Indian Railways

51
INDIAN RAILWAYS INDIAN RAILWAYS By Prithujit Biswas By Prithujit Biswas 07927859 07927859

description

A brief overview of Indian Railways by Prithujit

Transcript of Indian Railways

Page 1: Indian Railways

INDIAN RAILWAYSINDIAN RAILWAYS

By Prithujit BiswasBy Prithujit Biswas

0792785907927859

Page 2: Indian Railways

First in India in 1853 from Bombay First in India in 1853 from Bombay to Thanato Thana

Length of railway network is 63140 km.Length of railway network is 63140 km.5 billion passengers and 350 million tones5 billion passengers and 350 million tones

of freight are transported annually.of freight are transported annually.

Page 3: Indian Railways

There are 17 zones and each zone There are 17 zones and each zone consists of certain number of divisions consists of certain number of divisions with a total of 67 divisions.with a total of 67 divisions.

Page 4: Indian Railways

Three main categories of tracks:Three main categories of tracks:

Broad gauge – 1676mmBroad gauge – 1676mm

Meter gauge – 1000mmMeter gauge – 1000mm

Narrow gauge – 762mmNarrow gauge – 762mm

- 610mm- 610mm

Page 5: Indian Railways

Two basic types of engines are:Two basic types of engines are:

LocomotivesLocomotives

Multiple unitsMultiple units

Page 6: Indian Railways

locomotiveslocomotives

eg WDM-3Deg WDM-3D

Letters from the left indicate types of Letters from the left indicate types of gauge, power source, operation and horse gauge, power source, operation and horse power.power.

Page 7: Indian Railways

Production unitsProduction units

CLWCLW: The : The Chittaranjan Locomotive WorksChittaranjan Locomotive Works in in ChittaranjanChittaranjan makes electric locomotives. makes electric locomotives. DLWDLW: The : The Diesel Locomotive WorksDiesel Locomotive Works in in VaranasiVaranasi makes diesel locomotives. makes diesel locomotives. ICFICF: The : The Integral Coach FactoryIntegral Coach Factory in in PeramburPerambur makes makes integral coachesintegral coaches. These have a . These have a monocoquemonocoque construction, and the floor is an construction, and the floor is an integral unit with the undercarriage. integral unit with the undercarriage. RCFRCF: The : The Rail Coach FactoryRail Coach Factory in in KapurthalaKapurthala also also makes coaches for the Indian Railways. makes coaches for the Indian Railways. RWFRWF: The : The Rail Wheel FactoryRail Wheel Factory at at YelahankaYelahanka manufactures wheels and axles. manufactures wheels and axles.

Page 8: Indian Railways

WDP-4WDP-4

Page 9: Indian Railways

BAAZBAAZ

Page 10: Indian Railways

SpecificationSpecification

4000 hp4000 hp

Top speed 160 KmphTop speed 160 Kmph

Page 11: Indian Railways

WDP-3WDP-3

Page 12: Indian Railways

SpecificationSpecification

3100 hp3100 hp

Top speed 140 kmphTop speed 140 kmph

Both for WDP-2 and WDP-3Both for WDP-2 and WDP-3

Page 13: Indian Railways

WDP-2 with Trivandram RajdhaniWDP-2 with Trivandram Rajdhani

Page 14: Indian Railways

Most faithful work horse WDM-2Most faithful work horse WDM-2

Page 15: Indian Railways

SpecificationSpecification

2600 hp2600 hp

120 Kmph120 Kmph

Page 16: Indian Railways

WDM-3WDM-3

Page 17: Indian Railways

SpecificationSpecification

3100/3300 hp3100/3300 hp

120/160 Kmph120/160 Kmph

Page 18: Indian Railways

WDM-4 with Calcutta RajdhaniWDM-4 with Calcutta Rajdhani

Page 19: Indian Railways

SpecificationSpecification

2600 hp2600 hp

130 Kmph130 Kmph

Page 20: Indian Railways

WDM-4WDM-4

Page 21: Indian Railways

WDS-4 (Shunter)WDS-4 (Shunter)

