Industrial Automation and Modern Connectivity
-
Upload
controleng -
Category
Engineering
-
view
794 -
download
1
Transcript of Industrial Automation and Modern Connectivity
![Page 1: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/1.jpg)
Industrial Automation and Modern Connectivity
![Page 2: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/2.jpg)
DMC Overview
Established in 1996, offices in Chicago, Boston, & Denver and customers
throughout the worldemployees &
growing
70+
![Page 3: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/3.jpg)
Areas of Expertise
![Page 4: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/4.jpg)
Matt PuskalaProject Director, Sr. Management
Technical: Factory Automation, PC, Web, and Database Applications
B.S. in Electrical EngineeringKettering University (GMI)
Joined DMC in 1999Student co-op
Presenter Info
![Page 5: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/5.jpg)
Agenda1. Modern Connectivity
Overview2. Three Modern Connectivity
Storiesa. Automotive Storyb. Candy Storyc. Integrator Story
3. Security – Quick Tips
![Page 6: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/6.jpg)
Define “Modern Connectivity” in the context of Industrial Automation.
Modern Connectivity: Definition
![Page 7: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/7.jpg)
Traditional Automation LineModern Connectivity: Definition
PLCInterface
Factory Equipment
![Page 8: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/8.jpg)
Any time you are connecting the factory line to other networks to allow data transfer (input or output).
Modern Connectivity: Definition
• Intranet/Subnet• Internet
![Page 9: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/9.jpg)
Any time you are connecting the factory line to other networks to allow data transfer (input or output).
Modern Connectivity: Definition
• Servers and Databases• Enterprise Systems (MES, ERP)• Internet/Remote Access
Connections To:
![Page 10: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/10.jpg)
Pros
?Modern Connectivity – Why?
ConsCost
ComplexitySecurity
![Page 11: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/11.jpg)
1: Optimize ProductionModern Connectivity – Why?
Identification of productivity loss.
When?Tomorrow?Immediately?
![Page 12: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/12.jpg)
1: Optimize ProductionModern Connectivity – Why?
Improve your process.
Data mining.
![Page 13: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/13.jpg)
2: TraceabilityModern Connectivity – Why?
FDA Regulations
Recalls
![Page 14: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/14.jpg)
3: ConvenienceModern Connectivity – Why?
Remote Support
Plant floor visibility at your desk
![Page 15: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/15.jpg)
4: Standardize and Control the System InputsModern Connectivity – Why?
Recipe Management
RECIPE
Benefits:
• Consistency and Quality
• Reduce Product Change Over Time
![Page 16: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/16.jpg)
Definition? Why? Goal?
Modern ConnectivityFactory System
Internet
Intranet
![Page 17: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/17.jpg)
Introduce new ideas or new ways of looking at old ideas to help you get the most out of Modern Connectivity with your Industrial Systems.
Modern Connectivity - GoalFactory System
Internet
Intranet
![Page 18: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/18.jpg)
Automotive Story
![Page 19: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/19.jpg)
Continuous Improvement
![Page 20: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/20.jpg)
Solving Mysteries!!1. Identify a big problem.2. Find the Cause.3. Find a Solution.
Continuous Improvement
![Page 21: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/21.jpg)
Conveyor ->
Press 1
Station 1: Stamp
Part
Station 2: InsertSubPart
Station 5:Transfer to
Presses
Station 3: InspectInsert
Station 4:Stamp
Part
Press 2
Press 3
Press 4
Press 5
Example Continuous Improvement - Solving Mysteries
![Page 22: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/22.jpg)
Continuous Improvement - Solving Mysteries
Conveyor ->
Press 1
Station 1: Stamp
Part
Station 2: InsertSubPart
Station 5:Transfer to
Presses
Station 3: InspectInsert
Station 4:Stamp
Part
Press 2
Press 3
Press 4
Press 5
Mystery: Transfer Faults
Transfer Faults
(dropped parts)
![Page 23: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/23.jpg)
Mystery: Transfer Faults (Dropped Parts)Continuous Improvement - Solving Mysteries
SHIFT REPORT
Operator: Part:
Jim A27Fault: Count:
Transfer Fault 273E-Stop Fault 2Low Air Pressure Fault 0Press Jam Fault 5
Part A27: Smallest Diameter
![Page 24: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/24.jpg)
Mystery: Transfer Faults (Dropped Parts)Simple Solution: Improve the part transfer!
