INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the...

7
DN DN UP UP UP DN DN DN 001 STAIR #2 002 STORAGE 003 BOILER RM. 005 STORAGE 006 MAIL ROOM 008 ELECTRIC 009 LAV. 010 CORRIDOR 011 SECT Y 012 PROG 014 PROG 015 OFFICE 016 KEY PUNCH 017 AUX. EQUIPMENT 018 SERVER ROOM 019 STORAGE 020 STAIR #1 021 VEST. 022 EL./MACH. 023 STORAGE 024 LOUNGE/MTG RM. BOILER RM ENTRANCE BOILER ROOM WALLS ARE 8" CMU AREAWAY STEPS UP TO GRADE TYP PERIMETER BSBD HEAT ENCLOSURE MODIFY PER MEP DWGS TO ACCOMODATE NEW WORK EP - "E" PP - BR NEW ELEC PANEL PER ME0.1 RUN CONDUIT @ UNDERSIDE OF 1ST FLR, ABOVE SUSPENDED CEILINGS 102 JUDGE OFFICE 103 PROBATE OFFICE 105 VAULT 104 OFFICE 106 MEN 108 WOMEN 109 MEETING ROOM 110 HEALTH DEPT 111 OFFICE 112 OFFICE 114 VESTIBULE 115 INFO. 116 STAIR #1 117 OFFICE 118 HR DEPARTMENT 123 CONFERENCE ROOM 125 OFFICE 130 ASS'T DPW DIR 131 ASS'T ENG DIR 101 STAIR #2 113 LAB 107 CUST 163 ENGINEERING DEPARTMENT 164 OFFICE 125 OFFICE 165 STORAGE 166 SEWER DEPARTMENT 171 COPY ROOM 170 OFFICE 190 HALLWAY 119 PURCHASING DPT 167 OFFICE 168 OFFICE 169 OFFICE APP. LOCATION OF GAS METER. VERIFY SIZE & CAPACITY WITH UTILTY COMPANY PER MEP NOTES/SPECS TYP PERIMETER BSBD HEAT ENCLOSURE MODIFY PER MEP DWGS TO ACCOMODATE NEW WORK EP - "C" 132 ELEV 133 STAIR #1 134 OFFICE 135 OFFICE 136 OFFICE 137 STAIR 2 138 OFFICE 139 OFFICE 140 OFFICE 141 OFFICE 142 CONFERENCE ROOM 144 OFFICE 145 PLANNING AND ZONING 149 MEN 150 WOMEN 151 OFFICE 153 MEETING ROOM 154 OFFICE 155 CHIEF OF STAFF OFFICE 156 RECEPT 157 SECRETARY 158 FIRST SELECTMAN 159 CONF 161 WORK 162 FINANCE 172 BUILDING/CONSERVATION DEPARTMENT 183 FILES & STORAGE 181 FILE STORAGE 174 OFFICE 173 VAULT 186 HALLWAY 184 OFFICE 188 PARKING AUTHORITY 189 WORK AREA 180 LAV TYP PERIMETER BSBD HEAT ENCLOSURE MODIFY PER MEP DWGS TO ACCOMODATE NEW WORK THIS PROJECT CONSISTS OF PROVIDING TWO NEW GAS FIRED BOILERS INCLUDING BUT NOT LIMITED TO THE FOLLOWING WORK: 1. ASSOCIATED APPURTENANCES, INCLUDING BURNERS. 2. HOT WATER PUMPS, EXPANSION TANK, CHEMICAL SHOT FEEDER. 3. ASSOCIATED PIPING, VALVES, ACCESSORIES, PIPE INSULATION & MODIFICATIONS TO THE EXISTING PIPING. 4. GAS PIPING FROM THE EXISTING GAS METER TO THE NEW BOILERS 5. NEW SELF CONTAINED CONTROL VALVES THROUGHOUT THE BUILDING, INCLUDING ANY RELATED MODIFICATIONS TO BASEBOARD ENCLOSURES. 6. VARIABLE FREQUENCY DRIVES AND RELATED WIRING. 7. TEMPERATURE CONTROL WIRING. 8. CONCRETE HOUSEKEEPING PADS, INCLUDING THE REMOVAL OF EXISTING. 9. CUTTING AND PATCHING OF ANY FINISHES, CEILINGS, ETC. NECESSARY TO MAKE THE SPECIFIED PIPING CHANGES. 10. FIRE AND SMOKE STOPPING AT ALL PIPE &/OR CONDUIT PENETRATIONS THROUGH FLOORS AND PARTITIONS RELATED TO THIS WORK. WORK PERFORMED BY THE OWNER: 1. DEMOLITION AND REMOVAL OF THE EXISTING OIL FIRED BOILERS. 2. ANY RELATED ABATEMENT OF HAZARDOUS MATERIALS. ALL CONTRACTORS SHALL REVIEW THE HAZARDOUS MATERIALS REPORT INCLUDED IN THE PROJECT MANUAL. REPORT ANY SUSPECT MATERIALS THAT REQUIRE REMOVAL TO THE OWNER BEFORE PROCEEDING. 3. REMOVAL OF THE EXISTING UNDERGROUND STORAGE TANK. 4. ANY CHANGES TO THE UNDERGROUND GAS SERVICE TO THE BUILDING. IMMEDIATELY VERIFY THE SIZE AND CAPACITY OF THE EXISTING GAS SERVICE WITH THE GAS COMPANY. IF CHANGES ARE NECESSARY, REPORT TO THE OWNER ASAP. 1. THE FOLLOWING NOTES APPLY TO ALL WORK AND DRAWINGS IN PROJECT SCOPE. 2. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR DIRECTION PRIOR TO PROCEEDING. 3. EXISTING CONDITIONS ARE BASED ON ARCHIVE DOCUMENTS FURNISHED BY THE OWNER SUPPLEMENTED WITH GENERAL FIELD VERIFICATION BY THE ARCHITECT AND/OR ENGINEER. ALL CONTRACTORS SHALL PERFORM THEIR OWN FIELD VERIFICATION PRIOR TO COMMENCING WITH THE WORK. 4. IF INFORMATION ON DRAWINGS IS UNCLEAR OR ADDITIONAL DIMENSIONS ARE REQUIRED NOTIFY ARCHITECT PRIOR TO PROCEEDING WITH WORK. 5. EXERCISE CARE NOT TO DAMAGE EXISTING BUILDING ELEMENTS AND FINISHES TO REMAIN DURING CONSTRUCTION. IN THE EVENT THAT DAMAGE DOES OCCUR PATCH/REPAIR OR REPLACE DAMAGED ELEMENTS OR FINISHES IN KIND AND/OR TO MATCH EXISTING. 6. ALL PIPING PENETRATIONS THROUGH EXISTING MASONRY WALLS SHALL BE DRILLED AND SLEEVED. PENETRATIONS THOUGH INTERIOR WALLS SHALL BE FIRE SAFE WITH DESIGNATED UL SYSTEMS. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED WEATHERTIGHT. 7. PROVIDE TEMPORARY BARRICADES AND DUST ABATEMENT AS REQUIRED BY OWNER. 8. THE PREMISES SHALL BE KEPT FREE FROM ACCUMULATION OF TRASH AND CONSTRUCTION DEBRIS AT ALL TIMES. DISPOSE OF EXCESS TRASH AND DEBRIS OFF-SITE IN A SAFE, ACCEPTABLE MANNER. 9. LOCATE ALL EXISTING, EASEMENTS, UTILITIES AND BUILDING SERVICES, EXPOSED AND CONCEALED, PRIOR TO START OF WORK. 10. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. REPORT ANY DISCREPANCIES TO ARCHITECT PRIOR TO PROCEEDING. 11. DIMENSIONS INDICATED ON DRAWINGS ARE TO BE USED FOR CONSTRUCTION. DO NOT SCALE DRAWINGS. COORDINATE EXISTING CONDITIONS WITH NEW EQUIPMENT, PIPING, BREECHING DUCTWORK AND RELATED ELECTRICAL WORK. 12. REMOVE EXISTING CONCRETE HOUSEKEEPING PADS. PATCH/REPAIR EXIST CONCRETE SLAB FLOOR PER SPECIFICATIONS. 13. PROVIDE NEW CONCRETE HOUSEKEEPING PADS AS SPECIFIED AND INDICATED. COORDINATE SIZE WITH NEW EQUIPMENT, ANCHORING HARDWARE AND VIBRATION/SEISMIC REQUIREMENTS. 14. REVIEW ALL NEW THERMOSTAT LOCATIONS WITH OWNER'S REPRESENTATIVE & ARCHITECT, IN THE FIELD, PRIOR TO START OF WORK. DO NOT RELOCATE WITHOUT PRIOR WRITTEN AUTHORIZATION. 15. THE TERM "TYPICAL" OR "TYP" INDICATED ON THE CONTRACT DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME OR SIMILAR THROUGHOUT UNLESS OTHERWISE INDICATED. 16. ALL EXISTING FINISHES AND BUILDING ELEMENTS AFFECTED BY DEMOLITION AND NEW WORK SHALL BE PATCHED TO MATCH EXISTING, WHETHER OR NOT SPECIFICALLY CALLED FOR. 17. ALL WORK SHALL BE PERFORMED IN A UNIFORM, ACCURATE MANNER AS REQUIRED TO PROVIDE NEAT, STRAIGHT LINES FREE FROM DEFECTS, OVERLAPS AND IMPERFECTIONS. WORK SHALL BE INSTALLED LEVEL, PLUMB OR FLUSH WITH ADJOINING MATERIALS (WHERE APPLICABLE). WORK OF EACH TRADE SHALL MEET OR EXCEED NATIONALLY RECOGNIZED AND/OR PUBLISHED STANDARDS. 18. WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT THAN THE AFOREMENTIONED STANDARDS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SUCH 19. COORDINATE WITH AUTHORITIES HAVING JURISDICTION AND PROVIDE ALL REQUIRED TEMPORARY FIRE AND LIFE SAFETY PROVISIONS DURING CONSTRUCTION. 20. PROVIDE PORTABLE FIRE EXTINGUISHERS DURING CONSTRUCTION AS REQUIRED BY CODE AND AUTHORITY HAVING JURISDICTION. THESE NOTES APPLY TO ALL CONTRACT DRAWINGS CHRISTOPHER WILLIAMS ARCHITECTS 85 Willow Street New Haven, CT 06511 203 776 0184 cwarchitectsllc.com ARCHITECT OWNER MEP ENGINEER FAIRFIELD CT, 06824 725 OLD POST RD CONTACT Mr. James Ryan Building Maintenance Manager Town of Fairfield Department of Public Works 203 - 256 - 3179 7/29/2020 2:12:27 PM D:\Users\CWilliams\Documents\2009 Indy Hall HVAC [email protected] JULY 24, 2020 ISSUED FOR CONST TOWN OF FAIRFIELD 725 Old Post Road Fairfield CT 06824 CWA PROJECT NO: 2009 TOWN OF FAIRFIELD INDEPENDENCE HALL BOILER REPLACEMENT NO. SHEET NAME JULY 24, 2020 A0 COVER SHEET ME0.1 MECHANICAL NOTES ME1.1 MECHANICAL & ELECTRICAL SMT PLANS ME1.2 MECHANICAL & ELECTRICAL FIRST FLOOR PLAN ME1.3 MECHANICAL & ELECTRICAL 2ND FLOOR PLANS M2.1 MECHANICAL DETAILS M3.1 MECHANICAL & ELECTRICAL BASEMENT PART PLANS 1/16" = 1'-0" BASEMENT 1/16" = 1'-0" FIRST FLOOR 1/16" = 1'-0" SECOND FLOOR PROJECT DESCRIPTION LOCATION MAP KEY PLANS 0' 8' 16' 32' 48' 4' 0' 8' 16' 32' 48' 4' 0' 8' 16' 32' 48' 4' SHEET INDEX GENERAL NOTES

