Industrial Training Institute Majuragate Surat WELCOMES.
-
Upload
lara-rolfe -
Category
Documents
-
view
238 -
download
8
Transcript of Industrial Training Institute Majuragate Surat WELCOMES.
Industrial Training Institute
MajuragateSurat
WELCOMES
AN ISO 9001:2008 CERTIFIED
Email:[email protected]:-www.itisurat.org.in
Phone & Fax : 91-261- 2655794
Department of Employment & Training, Gandhinagar,
Govt. of Gujarat.
INDUSTRIAL TRAINING INSTITUTE, MAJURAGATE, SURAT
CENTRE OF EXCELLENCE-APPAREL & FABRICATION SECTORS
ITI- Surat Overview [1959-2011]
From a sapling to a huge banyan tree!
Established -1959- 104
seats
2011 – 4652 seats
[Regular - 3172, short
term -1480]
One of the eight ISO
9001:2008 certified
institute in Gujarat.
The Institute Salient Features• Area : 10.12 ACRES• No. of Buildings : 11 (7 + 4 work shop Wings.)
Administrative Block :01 Class rooms : 41
Workshop : 49Computer Lab : 05Library : 02Store : 02 ( One Divisional+ One Central Store)Canteen : 01
Hostels : 02 ( Cap.100 trainees/each )Conference Hall : 01
( with A/V facilities)Placement Advisory bureau :01English language Lab ; 01
Our Quality Policy
Industrial Training Institute shall strive to set exemplary standard for
Continuous Quality Improvement in skill building
Utmost trainee satisfaction.
Equipping unemployed youth by employable skill.
Meeting demand of Skilled manpower of Industry.
Continuous Improvement by offering Industry relevant Vocational Courses.
Training Schemes in The Institute
1. Craftsman Training Scheme (CTS)– N.C.V.T. Two Years– N.C.V.T. One Year– G.C.V.T. One Year– G.C.V.T. Short Term2. Apprenticeship Training Scheme (ATS)3. Centre of Excellence for Apparel Sector
Broad Base Basic Training. One YearAdvance Module Training Six Months
4. Centre of Excellence for Fabrication Sector (BBBT) Broad Base Basic Training. One Year
Advance Module Training Six Months5. Apparel Park Operator Training Program6. Modular Employable Skill ( NCVT & GCVT )7. CCC Computer Training For GOVT. Employee8. Construction Workers Training Programme.9. Construction skill Training Centre.
Staffing Pattern of ITI Surat
REGISTRY BRANCHJUNIOR CLERK
PRINCIPAL CLASS - I
PRINCIPAL /VICE PRINCIPAL CLASS IIADMINISTRATIVE OFFICER CLASS II
OFFICE SUPDT. CLASS III
APPRENTICE TRAINING SCHEME SECTIONASSISTANT APPRENTICESHIP ADVISORJUNIOR CLERK
ACCOUNT SECTIONHEAD CLERKSENIOR CLERKJUNIOR CLERK
ESTABLISHMENT SECTIONHEAD CLERKSENIOR CLERKJUNIOR CLERK
TRAINING SECTIONHEAD CLERKSENIOR CLERKJUNIOR CLERK
GROUP INSTRUCTOR CLASS III
STORE SUPDT. CLASS III
FOREMAN INSTRUCTOR CLASS III
HOSTEL SUPDT. CLASS III
SUPERVISOR INSTRUCTOR CLASS III
HOSTEL CLERK
STORE KEEPER
ASST.STORE KEEPER
TOOLROOM KEEPER
Total sanctions : 194 Regular + 69 GKS/KS = 263Total Filled up : 159 Regular + 05 GKS/KS = 164
Total Vacant : 35 Regular + 64 GKS/KS =99
Craftsman Training Scheme (CTS)1. Two Year Duration Trades (N.C.V.T.)
