costing
will capture different kinds of
expenses as per GRN. The costing
of items should be linked to Stock
valuation and accounts.
Various tax & expenses as
applicable will be accounted in
GRN.
In Orion, this is mapped through GRN Costing and
Level 1 Authorization (Authorization type - Vertical
All).
Various Tax / Expenses / Discounts can be either pulled
from PO or to be entered through Item level Tax /
Expense / Discount (TED) block during GRN Costing.
Accordingly Item landed cost will be calculated and
stock valuation will be maintained. Stock Financial
entries will also be passed based the GRN Item landed
cost.
Item WAC(Wholesale acquisition cost) to be defined as
stock valuation method in Item master. Accordingly
Item WAC will be updated.
3 Obsolete
stock
handling and
sale of
obsolete
stock.
Obsolete stock is identified and sold
to the scrap dealer.
Through Stock ageing report one can find total quantity
of Obsolete stock. This obsolete stock selling is
mapped through normal Sales process (Sales Order à
Sales Invoice à Payments from Customer and so on).
4 Stock
reconciliation
Stock reconciliation is done at the
end of every month to reconcile the
In Orion, this is mapped through Stock reconciliation
process i.e Stock take plan, Stock take sheet, Stock
![Page 14: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/14.jpg)
process
(Physical
Stock
verification)
physical stock balance (Closing
balance) based on inward and
outward movement of the item.
This Stock reconciliation is done for
all sites / locations separately.
Any deviation in the stock is
adjusted with the permission of
management at the end of financial
year.
variance report and stock adjustment.
In Orion, this is mapped through separate site-wise /
location-wise Stock Take Plan. Stock reconciliation
process is executed separately for each site / location.
In Orion, this is mapped through Stock adjustment &
Level 1 Authorization. (Authorization type - Vertical
All)..
5 Rejection
Note / Debit
Note
Debit note along with Rejection note
is prepared & sent to supplier in
case of material is rejected
subsequently to GRN acceptance
due to non-usability of materials /
equipments because of malfunction.
Stock is updated for rejected
material.
This is mapped through Supplier Return entry. Debit
Note / Rejection Note document can be printed as per
PIL given format.
Stock will be updated (reduced) during stock
confirmation of Supplier Return document.
6 Supplier Bill
booking
Provisional Liability is booked in
separate Provision Account during
GRN accounting.
At the time of bill booking, actual
supplier liability is booked and
provisional liability is reversed.
Provisional FEG will be passed based on Supplier
Suspense Account Setup at the time of GRN posting.
At the time of Supplier Bill registration, provisional
entry will gets reversed and actual supplier liability will
be booked.
7 Inventory /
Supplier
Accounting
Currently Supplier accounts are
maintained as follows:
o Sundry creditors for goods
o Sundry creditors for
Expenses
o Sundry creditors for
Capital
o Sundry creditors for
Subcontractor
Supplier classification is based on
Supplier Class as ‘A’,‘B’, and ‘C’
and not based upon the type of
material he is supplying.
Separate Creditors Control Accounts for various types
of creditors needs to be defined through Main Account
Master and Creditors as Sub-Account to be linked to
corresponding Creditors Control Account.
Supplier classification as ‘A’, ‘B’ or ‘C’ is mapped
through flex-1 in Supplier Master. PIL to enter the
Supplier corresponding class manually.
Stock value posting will be based on Inventory Account
Setup.
![Page 15: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/15.jpg)
Stock value is posted in Finance
based on Item sub-category.
8 Inventory
related
Documents /
Reports
List of Documents:
o GRN
o Material Issue slip
List of Reports:
o Location-wise (Site-wise) Stock
Ledger
o Stock Ageing Report
GRN Costing Sheet printing
Issue Slip document printing
Inventory Stock Ledger / Unconfirmed Stock Ledger
Location-wise Stock Ageing / Location group-wise
Stock Ageing
9 Finance related Documents / Reports
List of Documents:
o Cash / Bank Receipt Voucher o Cash / Bank Payment Vouchero Journal Vouchero Debit Noteo Credit Noteo Cheque Printing
Voucher PrintingVoucher PrintingVoucher PrintingVoucher PrintingVoucher PrintingAvailable standard format in Orion. Customized as per Viraj’s requirement
4.1.2 Benefits derived by ERP Implementation:
1. A common database from ERP, accounting no longer requires duplicate files and redundant data
entry. As manufacturing transactions are recorded, the financial equivalents are automatically
generated for updating the general ledger. This provides a complete audit trail from account
totals to source documents, ensures accurate and up to date financial information, and permits
tracking of actual versus budgeted expenses. Detailed transaction activity can also be easily
accessed online for answering account inquiries.
2. Since manufacturing transactions automatically update the general ledger, time-consuming
manual journal entries can be eliminated. Period end closing procedures can be performed in
hours or days, rather than weeks. This reduces clerical accounting work, and improves the
timeliness of financial reports.
3. Financial reports can be easily customized to meet the needs of various decision-makers.
Financial projections can be based on detailed ERP calculations for future requirements.
![Page 16: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/16.jpg)
4. Effects on product and process design - the product structure database offers engineering much
greater control over product and process design, especially in terms of engineering change
control. Planned changes can be phased in and emergency changes can be communicated
immediately. ERP systems offer numerous analytical tools for the engineering function. When
diagnosing the impact of changes to materials and resources, for example, engineers can check
where used information to identify the affected products.
5. Effects on production and materials management - ERP systems help establish realistic schedules
for production and communicate consistent priorities so that everyone knows the most important
job to work on at all times. Visibility of future requirements helps production prepare for
capacity problems, and also helps suppliers anticipate and meet your needs. As changes to
demands or supplies do occur, ERP helps identify the impact on production and purchasing.
6. Effects on sales - Customer service can be improved by making valid delivery promises and then
meeting those promises. Custom product quotations can be developed faster and more
accurately, which improves job estimating. Delivery lead times can be shortened and customer
inquiries on order status can be answered immediately.
7. Effects on the MIS function - An ERP system implemented as an integrated software package
offers several advantages to the MIS function. The software package can offer a growth path
from simple to comprehensive applications built on top of a database management system. It
provides an upgrade path to technology and functional enhancements supported by the software
vendor. It can reduce the development time and cost for software, documentation, and training
classes. These costs would be incurred before the firm can start obtaining the benefits of an ERP
system. It permits the MIS staff to focus their attention on organizational change and servicing
user needs for customization and professional assistance.
4.2 Time card system for Attendance
Viraj has implemented an automated attendance for its offices and workshops. Each employee has a
punch card which stores employee information. The employee needs to use the punch card at the
security gates which then automatically updates their attendance.
![Page 17: Information Technology Infrastructure Project](https://reader038.fdocuments.in/reader038/viewer/2022100516/5526ade65503468e6e8b4e6a/html5/thumbnails/17.jpg)
4.3 Document Management
Microsoft SharePoint Portal Server provides complete document management functionality, with a
robust routing and approval process for documents.
Versioning capabilities streamline collaboration efforts and make it easier for users to track changes in
documents. This improves the quality of documents and speeds the time to publication. With the
extensive SharePoint search and categorization features, published material is easier to locate, manage
and maintain.
These implementations made by Viraj have provided them with solutions that are flexible and cost
effective. The ERP allows them to scale their operations easily. It has also helped the organization in
getting consignments easily and meeting their deadlines within the given time period.
5. References