Index [alohashoredivers.com]alohashoredivers.com/links/DiveMan_rev6_index.pdfIndex–2 U.S. Navy...

12
Index Index–1 Index A ADS-IV 1-25 Air Decompression Table(s) 9-6 Air sampling local 4-10 NSWC-PC services 4-9 procedures 4-8 purpose of 4-7 source 4-7 Air supply air purity standards 8-16 air source sampling 4-7 criteria 6-28 duration 7-14 emergency gas supply requirements for enclosed space diving 8-7 flow requirements 8-16 MK 20 MOD 0 8-7 emergency gas supply 8-7 flow requirements 8-8 MK 21 MOD 1 8-2 emergency gas supply 8-2 flow requirements 8-3 pressure requirements 8-4 preparation 8-25 pressure requirements 8-16 primary 8-17 procurement from commercial source 7-16 recompression chamber 21-15 secondary 8-17 standby diver requirements 8-17 surface air supply requirements 8-16 water vapor control 8-17 Altitude diving planning considerations 6-20 Altitude diving procedures/flying after diving 17-33, 18-21 Aqua-Lung 1-10 Archimedes’ Principle 2-13 Armored diving suits development of 1-7 Ascent procedures decompression 7-39, 8-35 emergency free ascent 7-38 from the 20-fsw water stop 14-6 from under a vessel 7-38 surface-supplied diving 8-34 surfacing and leaving the water 7-40 Ascent rate 9-7 delay in arriving at first stop 14-7 delay in leaving a stop 14-8 delay in travel from 40-fsw to surface 14-8 MK 16 17-16 Ascent to altitude after diving/flying after diving 9-57 Ascent training and operations 6-3 Asymptomatic omitted decompression 9-42 Atmospheric air components of 2-14 B Bacon, Roger 1-3 Barracuda 5C-4 Bends origin of name 1-6 Biological contamination as a planning consideration 6-20 Blasting plan minimum information 6-38 Blood controlling massive bleeding 5B-1 internal bleeding 5B-6 Bloodworms 5C-13 Blowout plugs 7-6 Bottom movement on the 8-27 searching on the 8-28 Bottom time definition 9-2 mixed-gas diving 13-4 Bottom time in excess of the table 9-35 Bottom type as a planning consideration 6-13 Boyle’s law 2-17, 12-1 formula 12-1 Breathing bag closed-circuit UBA 17-4 Breathing bags diving with 1-3 Breathing gas analysis 16-8 compressed air purity standards 4-4 consumption rates 13-7 continuous flow mixing 16-7 heating system 15-9 helium purity standards 4-6 increasing oxygen percentage 16-5 mixing by partial pressure 16-1 mixing by volume 16-7 mixing by weight 16-8 nitrogen purity standards 4-6

Transcript of Index [alohashoredivers.com]alohashoredivers.com/links/DiveMan_rev6_index.pdfIndex–2 U.S. Navy...

Index Index–1

Index

AADS-IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25AirDecompressionTable(s) . . . . . . . . . . . . . . . . . . . 9-6Airsampling

local . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10NSWC-PCservices . . . . . . . . . . . . . . . . . . . . . . 4-9procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8purposeof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7

Airsupplyairpuritystandards . . . . . . . . . . . . . . . . . . . . . . 8-16airsourcesampling . . . . . . . . . . . . . . . . . . . . . . 4-7criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-28duration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-14emergencygassupplyrequirementsfor

enclosedspacediving . . . . . . . . . . . . . . . . . 8-7flowrequirements . . . . . . . . . . . . . . . . . . . . . . . 8-16MK20MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7

emergencygassupply . . . . . . . . . . . . . . . . 8-7flowrequirements . . . . . . . . . . . . . . . . . . . . 8-8

MK21MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2emergencygassupply . . . . . . . . . . . . . . . . 8-2flowrequirements . . . . . . . . . . . . . . . . . . . . 8-3pressurerequirements . . . . . . . . . . . . . . . . 8-4

preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25pressurerequirements . . . . . . . . . . . . . . . . . . . 8-16primary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-17procurementfromcommercialsource . . . . . . . 7-16recompressionchamber . . . . . . . . . . . . . . . . . 21-15secondary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-17standbydiverrequirements . . . . . . . . . . . . . . . 8-17surfaceairsupplyrequirements . . . . . . . . . . . . 8-16watervaporcontrol . . . . . . . . . . . . . . . . . . . . . . 8-17

Altitudedivingplanningconsiderations . . . . . . . . . . . . . . . . . . 6-20

Altitudedivingprocedures/flyingafterdiving . . . . . . . . . . . . . . . . . . . . . . 17-33,18-21

Aqua-Lung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10Archimedes’Principle . . . . . . . . . . . . . . . . . . . . . . . 2-13Armoreddivingsuits

developmentof . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7Ascentprocedures

decompression . . . . . . . . . . . . . . . . . . . . . 7-39,8-35emergencyfreeascent . . . . . . . . . . . . . . . . . . . 7-38fromthe20-fswwaterstop . . . . . . . . . . . . . . . . 14-6fromunderavessel . . . . . . . . . . . . . . . . . . . . . 7-38surface-supplieddiving . . . . . . . . . . . . . . . . . . . 8-34surfacingandleavingthewater . . . . . . . . . . . . 7-40

Ascentrate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7delayinarrivingatfirststop . . . . . . . . . . . . . . . 14-7delayinleavingastop . . . . . . . . . . . . . . . . . . . 14-8

delayintravelfrom40-fswtosurface . . . . . . . . 14-8MK16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16

Ascenttoaltitudeafterdiving/flyingafterdiving . . . 9-57Ascenttrainingandoperations . . . . . . . . . . . . . . . . . 6-3Asymptomaticomitteddecompression . . . . . . . . . . 9-42Atmosphericair

componentsof . . . . . . . . . . . . . . . . . . . . . . . . . 2-14

BBacon,Roger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3Barracuda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-4Bends

originofname . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6Biologicalcontamination

asaplanningconsideration . . . . . . . . . . . . . . . 6-20Blastingplan

minimuminformation . . . . . . . . . . . . . . . . . . . . 6-38Blood

controllingmassivebleeding . . . . . . . . . . . . . . 5B-1internalbleeding . . . . . . . . . . . . . . . . . . . . . . . . 5B-6

Bloodworms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-13Blowoutplugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6Bottom

movementonthe . . . . . . . . . . . . . . . . . . . . . . . 8-27searchingonthe . . . . . . . . . . . . . . . . . . . . . . . . 8-28

Bottomtimedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2mixed-gasdiving . . . . . . . . . . . . . . . . . . . . . . . 13-4

Bottomtimeinexcessofthetable . . . . . . . . . . . . . . 9-35Bottomtype

asaplanningconsideration . . . . . . . . . . . . . . . 6-13Boyle’slaw . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-17,12-1

formula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1Breathingbag

closed-circuitUBA . . . . . . . . . . . . . . . . . . . . . . 17-4Breathingbags

divingwith . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3Breathinggas

analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8compressedair

puritystandards . . . . . . . . . . . . . . . . . . . . . . 4-4consumptionrates . . . . . . . . . . . . . . . . . . . . . . 13-7continuousflowmixing . . . . . . . . . . . . . . . . . . . 16-7heatingsystem . . . . . . . . . . . . . . . . . . . . . . . . . 15-9helium

puritystandards . . . . . . . . . . . . . . . . . . . . . . 4-6increasingoxygenpercentage . . . . . . . . . . . . . 16-5mixingbypartialpressure . . . . . . . . . . . . . . . . 16-1mixingbyvolume . . . . . . . . . . . . . . . . . . . . . . . 16-7mixingbyweight . . . . . . . . . . . . . . . . . . . . . . . . 16-8nitrogen

puritystandards . . . . . . . . . . . . . . . . . . . . . . 4-6

Index–2 U.S. Navy Diving Manual

oxygenpuritystandards . . . . . . . . . . . . . . . . . . . . . . 4-4

procuredfromcommercialsourcepuritystandards . . . . . . . . . . . . . . . . . . . . . . 4-4

reducingoxygenpercentage . . . . . . . . . . . . . . 16-6requirements

deckdecompressionchamber . . . . . . . . . 15-3emergencygas . . . . . . . . . . . . . . . . . . . . 15-18mixed-gasdiving . . . . . . . . . . . . . . . . . . . . 13-7personneltransfercapsule . . . . . . . . . . . . 15-1surface-supplieddiving . . . . . . . . . . . . . . . 13-7treatmentgas . . . . . . . . . . . . . . . . . . . . . 15-18UBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-18

singlecylindermixingprocedure . . . . . . . . . . . 16-2Breathinghoses

prediveinspectionforSCUBAoperations . . . . 7-21Breathingtechnique

SCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-29Breathingtubes

divingwith . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2Bristleworms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-13Browne,Jack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18Buddydiver

buddybreathingprocedure . . . . . . . . . . . . . . . 7-32ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . .11-10responsibilities . . . . . . . . . . . . . . . . . . . . . 6-36,7-32