No. of Sanction Seats 1852No. of On Roll Trainees 1951No. of Units 121
2. One Year Duration Trades (N.C.V.T.)No. of Sanction Seats 496No. of On Roll Trainees 632No. of Units 033
3. One Year Duration Trades (G.C.V.T.)No. of Sanction Seats 440No. of On Roll Trainees 534No. of Units 024
4. Centre of Excellence (N.C.V.T.) – Apparel & Fabrication Sectors. No. of Sanctioned Seats( BBBT ) 192No. of On Roll Trainees 250No. of Units 012
5. Advance Module. Apparel & Fabrication Sectors.No. of Sanction Seats 192No. of On Roll Trainees 232No. of Units 012
Total Sanctioned Seats : 3172Total On roll Trainees :.
3503Total Units : 202
Trade wise On roll & Total Trainee Trained
No. Course Name Sanction seats On Roll
Pass Out Trainee July-10
1 Attendant Operator (Chemical Plant) 48 56 17
2 Electronic Mechanic 64 62 33
3 Electronic Mechanic (TASP) 16 21 --
4 Instrument Mechanic 80 78 78
5 Instrument Mechanic (TASP) 16 21 --
6 Computer Operator cum Prog. Asst. 80 104 59
7 Draughtsman (Civil) 48 57 12
8 Draughtsman (Mechanical) 48 57 12
9 Electrician 224 260 69
10 Wireman 288 291 82
11 Fitter 256 291 55
12 Information. Technology. & Electronics System Maintenance
60 66 19
13 Instrument Mechanic (Chemical Plant) 48 54 42
14 Carpenter 32 21 3
15 Machinist 72 78 46
No. Course Name Sanction seats On Roll
Pass Out Trainee July 10
16 Machinist Grinder 36 34 07
17 Mechanic Diesel 144 189 91
18 Mechanic Motor Vehicle 48 58 19
19 Mechanic Radio & Television 48 34 12
20 Mechanic Refrigeration & Air Conditioner
112 117 44
21 Mechanic Tractor 32 42 20
22 Plastic Processing Operator -- -- --
23 Surveyor 48 43 20
24 Turner 180 164 109
25 Painter General 32 16 12
26 Maintenance Mechanic (Chemical Plant)
48 51 35
27 Welder 144 192 100
28 Plumber 64 84 40
29 COE- BBBT APPAREL 96 125 78
30 COE- ADVANCE APPAREL 96 61 50
31 COE BBBT FABRICATION 96 125 90
32 COE ADVANCE FABRICATION 96 75 95
33 DRESS MAKING -- -- --
A1. CTS – NCVT TradeCentre of Excellence
SR NO
NAME OF SECTOR
NAME OF TRADE DURATION
SANCTION SEATS
1 BBBT APPAREL SECTOR
MODULE 1 : FONDAMENTAL OF GARMENT TECHNOLOGY 1 YRS 96
MODULE 2 : BASIC SEWING
MODULE 3 : ADVANCE SWEING
MODULE 4 : PATTERN MAKING
MODULE 5 : COMPUTERISED MAKING
MODULE 6 : QUALITY CONTROL FINISHING & PACKING
