Information Delivery Manual: Roadmapiug.buildingsmart.org/idms/roadmap/IDM_Roadmap_1_1.pdf ·...

28
International User Group Information Delivery Manual: Roadmap Contact information: International IDM Coordinator Jan Karlshøj, [email protected] , +45 2463 7721 Copenhagen: 10-12-2011 Adopted at the International User Group meeting in Abu Dhabi 30-31 March 2011

Transcript of Information Delivery Manual: Roadmapiug.buildingsmart.org/idms/roadmap/IDM_Roadmap_1_1.pdf ·...

International User Group

Information Delivery Manual:

Roadmap

Contact information:

International IDM Coordinator

Jan Karlshøj, [email protected], +45 2463 7721

Copenhagen: 10-12-2011

Adopted at the International User Group meeting in Abu Dhabi 30-31 March 2011

International User Group

IDM Roadmap:

Background

• The Executive User Committee (UserCom) initiated develop of an IDM

Roadmap

– Steen Sunesen, NO and Jan Karlshøj, DK made the initial draft which was

presented for UserCom in New York, December 2010

– UserCom ask IUG for adoption of the Roadmap

• Purpose of the Roadmap

– Identify the most important exchange scenarios during a lifecycle of a facility that

should be support by IDMs

– Prioritise which IDMs that should be developed first

– Stimulate development and implementation of the top prioritised IDMs

– Attract sponsors to financially support the development of the top prioritised

IDMs

• Content of the Roadmap

– Only identify overall exchange scenarios

– Identified top prioritised IDMs

– Indicate if development of the identified IDMs have started or not

International User Group

IDM Roadmap:

Preconditions and methodology

• Prerequisites

– Uses

– ISO 29481-1:2010, Table A.1 *

• Mapped to OmniClass table 31

– Define a list of Services

• Services mapped to OmniClass table 32

• Layout methodology

– Roadmap as a Matrix

• Stages; Pre-lifecycle, Pre-Construction, Construction, Post-construction

• Services

• There has been identified individual IDMs for each stage/phase.

• First and second level of top prioritized IDMs have been identified and in

which areas development already has started

• (Parties are not included yet)

International User Group

Life

cycl

e S

tage

s in

ISO

29

48

1

Pre-lifecycle stages Pre-Construction stages Construction stages

Post-construction stages

Inception Brief Design Production Maintenance Demolition

Port

folio

req

uir

emen

ts

Co

nce

pti

on

of

nee

d

Ou

tlin

e fe

asib

ility

Sub

stan

tive

fea

sib

ility

Ou

tlin

e co

nce

ptu

al d

esig

n

Full

con

cep

tual

des

ign

Co

ord

inat

ed d

esig

n(a

nd

p

rocu

rem

ent

Pro

du

ctio

n In

form

atio

n

C

on

stru

ctio

n

Op

erat

ion

an

d m

ain

ten

ance

Dis

po

sal

Om

niC

Lass

Tab

le 3

1

31

10

11

00

Nee

ds

Iden

tifi

cati

on

P

has

e

31

10

14

00

Co

nce

pt

Ph

ase

31

10

45

00

Pre

limin

ary

Des

ign

Ph

ase

31

10

45

00

Bu

dge

tin

g P

has

e

31

20

10

00

Pre

limin

ary

Pro

ject

D

escr

ipti

on

Ph

ase

31

20

20

00

Des

ign

Dev

elo

pm

ent

Ph

ase

31

25

00

00

Co

nst

ruct

ion

Do

cum

ents

St

age

31

40

00

00

Exe

cuti

on

Sta

ge

31

40

00

00

Exe

cuti

on

Sta

ge

31

50

00

00

Uti

lizat

ion

Sta

ge

31

60

00

00

Clo

sure

Sta

ge

IDM Roadmap:

ISO Stages mapped to OmniClass Table 31

International User Group

IDM Roadmap:

IDM Services mapped to OmniClass Table 32

Service OmniClass

Client's needs 32-41 21 00 Design Services, Programming 32-41 81 00 Design Services, Validating 32-57 81 13 Implementation Services, Assuring, Inspecting

Regulatory 32-81 61 00 Governmental Service, Regulating

Modeling 32-57 71 15 Implementation Services, Postconstructing, Commissioning 32-49 11 00 Modeling

Performance Analysis 32-35 57 13 Conceptualization Services, Information Processing, Analyzing