Buddylinetendingwith . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-36

BuoyancyArchimedes’Principle . . . . . . . . . . . . . . . . . . . . 2-13changing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13SCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-27surface-supplieddivingsystems . . . . . . . . . . . 6-28waterdensity . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13

CCaisson . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5

caissondisease . . . . . . . . . . . . . . . . . . . . . . . . . 1-6Canisterduration

MK16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17-11Carbondioxide

propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-16removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1scrubber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-3toxicity . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15,17-30

Carbondioxidescrubberfunctions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6

Carbonmonoxidepoisoning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21

Cardiopulmonaryresuscitation . . . . . . . . . . . . . . . . 5B-1ChamberDefinitions . . . . . . . . . . . . . . . . . . . . . . . . 21-1ChamberVentilationBill . . . . . . . . . . . . . . . . . . . . 21-21Charles’law . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4

formula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4Charles’/Gay-Lussac’slaw . . . . . . . . . . . . . . . . . . . 2-18

ChecklistsDivingSafetyandPlanningChecklist . . . . . . . . 6-41EmergencyAssistanceChecklist . . . . . . . . . . . 6-53EnvironmentalAssessmentWorksheet . . . . . . 6-10MK16MOD1DiveRecordSheet . . . . . . . . . 18-13NeurologicalExaminationChecklist . . . . . . . . . 5A-2RecompressionChamberPostdiveChecklist 21-23RecompressionChamberPrediveChecklist . 21-18ShipRepairSafetyChecklist . . . . . . . . . . . . . . 6-48Surface-SuppliedDivingOperations

PrediveChecklist . . . . . . . . . . . . . . . . . . . 6-50Chemicalcontamination

asaplanningconsideration . . . . . . . . . . . . . . . 6-20Chemicalinjury . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-31

causesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-31managing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-32symptomsof . . . . . . . . . . . . . . . . . . . . . . . . . . 17-32

Ciguaterafishpoisoning . . . . . . . . . . . . . . . . . . . . 5C-18Closed-circuitoxygendiving

medicalaspects . . . . . . . . . . . . . . . . . . . . . . . . 18-1Closed-circuitSCUBA

historyof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10Clothing

topsidesupportpersonnel . . . . . . . . . . . . . . . . .11-6CNSoxygentoxicity

innitrogen-oxygendiving . . . . . . . . . . . . . . . . . 10-2preventing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-26symptomsof . . . . . . . . . . . . . . . . . . . . . . . . . . 17-26treating

convulsions . . . . . . . . . . . . . . . . . . . . . . . 17-27CNSoxygentoxicityinthechamber . . . . . . . . . . . . 9-42CNSoxygentoxicitysymptoms(non-convulsive)

at30or20fswwaterstop . . . . . . . . . . . . . . . . 9-37CoastalSystemsStation

faxnumber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9Coelenterates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-9Coldwaterdiving

navigationalconsiderations . . . . . . . . . . . . . . . .11-1planningguidelines . . . . . . . . . . . . . . . . . . . . . . .11-1

Colorvisibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6Combatswimming

planningconsiderations . . . . . . . . . . . . . . . . . . . 6-5U .S .Navy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-14WorldWarII . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13

CommandSmoothDivingLog . . . . . . . . . . . . . . . . . . 5-2minimumdataitems . . . . . . . . . . . . . . . . . . . 5-2,5-7

Communicationsdiverintercommunicationsystems . . . . . . . . . . 8-22handsignals . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-31line-pullsignals . . . . . . . . . . . . . . . . . . . . . . . . . 7-31saturationdiving . . . . . . . . . . . . . . . . . . . . . . . . 15-3surface-suppliedoperations . . . . . . . . . . . . . . . 8-22through-watersystems . . . . . . . . . . . . . . . . . . . 7-31

CompassprediveinspectionforSCUBAoperations . . . . 7-23

Compressedairpuritystandards . . . . . . . . . . . . . . . . . . . . . . . . . 4-4

Index Index–3

Compressorsairfiltrationsystem . . . . . . . . . . . . . . . . . . . . . . 4-10capacityrequirements . . . . . . . . . . . . . . . . . . . 8-18certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21intercoolers . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21lubrication . . . . . . . . . . . . . . . . . . . . . . . . . 4-10,8-20

specifications . . . . . . . . . . . . . . . . . . . 4-11,8-20maintaining . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-20pressureregulators . . . . . . . . . . . . . . . . . . . . . 8-21reciprocating . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18selecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-18

Coneshells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-15ConshelfOne . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22ConshelfTwo . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22Contaminatedwater

divingin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17Contaminationofoxygensupplywithair . . . . . . . . . 9-37Convulsions

treatingunderwater . . . . . . . . . . . . . . . . 18-23,19-3Coordinationtests . . . . . . . . . . . . . . . . . . . . . . . . . . 5A-5Coral . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-11Corners

workingaround . . . . . . . . . . . . . . . . . . . . . . . . . 8-29Cousteau,Jacques-Yves . . . . . . . . . . . . . . . . . 1-10,1-22Cranialnerveassessment . . . . . . . . . . . . . . . . . . . . 5A-6Currents

typesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13workingin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15

Cylindersblowoutplugsandsafetydiscs . . . . . . . . . . . . . . 7-6chargingmethods . . . . . . . . . . . . . . . . . . . . . . . 7-16chargingwithcompressor . . . . . . . . . . . . . . . . 7-19DepartmentofTransportationspecifications . . . 7-4handlingandstorage . . . . . . . . . . . . . . . . . 4-13,7-6high-pressure . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21inspectionrequirements . . . . . . . . . . . . . . . . . . . 7-5manifoldconnectors . . . . . . . . . . . . . . . . . . . . . . 7-6operatingproceduresforcharging . . . . . . . . . . 7-17prediveinspectionforSCUBAoperations . . . . 7-21pressuregaugerequirements . . . . . . . . . . . . . . 7-7sizesofapproved . . . . . . . . . . . . . . . . . . . . . . . . 7-5toppingoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-19transporting . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13valvesandmanifoldassemblies . . . . . . . . . . . . . 7-6

DDalton’slaw . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24,12-11

formula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-12DavisSubmersibleDecompressionChamber . . . . . 1-20Deane,Charles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4Deane,John . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4Deckdecompressionchamber . . . . . . . . . . . . . . . . 15-3

atmospherecontrol . . . . . . . . . . . . . . . . . . . . . 15-17selectingstoragedepth . . . . . . . . . . . . . . . . . 15-14

Decompressionsaturation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-33theoryof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1

Decompressiondivedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

Decompressionscheduledefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

Decompressionsicknessinthewater . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-32saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-37TypeI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-37TypeII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-37

Decompressionsicknessduringthesurfaceinterval . . . . . . . . . . . . . . . . . . . . 9-40,14-21

Decompressionsicknessinthewater . . . . . . . 9-45,20-8Decompressionstop

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Decompressionstoptime . . . . . . . . . . . . . . . . . . . . . 9-7DecompressionTable

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Deepdivingsystem

emergencyprocedures . . . . . . . . . . . . . . . . . . 15-29Deepdivingsystems

ADS-IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25applications . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1components

deckdecompressionchamber . . . . . 1-24,15-3personneltransfercapsule . . . . . . . . 1-24,15-1PTChandlingsystem . . . . . . . . . . . . . . . . 15-4

developmentof . . . . . . . . . . . . . . . . . . . . . . . . . 1-24fireprevention . . . . . . . . . . . . . . . . . . . . . . . . . . 15-4MK1MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25MK2MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25MK2MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26

Deepestdepthdefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

Deeptendonreflexes . . . . . . . . . . . . . . . . . . . . . . 5A-10Demolitionmissions

planningconsiderations . . . . . . . . . . . . . . . . . . . 6-5Depth

asaplanningconsideration . . . . . . . . . . . . . . . 6-13Depthgauge

prediveinspectionforSCUBAoperations . . . . 7-23SCUBArequirements . . . . . . . . . . . . . . . . . . . . . 7-1

Depthlimitsmixed-gasdiving . . . . . . . . . . . . . . . . . . . . . . . 13-4MK20MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7MK21MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1open-circuitSCUBA . . . . . . . . . . . . . . . . . . . . . 6-26surface-suppliedairdiving . . . . . . . . . . . . . . . . 6-26

DescentproceduresSCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-29surface-suppliedoperations . . . . . . . . . . . . . . . 8-26

Descentrate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7closed-circuitmixed-gasdiving . . . . . . . . . . . 17-14

Descenttimedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

Index–4 U.S. Navy Diving Manual

Diffusiongasmixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27oflight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6

Divebriefingassistanceandemergencies . . . . . . . . . . . . . . 6-42debriefingthedivingteam . . . . . . . . . . . . . . . . 6-54establishmissionobjective . . . . . . . . . . . . . . . . 6-41identifytasksandprocedures . . . . . . . . . . . . . . 6-41mixed-gasoperations . . . . . . . . . . . . . . . . . . . 13-10personnelassignments . . . . . . . . . . . . . . . . . . 6-41reviewdivingprocedures . . . . . . . . . . . . . . . . . 6-41SCUBAoperations . . . . . . . . . . . . . . . . . . . . . . 7-23

Divechartingandrecording . . . . . . . . . . . . . . . . . . . . 9-4Diveknife

prediveinspectionforSCUBAoperations . . . . 7-23DiveReportingSystem . . . . . . . . . . . . . . . . . . . . . . .5-11Divesite

selecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-7shelter . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-7,11-8

DiverCandidatePressureTest . . . . . . . . . . . . . . . 21-30Diverfatigue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8Divertender

qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . 6-36

Divertrainingandqualification . . . . . . . . . . . . 6-37,13-8ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-7saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-14underwaterconstruction . . . . . . . . . . . . . . . . . . . 6-5underwatershiphusbandry . . . . . . . . . . . . . . . . 6-2

DiversPersonalDiveLog . . . . . . . . . . . . . . . . . . . . 5-10Divingataltitude . . . . . . . . . . . . . . . . . . . . . . 9-46,14-22Divingbell

DavisSubmersibleDecompressionChamber . 1-20developmentof . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

Divingcraftandplatformscriteriafor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-29smallcraftrequirements . . . . . . . . . . . . . . . . . . 6-29

Divingdressarmoreddivingsuits . . . . . . . . . . . . . . . . . . . . . . 1-7Deane’sPatentDivingDress . . . . . . . . . . . . . . . 1-4developmentof . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3MKV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8Siebe’sImprovedDivingDress . . . . . . . . . . . . . 1-4

Divinginjuriesinitialassessment . . . . . . . . . . . . . . . . . . . . . . . 5A-1

DivingMedicalOfficerresponsibilities . . . . . . . . . . . . . . . . . . . . . . . . . 6-34

DivingOfficerresponsibilities . . . . . . . . . . . . . . . . . . . . . . . . . 6-32

DivingSafetyandPlanningChecklist . . . . . . . . . . . 6-41DivingSupervisor

closed-circuitmixed-gasdivingbrief . . . . . . . 17-14postdiveresponsibilities . . . . . . . . . . . . . . . . . . 6-33predivechecklist . . . . . . . . . . . . . . . . . . . . . . . . 8-25prediveresponsibilities . . . . . . . . . . . . . . . . . . . 6-33qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-34responsibilitieswhileunderway . . . . . . . . . . . . 6-33

Divingteambuddydiver . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36CommandingOfficer . . . . . . . . . . . . . . . . . . . . 6-32crosstrainingandsubstitution . . . . . . . . . 6-37,13-8divertender . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36DivingMedicalOfficer . . . . . . . . . . . . . . . . . . . 6-34DivingOfficer . . . . . . . . . . . . . . . . . . . . . . . . . . 6-32divingpersonnel . . . . . . . . . . . . . . . . . . . . . . . . 6-34DivingSupervisor . . . . . . . . . . . . . . . . . . . . . . . 6-33explosivehandlers . . . . . . . . . . . . . . . . . . . . . . 6-38ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-7manninglevels . . . . . . . . . . . . . . . . . . . . . . . . . 6-30MasterDiver . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-32medicalpersonnel . . . . . . . . . . . . . . . . . . . . . . 6-36personnelqualifications . . . . . . . . . . . . . . 6-34,13-8physicalrequirements . . . . . . . . . . . . . . . . . . . 6-37recorder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36selectingandassembling . . . . . . . 6-30,13-8,15-14standbydiver . . . . . . . . . . . . . . . . . . . . . . . . . . 6-34supportpersonnel . . . . . . . . . . . . . . . . . . . . . . . 6-37underwatersalvagedemolitionpersonnel . . . . 6-38

Divingtechniquefactorswhenselecting . . . . . . . . . . . . . . . . . . . 6-24

DonninggearSCUBAdiving . . . . . . . . . . . . . . . . . . . . . . . . . . 7-24

Drydecksheltertechnicalprogrammanager . . . . . . . . . . . . . . . . 4-2

EEar

externalearprophylaxis . . . . . . . . . . . . . . . . . . . . . . . 15-21

Electricalshockhazardsasaplanningconsideration . . . . . . . . . . . . . . . 6-20

Eligibilityforsurfacedecompression . . . . . . . . . . . . . 9-8Emergencyassistance

checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-53Emergencybreathingsystem

MK16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-24Emergencygassupply . . . . . . . . . . . . . . . . . . . . . . 14-2

MK20MOD0enclosedspacediving . . . . . . . . 8-7MK21MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-12

Emergencymedicalequipment . . . . . . . . . . . . . . . 20-33Emergencyoperatingprocedures

approvalprocess . . . . . . . . . . . . . . . . . . . . . . . . 4-3formatfor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3non-standardizedequipment . . . . . . . . . . . . . . . 4-2proposedchangesorupdatestosubmitting . . . 4-2saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-17standardizedequipment . . . . . . . . . . . . . . . . . . . 4-2surface-supplieddivingsystems . . . . . . . . . . . 8-18

Emergencyprocedures . . . . . . . . . . . . . . . . . . . . . . 9-35atmospherecontamination . . . . . . . . . . . . . . . 15-31damagetohelmetanddivingdress . . . . . . . . . 8-32emergencyassistancechecklist . . . . . . . . . . . . 6-53

Index Index–5

equipmentfailure . . . . . . . . . . . . . . . . . . . . . . . 6-43falling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-32fouleddescentline . . . . . . . . . . . . . . . . . . . . . . 8-32fouledumbilicallines . . . . . . . . . . . . . . . . . . . . 8-32foulingandentrapment . . . . . . . . . . . . . . . . . . . 6-42freeascent . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-38lossofcarbondioxidecontrol . . . . . . . . . . . . . 15-31lossofcommunications . . . . . . . . . . . . . . . . . . 6-43lossofdepthcontrol . . . . . . . . . . . . . . . . . . . . 15-32lossofgassupply . . . . . . . . . . . . . . . . . . . . . . . 6-43lossofoxygencontrol . . . . . . . . . . . . . . . . . . . 15-30lossoftemperaturecontrol . . . . . . . . . . . . . . . 15-32lostdiver . . . . . . . . . . . . . . . . . . . . . . . . . 6-54,11-13

searchingfor . . . . . . . . . . . . . . . . . . . . . . .11-13notificationofshipspersonnel . . . . . . . . . . . . . 6-42

Enclosedspacedivinghazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-29MK20MOD0emergencygassupply

requirements . . . . . . . . . . . . . . . . . . . . . . . . 8-7planningconsiderations . . . . . . . . . . . . . . . . . . . 6-5safetyprecautions . . . . . . . . . . . . . . . . . . . . . . 8-29