2 BBBT FABRICATION SECTOR( FITTING & WELDING )
MODULEV 1 : BASIC FITTING & MEASUREMENT 1 YRS 96
MODULE 2 : BASIC SHEET METAL WORK AND FASTENING
MODULE 3 : BASIC MACHINE SHOP PRACTICE ( TURNING,MILLING & GRINDING )
MODULE 4: BASIC WELDING
MODULE 5 : METALS AND SURFACE FININSHING TECHNIQUES
MODULE 6 : BASIC ELECTRICAL, ELECTRONICS & COMPUTER SKILLS
A1. CTS – NCVT TradeCentre of Excellence Apparel
SR NO
NAME OF TRADE DURATION SANCTION SEATS
ADVANCE MODULES
1 FASHION DESIGNING ( AM OF COE ) 6 MONTHS 32
2 SHIRTS & TROUSERS ( AM OF COE ) 6 MONTHS 32
3 COMPUTER AIDED PATTERN MAKING (AM OF COE)
6 MONTHS 32
TOTAL : 96
A1. CTS – NCVT TradeCentre of Excellence Apparel
SR NO
NAME OF TRADE DURATION SANCTION SEATS
ADVANCE MODULES
1 FASHION DESIGNING ( AM OF COE ) 6 MONTHS 32
2 SHIRTS & TROUSERS ( AM OF COE ) 6 MONTHS 32
3 COMPUTER AIDED PATTERN MAKING (AM OF COE)
6 MONTHS 32
TOTAL : 96
Construction Skill Training Courses ( CSTC ) Course Details
SR NO
NAME OF COURSE DURATION SANCTION SEATS
FILLED SEAT
1 Bar Bending 3 MONTHS
20 7
2 Form Work Carpenter
3 MONTHS
20 10
3 Construction Electrician
3 MONTHS
20 --
4 Scaffolding 1 MONTHS
20 20
5 Plumbing & Sanitary 1 MONTHS
20 09
I.T.I. SuratNCVT / GCVT Short Term Courses
(2 to 6 Months)Name of Course Seats UnitsCOMPUTER COURSES Data Entry Operator 250 05 Desk Top Publishing 250 05 Financial Account Operator 250 05
APPAREL PARK OPERATOR TRAINING PROGRAMME Apparel Sewing Machine Operator 270 16 Apparel Pattern Cutting 20 01 Apparel Finishing Checker 20 01
UN ORGANIZED SECTOR Modular Employable Skill ( NCVT ) 350 35
Construction Worker Training Programmed 60 06
Tailoring 20 02 Modular Employable Skill ( SCVT ) Motor driving Training 10 01 Mobile Repairing ( For Minority ) 40 02 Constriction Skill Training Centre 110 05
TOTAL : 1480 75
Gujarat Council of Vocational Training (GCVT)
Name of Course Senct. Seats Units
Armature & Motor Rewinding 128 168
Steno cum Computer Operator (Gujarati) 32 43
Steno cum Computer Operator (English) 32 44
Two Wheeler Auto Repairer 64 84
Certificate Course in Multimedia Tech. & DTP 72 67
Certificate Course in Web Designing 72 92
Auto Cad 24 15
TOTAL : 440 534
DETAILS OF KVK CENTER UNDER SURAT NODEL
S.R. NO.