Transcript of INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the...

Page 1: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

DNDN

UP

UP

UP

DNDN

DN

001STAIR #2

002STORAGE

003BOILER RM.

005STORAGE

006MAIL ROOM

008ELECTRIC

009LAV.

010CORRIDOR

011SECT Y

012PROG

014PROG

015OFFICE

016KEY PUNCH

017

AUX.EQUIPMENT

018

SERVERROOM

019STORAGE

020STAIR #1

021VEST.

022EL./MACH.

023STORAGE

024

LOUNGE/MTGRM.

BOILER RM ENTRANCE

BOILER ROOM WALLS ARE 8" CMU

AREAWAY

STEPS UP TO GRADE

TYP PERIMETER BSBD HEAT ENCLOSUREMODIFY PER MEP DWGS TO ACCOMODATE NEW WORK

EP-"E"PP-BR

NEW ELEC PANEL PER ME0.1RUN CONDUIT @ UNDERSIDE OF1ST FLR, ABOVE SUSPENDED CEILINGS

102

JUDGEOFFICE

103

PROBATEOFFICE

105VAULT

104OFFICE 106

MEN108

WOMEN

109

MEETINGROOM 110

HEALTH DEPT111

OFFICE

112OFFICE

114VESTIBULE

115INFO.

116STAIR #1

117OFFICE

118

HRDEPARTMENT

123

CONFERENCEROOM

125OFFICE

130

ASS'T DPWDIR

131

ASS'T ENGDIR

101STAIR #2

113LAB

107CUST

163

ENGINEERINGDEPARTMENT

164OFFICE

125OFFICE

165STORAGE

166

SEWERDEPARTMENT

171COPY ROOM

170OFFICE

190HALLWAY

119

PURCHASINGDPT

167OFFICE

168OFFICE

169OFFICE

APP. LOCATION OF GAS METER. VERIFY SIZE & CAPACITY WITH UTILTY COMPANY PER MEP NOTES/SPECS TYP PERIMETER BSBD HEAT ENCLOSURE

MODIFY PER MEP DWGS TO ACCOMODATE NEW WORK

EP-"C"

132ELEV

133STAIR #1

134OFFICE

135OFFICE

136OFFICE

137STAIR 2

138OFFICE

139OFFICE

140OFFICE

141OFFICE

142

CONFERENCEROOM

144OFFICE

145

PLANNINGAND ZONING

149MEN

150WOMEN

151OFFICE

153

MEETINGROOM

154OFFICE 155

CHIEF OFSTAFF OFFICE

156RECEPT

157SECRETARY

158

FIRSTSELECTMAN

159CONF

161WORK

162FINANCE

172

BUILDING/CONSERVATIONDEPARTMENT

183

FILES &STORAGE

181

FILESTORAGE

174OFFICE

173VAULT

186HALLWAY

184OFFICE

188

PARKINGAUTHORITY

189WORK AREA

180LAV

TYP PERIMETER BSBD HEAT ENCLOSUREMODIFY PER MEP DWGS TO ACCOMODATE NEW WORK

THIS PROJECT CONSISTS OF PROVIDING TWO NEW GAS FIRED BOILERS INCLUDING BUT NOT LIMITED TO THE FOLLOWING WORK:1. ASSOCIATED APPURTENANCES, INCLUDING BURNERS. 2. HOT WATER PUMPS, EXPANSION TANK, CHEMICAL SHOT FEEDER.3. ASSOCIATED PIPING, VALVES, ACCESSORIES, PIPE INSULATION &

MODIFICATIONS TO THE EXISTING PIPING.4. GAS PIPING FROM THE EXISTING GAS METER TO THE NEW BOILERS 5. NEW SELF CONTAINED CONTROL VALVES THROUGHOUT THE BUILDING,

INCLUDING ANY RELATED MODIFICATIONS TO BASEBOARD ENCLOSURES.6. VARIABLE FREQUENCY DRIVES AND RELATED WIRING.7. TEMPERATURE CONTROL WIRING.8. CONCRETE HOUSEKEEPING PADS, INCLUDING THE REMOVAL OF EXISTING.9. CUTTING AND PATCHING OF ANY FINISHES, CEILINGS, ETC. NECESSARY TO

MAKE THE SPECIFIED PIPING CHANGES.10. FIRE AND SMOKE STOPPING AT ALL PIPE &/OR CONDUIT PENETRATIONS

THROUGH FLOORS AND PARTITIONS RELATED TO THIS WORK.

WORK PERFORMED BY THE OWNER:1. DEMOLITION AND REMOVAL OF THE EXISTING OIL FIRED BOILERS.2. ANY RELATED ABATEMENT OF HAZARDOUS MATERIALS. ALL CONTRACTORS

SHALL REVIEW THE HAZARDOUS MATERIALS REPORT INCLUDED IN THE PROJECT MANUAL. REPORT ANY SUSPECT MATERIALS THAT REQUIRE REMOVAL TO THE OWNER BEFORE PROCEEDING.

3. REMOVAL OF THE EXISTING UNDERGROUND STORAGE TANK. 4. ANY CHANGES TO THE UNDERGROUND GAS SERVICE TO THE BUILDING.

IMMEDIATELY VERIFY THE SIZE AND CAPACITY OF THE EXISTING GAS SERVICE WITH THE GAS COMPANY. IF CHANGES ARE NECESSARY, REPORT TO THE OWNER ASAP.

1. THE FOLLOWING NOTES APPLY TO ALL WORK AND DRAWINGS IN PROJECT SCOPE.

2. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR DIRECTION PRIOR TO PROCEEDING.

3. EXISTING CONDITIONS ARE BASED ON ARCHIVE DOCUMENTS FURNISHED BY THE OWNER SUPPLEMENTED WITH GENERAL FIELD VERIFICATION BY THE ARCHITECT AND/OR ENGINEER. ALL CONTRACTORS SHALL PERFORM THEIR OWN FIELD VERIFICATION PRIOR TO COMMENCING WITH THE WORK.

4. IF INFORMATION ON DRAWINGS IS UNCLEAR OR ADDITIONAL DIMENSIONS ARE REQUIRED NOTIFY ARCHITECT PRIOR TO PROCEEDING WITH WORK.