Energyclassifications

kineticenergy . . . . . . . . . . . . . . . . . . . . . . . 2-5potentialenergy . . . . . . . . . . . . . . . . . . . . . . 2-5

heat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10conduction . . . . . . . . . . . . . . . . . . . . . . . . . 2-10convection . . . . . . . . . . . . . . . . . . . . . . . . . 2-10radiation . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10

LawofConservationof . . . . . . . . . . . . . . . . . . . . 2-5light . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5mechanical . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6sound

effectsofwaterdepthon . . . . . . . . . . . . . . . 2-7effectsofwatertemperatureon . . . . . . . . . 2-7transmission . . . . . . . . . . . . . . . . . . . . . . . . 2-7

typesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4Entryhole

icediving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-8EnvironmentalAssessmentWorksheet . . . . . . . . . . .6-11Environmentalconditions

asaplanningconsideration . . . . . . . . . . . . . . . . 6-6mixed-gasdiving . . . . . . . . . . . . . . . . . . . . . . . 13-4

Environmentalcontrolsaturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-19

Environmentalhazardsbiologicalcontamination . . . . . . . . . . . . . . . . . . 6-20chemicalcontamination . . . . . . . . . . . . . . . . . . 6-20contaminatedwater . . . . . . . . . . . . . . . . . . . . . 6-17identifying . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15marinelife . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-22nuclearradiation . . . . . . . . . . . . . . . . . . . . . . . . 6-22temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16thermalpollution . . . . . . . . . . . . . . . . . . . . . . . . 6-19underwaterobstacles . . . . . . . . . . . . . . . . . . . . 6-20underwatervisibility . . . . . . . . . . . . . . . . . . . . . 6-16

Equipment

accessoryforsurface-supplieddiving . . . . . . . 8-15airsupplycriteria . . . . . . . . . . . . . . . . . . . . . . . 6-28alterationof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2ancillaryforice/coldwaterdiving . . . . . . . . . . . .11-7authorizedforNavyuse . . . . . . . . . . . 4-1,6-28,7-2demandregulatorassembly . . . . . . . . . . . . . . . . 7-2divingcraftandplatforms . . . . . . . . . . . . . . . . . 6-29forworkingincurrents . . . . . . . . . . . . . . . . . . . 6-15fullfacemask . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-4mixed-gasdiving . . . . . . . . . . . . . . . . . . . . . . . 13-3mouthpiece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4open-circuitSCUBA . . . . . . . . . . . . . . . . . . . . . . 7-2optionalforSCUBAoperations . . . . . . . . . . . . . 7-10plannedmaintenancesystem . . . . . . . . . . . . . . . 4-2postdiveprocedures . . . . . . . . . . . . . . . . . 7-40,8-36preparationforice/coldwaterdiving . . . . . . . . . .11-9requiredforclosed-circuitmixed-gasdives . . 17-12requiredforSCUBAoperations . . . . . . . . . . . . . 7-1selecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-28systemcertificationauthority . . . . . . . . . . . . . . . 4-1

Equivalentsingledivetimedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4

EX14technicalprogrammanager . . . . . . . . . . . . . . . . 4-2

Exceptionalexposuredive(s) . . . . . . . . . . . . . . . . . 9-31definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4

Explosions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8Explosiveordnancedisposal

planningconsiderations . . . . . . . . . . . . . . . . . . . 6-3Extremeexposuresuits . . . . . . . . . . . . . . . . . . . . . . .11-6Extremitystrengthassessment . . . . . . . . . . . . . . . . 5A-8

FFacemask

clearing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-30full . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-4prediveinspectionforSCUBAoperations . . . . 7-22

Facialnerveassessment . . . . . . . . . . . . . . . . . . . . . 5A-7FailureAnalysisReport

MK16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10MK20MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10MK21MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10MK25 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10open-circuitSCUBA . . . . . . . . . . . . . . . . . . . . . 5-10

Finger-to-nosetest . . . . . . . . . . . . . . . . . . . . . . . . . 5A-6Firstaid

barracudabites . . . . . . . . . . . . . . . . . . . . . . . . .5C-4bloodwormandbristlewormbites . . . . . . . . . . 5C-13ciguaterafishpoisoning . . . . . . . . . . . . . . . . . 5C-19coelenteratewounds . . . . . . . . . . . . . . . . . . . 5C-10coneshellstings . . . . . . . . . . . . . . . . . . . . . . . 5C-15coralwounds . . . . . . . . . . . . . . . . . . . . . . . . . 5C-11killerwhalebites . . . . . . . . . . . . . . . . . . . . . . . . 5C-4massivebleeding . . . . . . . . . . . . . . . . . . . . . . . 5B-1

Index–6 U.S. Navy Diving Manual

morayeelbites . . . . . . . . . . . . . . . . . . . . . . . . . 5C-5octopusbites . . . . . . . . . . . . . . . . . . . . . . . . . 5C-13paralyticshellfishpoisoning . . . . . . . . . . . . . . 5C-21pufferfishpoisoning . . . . . . . . . . . . . . . . . . . . 5C-20scromboidfishpoisoning . . . . . . . . . . . . . . . . 5C-20seacucumberirritation . . . . . . . . . . . . . . . . . . 5C-22sealionbites . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-5seasnakebites . . . . . . . . . . . . . . . . . . . . . . . 5C-17seaurchinstings . . . . . . . . . . . . . . . . . . . . . . 5C-14sharkbites . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-1spongestings . . . . . . . . . . . . . . . . . . . . . . . . . 5C-18stingraywounds . . . . . . . . . . . . . . . . . . . . . . . . 5C-9toxicfishwounds . . . . . . . . . . . . . . . . . . . . . . . 5C-7venomousfishwounds . . . . . . . . . . . . . . . . . . . 5C-6viralandbacterialshellfishpoisoning . . . . . . . 5C-21

FleetModernizedDouble-LockRecompressionChamber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-2

Fleuss,HenryA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10Flyingafterdiving

saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-39Formulas

Boyle’slaw . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1calculatingpartialpressure . . . . . . . . . . . . . . . . 2-26Charles’law . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4Dalton’slaw . . . . . . . . . . . . . . . . . . . . . . . . . . 12-12emergencygassupplyduration . . . . . . . . . . . 15-12equivalentairdepthforN2O2divingmeasured

infsw . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-31equivalentairdepthforN2O2divingmeasured

inmeters . . . . . . . . . . . . . . . . . . . . . . . . . . 2-31estimatingexplosionpressureonadiver . . . . . . 2-9firezonedepth . . . . . . . . . . . . . . . . . . . . . . . . 15-20generalgaslaw . . . . . . . . . . . . . . . . . . . . . . . . 12-8MK16gasendurance . . . . . . . . . . . . . . . . . . 17-10partialpressuremeasuredinata . . . . . . . . . . . 2-31partialpressuremeasuredinfsw . . . . . . . . . . . 2-31partialpressuremeasuredinpsi . . . . . . . . . . . 2-31surfaceequivalentvalue . . . . . . . . . . . . . . . . . . 2-27Tformulaformeasuringpartialpressure . . . . . 2-31UBAgasusage . . . . . . . . . . . . . . . . . . . . . . . . .15-11

GGagnan,Emile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10Gasanalysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8Gaslaws

Boyle’slaw . . . . . . . . . . . . . . . . . . . . . . . . 2-17,12-1Charles’law . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4Charles’/Gay-Lussac’slaw . . . . . . . . . . . . . . . . 2-18Dalton’slaw . . . . . . . . . . . . . . . . . . . . . . 2-24,12-11generalgaslaw . . . . . . . . . . . . . . . . . . . . 2-21,12-7Henry’slaw . . . . . . . . . . . . . . . . . . . . . . . 2-28,12-14