NAME OF KVK CENTER
TALUKATOTAL NO OF
TRAINING COMP. UNDER TRAING
1 KAMREJ KAMREJ 440 180
2 KATHOR KAMREJ 356 80
3 KHOLVAD KAMREJ 360 140
4 NAVAGAM KAMREJ NA 40
5 LASKANA KAMREJ NA 40
6 VARIYAV SURAT CITY NA 40
7 BHIMPORE SURAT CITY NA 40
8 DUMAS SURAT CITY NA 40
SR.NO. SCHEME SUBJECT NAME OF GUEST LECTURER
1 COE APPAREL.BBBT AND ADVANCE MODULE
GENERAL AWARENESS & ENTERPRENEURSHIP AND COMMUNICATION
1.SHRI NIMESH SHAH
2. ATUL C.KANTHARIA
2 COE FABRICATION(FITTING & WELDING)
GENERAL AWARENESS & ENTERPRENEURSHIP AND COMMUNICATION
1. SHRI NIMESH.I.SHAH
3 CTS SCHEME NCVT & GCVT
ENGLISH COMMUNICATION SMT. NAYANA AGRAVAT
SHRI MAHENDRA SHAH
4 CTS SCHEME NCVT & GCVT
DICIPLINE,PUNCTUALITY,MANNER
POSSITIVE ATTITUTE AND SOFT SKILL.SPORTS,TRAINING FOR SECUITY GUARD
1.SHRI. PASHUMAYVALA HEMANT ISHWARLAL
2. SHRI KAILASHCHANDRA RANKA.
5 PLACEMENT BUREO COUNCILING TO THE TRAINEES 1.SHRI V.M.PATEL.
2. SHRI D.H.PATEL
3.SHRI J.H.SHROF
4. SHRI P.V.RAMNI
Details of Guest Lecturer
No. Name Title Designation1 Dr.Ajoy Bhattacharya Chairman, Apparel Mfg.Asso.,Surat Chairman
2 Shri Atik M. Desai Head Personal EHS&TQM, L&T, Hazira Member
3 Shri Himanshu Bhatt Sr. Vice Precidant H.R. Reliance Ind,Surat Member
4 Shri.H.V.Patel Principal I.T.I.,Majuragate,Surat Secretary
5 Shri.Deepak S. Tandlekar Dy. Genral mamager, Garden Silk, Surat Member
6 Shri.Jayesh D.Shah Manegar, Batli boi, Surat Member
7 Shri.P.N.Baria RDD(TRG),Surat Member
8 Shri.H.G.Parmar ITI,Surat Member
9 Shri.B.R.Chaudhari Employment Officer,Surat Member
10 Shri.Sandip J. Baladia Student (GM,ITI),Surat Member
Details of IInstitute Management Committee (IMC)
Plantation Under Nirmal GujaratAnd Van Mahotsava.
Sr no Total land available in ITI
Open land available in
ITI
Existing No.s of Trees
Planing for plantation during Van Mahotsava
1 10.13 Acers 3.0 Acers 3089 5000
Placement advisory Bureau
Sr No
Budget Provision Rs in lac
Expenditure Rs in Lac
Visitors
1 2.17 1.49 525
Available facility
Computer with Printer
Library with Furniture
White Notice Board
Officer Chamber
Placement
Sr. No. Year No. of Campus Interviews
Placement of Trainees
1 2004 09 79
2 2005 12 983 2006 03 714 2007 29 6935 2008 71 17086 2009 58 7687 2010 57 7458 2011 64 1850
Being Aware is Being in Touch with Real Situation
ITI –Surat Major Accomplishments
ISO 9001-2008 Certificate from Bureau Veritas.
Successful implementation of COE concept in Apparel & Fabricator Sectors.
Continuous training of Staff
Motor Driving Training Centre.
Mega Apprentice Bharati Mela
57 campus interviews/placement of 745 trainees in 2010.
Fully Equipped Placement Bureau Started at ITI Surat
Launched ITI Surat web site ( www.itisurat.org.in )
Construction Skill Training Center start from August 2009.
Kausalya Vardhan Kendra start from August 2010 at Kholwad, Kamrej & Kathor.
Scope of MoU
TRAINING OF TRAINERS UPGRADING CURRICULUM INDUSTRIAL TRAINING OF TRAINEES PLACEMENT OF TRAINEES DONATION OF MACHINERY/ TRAINING KIT TECHNICAL SUPPORT FOR MAINTENANCE CONSULTATION FOR EFFECTIVE IMPLEMENTATION OF APPRENTICESHIP
TRAINING SCHEME ON THE JOB TRAINING TRADE DEVELOPMENT SKILL TESTING OF TRAINEES JOINT PROJECT INVOLVING COMPOSITE SKILLS WORKSHOP, SEMINARS. TRADE FAIRS
ITI is imparting vocational training to its Trainees In the field of various Engineering and Non-Engineering trades.
MoU is signed between I.T.I. Surat and L.G. Electronics India Pvt. Ltd. with a view to upgrading its existing Technical Education course like Electronics Mechanic & Refrigeration and Air conditioner Mech. for 3 years with effect from 1st October 2007 to 30th September 2010 and can be renewed on written mutual consent of both the parties.