Page 22: Indian Railways

WDS-6WDS-6

Page 23: Indian Railways

WDG-3A ‘Shakti’WDG-3A ‘Shakti’

Page 24: Indian Railways

SpecificationSpecification

3400 hp3400 hp

100 Kmph100 Kmph

Page 25: Indian Railways

The Mercs of Indian Railway WAP-The Mercs of Indian Railway WAP-77

Page 26: Indian Railways

SpecificationSpecification

6350 hp6350 hp

170 Kmph170 Kmph

Page 27: Indian Railways

WAP-5WAP-5

Page 28: Indian Railways

SpecificationSpecification

6000 hp6000 hp

160 Kmph160 Kmph

Page 29: Indian Railways

WAP-5 with Mumbai RajdhaniWAP-5 with Mumbai Rajdhani

Page 30: Indian Railways

WAP-4WAP-4

Page 31: Indian Railways

SpecificationSpecification

5350 hp5350 hp

140 Kmph140 Kmph

Page 32: Indian Railways

WAP-1WAP-1

Page 33: Indian Railways

SpecificationSpecification

3900 hp3900 hp

130 kmph130 kmph

Page 34: Indian Railways

WCAM-2PWCAM-2P

Page 35: Indian Railways

SpecificationSpecification

2910 hp2910 hp

112 Kmph112 Kmph

Page 36: Indian Railways

WCAM-3WCAM-3

Page 37: Indian Railways

SpecificationSpecification

3000 hp3000 hp

112 Kmph112 Kmph

Page 38: Indian Railways

WAG-6WAG-6

Page 39: Indian Railways

SpecificationSpecification

6110 hp6110 hp

100 Kmph100 Kmph

Page 40: Indian Railways

WAG-9WAG-9

Page 41: Indian Railways

SpecificationSpecification

6125 hp6125 hp

100 Kmph100 Kmph

Page 42: Indian Railways

Isn’t it too boring.Isn’t it too boring.

Some new looks.Some new looks.

Page 43: Indian Railways

DMU at BhadrachalamDMU at Bhadrachalam

Page 44: Indian Railways

DMU at TirupathiDMU at Tirupathi

Page 45: Indian Railways

EMU at DighaEMU at Digha

Page 46: Indian Railways

Old Beauty/BeastOld Beauty/Beast

Page 47: Indian Railways

Beast at dutyBeast at duty

Page 48: Indian Railways

Notable fact and achievementNotable fact and achievement

Darjeeling Himalayan Railway is a world Darjeeling Himalayan Railway is a world heritage site by UNESCO.heritage site by UNESCO.

Ghum near Darjeeling at an altitude of Ghum near Darjeeling at an altitude of 7000 ft is one of the highest hill station in 7000 ft is one of the highest hill station in the Asia.the Asia.

Kalka-Shimla railway has the steepest rise Kalka-Shimla railway has the steepest rise in altitude and made entry into Guinness in altitude and made entry into Guinness Book of World Record.Book of World Record.

Page 49: Indian Railways

Notable fact and achievementNotable fact and achievement

Electric locomotive in India first Electric locomotive in India first manufactured in 1970.manufactured in 1970.

Other information:Other information:

Overhead line voltage is generally 25000V Overhead line voltage is generally 25000V AC. In some place 1500V, DC current or AC. In some place 1500V, DC current or 750V, DC current.750V, DC current.

Page 50: Indian Railways

Other InformationOther Information

Fastest passenger train, Delhi Bhopal Fastest passenger train, Delhi Bhopal Shatabdi Express runs at 150km/hr.Shatabdi Express runs at 150km/hr.

Highest speed of goods train in India is Highest speed of goods train in India is 100km/hr.100km/hr.

Japanese magnetic levitation train Japanese magnetic levitation train JR.Maglev has a peak speed of 581km/hr.JR.Maglev has a peak speed of 581km/hr.

70% of Indian Railway revenues come 70% of Indian Railway revenues come from freight sector.from freight sector.

Page 51: Indian Railways

THANKYOUTHANKYOU