Gasmixtures100%oxygen . . . . . . . . . . . . . . . . . . . . . . . . . . 14-250%helium50%oxygen . . . . . . . . . . . . . . . . . 14-2air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2analyzingconstituents . . . . . . . . . . . . . . . . . . . 16-9

bottommixture . . . . . . . . . . . . . . . . . . . . . . . . . 14-2calculatingpartialpressure . . . . . . . . . . . . . . . . 2-26calculatingsurfaceequivalentvalue . . . . . . . . . 2-27continuous‑flowmixing . . . . . . . . . . . . . . . 10-9,16-7diffusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27gasesinliquids . . . . . . . . . . . . . . . . . . . . . . . . . 2-28humidityin . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27increasingoxygenpercentage . . . . . . . . . . . . . 16-5mixingbypartialpressure . . . . . . . . . . . . . . . . 16-1mixingbyvolume . . . . . . . . . . . . . . . . . . . . . . . 16-7mixingbyweight . . . . . . . . . . . . . . . . . . . . . . . . 16-8nitrogen-oxygendiving . . . . . . . . . . . . . . . 10-3,10-9partialpressure . . . . . . . . . . . . . . . . . . . . . . . . . 2-24reducingoxygenpercentage . . . . . . . . . . . . . . 16-6singlecylindermixingprocedure . . . . . . . . . . . 16-2solubility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28

Gasesindiving

atmosphericair . . . . . . . . . . . . . . . . . . . . . 2-14carbondioxide . . . . . . . . . . . . . . . . . . . . . . 2-16carbonmonoxide . . . . . . . . . . . . . . . . . . . . 2-16helium . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15hydrogen . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15neon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15nitrogen . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15oxygen . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15

kinetictheoryof . . . . . . . . . . . . . . . . . . . . . . . . 2-16measurements . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3

Gaugescalibrating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12helicalBourdon . . . . . . . . . . . . . . . . . . . . . . . . . 4-12maintaining . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12pressuregaugerequirementsforSCUBA . . . . . 7-7selecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-11

Generalgaslaw . . . . . . . . . . . . . . . . . . . . . . . . 2-21,12-7formula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8

Glossopharyngealnerveassessment . . . . . . . . . . . 5A-7

HHaldane,J .S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7Halley,Edmund . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3Handsignals

SCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-31Harness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7Harnessstrapsandbackpack

prediveinspectionforSCUBAoperations . . . . 7-21Heat

conduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10convection . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10lossthroughconduction . . . . . . . . . . . . . . . . . . .2-11protectingadiverfromlossof . . . . . . . . . . . . . .2-11radiation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10

Heel-shinslidetest . . . . . . . . . . . . . . . . . . . . . . . . . 5A-6Heel-to-toetest . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5A-5Helium

propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15

Index Index–7

puritystandards . . . . . . . . . . . . . . . . . . . . . . . . . 4-6Helium-oxygendiving

originsof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16Helmets

protectionfromsonar . . . . . . . . . . . . . . . . . . . . 1A-2Henry’slaw . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28,12-14Hoods

protectionfromsonar . . . . . . . . . . . . . . . . . . . . 1A-2Hose

clearing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-30Hotwatersuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-6Humidity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27

controllinginairsupply . . . . . . . . . . . . . . . . . . . 8-17Hydrogen

propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15Hydrogen-oxygendiving

originsof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18Hypercapnia . . . . . . . . . . . . . . . . . . . . . . . . . 3-15,17-30

symptomsof . . . . . . . . . . . . . . . . . . . . . . 3-16,17-30treating . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17,17-31

Hypoglossalnerveassessment . . . . . . . . . . . . . . . . 5A-7Hypoxia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12,17-29

causesof . . . . . . . . . . . . . . . . . . . . . . . . 3-13,17-29symptomsof . . . . . . . . . . . . . . . . . . . . . . 3-13,17-29treating . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14,17-29

IIn-waterdecompressiononair . . . . . . . . . . . . . . . . . 9-9In-waterdecompressiononairandoxygen . . . . . . . .9-11

KKelvintemperaturescale . . . . . . . . . . . . . . . . . . . . . . 2-3Killerwhales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-3

LLambertsen,C .J . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12Lastwaterstop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-8Lethbridge,John . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3Lifepreserver

ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-3prediveprocedures . . . . . . . . . . . . . . . . . . . . . . 7-22SCUBAtrainingrequirements . . . . . . . . . . . . . . 7-1

Lifelinesice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-8

Lightcolorvisibility . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6diffusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6effectsofturbidity . . . . . . . . . . . . . . . . . . . . . . . . 2-6refraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5

Line-pullsignalsSCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-31

Lossofoxygensupplyinthechamber . . . . . . . . . . 9-41Lossofoxygensupplyinthewater . . . . . . . . . . . . . 9-36

MMan-in-the-SeaProgram . . . . . . . . . . . . . . . . . . . . . 1-22Manifoldconnectors . . . . . . . . . . . . . . . . . . . . . . . . . 7-6Marinelife . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-22

barracuda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-4bloodworms . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-13bristleworms . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-13coelenterates . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-9coneshells . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-15coral . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-11killerwhales . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-3morayeels . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-4octopuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-12parasites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-22seacucumbers . . . . . . . . . . . . . . . . . . . . . . . . 5C-22sealions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-5seasnakes . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-16seaurchins . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-14sharks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-1sponges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-18stingrays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-9toxicfish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-7venomousfish . . . . . . . . . . . . . . . . . . . . . . . . . 5C-6

MasterDiverqualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-33responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . 6-32

Matteratoms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1molecules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1statesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2

Maximalbreathingcapacitydefinitionof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9

Maximumdepthdefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

Measurementabsolutepressure . . . . . . . . . . . . . . . . . . . . . . . 2-12atmosphericpressure . . . . . . . . . . . . . . . . . . . . 2-12barometricpressure . . . . . . . . . . . . . . . . . . . . . 2-12gasmeasurements . . . . . . . . . . . . . . . . . . . . . . . 2-3gaugepressure . . . . . . . . . . . . . . . . . . . . . . . . 2-12hydrostaticpressure . . . . . . . . . . . . . . . . . . . . . 2-12measuringsmallquantitiesofpressure . . . . . . 2-26pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-11Temperature

Celsiusscale . . . . . . . . . . . . . . . . . . . . . . . . 2-3Fahrenheitscale . . . . . . . . . . . . . . . . . . . . . 2-3Kelvinscale . . . . . . . . . . . . . . . . . . . . . . . . . 2-3Rankinescale . . . . . . . . . . . . . . . . . . . . . . . 2-3

MeasurementsystemsEnglish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2InternationalSystemofUnits(SI) . . . . . . . . . . . . 2-2

Mechanicalenergyunderwaterexplosions . . . . . . . . . . . . . . . . . . . . 2-8

Mentalstatusexam . . . . . . . . . . . . . . . . . . . . . . . . . 5A-5

Index–8 U.S. Navy Diving Manual

Missionobjectiveestablishingduringdivebriefing . . . . . . . . . . . . 6-41

Mixed-gasdivingdepthlimits . . . . . . . . . . . . . . . . . . . . . . . . 13-4,14-1evolutionof . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16helium-oxygen

descentprocedures . . . . . . . . . . . . . . . . . . 14-2emergencyprocedures . . . . . . . . . . . . . . . 14-9originsof . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16

hydrogen-oxygendivingoriginsof . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18

medicalconsiderations . . . . . . . . . . . . . . . . . . . 13-1methodconsideration . . . . . . . . . . . . . . . . . . . . 13-3planningtheoperation . . . . . . . . . . . . . . . . . . . 14-1selectingequipment . . . . . . . . . . . . . . . . . . . . . 13-3

MK1MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25MK16

emergencybreathingsystem . . . . . . . . . . . . . 17-24emergencyoperatingprocedures . . . . . . . . . . . . 4-2FailureAnalysisReport . . . . . . . . . . . . . . . . . . 5-10operatingprocedures . . . . . . . . . . . . . . . . . . . . . 4-2technicalprogrammanager . . . . . . . . . . . . . . . . 4-2

MK2MOD0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25MK2MOD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26MK20MOD0

airsupply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7depthlimits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7enclosedspacediving . . . . . . . . . . . . . . . . . . . 8-29FailureAnalysisReport . . . . . . . . . . . . . . . . . . 5-10flowrequirements . . . . . . . . . . . . . . . . . . . . . . . . 8-8operationandmaintenance . . . . . . . . . . . . . . . . 8-7technicalprogrammanager . . . . . . . . . . . . . . . . 4-2

