PROPOSED DESIGN, CONSTRUCTION AND COMPLETION
OF 548 UNITS GOVERNMENT APARTMENTS AT
PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA
PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target
![Page 2: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/2.jpg)
Surau 1 Storey
LAYOUT PLAN
Block E
Block D
Block C
Block B
Dewan 2 Storey
Car Park 1
Car Park 3
Car Park 2
Block A
IBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTSIBS: IBS: PROJECT COMPONENTSPROJECT COMPONENTS
Page 4
C 19 122
B 19 122
BLOCKS STOREYSUNITS
D 18 115E 16 74
TOTAL 548
Others: Car Parks 3 nos.(660 parking bays)
Substations 3 nos. Landscape Infrastructures
BLOCK A
BLOCK E
BLOCK D
BLOCK C
BLOCK B
DEWANSURAU
PERSPECTIVE
NA 18 115
![Page 3: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/3.jpg)
IBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTSIBS: IBS: CONSTRUCTION ELEMENTSCONSTRUCTION ELEMENTS
Page 5
PRECASTAPARTMENTS• 2nd Floor to 17th Floor• Structural precast walls• Precast hollowcore slab• Non-structural precast wall panels• Precast staircases• Blockwork infill wall
CAST-IN-SITUAMENITIES AND M&E ROOMS• Ground and first floor• Cast-in situ 250mm thk rc shear
wall • Blockwork infill• 2nd Floor• Cast-in situ slab
Precast
Cast-in Situ
![Page 4: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/4.jpg)
IBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUTIBS: IBS: TYPICAL FLOOR LAYOUTTYPICAL FLOOR LAYOUT
Page 6
![Page 5: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/5.jpg)
Page 7
(Cont’d)IBS: IBS: TYPICAL UNITTYPICAL UNITIBS: IBS: TYPICAL UNITTYPICAL UNIT
Unit Size -9.0m X 14.4m (1,200 sqf) 3 Bedrooms• Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m)1 Kitchen (4.2m X 3.5m)1 Store (1.3m x 1.5m)2 BathroomsDry Yard
![Page 6: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/6.jpg)
Page 8
IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)IBS: IBS: CASTING SECTION (Hollow Core Panel)CASTING SECTION (Hollow Core Panel)
![Page 7: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/7.jpg)
Page 9
IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)IBS: IBS: CASTING SECTION (Other Precast Panel)CASTING SECTION (Other Precast Panel)
![Page 8: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/8.jpg)
Page 10
(Cont’d)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)IBS: IBS: CASTING SECTION (Quality Assurance and Control)CASTING SECTION (Quality Assurance and Control)
![Page 9: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/9.jpg)
Page 11
(Cont’d)IBS: IBS: DELIVERY SECTION DELIVERY SECTION IBS: IBS: DELIVERY SECTION DELIVERY SECTION
![Page 10: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/10.jpg)
Page 12
(Cont’d)IBS: IBS: INSTALLATION SECTIONINSTALLATION SECTIONIBS: IBS: INSTALLATION SECTIONINSTALLATION SECTION
![Page 11: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/11.jpg)
Page 13
(Cont’d)IBS: IBS: Construction of Joints and SupportConstruction of Joints and SupportIBS: IBS: Construction of Joints and SupportConstruction of Joints and Support
![Page 12: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/12.jpg)
Overall progress on 28 June 2009
Block E on 28 June 2009
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
![Page 13: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/13.jpg)
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block D on 28 June 2009
Block C on 28 June 2009
![Page 14: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/14.jpg)
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
Block B on 28 June 2009
Block A on 28 June 2009
![Page 15: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/15.jpg)
(Cont’d)IBS: IBS: Progress PhotosProgress PhotosIBS: IBS: Progress PhotosProgress Photos
![Page 16: Industrialised Building System Project](https://reader033.fdocuments.in/reader033/viewer/2022061116/5466b00cb4af9ff9748b49c7/html5/thumbnails/16.jpg)
Page 18
(Cont’d)IBS: IBS: MOCK-UP UNITMOCK-UP UNITIBS: IBS: MOCK-UP UNITMOCK-UP UNIT