Continuous Improvement - Solving Mysteries
SHIFT REPORT
Operator: Part:
Jim A27Fault: Count:
Transfer Fault 3E-Stop Fault 2Low Air Pressure Fault 0Press Jam Fault 5
![Page 25: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/25.jpg)
Continuous Improvement - Solving Mysteries
Conveyor ->
Press 1
Station 1: Stamp
Part
Station 2: InsertSubPart
Station 5:Transfer to
Presses
Station 3: InspectInsert
Station 4:Stamp
Part
Press 2
Press 3
Press 4
Press 5
Mystery: Jammed Station 4
Jammed Stamping Press
DAILY FAULT COUNTS
Fault: Count:
Transfer Fault 9Press Jam Fault 132Low Air Pressure Fault 7E-Stop Fault 5
![Page 26: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/26.jpg)
Continuous Improvement - Solving Mysteries
Conveyor ->
Press 1
Station 1: Stamp
Part
Station 2: InsertSubPart
Station 5:Transfer to
Presses
Station 3: InspectInsert
Station 4:Stamp
Part
Press 2
Press 3
Press 4
Press 5
Mystery: Jammed Station 4
DAILY FAULT COUNTS
Fault: Count:
Transfer Fault 9Press Jam Fault 0Low Air Pressure Fault 7E-Stop Fault 5
Add better part queuing.
![Page 27: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/27.jpg)
Simple Mysteries:• Problem -> Cause• Paper data collection by operators
Complicated Mysteries?
Continuous Improvement - Solving Mysteries
![Page 28: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/28.jpg)
Challenging Mystery: Inconsistent Production
Continuous Improvement - Solving Mysteries
![Page 29: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/29.jpg)
Challenging Mystery: Inconsistent Production
Cause?:• Particular Part• Particular Fault• No obvious pattern
Continuous Improvement - Solving Mysteries
![Page 30: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/30.jpg)
Challenging Mystery: Inconsistent ProductionReal Problem?: Inconsistent Data Tracking
Continuous Improvement - Solving Mysteries
SHIFT REPORT
Operator: Part:
Jim A27Fault: Count:
Transfer Fault 3E-Stop Fault 2Low Air Pressure Fault 0Press Jam Fault 5
![Page 31: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/31.jpg)
Improve Inconsistent Data Collection? Continuous Improvement – Solving Mysteries
Through Automation!:
• Automated Data Collection
• Automated Reporting
![Page 32: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/32.jpg)
Daily Emails of Reports to Engineers and Shift Supervisors
Continuous Improvement - Solving Mysteries
SHIFT REPORT
Operator: Part:
Jim A27Fault: Count:
Transfer Fault 3E-Stop Fault 2Low Air Pressure Fault 0Press Jam Fault 5
![Page 33: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/33.jpg)
Challenging Mystery: Inconsistent Production
What was the cause?Unmasking the culprit
Continuous Improvement - Solving Mysteries
![Page 34: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/34.jpg)
Continuous Improvement - Solving Mysteries
Conveyor ->
Press 1
Station 1: Stamp
Part
Station 2: InsertSubPart
Station 5:Transfer to
Presses
Station 3: InspectInsert
Station 4:Stamp
Part
Press 2
Press 3
Press 4
Press 5
Mystery: Inconsistent Production
Part Change OverDisabling presses.Reduction in throughput.
![Page 35: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/35.jpg)
Challenging Mystery: Inconsistent Production
Continuous Improvement - Solving Mysteries
![Page 36: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/36.jpg)
Continuous Improvement - Solving MysteriesAutomated Data Collection and Reporting
• Consistent Quality Data• Visibility
Technical Details?