MK21MOD1airsupply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2depthlimits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1emergencygassupplyrequirements . . . . . . . . . 8-2FailureAnalysisReport . . . . . . . . . . . . . . . . . . 5-10flowrequirements . . . . . . . . . . . . . . . . . . . . . . . . 8-3operationandmaintenance . . . . . . . . . . . . . . . . 8-1pressurerequirements . . . . . . . . . . . . . . . . . . . . 8-4technicalprogrammanager . . . . . . . . . . . . . . . . 4-2

MK25emergencyoperatingprocedures . . . . . . . . . . . . 4-2FailureAnalysisReport . . . . . . . . . . . . . . . . . . 5-10operatingprocedures . . . . . . . . . . . . . . . . . . . . . 4-2technicalprogrammanager . . . . . . . . . . . . . . . . 4-2

Morayeels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-4Mouthpiece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4

clearing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-30

NNavalSubmarineMedicalResearchLaboratory . . . 15-6Navigationlines

ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-8

NavyExperimentalDivingUnit . . . . . . . . . . . . . . . . 15-5Neon

propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15Neurologicalassessment . . . . . . . . . . . . . . . . . . . . 5A-2Nitrogen

propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15puritystandards . . . . . . . . . . . . . . . . . . . . . . . . . 4-6

Nitrogen-oxygendivingadvantages/disadvantages . . . . . . . . . . . . . . . . 10-1breathinggaspurity . . . . . . . . . . . . . . . . . . . . . 10-9CNSoxygentoxicityrisks . . . . . . . . . . . . . . . . . 10-2equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7fleettraining . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-7gasmixingtechniques . . . . . . . . . . . . . . . . . . . 10-9gassystems . . . . . . . . . . . . . . . . . . . . . . . . . . 10-12repetitivediving . . . . . . . . . . . . . . . . . . . . . . . . 10-5selectinggasmixture . . . . . . . . . . . . . . . . . . . . 10-3

No-decompression(no“D”)limitdefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

No-decompressiondivedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

No-DecompressionLimitsandRepetitiveGroupDesignationTableforNo-DecompressionAirDives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6

No-decompressionlimitsandrepetitivegroupdesignatorsforno-decompressionairdives . . . . . . . . . . . . . . . . . . . . . . . . . .9-62,2A-2

Nohl,MaxGene . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18Nuclearradiation

asaplanningconsideration . . . . . . . . . . . . . . . 6-22

OObjectrecovery

OceanSimulationFacility . . . . . . . . . . . . . . . . . 15-5planningconsiderations . . . . . . . . . . . . . . . . . . . 6-3

Octopus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4Octopuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-12Oculomotornerveassessment . . . . . . . . . . . . . . . . 5A-6Olfactorynerve . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5A-6Open-circuitSCUBA

components . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2demandregulatorassembly . . . . . . . . . . . . . . . . 7-2depthlimits . . . . . . . . . . . . . . . . . . . . . . . . 6-25,6-55FailureAnalysisReport . . . . . . . . . . . . . . . . . . 5-10historyof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9

Operatingproceduresapprovalprocess . . . . . . . . . . . . . . . . . . . . . . . . 4-3chargingSCUBAtanks . . . . . . . . . . . . . . . . . . . 7-17formatfor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3non-standardizedequipment . . . . . . . . . . . . . . . 4-2proposedchangesorupdatestosubmitting . . . 4-2recompressionchambers . . . . . . . . . . . . . . . . 21-17saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-16standardizedequipment . . . . . . . . . . . . . . . . . . . 4-2surface-supplieddivingsystems . . . . . . . . . . . 8-18

Index Index–9

Operationalhazardschemicalinjury . . . . . . . . . . . . . . . . . . . . . . . . 17-31explosions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8identifying . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15territorialwaters . . . . . . . . . . . . . . . . . . . . . . . . 6-24vesselandsmallboattraffic . . . . . . . . . . . . . . . 6-22

Operationaltasksidentifying . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2identifyingduringdivebriefing . . . . . . . . . . . . . 6-41jobsiteprocedures . . . . . . . . . . . . . . . . . . . . . . 8-30planningandscheduling . . . . . . . . . . . . . . . . . . 6-40underwatershiphusbandry(UWSH) . . . . . . . . 8-31

Opticnerveassessment . . . . . . . . . . . . . . . . . . . . . 5A-6Oxygen

deficiency . . . . . . . . . . . . . . . . . . . . . . . . 3-12,17-29MK16flaskendurance . . . . . . . . . . . . . . . . . . . 17-9propertiesof . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15puritystandards . . . . . . . . . . . . . . . . . . . . . . . . . 4-5

Oxygenconvulsionatthe30-or20-fswwaterstop . . . . . . . . . . . . . . . . . . . . . . . 9-38

OxygenRegulatorConsoleAssembly(ORCA) . . . . 8-13Oxygensupply

MK25 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19-11

PParasiticinfestation . . . . . . . . . . . . . . . . . . . . . . . . 5C-22Pasley,William . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5PermissibleExposureLimit(sonar) . . . . . . . . . . . . . 1A-1Personneltransfercapsule . . . . . . . . . . . . . . . . . . . 15-1

atmospherecontrol . . . . . . . . . . . . . . . . . . . . . 15-17divingprocedures . . . . . . . . . . . . . . . . . . . . . . 15-29handlingsystems . . . . . . . . . . . . . . . . . . . . . . . 15-4

Planningconsiderationsdepth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-1identifyingavailableresources . . . . . . . . . . . . . . 6-1naturalfactors . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10seastate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10surfaceconditions . . . . . . . . . . . . . . . . . . . . . . . 6-9temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10tidesandcurrents . . . . . . . . . . . . . . . . . . . . . . . 6-13typeofbottom . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13

Postdiveproceduresclosed-circuitmixed-gasdiving . . . . . . . . . . . 17-16equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-36ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . .11-12personnelandreporting . . . . . . . . . . . . . . . . . . 8-35recompressionchamber . . . . . . . . . . . . . . . . . 21-23saturationdiving . . . . . . . . . . . . . . . . . . . . . . . 15-39SCUBAoperations . . . . . . . . . . . . . . . . . . . . . . 7-40tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-40

PredescentsurfacecheckSCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-28surface-suppliedoperations . . . . . . . . . . . . . . . 8-26

PrediveinspectionSCUBAoperations . . . . . . . . . . . . . . . . . . . . . . 7-25

Prediveproceduresaircylinderinspection . . . . . . . . . . . . . . . . . . . . 7-21airsupplypreparation . . . . . . . . . . . . . . . . . . . . 8-25breathinghoseinspection . . . . . . . . . . . . . . . . 7-21completingthepredivechecklist . . . . . . . . . . . 8-24depthgaugeandcompassinspection . . . . . . . 7-23diveknifeinspection . . . . . . . . . . . . . . . . . . . . . 7-23diverpreparationandbrief . . . . . . . . . . . . . . . . 7-23divingstationpreparation . . . . . . . . . . . . . . . . . 8-25DivingSupervisorinspection . . . . . . . . . . . . . . 7-25DivingSupervisorresponsibilities . . . . . . . . . . . 6-33donninggear . . . . . . . . . . . . . . . . 7-24,8-25,11-11equipmentpreparation . . . . . . . . . . . . . . . . . . . 7-20facemaskinspection . . . . . . . . . . . . . . . . . . . . 7-22harnessstrapsandbackpackinspection . . . . . 7-21inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25lifepreserver/buoyancy

compensatorinspection . . . . . . . . . . . . . . 7-22linepreparation . . . . . . . . . . . . . . . . . . . . . . . . . 8-25miscellaneousequipmentinspection . . . . . . . . 7-23recompressionchamber . . . . . . . . . . . . . . . . . 21-17recompressionchamberinspectionand

preparation . . . . . . . . . . . . . . . . . . . . . . . . 8-25regulatorinspection . . . . . . . . . . . . . . . . . . . . . 7-21snorkelinspection . . . . . . . . . . . . . . . . . . . . . . . 7-23submersiblewristwatchinspection . . . . . . . . . 7-23Surface-SuppliedDivingOperations

PrediveChecklist . . . . . . . . . . . . . . . . . . . 6-41swimfinsinspection . . . . . . . . . . . . . . . . . . . . . 7-22weightbeltinspection . . . . . . . . . . . . . . . . . . . . 7-23

Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-11absolute . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12atmospheric . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12barometric . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12expressingsmallquantitiesof . . . . . . . . . . . . . 2-26gauge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12hydrostatic . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12termsusedtodescribe . . . . . . . . . . . . . . . . . . . 2-12