Cost 32-35 51 11 Conceptualization Services, Quantifying, Taking Off 32-11 00 00 Transactional Services, Estimating

Construction 32-57 61 00 Implementation Services, Constructing

Operate 32-65 21 Utilization Services, Operating 32-65 31 00 Utilization Services, Maintaining

Documentation 32-49 61 00 Documentation Services, Record Keeping

Coordination 32-35 57 19 Conceptualization Services, Information Processing, Coordinating

Presentation 32-49 51 00 Documentation Services, Recording

International User Group

IDM Roadmap:

Services, Lifecycle stages and IDM

Services

ISO 29481-1:2010, Table A.1 Stages

IDM IDM

IDM IDM

IDM IDM

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages

Inception Brief

Portfolio requirements

Conception of need Outline feasibility Substantive feasibility

Client's needs Design brief to design

Compare proposal with brief

Client's evaluation

Regulatory Do code compliance checking

Modelling Existing conditions building/ environment to

design

Make Archi. BIM model

Make Elect. BIM modeL

Make HVAC. BIM model

Make Struc. BIM model

Make Georeferencing

IDM Roadmap:

Identified IDM per stage per service

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages

Inception Brief

Portfolio requirements

Conception of need Outline feasibility Substantive feasibility

Performance Analysis

Perform energy analysis

Perform HVAC control analysis

Perform Structural analysis

Perform Elec analysis

Perform Daylight analysis

Perform Egress analysis

Perform LCC analysis

Perform security analysis

Cost Make quantity take-off

Perform cost analysis

Coordination Perform consistency control

Presentation Visualize Solution

IDM Roadmap:

Identified IDM per stage per service

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Client’s needs Compare proposal with brief

Compare proposal with brief Compare proposal with brief

Client's evaluation

Regulatory Do code compliance checking Do code compliance checking

Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model

Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model

Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model

Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model

Performance Analysis Perform energy analysis Perform energy analysis

Perform HVAC control analysis Perform HVAC control analysis

Perform Structural analysis Perform Structural analysis

Perform Elec analysis Perform Elec analysis

Perform Accessibility analysis Perform Accessibility analysis

Perform Acoustic Simulation Perform Acoustic Simulation

Perform Daylight analysis Perform Daylight analysis

IDM Roadmap:

Identified IDM per stage per service

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Performance Analysis cont.

Perform Egress analysis Perform Egress analysis

Perform LCC analysis Perform LCC analysis

Enhance element with Fire requirements

Perform security analysis Perform security analysis

Cost Make quantity take-off Make quantity take-off Make quantity take-off

Perform cost analysis Perform cost analysis Perform cost analysis

Documentation BIM handover to contractor

Make FM documentation

Coordination Perform Consistency control Perform Consistency control Perform Consistency control

Presentation Visualize Solution Visualize Solution Visualize Solution

IDM Roadmap:

Identified IDM per stage per service

International User Group

Services ISO 29481-1:2010, Table A.1: Construction stages

Production

Production Information Construction

Client’s needs Compare proposal with brief Compare proposal with brief

Regulatory Start commissioning

Cost Make quantity take-off

Perform cost analysis Perform cost analysis

Construction Find construction products

Sim.construction sequencing

Perform procurement

Perpare safty on site

Control machinery

Handle construction logistics

Documentation BIM handover to subcontractor

Make production doc.

Make FM documentation

Coordination Perform consistency control

Presentation Visualize Solution Visualize Solution

IDM Roadmap:

Identified IDM per stage per service

International User Group

Services ISO 29481-1:2010, Table A.1: Post Construction stages

Maintenance Demolition

Operation and maintenance

Disposal

Performance Analysis

Perform energy optimization

Monitor building

Regulatory Recycle material

Prepare demolition of building

Operation Manage spaces

Schedule maintenance

Documentation Make FM documentation

Make FM docu. from non BIM

Create opera. doc. from BIM

IDM Roadmap:

Identified IDM per stage per service

International User Group

IDM Roadmap:

Prioritised IDMs

• The main purpose of an Information Delivery Manual is to certify that

the relevant data is communicated in such a way that the software at

the receiving end can interpret it. It is important point out that in order

to make an Information Delivery Manual functional, it has to be

supported by software.

• By identifying and focusing on top prioritized IDMs the aim is to gain

momentum and profit on already existing results. Several areas have

been identified as crucial for the industry as shown in the tables.