5. EXERCISE CARE NOT TO DAMAGE EXISTING BUILDING ELEMENTS AND FINISHES TO REMAIN DURING CONSTRUCTION. IN THE EVENT THAT DAMAGE DOES OCCUR PATCH/REPAIR OR REPLACE DAMAGED ELEMENTS OR FINISHES IN KIND AND/OR TO MATCH EXISTING.

6. ALL PIPING PENETRATIONS THROUGH EXISTING MASONRY WALLS SHALL BE DRILLED AND SLEEVED. PENETRATIONS THOUGH INTERIOR WALLS SHALL BE FIRE SAFE WITH DESIGNATED UL SYSTEMS. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED WEATHERTIGHT.

7. PROVIDE TEMPORARY BARRICADES AND DUST ABATEMENT AS REQUIRED BY OWNER.

8. THE PREMISES SHALL BE KEPT FREE FROM ACCUMULATION OF TRASH AND CONSTRUCTION DEBRIS AT ALL TIMES. DISPOSE OF EXCESS TRASH AND DEBRIS OFF-SITE IN A SAFE, ACCEPTABLE MANNER.

9. LOCATE ALL EXISTING, EASEMENTS, UTILITIES AND BUILDING SERVICES, EXPOSED AND CONCEALED, PRIOR TO START OF WORK.

10. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. REPORT ANY DISCREPANCIES TO ARCHITECT PRIOR TO PROCEEDING.

11. DIMENSIONS INDICATED ON DRAWINGS ARE TO BE USED FOR CONSTRUCTION. DO NOT SCALE DRAWINGS. COORDINATE EXISTING CONDITIONS WITH NEW EQUIPMENT, PIPING, BREECHING DUCTWORK AND RELATED ELECTRICAL WORK.

12. REMOVE EXISTING CONCRETE HOUSEKEEPING PADS. PATCH/REPAIR EXIST CONCRETE SLAB FLOOR PER SPECIFICATIONS.

13. PROVIDE NEW CONCRETE HOUSEKEEPING PADS AS SPECIFIED AND INDICATED. COORDINATE SIZE WITH NEW EQUIPMENT, ANCHORING HARDWARE AND VIBRATION/SEISMIC REQUIREMENTS.

14. REVIEW ALL NEW THERMOSTAT LOCATIONS WITH OWNER'S REPRESENTATIVE & ARCHITECT, IN THE FIELD, PRIOR TO START OF WORK. DO NOT RELOCATE WITHOUT PRIOR WRITTEN AUTHORIZATION.

15. THE TERM "TYPICAL" OR "TYP" INDICATED ON THE CONTRACT DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME OR SIMILAR THROUGHOUT UNLESS OTHERWISE INDICATED.

16. ALL EXISTING FINISHES AND BUILDING ELEMENTS AFFECTED BY DEMOLITION AND NEW WORK SHALL BE PATCHED TO MATCH EXISTING, WHETHER OR NOT SPECIFICALLY CALLED FOR.

17. ALL WORK SHALL BE PERFORMED IN A UNIFORM, ACCURATE MANNER AS REQUIRED TO PROVIDE NEAT, STRAIGHT LINES FREE FROM DEFECTS, OVERLAPS AND IMPERFECTIONS. WORK SHALL BE INSTALLED LEVEL, PLUMB OR FLUSH WITH ADJOINING MATERIALS (WHERE APPLICABLE). WORK OF EACH TRADE SHALL MEET OR EXCEED NATIONALLY RECOGNIZED AND/OR PUBLISHED STANDARDS.

18. WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT THAN THE AFOREMENTIONED STANDARDS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SUCH

19. COORDINATE WITH AUTHORITIES HAVING JURISDICTION AND PROVIDE ALL REQUIRED TEMPORARY FIRE AND LIFE SAFETY PROVISIONS DURING CONSTRUCTION.

20. PROVIDE PORTABLE FIRE EXTINGUISHERS DURING CONSTRUCTION AS REQUIRED BY CODE AND AUTHORITY HAVING JURISDICTION. THESE NOTES APPLY TO ALL CONTRACT DRAWINGS

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511

203 776 0184 cwarchitectsllc.com

ARCHITECT OWNERMEP ENGINEER

FAIRFIELD CT, 06824

725 OLD POST RD

CONTACTMr. James RyanBuilding Maintenance ManagerTown of Fairfield Department of Public Works203-256-3179

7/29/2020 2:12:27 PMD:\Users\CWilliams\Documents\2009 Indy Hall HVAC [email protected]

JULY 24, 2020

ISSUED FOR CONST

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824

CWA PROJECT NO: 2009

TOWN OF FAIRFIELD

INDEPENDENCE HALLBOILER REPLACEMENT

NO. SHEET NAMEJULY 24,

2020

A0 COVER SHEET ●ME0.1 MECHANICAL NOTES ●ME1.1 MECHANICAL & ELECTRICAL SMT PLANS ●ME1.2 MECHANICAL & ELECTRICAL FIRST

FLOOR PLAN ●

ME1.3 MECHANICAL & ELECTRICAL 2ND FLOORPLANS ●

M2.1 MECHANICAL DETAILS ●M3.1 MECHANICAL & ELECTRICAL BASEMENT

PART PLANS ●

1/16" = 1'-0"BASEMENT

1/16" = 1'-0"FIRST FLOOR

1/16" = 1'-0"SECOND FLOOR

PROJECT DESCRIPTION

LOCATION MAPKEY PLANS

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'

0' 8' 16' 32' 48'4'