Another MoU is signed between I.T.I. Surat and L& T Hazira, for up gradation of Center of Excellence in Fabrication Sector from August 2007.
Under “ Basic Fabrication Skills” Programme ITI surat has signed MoU with L& T hazira for upgradation of fitter trade.
MoU Signed
Progress of Flexi MoU signed.
Sr No
MoU Partner
Trade Starting Batch Date
Completed
Training.
On Roll
Trainee
selected
under MoU
1 L & T Ltd Surat
CoE Fabrication
1- 8- 2008 31- 7- 2009 107 107
2 L & T Ltd Surat
Trade skill up gradation “ Fitter” Trade 64 Batch
1- 8- 2007 31- 7- 2009 49 42
3 LG Electronics India Pvt Ltd.
Refrigeration and Air conditioner Mechanic. Trade 64 Batch
1- 8- 2007 31- 7- 2009 41 08
4 LG Electronics India Pvt Ltd.
Electronics Mechanic Trade 64 Batch
1- 8- 2007 31- 7- 2009 33 05
VIBRANT MOU With ITI, Surat
Sr. No.
Name of CompanyContact Person
Trades covered under the MoU
Progress Detail of MoU
1
KATARIA AUTOMOBILES LTD
Mr Ajay K Vijay, Alpesh Gajjar
MMV,MD,TRM,TWA
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
Beside Gujarat Gas CNG Station, Opp Vatsalya Bunglows, Udhana Magdalla Road, Vesu, Surat
Meeting with workshop Manager of MoU company & ITI Faculty on 03-03-2011 and plan out the theory and practical training program.
Theoretical Training program from : 07-03-2011 to 29-03-2011 for 148 student.
practical Training Program on shop floor at company. From 25-4-2011 to 21-5-2011 Batch wise training for 148 Student.
2
JIVAN JYOT MOTORS PVT LTDJivan Jyot Theatre Compund Udhana Main Road Surat 394210
Mr Chintan Parikh
MMV,MD,TRM,TWA
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
03
HINDUSTAN CHEMICALS COMPANY Mr B.S.
Pathak MMCP
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
Sr. No.
Name of Company Contact PersonTrades covered under the MoU
Progress Detail of MoU
04
UNIMARK REMEDIES LTD , Surat
Mr C.H. Gadhecha
Electrician, Fitter, Boiler Operator,
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
05RADHA INDUSTRIES , Surat
Mr Maganbhai M Bhagat
Draftsman Mechanic
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
06HAPPY ENGINEERING , Surat
Mr Hetal Rumendra Mehta
Armature Rewinding
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
07ASOPALAV CREATION PVT. LTD. , Surat
Mr Vikas Ramgopal Dhaniwal
Apparel Group
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
08
BATLIBOI LTD , Surat
Mr Sunil Sharma
Machinist, Machinist Grinder
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
09
TECHNOLOGY EXCHNOLOGY SERVICES,
AhmedabadMr Dhrmendra K. Shrma
MechanicalChemical
AutomobileInstrumentation
Primary Meeting at ITI surat all ready arrange and matter Required for final MoU and Area of MoU For Skill Upgradation Has been collect.
A. MoU For Up gradation of ITI into CoE (Fabrication)
• MoU is signed between I.T.I. Surat and L& T Hazira, for up gradation of Center of Excellence in Fabrication Sector on 7th March, 2008 for the period of 5 years with effect from 1st August, 2007 to 31st October 2012.
B. MoU Under Basic Fabrication Skills Programmed for Fitter Trade
• MoU is signed between I.T.I. Surat and L& T Hazira, Under “ Basic Fabrication Skills” programme for up gradation of Fitter Trade on 23rd May, 2008.
C. MoU Under Trade Skill Up gradation Programmed for RFM & ETN Trades
• MoU is signed between I.T.I. Surat and LG India Ltd., for up gradation of RFM & ETN Trades on 1st October, 2007 for the period of 3 years, effective from 1st October, 2007.