• The top prioritized IDMs are subdivided into a primary and secondary

group as shown in the following tables.

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages

Inception Brief

Portfolio requirements

Conception of need Outline feasibility Substantive feasibility

Performance Analysis

Perform energy analysis

Perform HVAC control analysis

Perform Structural analysis

Perform Elec analysis

Perform Daylight analysis

Perform Egress analysis

Perform LCC analysis

Perform security analysis

Cost Make quantity take-off

Perform cost analysis

Coordination Perform consistency control

Presentation Visualize Solution

IDM Roadmap:

Prioritised Information Delivery Manual (IDM) Primary Secondary

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Client’s needs Compare proposal with brief

Compare proposal with brief Compare proposal with brief

Client's evaluation

Regulatory Do code compliance checking Do code compliance checking

Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model

Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model

Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model

Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model

Performance Analysis Perform energy analysis Perform energy analysis

Perform HVAC control analysis Perform HVAC control analysis

Perform Structural analysis Perform Structural analysis

Perform Elec analysis Perform Elec analysis

Perform Accessibility analysis Perform Accessibility analysis

Perform Acoustic Simulation Perform Acoustic Simulation

Perform Daylight analysis Perform Daylight analysis

Primary Secondary IDM Roadmap:

Prioritised Information Delivery Manual (IDM)

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Performance Analysis cont.

Perform Egress analysis Perform Egress analysis

Perform LCC analysis Perform LCC analysis

Enhance element with Fire requirements

Perform security analysis Perform security analysis

Cost Make quantity take-off Make quantity take-off Make quantity take-off

Perform cost analysis Perform cost analysis Perform cost analysis

Documentation BIM handover to contractor

Make FM documentation

Coordination Perform Consistency control Perform Consistency control Perform Consistency control

Presentation Visualize Solution Visualize Solution Visualize Solution

Primary Secondary IDM Roadmap:

Prioritised Information Delivery Manual (IDM)

International User Group

Services ISO 29481-1:2010, Table A.1: Construction stages

Production

Production Information Construction

Client’s needs Compare proposal with brief Compare proposal with brief

Regulatory Start commissioning

Cost Make quantity take-off

Perform cost analysis Perform cost analysis

Construction Find construction products

Sim.construction sequencing

Perform procurement

Perpare safty on site

Control machinery

Handle construction logistics

Documentation BIM handover to subcontractor

Make production doc.

Make FM documentation

Coordination Perform consistency control

Presentation Visualize Solution Visualize Solution

Primary Secondary IDM Roadmap:

Prioritised Information Delivery Manual (IDM)

International User Group

IDM Stage Service

Perform energy analysis Outline feasibility Performance Analysis

Make Archi. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)

Modeling

Make Elect. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)

Modeling

Make HVAC. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)

Modeling

Make Struc. BIM model Outline conceptual design Full conceptual design Coordinated design(and procurement)

Modeling

Make quantity take-off Coordinated design(and procurement) Costing

Perform cost analysis Coordinated design(and procurement) Costing

Make FM documentation Coordinated design(and procurement) Documentation

Perform consistency control Coordinated design(and procurement) Coordination

IDM Roadmap: Content table for Primary prioritised Information Delivery Manual (IDM)

International User Group

IDM Stage Service

Design brief to design Conception of need Client's needs

Perform LCC analysis Outline feasibility Performance Analysis

Do code compliance checking Full conceptual design Regulatory

Perform procurement Production Information Construction

Make FM documentation Construction Documentation

IDM Roadmap: Content table for Secondary prioritised Information Delivery Manual (IDM)

International User Group

IDM Roadmap:

Existing IDMs

• Current Capabilities

– A number of IDM projects were started simultaneously as the methodology was

developed.

– Several of the IDM project have lead to specifications that have been tested in

real construction projects or competitions. The concept is today explored and

collaborative efforts are being made in order to make IDMs that can be used.

– Despite the progress it is conclusive that it is a challenge to make IDMs in some

areas, because there is a lack of structured and well-documented processes. In

such cases, it is necessary to agree on the processes and the relevant activities

and exchange requirements. In some cases it is necessary to have the IDM

development work followed by a software development phase.

– This means that if the software development is nonexistent it will not be possible

to get the expected results. It is therefore crucial to make sure that the initiator

behind an IDM has a clear strategy on how to get the IDM implemented in

software solutions.