![Page 37: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/37.jpg)
Technical Details – FactoryTalk Metrics
• Data Collection• Reporting• Preconfigured Reports and Wizards• Open System
![Page 38: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/38.jpg)
Technical Details – FactoryTalk MetricsPLC 1
PLC 2
PLC 3
Reports
![Page 39: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/39.jpg)
PLC 1
PLC 2
PLC 3
Reports
Technical Details
TagsSystem StatePart Created
Part NumberFault NumberOperator
PLC 1
Good PartRejected PartRejection Cause
TagsSystem StatePart Created
PLC 1
RunningFaultedSetup (Change over)Test ModeStarved (Up Stream Problem)Blocked (Down Stream Problem)
![Page 40: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/40.jpg)
PLC 1
PLC 2
PLC 3
Technical Details
![Page 41: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/41.jpg)
Technical Details
Report Expert
Built in basic reports. Viewable by Web Browser Viewable by Web Browser
Full Power of MS SQL Server Advanced/Complex ReportsSMTP Server
![Page 42: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/42.jpg)
• Why? - Optimize Production
• How? – FactoryTalk Metrics and Advanced Customizations
• Automated Emailed Reports• Visibility!
Automotive Story Recap!
![Page 43: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/43.jpg)
Candy Story
![Page 44: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/44.jpg)
Recipes produce variety on a single machine
Recipes
![Page 45: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/45.jpg)
Innovate
![Page 46: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/46.jpg)
New Crossover Recipe: Global Implementation
![Page 47: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/47.jpg)
Global Platform Variety
1998:USA Plant 1
2007:China Plant
2012:USA Plant 3
2010:India Plant
2002:USA Plant 2
2000 2005 2010
![Page 48: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/48.jpg)
New Crossover Recipe: Global Implementation
![Page 49: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/49.jpg)
5 Months$100,000+
Cost of Implementation?
Ready for the next new product?
Better way?!!
![Page 50: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/50.jpg)
• Single Website• Uniform Recipe Management System• Keep Existing Control Hardware and
Software
A Better Way!
![Page 51: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/51.jpg)
1. Log In To the Website2. Select Plant3. Select Production Line4. Select Existing Recipe and
EditOR
Create New Recipe
New System Update Recipe?
Technical Details?
![Page 52: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/52.jpg)
Technical Details - Overview
IntranetWebsite
USA Plant 1
USA Plant 3
India Plant
Custom Service
![Page 53: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/53.jpg)
Technical Details
IntranetWebsite
USA Plant 1
USA Plant 3
India Plant
Custom Service
![Page 54: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/54.jpg)
DNN: a Content Management System (CMS)
Built on the Microsoft Stack:• ASP.NET• SQL Server Database
Technical Details: Intranet Website
![Page 55: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/55.jpg)
Proven Pre-existing Functionality:• Security• User Management• Hundreds of Third Party
Tools
Why Content Management System?
![Page 56: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/56.jpg)
• Easy to Add Pages and Features
• Up and Running Fast
Why Content Management System?
![Page 57: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/57.jpg)
Technical Details
IntranetWebsite
USA Plant 1
USA Plant 3
India Plant
Custom Service
Intranet Website
DNN Tables
Custom Recipe Tables
Custom Functionality
![Page 58: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/58.jpg)
Technical Details
IntranetWebsite
USA Plant 1
USA Plant 3
India Plant
Custom Service
![Page 59: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/59.jpg)
15.315.23.1.2.3
Legacy System
Technical DetailsPLC
Select Recipe:1
Interface
Tags
Recipe NumberSugar (kg)Gelatine (kg)Water (L)Flavor 1 (kg)Flavor 2 (kg)
![Page 60: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/60.jpg)
New System
Technical DetailsPLC Select Recipe:
1
Interface
Tags
Recipe NumberSugar (kg)Gelatine (kg)Water (L)Flavor 1 (kg)Flavor 2 (kg)
1
Custom Service
5.315.23.1.2.3
![Page 61: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/61.jpg)
Technical Details
5.315.23.1.2.3
Custom Service
1
PLCDNN Tables
Custom Recipe Tables
OPC Server
USA Plant 1
USA Plant 3
India Plant
![Page 62: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/62.jpg)
Technical DetailsOPC Server:• Standard: Support for 100s of
Industrial Platforms• 1996• OPC: “OLE for Process Control”• OPC: “Open Platform for
Communications”
![Page 63: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/63.jpg)
Candy Story Recap!• Why?