Pufferfishpoisoning . . . . . . . . . . . . . . . . . . . . . . . 5C-20Puritystandards

air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-16compressedair . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4helium . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6nitrogen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6oxygen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5

RRankinetemperaturescale . . . . . . . . . . . . . . . . . . . . 2-3Rapidalternatingmovementtest . . . . . . . . . . . . . . . 5A-6Recirculationsystem

maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-4Recompressionchamber

closed-circuitmixed-gasdiving . . . . . . . . . . . 17-13generaloperatingprocedures . . . . . . . . . . . . 21-17postdivechecklist . . . . . . . . . . . . . . . . . . . . . . 21-23predivechecklist . . . . . . . . . . . . . . . . . . . . . . . 21-18

Index–10 U.S. Navy Diving Manual

prediveinspectionandpreparation . . . . . . . . . 8-25safetyprecautions . . . . . . . . . . . . . . . . . . . . . 21-17scheduledmaintenance . . . . . . . . . . . . . . . . . 21-23ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-20

Recordkeepingdocuments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

chamberatmospheredatasheet . . . . . . 15-16CommandDivingLog . . . . . . . . . . . . . . . 15-15CommandSmoothDivingLog . . . . . . . . . . 5-2DiveReportingSystem . . . . . . . . . . . . . . . .5-11diver’spersonaldivelog . . . . . . . . . . . . . . 5-10FailureAnalysisReport . . . . . . . . . . . . . . . 5-10gasstatusreport . . . . . . . . . . . . . . . . . . . 15-16individualdiverecord . . . . . . . . . . . . . . . 15-17machinerylog . . . . . . . . . . . . . . . . . . . . . 15-16masterprotocol . . . . . . . . . . . . . . . . . . . . 15-15servicelock . . . . . . . . . . . . . . . . . . . . . . . 15-16

mixed-gasdiving . . . . . . . . . . . . . . . . . . . . . . .13-11objectivesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

Recorderresponsibilities . . . . . . . . . . . . . . . . . . . . . . . . . 6-36

Refraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5definitionof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5effectondistantobjects . . . . . . . . . . . . . . . . . . . 2-5effectonsizeandshapeofobjects . . . . . . . . . . 2-5

Regulatorcoldwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-3demand

assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2prediveinspectionforSCUBAoperations . . . . 7-21singlehose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2

Repetitiveair-MK16dives . . . . . . . . . . . . . . . . . . . . 9-29Repetitivedive

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Repetitivedives . . . . . . . . . . . . . . . . . . . . . . . . 9-21,9-53

nitrogen-oxygendiving . . . . . . . . . . . . . . . . . . . 10-5Repetitivegroupdesignation

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Repetitivegroupsassociatedwithinitial

ascenttoaltitudetable . . . . . . . . . . . . . . . . . . . . 9-7Reporting

accidentscriteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12requiredactions . . . . . . . . . . . . . . . . . . . . . 5-12

equipmentfailure . . . . . . . . . . . . . . . . . . . . . . . 5-10incidents

criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12requiredactions . . . . . . . . . . . . . . . . . . . . . 5-12

mishaps/casualty . . . . . . . . . . . . . . . . . . . . . . . 5-10objectivesof . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1surface-suppliedairoperations . . . . . . . . . . . . 8-36

Requiredsurfaceintervalbeforeascenttoaltitudeafterdiving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7

Residualnitrogendefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

Residualnitrogentimedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

Residualnitrogentimetableforrepetitiveairdives . . 9-6Resuscitationofapulselessdiver . . . . . . . . . . . . . . 20-4RNTExceptionRule . . . . . . . . . . . . . . . . . . . . . . . . 9-25RombergTest . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5A-6

SSafetydiscs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6Salvagediving

planningconsiderations . . . . . . . . . . . . . . . . . . . 6-3Vietnamera . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-30WorldWarII . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-29

SaturationdivingConshelfOne . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22ConshelfTwo . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22deepdivingsystems . . . . . . . . . . . . . . . . . 1-24,15-1evolutionof . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-21GenesisProject . . . . . . . . . . . . . . . . . . . . . . . . 1-22Man-in-the-SeaProgram . . . . . . . . . . . . . . . . . 1-22missionabort . . . . . . . . . . . . . . . . . . . . . . . . . 15-35SealabProgram . . . . . . . . . . . . . . . . . . . . . . . . 1-22thermalprotectionsystem . . . . . . . . . . . . . . . . 15-9UnlimitedDurationExcursionTables . . . . . . . 15-25

Scromboidfishpoisoning . . . . . . . . . . . . . . . . . . . 5C-19SCUBA

buoyancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-27coldwaterdiving . . . . . . . . . . . . . . . . . . . . . . . . .11-1communicationsystems . . . . . . . . . . . . . . . . . . 7-31environmentalprotectionwhenusing . . . . . . . . 6-28mobility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-27opencircuit

depthlimits . . . . . . . . . . . . . . . . . . . . . . . . 6-25operationalcharacteristics . . . . . . . . . . . . 6-28operationallimitations . . . . . . . . . . . . . . . . 6-27

portabilityof . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-27swimmingtechnique . . . . . . . . . . . . . . . . . . . . . 7-30

SCUBAdivingoptionalequipment . . . . . . . . . . . . . . . . . . . . . . 7-10prediveprocedures . . . . . . . . . . . . . . . . . . . . . . 7-20requiredequipment . . . . . . . . . . . . . . . . . . . . . . 7-1

Seacucumbers . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-22SeaLevelEquivalentDepthTable . . . . . . . . . . . . . . . 9-6Sealions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-5Seasnakes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-16Seastate

planningconsiderations . . . . . . . . . . . . . . . . . . 6-10Seaurchins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-14SealabProgram

SealabI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-23SealabII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-23SealabIII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-23

Searchmissionsplanningconsiderations . . . . . . . . . . . . . . . . . . . 6-3

Securityswimsplanningconsiderations . . . . . . . . . . . . . . . . . . . 6-3

Semiclosed-circuitSCUBAhistoryof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12

Index Index–11

Sensoryfunctionassessment . . . . . . . . . . . . . . . . . 5A-8Sharks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-1Shellfish

bacterialandviraldiseasesfrom . . . . . . . . . . 5C-21paralyticshellfishpoisoning . . . . . . . . . . . . . . 5C-20

ShipRepairSafetyChecklist . . . . . . . . . . . . . . . . . . 6-41Shock

signsandsymptomsof . . . . . . . . . . . . . . . . . . .5B-6treating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5B-7

Siebe,Augustus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4Singledive

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Singlemarkeddiving . . . . . . . . . . . . . . . . . . . . . . . 17-13Snorkel

prediveinspectionforSCUBAoperations . . . . 7-23Solubility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28

effectsoftemperatureon . . . . . . . . . . . . . . . . . 2-29Sonar

lowfrequency . . . . . . . . . . . . . . . . . . . . . . . . . 1A-16safedivingdistance . . . . . . . . . . . . . . . . .1A-1,6-22ultrasonic . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1A-16worksheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1A-2

Soundeffectsofwaterdepthon . . . . . . . . . . . . . . . . . . 2-7effectsofwatertemperatureon . . . . . . . . . . . . . 2-7transmission . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7

Soundpressurelevel . . . . . . . . . . . . . . . . . . . . . . . . 1A-1Spinalaccessorynerveassessment . . . . . . . . . . . . 5A-7Sponges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-18Stagedepth

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2Standbydiver

airrequirements . . . . . . . . . . . . . . . . . . . . . . . . 8-17closed-circuitmixed-gasdives . . . . . . . . . . . . 17-12ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . .11-10qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-35

Stillson,GeorgeD . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26Stingrays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-9Storagedepth . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-25

compressionto . . . . . . . . . . . . . . . . . . . . . . . . 15-24selecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-14

Subcutaneousemphysematreating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36

SubmarinesalvageandrescueDeepSubmergenceSystemsProject . . . . . . . 1-29USSF-4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26USSS-4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27USSS-51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27USSSqualus . . . . . . . . . . . . . . . . . . . . . . . . . . 1-28USSThresher . . . . . . . . . . . . . . . . . . . . . . . . . . 1-28