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages

Inception Brief

Portfolio requirements

Conception of need Outline feasibility Substantive feasibility

Client's needs Design brief to design

Compare proposal with brief

Client's evaluation

Regulatory Do code compliance checking

Modelling Existing conditions building/ environment to

design

Make Archi. BIM model

Make Elect. BIM modeL

Make HVAC. BIM model

Make Struc. BIM model

Make Georeferencing

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-lifecycle stages

Inception Brief

Portfolio requirements

Conception of need Outline feasibility Substantive feasibility

Performance Analysis

Perform energy analysis

Perform HVAC control analysis

Perform Structural analysis

Perform Elec analysis

Perform Daylight analysis

Perform Egress analysis

Perform LCC analysis

Perform security analysis

Cost Make quantity take-off

Perform cost analysis

Coordination Perform consistency control

Presentation Visualize Solution

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Client’s needs Compare proposal with brief

Compare proposal with brief Compare proposal with brief

Client's evaluation

Regulatory Do code compliance checking Do code compliance checking

Modelling Make Archi. BIM model Make Archi. BIM model Make Archi. BIM model

Make Elect. BIM model Make Elect. BIM model Make Elect. BIM model

Make HVAC. BIM model Make HVAC. BIM model Make HVAC. BIM model

Make Struc. BIM model Make Struc. BIM model Make Struc. BIM model

Performance Analysis Perform energy analysis Perform energy analysis

Perform HVAC control analysis Perform HVAC control analysis

Perform Structural analysis Perform Structural analysis

Perform Elec analysis Perform Elec analysis

Perform Accessibility analysis Perform Accessibility analysis

Perform Acoustic Simulation Perform Acoustic Simulation

Perform Daylight analysis Perform Daylight analysis

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

Services ISO 29481-1:2010, Table A.1: Pre-construction stages

Design

Outline conceptual design Full conceptual design Coordinated design(and procurement)

Performance Analysis cont.

Perform Egress analysis Perform Egress analysis

Perform LCC analysis Perform LCC analysis

Enhance element with Fire requirements

Perform security analysis Perform security analysis

Cost Make quantity take-off Make quantity take-off Make quantity take-off

Perform cost analysis Perform cost analysis Perform cost analysis

Documentation BIM handover to contractor

Make FM documentation

Coordination Perform Consistency control Perform Consistency control Perform Consistency control

Presentation Visualize Solution Visualize Solution Visualize Solution

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

Services ISO 29481-1:2010, Table A.1: Construction stages

Production

Production Information Construction

Client’s needs Compare proposal with brief Compare proposal with brief

Regulatory Start commissioning

Cost Make quantity take-off

Perform cost analysis Perform cost analysis

Construction Find construction products

Sim.construction sequencing

Perform procurement

Perpare safty on site

Control machinery

Handle construction logistics

Documentation BIM handover to subcontractor

Make production doc.

Make FM documentation

Coordination Perform consistency control

Presentation Visualize Solution Visualize Solution

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

Services ISO 29481-1:2010, Table A.1: Post Construction stages

Maintenance Demolition

Operation and maintenance Disposal

Performance Analysis

Perform energy optimization

Monitor building

Regulatory Recycle material

Prepare demolition of building

Operation Manage spaces

Schedule maintenance

Documentation Make FM documentation

Make FM docu. from non BIM

Create opera. doc. from BIM

IDM Roadmap:

Existing Information Delivery Manual (IDM) IDMs initiated

International User Group

IDM Roadmap:

Summary

• The IDM development process

– Has the objective of understanding business requirements for information

exchange and/or sharing and developing an object model and software

implementations that can be used by practitioners within the industry to satisfy

those requirements. It is a process that results in a number of components

whose interaction is examined in the IDM Technical Architecture section

• The prioritized IDMs

– Are characterized by their support of exchange scenarios that frequently occur

and aims at both to ease the job for the involved parties as well as increase the

quality of the end product.

• buildingSMART is looking for organizations and sponsors

– That whish to participate in developing the prioritized IDMs. By their participation

they will be able to influence the outcome, include their company’s, national or

regional requirements into the process in order to make the final result applicable

for their own needs.

International User Group

• A single page document have been produced to encourage

organizations to take active part in or sponsor the development of top

prioritised Information Delivery Manuals.

IDM Roadmap:

Invitation letter