• Standardize and Control the System Inputs
• Convenience• How? – Cost-Effective Custom
System• Flexible – Feed Multiple Platforms
![Page 64: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/64.jpg)
Integrator Story
![Page 65: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/65.jpg)
43
![Page 66: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/66.jpg)
Onsite Commissioning - Chemical
![Page 67: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/67.jpg)
I/O IssuesOnsite Commissioning - Chemical
InterfacePump 1
System
REV FWD
Pump 5
REV
![Page 68: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/68.jpg)
I/O Issues:• Hundreds of
I/O Points• Trial and
Error Debugging
Onsite Commissioning - Chemical
![Page 69: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/69.jpg)
Slow 2 Person Job
Onsite Commissioning - Chemical
Controls
Pumps100’
![Page 70: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/70.jpg)
Onsite Commissioning - Chemical Days?
WEEKS?
![Page 71: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/71.jpg)
Onsite Commissioning - ChemicalSimple Idea!
![Page 72: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/72.jpg)
Onsite Commissioning - Chemical
Controls
Pumps
Controls
![Page 73: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/73.jpg)
Technical DetailsInterface
System: Pumps Valves Feedback
PLCs
D͞Mobile Interface E͞
![Page 74: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/74.jpg)
Onsite Commissioning - Chemical
![Page 75: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/75.jpg)
Onsite Commissioning - Chemical
![Page 76: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/76.jpg)
![Page 77: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/77.jpg)
• Why? – Convenience• Remote Desktop Protocol – Simple and Cost
Effective!
Integrator Story Recap
![Page 78: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/78.jpg)
Security Considerations
![Page 79: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/79.jpg)
Security is Complicated
1. Three Quick Recommendations2. Some Resources
Security Considerations
![Page 80: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/80.jpg)
• Any time any change is made!• Archive or software repository is best.
Recommendation #1: Back Up Control Software
![Page 81: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/81.jpg)
• Use VPN for External Access• Be wary of WiFi• Remove internet access all together?
Recommendation #2:Isolate from Outside
![Page 82: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/82.jpg)
• Consider using internal Subnets and Firewalls
Recommendation #3: Isolate from Inside
![Page 83: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/83.jpg)
Resources
1. Recommended Practiceshttps://ics-cert.us-cert.gov/Recommended-Practices
![Page 84: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/84.jpg)
Resources
Recommended Best Practices“Improving Industrial Control Systems Cybersecurity with Defense-in-Depth Strategies”https://ics-cert.us-cert.gov/sites/default/files/recommended_practices/Defense_in_Depth_Oct09.pdf
![Page 85: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/85.jpg)
Resources
2. List of Vulnerabilitieshttps://ics-cert.us-cert.gov/ics-archive/
![Page 86: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/86.jpg)
Recap!
Modern Connectivity and Industrial Automation:• Defined
• Why?• Optimize Production• Traceability• Convenience• Standardize and Control
the System Inputs
Factory System
Internet
Intranet
![Page 87: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/87.jpg)
Recap!
Stories:
Factory System
Internet
Intranet
![Page 88: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/88.jpg)
Recap!
Security
Factory System
Internet
Intranet
![Page 89: Industrial Automation and Modern Connectivity](https://reader031.fdocuments.in/reader031/viewer/2022022414/58732ad21a28ab596c8b587f/html5/thumbnails/89.jpg)
Thank You!