Information Delivery Manual: Roadmapiug.buildingsmart.org/idms/roadmap/IDM_Roadmap_1_1.pdf ·...
Transcript of Information Delivery Manual: Roadmapiug.buildingsmart.org/idms/roadmap/IDM_Roadmap_1_1.pdf ·...
International User Group
Information Delivery Manual:
Roadmap
Contact information:
International IDM Coordinator
Jan Karlshøj, [email protected], +45 2463 7721
Copenhagen: 10-12-2011
Adopted at the International User Group meeting in Abu Dhabi 30-31 March 2011
International User Group
IDM Roadmap:
Background
• The Executive User Committee (UserCom) initiated develop of an IDM
Roadmap
– Steen Sunesen, NO and Jan Karlshøj, DK made the initial draft which was
presented for UserCom in New York, December 2010
– UserCom ask IUG for adoption of the Roadmap
• Purpose of the Roadmap
– Identify the most important exchange scenarios during a lifecycle of a facility that
should be support by IDMs
– Prioritise which IDMs that should be developed first
– Stimulate development and implementation of the top prioritised IDMs
– Attract sponsors to financially support the development of the top prioritised
IDMs
• Content of the Roadmap
– Only identify overall exchange scenarios
– Identified top prioritised IDMs
– Indicate if development of the identified IDMs have started or not
International User Group
IDM Roadmap:
Preconditions and methodology
• Prerequisites
– Uses
– ISO 29481-1:2010, Table A.1 *
• Mapped to OmniClass table 31
– Define a list of Services
• Services mapped to OmniClass table 32
• Layout methodology
– Roadmap as a Matrix
• Stages; Pre-lifecycle, Pre-Construction, Construction, Post-construction
• Services
• There has been identified individual IDMs for each stage/phase.
• First and second level of top prioritized IDMs have been identified and in
which areas development already has started
• (Parties are not included yet)
International User Group
Life
cycl
e S
tage
s in
ISO
29
48
1
Pre-lifecycle stages Pre-Construction stages Construction stages
Post-construction stages
Inception Brief Design Production Maintenance Demolition
Port
folio
req
uir
emen
ts
Co
nce
pti
on
of
nee
d
Ou
tlin
e fe
asib
ility
Sub
stan
tive
fea
sib
ility
Ou
tlin
e co
nce
ptu
al d
esig
n
Full
con
cep
tual
des
ign
Co
ord
inat
ed d
esig
n(a
nd
p
rocu
rem
ent
Pro
du
ctio
n In
form
atio
n
C
on
stru
ctio
n
Op
erat
ion
an
d m
ain
ten
ance
Dis
po
sal
Om
niC
Lass
Tab
le 3
1
31
10
11
00
Nee
ds
Iden
tifi
cati
on
P
has
e
31
10
14
00
Co
nce
pt
Ph
ase
31
10
45
00
Pre
limin
ary
Des
ign
Ph
ase
31
10
45
00
Bu
dge
tin
g P
has
e
31
20
10
00
Pre
limin
ary
Pro
ject
D
escr
ipti
on
Ph
ase
31
20
20
00
Des
ign
Dev
elo
pm
ent
Ph
ase
31
25
00
00
Co
nst
ruct
ion
Do
cum
ents
St
age
31
40
00
00
Exe
cuti
on
Sta
ge
31
40
00
00
Exe
cuti
on
Sta
ge
31
50
00
00
Uti
lizat
ion
Sta
ge
31
60
00
00
Clo
sure
Sta
ge
IDM Roadmap:
ISO Stages mapped to OmniClass Table 31
International User Group
IDM Roadmap:
IDM Services mapped to OmniClass Table 32
Service OmniClass
Client's needs 32-41 21 00 Design Services, Programming 32-41 81 00 Design Services, Validating 32-57 81 13 Implementation Services, Assuring, Inspecting
Regulatory 32-81 61 00 Governmental Service, Regulating
Modeling 32-57 71 15 Implementation Services, Postconstructing, Commissioning 32-49 11 00 Modeling
Performance Analysis 32-35 57 13 Conceptualization Services, Information Processing, Analyzing
Cost 32-35 51 11 Conceptualization Services, Quantifying, Taking Off 32-11 00 00 Transactional Services, Estimating
Construction 32-57 61 00 Implementation Services, Constructing
Operate 32-65 21 Utilization Services, Operating 32-65 31 00 Utilization Services, Maintaining
Documentation 32-49 61 00 Documentation Services, Record Keeping
Coordination 32-35 57 19 Conceptualization Services, Information Processing, Coordinating
Presentation 32-49 51 00 Documentation Services, Recording
International User Group
IDM Roadmap:
Services, Lifecycle stages and IDM
Services
ISO 29481-1:2010, Table A.1 Stages
IDM IDM
IDM IDM
IDM IDM
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages
Inception Brief
Portfolio requirements