SHEET INDEX

GENERAL NOTES

Page 2: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

SYMBOLSGENERAL SYMBOLS

ABBRIVIATIONS

MECHANICAL - CONTROL - GENERAL NOTES

GENERAL NOTES

PIPING GENERAL NOTES

DEMOLITION WORK - GENERAL NOTES

DEMOLITION WORK

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL ABBREVIATIONS,SYMBOLS AND GENERAL NOTES

ME0.1

AutoCAD SHX Text
STRAINER NORMALLY OPEN BALL VALVE NORMALLY CLOSE BALL VALVE GAS SHUT-OFF VALVE CHECK VALVE END CAP OR CAPPED END OF PIPE FLOW DIRECTION NORMALLY OPEN BUTTERFLY VALVE NORMALLY CLOSE BUTTERFLY VALVE BALANCE VALVE TRIPLE DUTY VALVE PIPE ELBOW UP PIPE ELBOW DOWN PIPE UP THERMOSTAT THERMOSTAT WITH GUARD PIPE ANCHOR PIPE GUIDE PIPING UNION PRESSURE GAUGE THERMOMETER WITH SEPARABLE SOCKET IN IMMERSIBLE WELL MOTORIZED 3-WAY VALVE MOTORIZED VALVE. PRESSURE REDUCER VALVE PRESSURE TRANSDUCER TEMPERATURE TRANSDUCER FLOW SWITCH. DIFFERENTIAL PRESSURE SENSOR. FINNED TUBE OR CONVECTOR ELEMENT PUMP
AutoCAD SHX Text
P
AutoCAD SHX Text
T
AutoCAD SHX Text
THICK, DARK SOLID LINES INDICATE NEW OR RELOCATED ITEMS. THIN, LIGHT SOLID LINES INDICATE EXISTING ITEMS TO REMAIN IN PLACE AND REUSE. POINT OF NEW TO EXISTING CONNECTION, INCLUDE TRANSITION. SUB LETTER 'EX' INDICATES EXISTING EQUIPMENT.
AutoCAD SHX Text
EX
AutoCAD SHX Text
HOT WATER SUPPLY HWS HWS HOT WATER RETURN HWR HWR PUMP P P BOILER B B EXPANSION TANK ET ET BUTTERFLY VALVE BV BV MOTOR OPERATED VALVE MOV MOV TRIPLE DUTY VALVE TDV TDV VARIABLE FREQUENCY DRIVE VFD VFD US GALLON PER MINUTE GPM GPM RADIANT CEILING PANEL RCP RCP UNIT HEATER UH UH HOT WATER COIL HWC HWC UNIT VENTILATOR UV UV CABINET UNIT HEATER CUH CUH AIR SEPARATOR AS AS HEAT EXCHANGER HX HX CHILLER CH CH STEAM STM STM CONDENSATE C C CHILLED WATER SUPPLY CHWS CHWS CHILLED WATER RETURN CHWR CHWR AIR VENT AV AV PILOT OPERATOR DIFFERENTIAL PRESSURE CONTROLLER VALVE ASSEMBLY DPC DPC
AutoCAD SHX Text
1. ALL ELECTRIC WIRING, CONNECTIONS, DEVICES, RACEWAY AND HARDWARE REQUIRED FOR THE INSTALLATION OF ALL ELECTRIC WIRING, CONNECTIONS, DEVICES, RACEWAY AND HARDWARE REQUIRED FOR THE INSTALLATION OF THE TEMPERATURE CONTROL SYSTEM AS SPECIFIED AND SHOWN ON THE DRAWINGS SHALL BE PROVIDED BY THE TEMPERATURE CONTROLS CONTRACTOR (TCC). 2. ALL CONTROL WIRING SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTROL SYSTEM MANUFACTURER'S ALL CONTROL WIRING SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTROL SYSTEM MANUFACTURER'S REQUIREMENTS AND CURRENT CODE. 3. ALL LOW VOLTAGE CONTROL WIRING SHALL BE PLENUM RATED CABLE OF TYPES AND SIZES REQUIRED BY ALL LOW VOLTAGE CONTROL WIRING SHALL BE PLENUM RATED CABLE OF TYPES AND SIZES REQUIRED BY THE CONTROL SYSTEM MANUFACTURER. 4. PROVIDE MINIMUM OF 3/4" EMT CONDUIT FOR ALL WIRING EXPOSED TO VIEW AND FOR WIRING DROPS AND PROVIDE MINIMUM OF 3/4" EMT CONDUIT FOR ALL WIRING EXPOSED TO VIEW AND FOR WIRING DROPS AND RUNS WITHIN NEW WALLS.ALL CONDUITS SHALL TERMINATE WITH JUNCTION BOXES OR OUTLET BOXES. PROVIDE BUSHINGS FOR ALL WIRING ENTERIES INTO THE CONDUIT SYSTEM. 5. ALL CONTROL WIRING SHALL BE NEATLY INSTALLED WITH CABLE RUNS INSTALLED PARALLEL TO OR AT RIGHT ALL CONTROL WIRING SHALL BE NEATLY INSTALLED WITH CABLE RUNS INSTALLED PARALLEL TO OR AT RIGHT ANGLES TO THE LINES OF THE BUILDING. ALL WIRING IN NORMALLY OCCUPIED AREAS OF THE BUILDING SHALL BE CONCEALED FROM VIEW. OPEN CABLE RUNS ABOVE CEILINGS SHALL BE BUNDLE TIED WITH PLASTIC CABLE TIES AND SHALL BE SUPPORTED FREE FROM THE CEILING AND MECHANICAL/ELECTRICAL EQUIPMENT USING APPROVED CABLE HANGERS AND CABLE CLIPS. 6. THE CONTROL CONTRACTOR SHALL COORDINATE POWER SUPPLY REQUIREMENTS OF THE CONTROL SYSTEM THE CONTROL CONTRACTOR SHALL COORDINATE POWER SUPPLY REQUIREMENTS OF THE CONTROL SYSTEM WITH DIVISION 26. 7. REFER TO SPECIFICATION FOR ADDITIONAL CONTROLS REQUIREMENTS. REFER TO SPECIFICATION FOR ADDITIONAL CONTROLS REQUIREMENTS. 8. ALL CONTROLS DEVICES AND ELECTRONICS SHALL BE INSTALLED WITHIN A NEMA-1 ENCLOSURE LOCATED ALL CONTROLS DEVICES AND ELECTRONICS SHALL BE INSTALLED WITHIN A NEMA-1 ENCLOSURE LOCATED WITHIN PROXIMITY TO THE EQUIPMENT SERVED.
AutoCAD SHX Text
1. CONTRACTORS SHALL BE RESPONSIBLE TO VERIFY AND FAMILIARIZE THEMSELVES WITH ACTUAL FIELD CONTRACTORS SHALL BE RESPONSIBLE TO VERIFY AND FAMILIARIZE THEMSELVES WITH ACTUAL FIELD CONDITIONS ASSOCIATED WITH WORK UNDER THIS CONTRACT. A VISIT TO THE SITE AND EXAMINATION OF THE OTHER MECHANICAL TRADES SHOWING ALL DETAILS OF CONSTRUCTION IS REQUIREMENT PRIOR TO SUBMITTING THEIR BID. 2. IT IS THE INTENT THAT ALL WORK SHALL BE COMPLETED IN EVERY RESPECT AND THAT MATERIAL OR WORK IT IS THE INTENT THAT ALL WORK SHALL BE COMPLETED IN EVERY RESPECT AND THAT MATERIAL OR WORK SPECIFICALLY NOT INDICATED ON THE DRAWINGS, BUT NECESSARY TO COMPLETE THE WORK SHALL BE PROVIDED. 3. THE DRAWING ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK, NOT EXACT EQUIPMENT AND PIPING THE DRAWING ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK, NOT EXACT EQUIPMENT AND PIPING LOCATIONS, ALL OFFSETS, FITTINGS, TRANSITIONS AND ACCESSORIES ARE NOT NECESSARY SHOWN. COORDINATE THE INSTALLATION OF ALL PIPING, EQUIPMENT AND OTHER WORK WITH ALL TRADES IN ORDER TO AVOID CONFLICT. 4. MAINTAIN MINIMUM 80" CLEARANCE HEIGHT UNDER ALL THE EQUIPMENTS, PIPING AND DUCTWORK MAINTAIN MINIMUM 80" CLEARANCE HEIGHT UNDER ALL THE EQUIPMENTS, PIPING AND DUCTWORK
AutoCAD SHX Text
1. INSTALL PIPES IN SUCH A WAY THAT WILL ALLOW EASY ACCESS TO VALVES. IN GENERAL, PIPES SHALL RUN INSTALL PIPES IN SUCH A WAY THAT WILL ALLOW EASY ACCESS TO VALVES. IN GENERAL, PIPES SHALL RUN BELOW DUCTS. 2. PROVIDE AIR VENTS AT ALL HIGH POINTS. PROVIDE AIR VENTS AT ALL HIGH POINTS. 3. INSTALL DRAIN VALVES WITH HOSE CONNECTION AT ALL LOW POINTS. INSTALL DRAIN VALVES WITH HOSE CONNECTION AT ALL LOW POINTS. 4. PROVIDE HOSE END CAPS WITH CHAIN ON ALL DRAIN VALVES AND AIR VENTS. PROVIDE HOSE END CAPS WITH CHAIN ON ALL DRAIN VALVES AND AIR VENTS. 5. DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK. CONTRACTOR SHALL COORDINATE WITH DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES BEFORE WORK BEGINS. 6. ALL TESTS SHALL BE COMPLETED BEFOR ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED ALL TESTS SHALL BE COMPLETED BEFOR ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED 7. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF PIPE AND DOWNSTREAM AS RECOMMENDED BY MANUFACTURER FOR GOOD ACCURACY. 8. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOP) 9. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOM MOUNTED GREATER THAN 7'-0" PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOM MOUNTED GREATER THAN 7'-0" ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7'-0" ABOVE FLOOR LEVEL. 10. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING. 11. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES. OFFSETS IN PIPING AROUND OBSTRUCTIONS ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 12. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, COOLING PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION, FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE, OR AS INDICATED ON THE DRAWINGS. 13. CONNECTION TO MAIN SHALL BE FROM THE BOTTOM OF SIDE OF THE MAINS
AutoCAD SHX Text
F
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
DP
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITY THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITY LINES INCLUDING ELECTRICAL, SEWER, WATER, GAS, TELEPHONE, ETC. 2. THE DRAWINGS SHOW DIAGRAMMATICALLY THE APPROXIMATE LOCATION OF UTILITIES WHERE INFORMATION IS THE DRAWINGS SHOW DIAGRAMMATICALLY THE APPROXIMATE LOCATION OF UTILITIES WHERE INFORMATION IS AVAILABLE, BUT THE DRAWINGS ARE NOT EXACT AS TO THE QUANTITY, EXTENT OR LOCATION. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING ALL PHASES OF THE WORK TO LOCATE, IDENTIFY, AND PROTECT EXISTING UTILITIES. THE CONTRACTOR SHALL RECORD LOCATION OF AND REPAIR DAMAGE TO EXISTING UTILITIES WHICH ARE ENCOUNTERED AS A RESULT OF WORK UNDER THIS CONTRACT. 3. ANY EQUIPMENT REMOVED DURING DEMOLITION WORK MAY BE RETAINED BY THE OWNER AT HIS OPTION. ANY ANY EQUIPMENT REMOVED DURING DEMOLITION WORK MAY BE RETAINED BY THE OWNER AT HIS OPTION. ANY SUCH MATERIAL SHALL BE STORED IN THE BUILDING AT A LOCATION DESIGNATED BY THE OWNER. REMOVAL OF SUCH MATERIAL FROM THE JOB SITE SHALL BE THE OWNER'S RESPONSIBILITY. 4. COORDINATE ALL DEMOLITION WORK WITH THE REQUIREMENTS OF THE NEW SCOPE OF WORK. COORDINATE ALL DEMOLITION WORK WITH THE REQUIREMENTS OF THE NEW SCOPE OF WORK. 5. PRIOR TO SUBMITTING HIS BID, CONTRACTOR SHALL VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND PRIOR TO SUBMITTING HIS BID, CONTRACTOR SHALL VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK TO BE PERFORMED. CONTRACTOR SHALL MEASURE, RECORD AND SUBMIT EXISTING AHU'S AIR AND EXISTING PUMPS WATER FLOWS PRIOR TO COMMENCING ANY DEMOLITION WORK. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS. INCLUDE IN THE BID ALL DEMOLITION WORK REQUIRED. 6. AFTER THE PROJECT IS COMPLETED, THE CONTRACTOR SHALL RE-BALANCE THE UNITS FOR THE ORIGINAL AIR AFTER THE PROJECT IS COMPLETED, THE CONTRACTOR SHALL RE-BALANCE THE UNITS FOR THE ORIGINAL AIR FLOWS, UNLESS NOTED OTHERWISE 7. THE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND THE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND TO ASSIST THE CONTRACTOR DURING BIDDING. THE DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM WHICH MUST BE DISCONNECTED, REMOVED, OR RELOCATED IN ORDER TO FACILITATE NEW WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION WORK REQUIRED WHETHER OR NOT SHOWN ON THE PLANS. 8. COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE INCONVENIENCE TO THE BUILDING COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE INCONVENIENCE TO THE BUILDING OCCUPANTS. ALL SERVICES AND SYSTEMS SERVING OCCUPIED AREAS OF THE BUILDING SHALL BE MAINTAINED IN OPERATION DURING WORKING SHIFTS. 9. CONTRACTOR IS RESPONSIBLE FOR ANY TEMPORARY WORK REQUIRED TO KEEP THE BUILDING OCCUPIED CONTRACTOR IS RESPONSIBLE FOR ANY TEMPORARY WORK REQUIRED TO KEEP THE BUILDING OCCUPIED DURING CONSTRUCTION. 10. REMOVE AND/OR RELOCATE ALL EXISTING MECHANICAL EQUIP. AS NECESSARY FOR THE PERFORMANCE OF THE REMOVE AND/OR RELOCATE ALL EXISTING MECHANICAL EQUIP. AS NECESSARY FOR THE PERFORMANCE OF THE WORK OF THIS CONTRACT. 11. REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS NOTED DIFFERENTLY. REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS NOTED DIFFERENTLY. 12. CONTRACTOR SHALL FIELD VERIFY LOCATION AND SIZE OF EXISTING MECHANICAL EQUIPMENT. CONTRACTOR SHALL FIELD VERIFY LOCATION AND SIZE OF EXISTING MECHANICAL EQUIPMENT. 13. REFER TO SPECIFICATIONS FOR ADDITIONAL DEMOLITION NOTES. REFER TO SPECIFICATIONS FOR ADDITIONAL DEMOLITION NOTES. 14. CONTRACTOR SHALL MEASURE AND RECORD WATER FLOWS FOR ALL PUMPS PRIOR TO DEMOLITION CONTRACTOR SHALL MEASURE AND RECORD WATER FLOWS FOR ALL PUMPS PRIOR TO DEMOLITION 15. REMOVE AND REPLACE ALL EXISTING PIPE INSULATION. PROVIDE NEW PIPE HANGERS TO MATCH NEW REMOVE AND REPLACE ALL EXISTING PIPE INSULATION. PROVIDE NEW PIPE HANGERS TO MATCH NEW INSULATION IN THE BOILER ROOM. 16. THIS CONTRACTOR IS RESPONSIBLE FOR PROTECTION EXISTING FINISHES, FURNITURE AND EQUIPMENT DURING THIS CONTRACTOR IS RESPONSIBLE FOR PROTECTION EXISTING FINISHES, FURNITURE AND EQUIPMENT DURING CONSTRUCTION. 17. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF EXISTING CEILING TILES TO THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REINSTALLATION OF EXISTING CEILING TILES TO PERFORM WORK UNDER THIS CONTRACT. THIS CONTRACTOR SHALL REPLACE ANY TILES DAMAGED AS A RESULT OF WORK UNDER THIS CONTRACT. CONTRACTOR SHALL RECORD AND GIVE NOTICE OF ANY DAMAGED CEILING TILES PRIOR TO STARTING THE DEMOLITION.
AutoCAD SHX Text
1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF THE EXISTING OIL PIPES AND ACCESSORIES THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF THE EXISTING OIL PIPES AND ACCESSORIES AND THE DISPOSAL OF THE EXISTING OIL IN A A SAFE MANNER, IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS 2. REMOVE EXISTING BREACHING ASSOCIATED WITH THE EXISTING BOILERS REMOVE EXISTING BREACHING ASSOCIATED WITH THE EXISTING BOILERS 3. CLEAN EXISTING CHIMNEY AND EXISTING REMAINING BREACHING CLEAN EXISTING CHIMNEY AND EXISTING REMAINING BREACHING 4. REMOVE AND REPLACE ALL EXISTING PIPE INSULATION. REMOVE AND REPLACE ALL EXISTING PIPE INSULATION. 5. REMOVE ALL EXISTING BASE MOUNTED CIRCULATING PUMPS. REMOVE ALL EXISTING BASE MOUNTED CIRCULATING PUMPS. 6. EXISTING COMBUSTION AIR LOUVER SHALL REMAIN EXISTING COMBUSTION AIR LOUVER SHALL REMAIN 7. EXISTING AIR SEPARATOR SHALL BE REMOVED AND REPLACED EXISTING AIR SEPARATOR SHALL BE REMOVED AND REPLACED 8. EXISTING EXPANSION TANK SHALL DISCONNECTED AND REUSED. EXISTING EXPANSION TANK SHALL DISCONNECTED AND REUSED. 9. REMOVE EXISTING PIPING AS REQUIRED TO ALLOW FOR THE INSTALLATION OF THE NEW BOILERS REMOVE EXISTING PIPING AS REQUIRED TO ALLOW FOR THE INSTALLATION OF THE NEW BOILERS 10. EXISTING HOT WATER MAKE-UP WATER SYSTEM SHALL REMAIN. RECONNECT TO NEW SYSTEM.EXISTING HOT WATER MAKE-UP WATER SYSTEM SHALL REMAIN. RECONNECT TO NEW SYSTEM.
AutoCAD SHX Text
SPECIAL EQUIPMENT POWER CONNECTION. EQUIPMENT AS DESIGNATED.
AutoCAD SHX Text
MOTOR POWER CONNECTION. EQUIPMENT AS DESIGNATED.
AutoCAD SHX Text
CONDUCTORS IN CONDUIT. CROSS LINES INDICATE NUMBER OF CONDUCTORS.
AutoCAD SHX Text
A
AutoCAD SHX Text
AMPS.
AutoCAD SHX Text
ELECTRICAL LEGEND
AutoCAD SHX Text
SYMBOL/ABBREVIATION
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
C
AutoCAD SHX Text
CONDUIT.
AutoCAD SHX Text
GND.
AutoCAD SHX Text
GROUND.
AutoCAD SHX Text
P
AutoCAD SHX Text
POLE.
AutoCAD SHX Text
BRANCH CIRCUIT HOMERUN IN CONDUIT. CROSS LINES INDICATE NUMBER OF CONDUCTORS.
AutoCAD SHX Text
EO
AutoCAD SHX Text
S
AutoCAD SHX Text
2-POLE 20A (MOTOR RATED) EMERGENCY SHUT OFF SWITCH, 60" AFF.
AutoCAD SHX Text
CO
AutoCAD SHX Text
CARBON MONOXIDE DETECTOR.
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ABOVE FINISHED FLOOR.
AutoCAD SHX Text
C/B
AutoCAD SHX Text
CIRCUIT BREAKER.
AutoCAD SHX Text
FLEXIBLE WIRING AND CONNECTION TO EQUIPMENT.
AutoCAD SHX Text
M
AutoCAD SHX Text
S
AutoCAD SHX Text
20A MOTOR RATED SWITCH
AutoCAD SHX Text
-
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
-
AutoCAD SHX Text
BOILER #2
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
20
AutoCAD SHX Text
POLE
AutoCAD SHX Text
PUMP P-1
AutoCAD SHX Text
3
AutoCAD SHX Text
30
AutoCAD SHX Text
TRIP
AutoCAD SHX Text
CKT
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
TRIP
AutoCAD SHX Text
20
AutoCAD SHX Text
1
AutoCAD SHX Text
POLE
AutoCAD SHX Text
CKT
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
7
AutoCAD SHX Text
5
AutoCAD SHX Text
BOILER #1
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
16
AutoCAD SHX Text
14
AutoCAD SHX Text
12
AutoCAD SHX Text
20
AutoCAD SHX Text
18
AutoCAD SHX Text
15
AutoCAD SHX Text
13
AutoCAD SHX Text
11
AutoCAD SHX Text
19
AutoCAD SHX Text
17
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
5) PROVIDE WITH TYPE WRITTEN CIRCUIT DIRECTORY REPRESENTING
AutoCAD SHX Text
CIRCUITS AS ACTUALLY CONNECTED TO PANEL.
AutoCAD SHX Text
FIXED TO PANEL WITH TWO SCREWS OR RIVETS.
AutoCAD SHX Text
3) PROVIDE WITH BLACK FACE, WHITE CORE ENGRAVED NAMEPLATE
AutoCAD SHX Text
1) PROVIDE WITH COPPER BUS BARS AND COPPER GROUND BAR.
AutoCAD SHX Text
2) PROVIDE WITH DOOR-IN-DOOR TRIM.
AutoCAD SHX Text
6) CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE.
AutoCAD SHX Text
4) PROVIDE WITH METAL FRAME, GLASS COVER CIRCUIT DIRECTORY FRAME.
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
29
AutoCAD SHX Text
23
AutoCAD SHX Text
27
AutoCAD SHX Text
25
AutoCAD SHX Text
21
AutoCAD SHX Text
30
AutoCAD SHX Text
24
AutoCAD SHX Text
28
AutoCAD SHX Text
26
AutoCAD SHX Text
22
AutoCAD SHX Text
20
AutoCAD SHX Text
1
AutoCAD SHX Text
PANEL #BR - CUTLER-HAMMER TYPE PRL2a, SURFACE, 208Y/120V,
AutoCAD SHX Text
3-PHASE, 4 WIRE, 60 AMP MAIN C/B, 10K A.I.C. MIN. (FULLY RATED)
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
1
AutoCAD SHX Text
20
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
1
AutoCAD SHX Text
20
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
VFD
AutoCAD SHX Text
DISCONNECT SWITCH.
AutoCAD SHX Text
VFD WITH INTEGRAL DISCONNECT.
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMP P-2
AutoCAD SHX Text
3
AutoCAD SHX Text
30
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMP P-3
AutoCAD SHX Text
3
AutoCAD SHX Text
20
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMP P-4
AutoCAD SHX Text
3
AutoCAD SHX Text
20
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMP P-5
AutoCAD SHX Text
3
AutoCAD SHX Text
20
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
PUMP P-6
AutoCAD SHX Text
3
AutoCAD SHX Text
20
AutoCAD SHX Text
%%UPARTIAL POWER RISER DIAGRAM
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
EXISTING PANEL "E" 208Y/120V-3Ø-4W 225A GE #NLTQ
AutoCAD SHX Text
REMOVE EXISTING BREAKER FEEDING EXISTING HOT WATER PUMPS, PROVIDE NEW 3P-60A BREAKER IN SPACE MADE AVAILABLE BY REMOVAL & CONNECT.
AutoCAD SHX Text
NEW PANEL BR 208Y/120V-3Ø-4W (SEE SCHEDULE)
AutoCAD SHX Text
NEW 60A FEEDER: 4 #6 THWN, 1 #10GND THWN IN 1" EMT.
AutoCAD SHX Text
ELECTRICAL PANEL 208Y/120V-3Ø-4W.
AutoCAD SHX Text
EMT
AutoCAD SHX Text
ELECTRICAL METALLIC CONDUIT.
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
BLANK FOR FUTURE USE
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE.
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION
Page 3: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

