Transcript of INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani,...
INFN GEM Front Tracker
2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1
V. Bellini, M. Capogni, E. Cisbani,S. Colilli, F. Giuliani, M. Gricia,
F. Librizzi, M. Lucentini, F. Mammoliti,F. Noto, S. Minutoli, P. Musico,R. Perrino, F. Santavenere ...
INFN / Bari-Lecce, Catania, Genova, Roma-Sanità
SBS Collaboration Meeting
Oct 18-19 2012
JLab
Readout Electronics development will be presented by Paolo Musico
Front Chamber reqs and design• Hit spatial resolution ~ 70 mm• Stand large background (g ~ 250 MHz/cm2, e/p 160 kHz/cm2)• Transverse area at least 40x120 cm2
• Event rate at the level of 20 kevents/s• Reuse in different configurations
2012 Oct 18 / SBS Coll. / JLab E. Cisbani 2
GEM base module 20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
3
40x50 cm2
• Large GEM module with small dead area • Low material budget/Light Structure• Modular design• Flexible configuration• Balanced weight
• Segmented HVs and individual
protection resistors
• Spacers to keep gap
• Thin PERMAGLAS frame
E. Cisbani 4
Service Frame / Detail
2012 Oct 18 / SBS Coll. / JLab
• External service frame made of smaller segments in
carbon fiber• Rigid structure, can correct small GEM module
bending• Prototyping under production
5
Beam test @ DESY / Full Module Size 40x50 cm22
012
Oct 1
8 / S
BS
Co
ll. / JLa
bE
. Cisb
ani
DGEM = 400, 390, 350 V
3 mm drift gap Ar:CO2 70:304 GeV electron ionization: 28 pairsGain: 17600
charge: 500 ke / 2000 ADC ch
6
Parassitic beam test of new electronics/Jul-Aug 2012 20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
7
2012/CERN Test – Event display 20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
Event
Strip Plane
HV=3750 VSignal > 1000RMS ~ 50
8
2012/CERN Test – Signal development
• Signal saturated, and wrong clock phase both fixed
• However, position information are available
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
9
Calibration pulse development
• Left: normal signal
• Bottom: «saturated»
• «Saturation» depends on the baseline level
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
10
Gas Component / Radiation test
• We would like to use differential pressure transmitters at gas inlet and outlet to evaluate pressure drop in the chamber and any potential problem
• Negative Rad Hard Test
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
11
HV divider and Spark counter
• In lab test we use LNF/GEM-HV module with 7 independent HV levels and current feedback.
• In operation we intend to use a voltage divider (based on Olympus/Abruzzio design);
• Working on asimple sparkcounter based onstandard preamcomponents(CREMAT CR110) +some standardmodules
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
CREMAT amp. is probably not RAD HARD
12
E. C
isba
ni
DAQ
Bus Interface
Generic Model(virtual class)
MPDLibrary
Low Level
I2C
Trigger
ADC
Other
High Level
Initialize
Configure
Discovery
Read
WrapperDB
Module
Structured text file for
configuration
Based on libconfig++
Main
Implemented on C++
• Run on Linux
• MPD as independent library
• One configuration file (text
format)
• Use open source libconfig++
• Self consistent output binary
raw data
DAQ Software 20
12 O
ct 18
/ SB
S C
oll. / JL
ab
Still some work on event readout library
Tested on 3 VME platforms (Struck, CAEN USB and Optical)bug fixed: clock phase was not set properly.
13
Catania Tools for assembling / READY to go
• Clean room with gas system
• HV probe box and accessories
• GEM foil Stretcher
• Fiducial pin extractors
• Consumables ...
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
14
Catania Assembling Test and Training
• Used spare/damaged parts of the previous design to get experience in gluing/assembling gems modules (2 dummy modules assembled)
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
15
Material for 6 chambers (18 GEM modules)Frames
Drift foils
GEM foils
Readout
Honeycomb
Service frame
Required 18 18 54 18 18 6
Spare 4 4 14 22 22 (1)
Procured 18 14 5 7 7 -
Ordered 4 3 10 3 1 1
Budget 2012
1 42 8 10 3
Budget 2013
9 4 4 2 (+1)
20
12 O
ct 18
/ SB
S C
oll. / JL
ab
E. C
isba
ni
1. We have to put a large foils production order before end of Italian
fiscal year, production can be delayed some months (if needed) – in
addition to the CERN «natural» delay
2. We still have some margin for improvements, which will be
considered after assembling and characterization
Short term plan● GEM Chamber:
– Assembling of the first 40x50 cm2 module will start the 22° of October (due to people previous committments)
– Assembling expected to last 2 full weeks (at least)
– characterize the module in lab (with rad. Sources)● Mechanics:
– Service frame prototype in production
– Test service frame on three modules (first proto, training module and first final module)
● Test
– November: Chance to access the RD51 test beam (second week of November)or RICH-CLAS12 at the end of November – most likely
● Electronics
Paolo Talk
Expected to go into «mass» assembling
early next year
2012 Oct 18 / S
BS
Co
ll. / JLab
E. C
isban
i
16