Conception of need Outline feasibility Substantive feasibility
Client's needs Design brief to design
Compare proposal with brief
Client's evaluation
Regulatory Do code compliance checking
Modelling Existing conditions building/ environment to
design
Make Archi. BIM model
Make Elect. BIM modeL
Make HVAC. BIM model
Make Struc. BIM model
Make Georeferencing
IDM Roadmap:
Identified IDM per stage per service
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages
Inception Brief
Portfolio requirements
Conception of need Outline feasibility Substantive feasibility
Performance Analysis
Perform energy analysis
Perform HVAC control analysis
Perform Structural analysis
Perform Elec analysis
Perform Daylight analysis
Perform Egress analysis
Perform LCC analysis
Perform security analysis
Cost Make quantity take-off
Perform cost analysis
Coordination Perform consistency control
Presentation Visualize Solution
IDM Roadmap:
Identified IDM per stage per service
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Client’s needs Compare proposal with brief
Compare proposal with brief Compare proposal with brief
Client's evaluation
Regulatory Do code compliance checking Do code compliance checking
Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model
Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model
Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model
Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model
Performance Analysis Perform energy analysis Perform energy analysis
Perform HVAC control analysis Perform HVAC control analysis
Perform Structural analysis Perform Structural analysis
Perform Elec analysis Perform Elec analysis
Perform Accessibility analysis Perform Accessibility analysis
Perform Acoustic Simulation Perform Acoustic Simulation
Perform Daylight analysis Perform Daylight analysis
IDM Roadmap:
Identified IDM per stage per service
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Performance Analysis cont.
Perform Egress analysis Perform Egress analysis
Perform LCC analysis Perform LCC analysis
Enhance element with Fire requirements
Perform security analysis Perform security analysis
Cost Make quantity take-off Make quantity take-off Make quantity take-off
Perform cost analysis Perform cost analysis Perform cost analysis
Documentation BIM handover to contractor
Make FM documentation
Coordination Perform Consistency control Perform Consistency control Perform Consistency control
Presentation Visualize Solution Visualize Solution Visualize Solution
IDM Roadmap:
Identified IDM per stage per service
International User Group
Services ISO 29481-1:2010, Table A.1: Construction stages
Production
Production Information Construction
Client’s needs Compare proposal with brief Compare proposal with brief
Regulatory Start commissioning
Cost Make quantity take-off
Perform cost analysis Perform cost analysis
Construction Find construction products
Sim.construction sequencing
Perform procurement
Perpare safty on site
Control machinery
Handle construction logistics
Documentation BIM handover to subcontractor
Make production doc.
Make FM documentation
Coordination Perform consistency control
Presentation Visualize Solution Visualize Solution
IDM Roadmap:
Identified IDM per stage per service
International User Group
Services ISO 29481-1:2010, Table A.1: Post Construction stages
Maintenance Demolition
Operation and maintenance
Disposal
Performance Analysis
Perform energy optimization
Monitor building
Regulatory Recycle material
Prepare demolition of building
Operation Manage spaces
Schedule maintenance
Documentation Make FM documentation
Make FM docu. from non BIM
Create opera. doc. from BIM
IDM Roadmap:
Identified IDM per stage per service
International User Group
IDM Roadmap:
Prioritised IDMs
• The main purpose of an Information Delivery Manual is to certify that
the relevant data is communicated in such a way that the software at
the receiving end can interpret it. It is important point out that in order
to make an Information Delivery Manual functional, it has to be
supported by software.