UP

UP

1 2 4 5 6 7 8 9 10 11 13 15 16

M

O

P

Q

EP "E"

EP "R"

024

LOUNGE/MTGRM.

001STAIR #2

002STORAGE

003BOILER RM.

006TRASH

005STORAGE 007

MAIL009

CUST. LKR

008CUST.

014PROG

015OFFICE

016KEY PUNCH

012PROG

011SECT Y

017

AUX.EQUIPMENT

022EL./MACH.

021VEST.

018

COMPUTERRM 019

STORAGE

020STAIR #1

023STORAGE

010CORRIDOR

UP

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL & ELECTRICALBASEMENT FLOOR PLAN

ME1.1

ME1.11

SCALE: 1/8" = 1'-0" ME1.11

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text
B-02
AutoCAD SHX Text
B-01
AutoCAD SHX Text
P-01
AutoCAD SHX Text
P-02
AutoCAD SHX Text
P-03
AutoCAD SHX Text
P-04
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
1 " HWS UP TO 1ST AND 2ND 12" HWS UP TO 1ST AND 2ND FLOORS EAST ZONE RADIATION
AutoCAD SHX Text
1 " HWS UP TO 1ST AND 2ND 12" HWS UP TO 1ST AND 2ND FLOORS WEST ZONE RADIATION
AutoCAD SHX Text
2" HWS UP TO 1ST AND 2ND FLOORS EAST ZONE RADIATION
AutoCAD SHX Text
1 " HWS UP TO 1ST AND 2ND 12" HWS UP TO 1ST AND 2ND FLOORS WEST ZONE RADIATION
AutoCAD SHX Text
2" HWR DOWN FROM 1ST AND 2ND FLOORS WEST ZONE RADIATION.
AutoCAD SHX Text
2"HWR DOWN FROM 1ST AND 2ND FLOORS EAST ZONE RADIATION.
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING THERMOSTAT CONTROLLING EXISTING UNIT HEATER SHALL REMAIN (typ. of 6)
AutoCAD SHX Text
DEMOLITION NOTES: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
AutoCAD SHX Text
CONNECT NEW 8" BOILER FLUE TO EXISTING 15"dia. BREECHING IN THIS AREA (typ. of 2)
AutoCAD SHX Text
NEW GAS METER INSTALLED PER LOCAL GAS COMPANY REQUIREMENTS. THIS CONTRACTOR SHALL COORDINATE WITH LOCAL GAS COMPANY PROVIDE EMERGENCY SHUT-OFF VALVE. 2 "G TO BOILERS; 2"G 12"G TO BOILERS; 2"G DROP WITH ISOLATION VALVE TO EACH BOILER
AutoCAD SHX Text
2 "G12"G
AutoCAD SHX Text
2 "G12"G
AutoCAD SHX Text
2"G
AutoCAD SHX Text
2"G
AutoCAD SHX Text
2
AutoCAD SHX Text
NEW TEMPERATURE CONTROL VALVE. INSTALL AT THIS LOCATION (ADD ALTERNATE #1)
AutoCAD SHX Text
1
AutoCAD SHX Text
MECHANICAL NEW WORK KEYED NOTES
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR HOT WATER RESET(BASE BID ONLY)
AutoCAD SHX Text
2
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR ZONE CONTROL (ADD ALTERNATE #1 ONLY)
AutoCAD SHX Text
3
AutoCAD SHX Text
DISCONNECT & REMOVE EXISTING PUMPS (P1, P2, P3 & P4) ELECTRICAL (DISCONNECTS, STARTERS & TROUGH) AND ALL ASSOCIATED OBSOLETE WIRING, CUT BACK CONDUIT TO STRUCTURE, CAP AND SECURE.
AutoCAD SHX Text
ELECTRICAL DEMOLITION KEYED NOTES
AutoCAD SHX Text
1
AutoCAD SHX Text
DISCONNECT & REMOVE EXISTING 3P-40A CIRCUIT BREAKER, MADE OBSOLETE BY REMOVAL OF EXISTING HOT WATER PUMPS.
AutoCAD SHX Text
2
AutoCAD SHX Text
B-02
AutoCAD SHX Text
B-01
AutoCAD SHX Text
P-01
AutoCAD SHX Text
P-02
AutoCAD SHX Text
P-03
AutoCAD SHX Text
P-04
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
M
AutoCAD SHX Text
CO
AutoCAD SHX Text
EO
AutoCAD SHX Text
S
AutoCAD SHX Text
M
AutoCAD SHX Text
1
AutoCAD SHX Text
BR
AutoCAD SHX Text
NEW BOILER ROOM ELECTRICAL PANEL BR (SEE SCHEDULE & RISER).
AutoCAD SHX Text
VFD
AutoCAD SHX Text
P-05
AutoCAD SHX Text
P-06
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
PROVIDE NEW CARBON MONOXIDE DETECTOR. PROVIDE WIRING, CONNECTIONS, PROGRAMMING AND MONITORING MODULE AS REQUIRED AND CONNECT TO LOCAL FIRE ALARM INITIATION CIRCUIT.
AutoCAD SHX Text
BR/1 THRU E/O
AutoCAD SHX Text
BR/3 THRU E/O
AutoCAD SHX Text
BR/5,7,9
AutoCAD SHX Text
BR/2,4,6
AutoCAD SHX Text
BR/8,10,12
AutoCAD SHX Text
BR/14,16,18
AutoCAD SHX Text
BR/20,22,24
AutoCAD SHX Text
BR/11,13,15
AutoCAD SHX Text
MECHANCIAL BASEMENT PLAN - NEW WORK
AutoCAD SHX Text
BOILER ROOM POWER PART PLAN
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION
Page 4: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

DN

DN

UP

UP

UP

1 2 4 5 6 7 8 9 10 11 13 15 16

A

N

C

J

M

O

P

Q

EP "D"

EP "C"

102

HEARINGROOM

103

SECT'YPROBATE

105VAULT 109

LOUNGE

110HEALTH

104CONF

107CUST

106MEN

108WOMEN 115

Room114

VESTIBULE

113WORK RM

112Room

111Room

116STAIR #1

117Room

119STORAGE

118Room

122OFFICE

121OFFICE

123SEWER

124

MEETINGROOM

126DIR DPW

125REC & SEC

127STORAGE

128LOCKER

129ENGINEERING

130

ASS'T DPWDIR

131

ASS'T ENGDIR

101STAIR #2

120OFFICE

108WOMEN

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL & ELECTRICAL1ST FLOOR PLAN