• Campus Interview was held on 10th January, 2008 for the trainees of RFM and ETN trades. Company will paid stipend Rs. 1000/- Per Month. After the completion of course, then after pay Rs 5000/- Per Month on regular Basis.
Profile of MoU Company
L & T Ltd., Surat a company
incorporated under the companies
Act,1956, which is leading in
various sectors like, Design,
Engineering, Manufacturing and
Commissioning of High tech
Plants and Equipments for core
sector like oil & Gas ,
Petrochemicals & Refineries,
Fertilizers, power plants, Defense,
Nuclear Power Plants, Aerospace
and Ship –building etc in India and
abroad.
L&T LTD, HAZIRA, SURAT.
Profile of MoU Company
LG ELECTRONICS INDIA LTD.
L G Electronics India Pvt.
Ltd., a company
incorporated under
companies Act ,1956 is
engaged in the business of
manufacturing and selling
consumer durable Digital
Home Appliances viz. Air
Conditioners, Refrigerator,
Color Television, Washing
Machines, Microwave
ovens, Vacuum Cleaners, IT
related products etc in
India.
Trainers’ TrainingL & T LTD, SURAT. Provided periodical training to Seven Instructors/Faculty of I.T.I. Surat
during 7-4-2010 To 19-4-2010 with free transport, Food and safety equipment at company premises, Hazira ,Surat, who are impart training to the COE
fabrication trainees of the I.T.I. Surat.
Sr No Name Designation
1 Mr. S.S. Baluch C.I. Welder
2 Mr. G.B.Parmar C.I. Fitter
3 Mr. J. S. Bhatt C.I. MH
4 Mr. D.M.Patel C.I. WD
5 Mr. A.N. Pathan C.I. Fitter
6 Mr. J.K.Chaudhari C.I. IT
7. Mr. C.J.Makwana C.I. Turner
DETAILS OF THE STAFF TRAINED
Trainers’ TrainingL & T LTD, SURAT. As per the MoU for up gradation of fitter Trade L& T Surat
provided Training to four C.I./ Supervisory staff I.T.I. Surat at L& T Hazira, Surat. From 07-04-2010 to 14-04-2010.
Sr No
Name Designation
1 Mr. S.Z. Panchal S.I.
2 Mr. I.D. Tandel C.I. Fitter
3 Mr. B.R. Mokaria C.I. Fitter
4 Mr. A.P. Tandel C.I. Drawing
DETAILS OF THE STAFF TRAINED
Trainers’ TrainingL G ELECRONICS INDIA PVT. LTD. Provided Training to Four Instructors/Faculty of I.T.I. Surat at
company premises Pune during 19-11-07 TO 24-11-07. on its own costs and bear the expenses for Traveling of such Trainers, who are impart training to the trainees of the I.T.I. Surat
Sr No Name Designation
1 Mr. M.P Patel C.I. RFM
2 Mr. V.K. Mehta C.I. RFM
3 Mr. D.Z. Gandhi C.I. ETN
4 Mr. K.P. Patel C.I. ETN
DETAILS OF THE STAFF TRAINED
TRAINING AIDS/EQUIPMENTS/STUDY MATERIALS GIVEN BY THE MoU COMPANY
L&T Ltd., Surat - Has Renovated the premises
allotted for the Fabrication Sector and complete the civil, electrical and gardening work.
Has given certain specialized Raw Materials apart from the syllabus , Dress code, Shoes, Safety Helmet to the Trainees and Trainers.
Has given specialized equipments, tools and consumables
Has given equipment for modules related to Fabrication & Surface treatment training.