Submersiblewristwatchprediveinspection . . . . . . . . . . . . . . . . . . . . . . 7-23SCUBArequirements . . . . . . . . . . . . . . . . . . . . . 7-1

Suitshotwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-6ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-5protectionfromsonar . . . . . . . . . . . . . . . . . . . . 1A-2

variablevolumedry . . . . . . . . . . . . . . . . . . . . . .11-6Surfacedecompression

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4transferringadivertothechamber . . . . . . . . . 8-35

Surfacedecompressiononoxygen(SurDO2) . . . . . 9-15Surfaceinterval

definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3Surfaceintervalgreaterthan5minutes . . . . . . . . . . 9-39Surfaceswimming

SCUBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-29Surface-supplieddiving

breathinggasrequirements . . . . . . . . . . . . . . . 13-7depthlimits . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-25originsof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1Surface-SuppliedDivingOperations

PrediveChecklist . . . . . . . . . . . . . . . . . . . 6-41Surface-supplieddivingsystems

buoyancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-28effectoficeconditionson . . . . . . . . . . . . . . . . . .11-5environmentalprotectionwhenusing . . . . . . . . 6-28ice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . . .11-4mobility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-28operationalcharacteristics . . . . . . . . . . . . . . . . 6-28operationallimitations . . . . . . . . . . . . . . . . . . . . 6-28

SwimfinsprediveinspectionforSCUBAoperations . . . . 7-22

TTechnicalprogrammanagers

divingapparatus . . . . . . . . . . . . . . . . . . . . . . . . . 4-2shorebasedsystems . . . . . . . . . . . . . . . . . . . . . 4-2

Temperatureasaplanningconsideration . . . . . . . . . . . . . . . 6-10Celsiusscale . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3convertingCelsiustoKelvin . . . . . . . . . . . . . . . . 2-3convertingFahrenheittoRankine . . . . . . . . . . . 2-3Fahrenheitscale . . . . . . . . . . . . . . . . . . . . . . . . . 2-3Kelvinscale . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3windchillfactor . . . . . . . . . . . . . . . . . . . . . . . . . 6-10

Tendingice/coldwaterdiving . . . . . . . . . . . . . . . . . . . . .11-10surface-supplieddiver . . . . . . . . . . . . . . . . . . . 8-32withnosurfaceline . . . . . . . . . . . . . . . . . . . . . . 7-36withsurfaceorbuddyline . . . . . . . . . . . . . . . . . 7-36

Territorialwatersoperatingin . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-24

Thermalpollutionasaplanningconsideration . . . . . . . . . . . . . . . 6-19

Thermalprotectionsystemsaturationdiving . . . . . . . . . . . . . . . . . . . . . . . . 15-9

Thomson,Elihu . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16Tidesandcurrents

asaplanningconsideration . . . . . . . . . . . . . . . 6-13Tinnitus . . . . . . . . . . . . . . . . . . . . . . . . . 3-27,3-43,19-3Tools

workingwith . . . . . . . . . . . . . . . . . . . . . . . 7-36,8-31

Index–12 U.S. Navy Diving Manual

Totaldecompressiontimedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

Totaltimeofdivedefinition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2

Tourniquet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5B-4Toxicfish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-7Transferlock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-3Transportablerecompressionchambersystem . . . 21-3TreatmentTable4 . . . . . . . . . . . . . . . . . . . . . . . . . 20-43TreatmentTable6A . . . . . . . . . . . . . . . . . . . . . . . . 20-42TreatmentTable9 . . . . . . . . . . . . . . . . . . . . . . . . . 20-46Trigeminalnerveassessment . . . . . . . . . . . . . . . . . 5A-7Trochlearnerveassessment . . . . . . . . . . . . . . . . . . 5A-6Turbidity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6

UUnderwaterconditions

adaptingto . . . . . . . . . . . . . . . . . . . . . . . . 7-37,8-27Underwaterconstruction

divertrainingandqualificationrequirements . . . 6-5equipmentrequirements . . . . . . . . . . . . . . . . . . . 6-5planningconsiderations . . . . . . . . . . . . . . . . . . . 6-4planningresources . . . . . . . . . . . . . . . . . . . . . . . 6-5

Underwaterexplosions . . . . . . . . . . . . . . . . . . . 2-8,6-22effectofwaterdepthon . . . . . . . . . . . . . . . . . . . 2-8effectsoflocationofexplosivecharge . . . . . . . . 2-8effectsoftheseabedon . . . . . . . . . . . . . . . . . . . 2-8effectsonsubmergeddivers . . . . . . . . . . . . . . . 2-9formulaforestimatingexplosion

pressureonadiver . . . . . . . . . . . . . . . . . . . 2-9protectingdiverfrom . . . . . . . . . . . . . . . . . . 2-7,2-10typeofexplosiveandsizeofthecharge . . . . . . 2-8

Underwaterobstaclesasaplanningconsideration . . . . . . . . . . . . . . . 6-20

Underwaterproceduresadaptingtoconditions . . . . . . . . . . . . . . . 7-37,8-27bottomchecks . . . . . . . . . . . . . . . . . . . . . . . . . 8-30breathingtechnique . . . . . . . . . . . . . . . . . . . . . 7-29buddydiving . . . . . . . . . . . . . . . . . . . . . . . . . . .11-10closed-circuitmixed-gasdiving . . . . . . . . . . . 17-15hoseandmouthpiececlearing . . . . . . . . . . . . . 7-30maskclearing . . . . . . . . . . . . . . . . . . . . . . . . . . 7-30movementonthebottom . . . . . . . . . . . . . . . . . 8-27searchingonthebottom . . . . . . . . . . . . . . . . . . 8-28tendingthediver . . . . . . . . . . . . . . . . . . . . . . . .11-10workingaroundcorners . . . . . . . . . . . . . . . . . . 8-29workinginsideawreck . . . . . . . . . . . . . . . . . . . 8-30workingnearlinesormoorings . . . . . . . . . . . . 8-30

Underwatershiphusbandrydivertrainingandqualificationrequirements . . . 6-2objectiveof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-31repairrequirements . . . . . . . . . . . . . . . . . . . . . . 6-2trainingprogramrequirements . . . . . . . . . . . . . . 6-3

UnlimitedDurationExcursionTables . . . . . . . . . . . 15-25USSF-4

salvageof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26

USSS-4salvageof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27

USSS-51salvageof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27

USSSqualus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-28USSThresher

salvageof . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-28

VVagusnerveassessment . . . . . . . . . . . . . . . . . . . . 5A-7Variablevolumedrysuits . . . . . . . . . . . . . . . . . . . . . .11-6Variationsinrateofascent . . . . . . . . . . . . . . . . . . . 9-31Venomousfish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5C-6Ventilation

recompressionchamber . . . . . . . . . . . . . . . . . 21-20

WWatchstationDivingOfficer . . . . . . . . . . . . . . . . . . . 6-32Waterentry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-25

fromthebeach . . . . . . . . . . . . . . . . . . . . . . . . . 7-28rearrollmethod . . . . . . . . . . . . . . . . . . . . . . . . 7-26step-inmethod . . . . . . . . . . . . . . . . . . . . . . . . . 7-26

Weightbeltprediveinspection . . . . . . . . . . . . . . . . . . . . . . 7-23

Wetsuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-5Windchill

asaplanningconsideration . . . . . . . . . . . . . . . 6-10Worksheets

DiveWorksheetforRepetitive0 .7ataConstantPartialPressureOxygeninNitrogenDives . . . . . . . . . . . . . . 17-18,17-24

DivingSafetyandPlanningChecklist . . . . . . . . 6-41EmergencyAssistanceChecklist . . . . . . . . . . . 6-42EnvironmentalAssessmentWorksheet . . . . . . .6-11RecompressionChamberPostdive

Checklist . . . . . . . . . . . . . . . . . . . . . . . . . 21-23RecompressionChamberPredive

Checklist . . . . . . . . . . . . . . . . . . . . . . . . . 21-18ShipRepairSafetyChecklist . . . . . . . . . . 6-37,6-41Surface-SuppliedDivingOperations

PrediveChecklist . . . . . . . . . . . . . . . . . . . 6-41Wrecks

workinginside . . . . . . . . . . . . . . . . . . . . . . . . . . 8-30