ME1.2

ME1.21

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text
1 " HWS UP FROM 12" HWS UP FROM BASEMENT AND 1 " HWS 14" HWS UP TO 2ND FLOOR EAST ZONE RADIATION.
AutoCAD SHX Text
1 " HWS UP FROM 12" HWS UP FROM BASEMENT AND 1 " HWS 14" HWS UP TO 2ND FLOOR WEST ZONE RADIATION.
AutoCAD SHX Text
1 " HWR DOWN FROM 2ND 12" HWR DOWN FROM 2ND FLOOR AND 2" HWR DOWN TO BASEMENT CEILING WEST ZONE RADIATIONS
AutoCAD SHX Text
2" HWR FROM 1ST AND 2ND FLOORS EAST ZONE RADIATION DOWN TO BASEMENT CEILING.
AutoCAD SHX Text
2" HWS UP FROM BELOW, AND 1 " HWS UP TO 2ND 14" HWS UP TO 2ND FLOOR EAST ZONE RADIATION.
AutoCAD SHX Text
1 " HWS UP FROM BELOW 12" HWS UP FROM BELOW AND 1 " UP TO SECOND 14" UP TO SECOND FLOOR WEST ZONE RADIATION
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
NEW TEMPERATURE CONTROL VALVE. INSTALL AT THIS LOCATION (ADD ALTERNATE #1)
AutoCAD SHX Text
1
AutoCAD SHX Text
NEW WORK KEYED NOTES
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR HOT WATER RESET(BASE BID ONLY)
AutoCAD SHX Text
2
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR ZONE CONTROL (ADD ALTERNATE #1 ONLY)
AutoCAD SHX Text
3
AutoCAD SHX Text
MECHANCIAL AND ELECTRICAL 1ST FLOOR PLAN - NEW WORK
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION
Page 5: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

DN

DN

DN

1 2 4 5 6 7 8 9 10 11 13 15 16

A

N

C

J

M

O

P

Q

162FINANCE

132ELEV

151OFFICE

150WOMEN

149MEN

147PURCHASING

140OFFICE

139OFFICE138

OFFICE

137STAIR 2

154OFFICE

142

CONFERENCEROOM

144OFFICE

153

MEETINGROOM

155

CHIEF OFSTAFF OFFICE

156RECEPT 161

WORK

157SECRETARY

158

FIRSTSELECTMAN

159CONF

133STAIR #1

134OFFICE

135OFFICE

136OFFICE

172

BUILDING/CONSERVATIONDEPARTMENT

173Room

174OFFICE

175Room

176OFFICE

177CLOS.

178CLOS.

179CLOS.

180LAV

181Room

182COPY ROOM

183

FILES &STORAGE

184OFFICE

141OFFICE

EP "B"

EP "A"

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL & ELECTRICAL2ND FLOOR PLAN

ME1.3

ME1.31

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text
1 1/4" HWS UP FROM BELOW, FLOOR EAST ZONE RADIATION.
AutoCAD SHX Text
1 1/4" HWS UP FROM BELOW FLOOR WEST ZONE RADIATION
AutoCAD SHX Text
1 " HWS DOWN 14" HWS DOWN EAST ZONE RADIATION.
AutoCAD SHX Text
1 " HWS DOWN 14" HWS DOWN WEST ZONE RADIATION.
AutoCAD SHX Text
1 " HWR DOWN TO BELOW 14" HWR DOWN TO BELOW WEST ZONE RADIATIONS
AutoCAD SHX Text
1 " DOWN TO BELOW EAST 12" DOWN TO BELOW EAST ZONE RADIATION DOWN
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
3
AutoCAD SHX Text
T
AutoCAD SHX Text
2
AutoCAD SHX Text
T
AutoCAD SHX Text
2
AutoCAD SHX Text
T
AutoCAD SHX Text
NEW TEMPERATURE CONTROL VALVE. INSTALL AT THIS LOCATION (ADD ALTERNATE #1)
AutoCAD SHX Text
1
AutoCAD SHX Text
NEW WORK KEYED NOTES
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR HOT WATER RESET(BASE BID ONLY)
AutoCAD SHX Text
2
AutoCAD SHX Text
NEW WALL MOUNTED THERMOSTAT FOR ZONE CONTROL (ADD ALTERNATE #1 ONLY)
AutoCAD SHX Text
3
AutoCAD SHX Text
MECHANCIAL AND ELECTRICAL 2ND FLOOR PLAN - NEW WORK
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION
Page 6: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

TYPICAL HOUSE KEEPING PAD DETAILCP

DO

R-1

TS-2

TS-1

TS-4AITS-5

TS-3

P-X

P-X

FV D

R-5

R-6

V DF

PS-7

PS-1

PS-8

PS-2

R-3

CS-1

R-4

CS-2

DO

AI

DO

DI DI

AI

AO

DODI

AODO

DI

AI

AI

AI

AI AI

AI

AI

PS-6

AI

PS-5

P-X

R-8

AO

DO

VF

DI

D

AODO

R-7

VF

P-X

DI

D

TS-7 AI

TS-6 AI

DI

DI

AO

AI

PS-4

AI

PS-3

TS-X

AI

AI

TS-X

DO

DO

DM-3

DM-2

TS-#

AI

TS-X

AI

TS-X

TS-XAI

CP

DO

R-1

DI

DI

AO

TS-XAI

AO

AO

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL DETAILS

M2.1

AutoCAD SHX Text
%%UTYPICAL HOT OR CHILLED WATER PIPING INSULATION
AutoCAD SHX Text
TEMPERATURES OVER 450%%DF
AutoCAD SHX Text
NOT RECOMMENDED FOR
AutoCAD SHX Text
GOLD INSERT
AutoCAD SHX Text
CLEVIS HANGER
AutoCAD SHX Text
THERMO-12
AutoCAD SHX Text
(232%%DC)
AutoCAD SHX Text
MICRO-LOC
AutoCAD SHX Text
AP-T PLUS JACKET
AutoCAD SHX Text
METAL SHIELD
AutoCAD SHX Text
WOODEN BLOCK
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UTYPICAL PIPING DETAIL FOR BASE MOUNTED PUMPS
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
6" CONCRETE PAD
AutoCAD SHX Text
PROVIDE SUCTION DIFFUSER WITH STRAINER REMOVAL CLEARANCE AND 3/4" BALL VALVE WITH HOSE END CONNECTION
AutoCAD SHX Text
PIPING FLEXIBLE CONNECTOR
AutoCAD SHX Text
NC
AutoCAD SHX Text
PROVIDE PIPING SUPPORT
AutoCAD SHX Text
PROVIDE PIPING TRANSITIONS TO TRIPLE DUTY FLOW VALVE AND SUCTION DIFFUSER AS REQUIRED
AutoCAD SHX Text
TRIPLE DUTY FLOW VALVE. REFER TO DRAWINGS FOR STRAIGHT OR ANGLE PATTERN TYPE.
AutoCAD SHX Text
MASON SUPER W PADS AND MASON ANCHOR BOLTS, TYPICAL OF 4. BOLT PUMP TO CONCRETE PAD.
AutoCAD SHX Text
BASE MOUNTED END SUCTION PUMP. PROVIDE REQUIRED SERVICE CLEARANCE FOR PUMP, VALVES AND CONTROLS.
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
REFER TO DRAWINGS FOR PIPING SIZES REQUIREMENT
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PROVIDE TRUMPET VALVE
AutoCAD SHX Text
COUPLER GUARD
AutoCAD SHX Text
CONTRACTOR SHALL FILL WITH GROUT TO THE TOP OF THE RAIL
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
%%UTYPICAL VERTICAL EXPANSION TANKS WITH AIR SEPARATOR DETAIL
AutoCAD SHX Text
LOCK-SHIELD TYPE SHUT-OFF VALVE RECOMMENDED.
AutoCAD SHX Text
DRAIN VALVE ALSO REQUIRED TO PROPERLY PRECHARGE
AutoCAD SHX Text
TANK CONNECTION LOCATIONS MAY VARY DEPENDING
AutoCAD SHX Text
ON TANK SIZE AND MODEL.
AutoCAD SHX Text
PROVIDE ANTI-THERMOSYPHON LOOP TO PREVENT
AutoCAD SHX Text
GRAVITY HEATING OF TANK. 12"MIN. DROP.
AutoCAD SHX Text
CONNECT TO SIDE OF MAIN.
AutoCAD SHX Text
AVOID TOP OR BOTTOM CONNECTION TO PREVENT
AutoCAD SHX Text
AIR OR DEBRIS FROM ENTERING PIPE TO TANK
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
PRE-CHARGING
AutoCAD SHX Text
AIR CONNECTION
AutoCAD SHX Text
PRESSURED
AutoCAD SHX Text
FROM SYSTEM
AutoCAD SHX Text
2
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
2
AutoCAD SHX Text
TANK.
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
AIR VENT
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
GAGE
AutoCAD SHX Text
NEW AIR SEPARATOR BELL & GOSSETT MODEL RL3
AutoCAD SHX Text
1
AutoCAD SHX Text
TO SYSTEM PUMPS
AutoCAD SHX Text
1
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
(REMOVE HANDLE).
AutoCAD SHX Text
NORMALLY OPEN BALL
AutoCAD SHX Text
VALVE IN VERTICAL LINE
AutoCAD SHX Text
AIR VENT
AutoCAD SHX Text
UNION IN VERTICAL LINE
AutoCAD SHX Text
AUTOMATIC
AutoCAD SHX Text
HIGH CAPACITY
AutoCAD SHX Text
COLD WATER FILL LINE
AutoCAD SHX Text
BUTTERFLY VALVE, TYP.
AutoCAD SHX Text
BALL DRAIN VALVE WITH HOSE END CONNECTION
AutoCAD SHX Text
STRAINER SERVICE CLEARANCE
AutoCAD SHX Text
BALL VALVE, NORMALLY OPEN (NO)
AutoCAD SHX Text
PIPE AUTOMATIC AIR VENT TO FLOOR DRAIN (TYP.)
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING RELOCATED EXPANSION TANK
AutoCAD SHX Text
34" CONT. CHAMFER TYP.
AutoCAD SHX Text
#5 BARS @10" O.C. BOTH WAYS.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
LIGHT BROOM FINISH
AutoCAD SHX Text
#4 BARS EPOXIED 4" INTO EXISTING SLAB AT 18" O.C. AROUND PERIMETER
AutoCAD SHX Text
BOILER 2
AutoCAD SHX Text
BOILER 1
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
LOCATE IN
AutoCAD SHX Text
LOCATION IN BUILDING
AutoCAD SHX Text
LOCATION IN BUILDING
AutoCAD SHX Text
LOCATE IN
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
HWS to EXIST. BUILDING
AutoCAD SHX Text
HWS to NEW ADDITION
AutoCAD SHX Text
HWR from EXIST. BUILDING
AutoCAD SHX Text
HWR from NEW ADDITION
AutoCAD SHX Text
%%UCOMBUSTION AIR DAMPERS CONTROL DIAGRAM
AutoCAD SHX Text
120 VAC
AutoCAD SHX Text
%%UMISC. RADIATION
AutoCAD SHX Text
HWS
AutoCAD SHX Text
RADIATION
AutoCAD SHX Text
HWR
AutoCAD SHX Text
SPACE TERMOSTAT
AutoCAD SHX Text
%%UHYDRONIC SYSTEM CONTROL DIAGRAM
AutoCAD SHX Text
INSTALL ON NORTH SIDE OF BLDG.
AutoCAD SHX Text
PROVIDE SUN SHIELD
AutoCAD SHX Text
B
AutoCAD SHX Text
AB
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
AB
AutoCAD SHX Text
A
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION
Page 7: INDEPENDENCE HALL BOILER REPLACEMENT · 2020-08-04 · 2. t對he drawings show diagrammatically the approximate location of utilities where information is the drawings show diagrammatically\ഠthe