Expenses By The L&T
A. For upgradation of CoE Fabrication :Capital ItemsRenovation and Garden Development : Rs. 13,00,000/-Cost of furniture and other class room items : Rs. 3,00,000/-Cost of frontage development : Rs. 2,00,000/-Tools and Equipments by L&T : Rs. 3,00,000/-Tools and Equipments for BBBT : Rs. 25,00,000/- For Mod.2 & 5 Ordered
For Advance Module : Rs. 12,00,000/- ============== Rs. 58,00,000/-
Revenue Gardener for landscaping maintenance : Rs. 50,000/ yearSweeper for house keeping : Rs. 24,000/ yearFaculty for COE lectures by L&T : Rs. 1,44,000/ yearCharges to consultant engaged by L&T : Rs. 4,00,000/yearConsumable materials for practical : Rs. 2,50,000/year
================ Rs. 8,68,000 B.
For upgradation of Fitter Trade :Student seating bench, White / Green BoardInstructor revolving Chair, Table and Cupboard Rs. 2,55,000 /-Renovation of Building Rs. 5,00,000/-
================ Rs.7,55,000/-
Details of Training Given By The MoU Company
L & T has posted one full
time Technical expert
for Specialized / Extra
training to Trainees of
COE fabrication. And Fitter
trade Trainees.
TRAINING AIDS/EQUIPMENTS/STUDY MATERIALS GIVEN BY THE MoU COMPANY
LG ELECTRONICS INDIA PVT. LTD, Company have donated its product for
demonstration during training.
1. Split Air Conditioner 1.5 Ton. Cap 24000 Rs.
2. Window A.C. 1.5 Ton cap 18000 Rs
3. 185 ltr Refrigerator 8600 Rs
4. 300 ltr Refrigerator 12000 Rs
5. Trainers Model of C.D. Player 4000 Rs
6. Trainers Model of Flatron 21” color T.V. 12000 Rs
7. H.T. System 8000 Rs
=========================================
86,000 Rs
Industrial Visit Details
Trainees of C.O.E. Fabrication (Fitting & Welding) have
taken a Module Based Industrial Visit of the Company
L & T Ltd., Hazira, Surat during January 2008.
L.G. Electronics India have arranged Industrial Visit to
its Authorized Dealer at Surat for candidates of RFM &
Electronic Trade.
PLACEMENT/ENTERPRENEAURESHIP DETAILS
L&T Surat has selected 114 candidates for COE Fabrication out of which 107 are the
on roll candidates.
LG Electronics India Ltd have selected 13 candidates during campus interview held
on 10-01-2008 with stipend @ Rs.1000/- per month during the remaining training
period then after regular salary will start.
MAIN GATE
ENTRANCE OF ITIENTRANCE OF ITI
ENTRANCE OF ITIENTRANCE OF ITI
ENTRANCE OF ITIENTRANCE OF ITI
ENTRANCE OF ITIENTRANCE OF ITI
I.T.I. Surat Activities Campus Development
I.T.I. Surat Activities Campus Development
I.T.I. Surat Activities Campus Development
I.T.I. Surat Activities Campus Development
I.T.I. Surat Activities CoE Fabrication Garden & Building
Progress of MoU implementation CoE Fabrication Workshop with L&T
Progress of MoU implementation CoE Fabrication Workshop with L&T
Progress of MoU implementation CoE Fabrication Workshop with L&T
Progress of MoU implementation CoE Fabrication Workshop with L&T
Progress of MoU implementation CoE Fabrication Workshop with L&T
Progress of MoU implementation
ETN & RFM Workshop with LG Electronics
Progress of MoU implementation
ETN & RFM Workshop with LG Electronics
Progress of MoU implementation
ETN & RFM Workshop with LG Electronics
Skill Up gradation Training by Kataria Automobiles
Other Training Activities Run by ITI Surat
Service Provider Training Programme under MME
Construction Workers Training Programme
under “Umeed Yojana”
CSTC TRAINING
CSTC TRAINING
COE - Apparel
COE - Apparel
Motor Driving School
THANK YOUPRESENTED BY
H.V. Patel(Principal ITI Surat)