• By identifying and focusing on top prioritized IDMs the aim is to gain
momentum and profit on already existing results. Several areas have
been identified as crucial for the industry as shown in the tables.
• The top prioritized IDMs are subdivided into a primary and secondary
group as shown in the following tables.
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages
Inception Brief
Portfolio requirements
Conception of need Outline feasibility Substantive feasibility
Performance Analysis
Perform energy analysis
Perform HVAC control analysis
Perform Structural analysis
Perform Elec analysis
Perform Daylight analysis
Perform Egress analysis
Perform LCC analysis
Perform security analysis
Cost Make quantity take-off
Perform cost analysis
Coordination Perform consistency control
Presentation Visualize Solution
IDM Roadmap:
Prioritised Information Delivery Manual (IDM) Primary Secondary
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Client’s needs Compare proposal with brief
Compare proposal with brief Compare proposal with brief
Client's evaluation
Regulatory Do code compliance checking Do code compliance checking
Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model
Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model
Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model
Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model
Performance Analysis Perform energy analysis Perform energy analysis
Perform HVAC control analysis Perform HVAC control analysis
Perform Structural analysis Perform Structural analysis
Perform Elec analysis Perform Elec analysis
Perform Accessibility analysis Perform Accessibility analysis
Perform Acoustic Simulation Perform Acoustic Simulation
Perform Daylight analysis Perform Daylight analysis
Primary Secondary IDM Roadmap:
Prioritised Information Delivery Manual (IDM)
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Performance Analysis cont.
Perform Egress analysis Perform Egress analysis
Perform LCC analysis Perform LCC analysis
Enhance element with Fire requirements
Perform security analysis Perform security analysis
Cost Make quantity take-off Make quantity take-off Make quantity take-off
Perform cost analysis Perform cost analysis Perform cost analysis
Documentation BIM handover to contractor
Make FM documentation
Coordination Perform Consistency control Perform Consistency control Perform Consistency control
Presentation Visualize Solution Visualize Solution Visualize Solution
Primary Secondary IDM Roadmap:
Prioritised Information Delivery Manual (IDM)
International User Group
Services ISO 29481-1:2010, Table A.1: Construction stages
Production
Production Information Construction
Client’s needs Compare proposal with brief Compare proposal with brief
Regulatory Start commissioning
Cost Make quantity take-off
Perform cost analysis Perform cost analysis
Construction Find construction products
Sim.construction sequencing
Perform procurement
Perpare safty on site
Control machinery
Handle construction logistics
Documentation BIM handover to subcontractor
Make production doc.
Make FM documentation
Coordination Perform consistency control
Presentation Visualize Solution Visualize Solution
Primary Secondary IDM Roadmap:
Prioritised Information Delivery Manual (IDM)
International User Group
IDM Stage Service
Perform energy analysis Outline feasibility Performance Analysis
Make Archi. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)
Modeling
Make Elect. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)
Modeling
Make HVAC. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)
Modeling
Make Struc. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)
Modeling
Make quantity take-off Coordinated design(and procurement) Costing
Perform cost analysis Coordinated design(and procurement) Costing
Make FM documentation Coordinated design(and procurement) Documentation
Perform consistency control Coordinated design(and procurement) Coordination
IDM Roadmap: Content table for Primary prioritised Information Delivery Manual (IDM)
International User Group
IDM Stage Service
Design brief to design Conception of need Client's needs
Perform LCC analysis Outline feasibility Performance Analysis
Do code compliance checking Full conceptual design Regulatory
Perform procurement Production Information Construction
Make FM documentation Construction Documentation
IDM Roadmap: Content table for Secondary prioritised Information Delivery Manual (IDM)
International User Group
IDM Roadmap:
Existing IDMs
• Current Capabilities
– A number of IDM projects were started simultaneously as the methodology was
developed.
– Several of the IDM project have lead to specifications that have been tested in
real construction projects or competitions. The concept is today explored and
collaborative efforts are being made in order to make IDMs that can be used.
– Despite the progress it is conclusive that it is a challenge to make IDMs in some
areas, because there is a lack of structured and well-documented processes. In
such cases, it is necessary to agree on the processes and the relevant activities
and exchange requirements. In some cases it is necessary to have the IDM
development work followed by a software development phase.
– This means that if the software development is nonexistent it will not be possible
to get the expected results. It is therefore crucial to make sure that the initiator
behind an IDM has a clear strategy on how to get the IDM implemented in
software solutions.
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages
Inception Brief
Portfolio requirements
Conception of need Outline feasibility Substantive feasibility
Client's needs Design brief to design
Compare proposal with brief
Client's evaluation
Regulatory Do code compliance checking
Modelling Existing conditions building/ environment to
design
Make Archi. BIM model
Make Elect. BIM modeL
Make HVAC. BIM model
Make Struc. BIM model
Make Georeferencing
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages
Inception Brief
Portfolio requirements
Conception of need Outline feasibility Substantive feasibility
Performance Analysis
Perform energy analysis
Perform HVAC control analysis
Perform Structural analysis
Perform Elec analysis
Perform Daylight analysis
Perform Egress analysis
Perform LCC analysis
Perform security analysis
Cost Make quantity take-off
Perform cost analysis
Coordination Perform consistency control
Presentation Visualize Solution
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Client’s needs Compare proposal with brief
Compare proposal with brief Compare proposal with brief
Client's evaluation
Regulatory Do code compliance checking Do code compliance checking
Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model
Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model
Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model
Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model
Performance Analysis Perform energy analysis Perform energy analysis
Perform HVAC control analysis Perform HVAC control analysis
Perform Structural analysis Perform Structural analysis
Perform Elec analysis Perform Elec analysis
Perform Accessibility analysis Perform Accessibility analysis
Perform Acoustic Simulation Perform Acoustic Simulation
Perform Daylight analysis Perform Daylight analysis
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
Services ISO 29481-1:2010, Table A.1: Pre-construction stages
Design
Outline conceptual design Full conceptual design Coordinated design(and procurement)
Performance Analysis cont.
Perform Egress analysis Perform Egress analysis
Perform LCC analysis Perform LCC analysis
Enhance element with Fire requirements
Perform security analysis Perform security analysis
Cost Make quantity take-off Make quantity take-off Make quantity take-off
Perform cost analysis Perform cost analysis Perform cost analysis
Documentation BIM handover to contractor
Make FM documentation
Coordination Perform Consistency control Perform Consistency control Perform Consistency control
Presentation Visualize Solution Visualize Solution Visualize Solution
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
Services ISO 29481-1:2010, Table A.1: Construction stages
Production
Production Information Construction
Client’s needs Compare proposal with brief Compare proposal with brief
Regulatory Start commissioning
Cost Make quantity take-off
Perform cost analysis Perform cost analysis
Construction Find construction products
Sim.construction sequencing
Perform procurement
Perpare safty on site
Control machinery
Handle construction logistics
Documentation BIM handover to subcontractor
Make production doc.
Make FM documentation
Coordination Perform consistency control
Presentation Visualize Solution Visualize Solution
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
Services ISO 29481-1:2010, Table A.1: Post Construction stages
Maintenance Demolition
Operation and maintenance Disposal
Performance Analysis
Perform energy optimization
Monitor building
Regulatory Recycle material
Prepare demolition of building
Operation Manage spaces
Schedule maintenance
Documentation Make FM documentation
Make FM docu. from non BIM
Create opera. doc. from BIM
IDM Roadmap:
Existing Information Delivery Manual (IDM) IDMs initiated
International User Group
IDM Roadmap:
Summary
• The IDM development process
– Has the objective of understanding business requirements for information
exchange and/or sharing and developing an object model and software
implementations that can be used by practitioners within the industry to satisfy
those requirements. It is a process that results in a number of components
whose interaction is examined in the IDM Technical Architecture section
• The prioritized IDMs
– Are characterized by their support of exchange scenarios that frequently occur
and aims at both to ease the job for the involved parties as well as increase the
quality of the end product.
• buildingSMART is looking for organizations and sponsors
– That whish to participate in developing the prioritized IDMs. By their participation
they will be able to influence the outcome, include their company’s, national or
regional requirements into the process in order to make the final result applicable
for their own needs.