CHRISTOPHER WILLIAMS ARCHITECTS

85 Willow Street New Haven, CT 06511203 776 0184 cwarchitectsllc.com

A

B

C

D

A

B

C

D

6 5 4 3 2 1

6 5 4 3 2 1PROJECT NAME

Ownership and use of documents:

Drawings and specifications, as instruments ofprofessional service, are and shall remain theproperty of the Architect. These documents are notto be used in whole or in part, for any other projectsor purposes, or by any other parties, than thoseproperly authorized by contract, without the specificwritten authorization of Christopher WilliamsArchitects, LLC.

STAMP DRAWING TITLE

SHEET NUMBER

PROJECT NUMBER

CONSULTANTCONSULTANTOWNER

ISSUE/REVISION

The Town of Fairfield Connecticut725 Old Post RoadFairfield CT 06824

7/16/2020 3:05:09 PM

INDEPENDENCE HALL

TOWN OF FAIRFIELD725 Old Post RoadFairfield CT 06824 2009

NO. DATE DESCRIPTION

MECHANICAL & ELECTRICALBASEMENT PART PLANS

M3.1

M3.11

NTS

AutoCAD SHX Text
HOT WATER BOILER SCHEDULE
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
INPUT MBH
AutoCAD SHX Text
OUTPUT MBH
AutoCAD SHX Text
THERMAL EFFICIENCY
AutoCAD SHX Text
EWT °F
AutoCAD SHX Text
LWT °F
AutoCAD SHX Text
MIN. / MAX WATER FLOW GPM
AutoCAD SHX Text
PRESSURE DROP
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
B-01 / B-02
AutoCAD SHX Text
BURNHAM
AutoCAD SHX Text
V906A
AutoCAD SHX Text
1010
AutoCAD SHX Text
808
AutoCAD SHX Text
80.1%
AutoCAD SHX Text
180
AutoCAD SHX Text
200
AutoCAD SHX Text
208
AutoCAD SHX Text
1
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
NOTES: 1.
AutoCAD SHX Text
BOILER BURNER SCHEDULE
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
INPUT MBH
AutoCAD SHX Text
MIN INLET GAS PRESSURE W.C
AutoCAD SHX Text
BU-01 / BU-02
AutoCAD SHX Text
POWER FLAME
AutoCAD SHX Text
JR30A-12
AutoCAD SHX Text
808
AutoCAD SHX Text
4.1"
AutoCAD SHX Text
NOTES: 1.
AutoCAD SHX Text
HOT WATER PUMP SCHEDULE
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
SERIES
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
GPM
AutoCAD SHX Text
HEAD (FT)
AutoCAD SHX Text
EFF %
AutoCAD SHX Text
IMPELLER DIA (IN)
AutoCAD SHX Text
MOTOR (HP)
AutoCAD SHX Text
BHP
AutoCAD SHX Text
RPM
AutoCAD SHX Text
VOLT/PH/HZ
AutoCAD SHX Text
WEIGHT (LBS)
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
P-01 / P-02
AutoCAD SHX Text
BELL & GOSSETT
AutoCAD SHX Text
e-1510
AutoCAD SHX Text
1.5AD-es
AutoCAD SHX Text
BASE MOUNTED END SUCTION PUMP
AutoCAD SHX Text
63.1
AutoCAD SHX Text
40
AutoCAD SHX Text
65.3
AutoCAD SHX Text
1.5
AutoCAD SHX Text
0.9650
AutoCAD SHX Text
1750
AutoCAD SHX Text
208/3/60
AutoCAD SHX Text
175
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
P-03/P-04
AutoCAD SHX Text
BELL & GOSSETT
AutoCAD SHX Text
e-1510
AutoCAD SHX Text
1.25AD
AutoCAD SHX Text
BASEMOUNTED END SUCTION PUMP
AutoCAD SHX Text
48.2000
AutoCAD SHX Text
40
AutoCAD SHX Text
60.8000
AutoCAD SHX Text
1.0000
AutoCAD SHX Text
1750
AutoCAD SHX Text
208/3/60
AutoCAD SHX Text
165
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
P-05 / P-06
AutoCAD SHX Text
BELL AND GOSSETT
AutoCAD SHX Text
PL
AutoCAD SHX Text
e-60 1.5x1.5x5.25
AutoCAD SHX Text
CIRCULATOR DRY ROTOR
AutoCAD SHX Text
53
AutoCAD SHX Text
20
AutoCAD SHX Text
60.4
AutoCAD SHX Text
-
AutoCAD SHX Text
34
AutoCAD SHX Text
-
AutoCAD SHX Text
1750
AutoCAD SHX Text
208/3/601
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
NOTES: 1. UNIT MANUFACTURER SHALL PROVIDE TRIPPLE DUTY VALVES AND SUCTION DIFFUSERSUNIT MANUFACTURER SHALL PROVIDE TRIPPLE DUTY VALVES AND SUCTION DIFFUSERS
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE SCHEDULE (add alternate #1)
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
SERVES
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
MOTOR (HP)
AutoCAD SHX Text
VOLT/PH/HZ
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
VFD-P-01 VFD-P-02
AutoCAD SHX Text
ABB
AutoCAD SHX Text
P-01 P-02
AutoCAD SHX Text
ACH 580
AutoCAD SHX Text
1.5
AutoCAD SHX Text
208/3/60
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
VFD-P-03 VFD-P-04
AutoCAD SHX Text
ABB
AutoCAD SHX Text
P-03 P-04
AutoCAD SHX Text
ACH 580
AutoCAD SHX Text
1
AutoCAD SHX Text
208/3/60
AutoCAD SHX Text
REFER TO NOTES
AutoCAD SHX Text
NOTES: 1.
AutoCAD SHX Text
AV-1
AutoCAD SHX Text
AS-2
AutoCAD SHX Text
EXISTING BACKFLOW PREVENTER
AutoCAD SHX Text
FROM COLD WATER MAIN
AutoCAD SHX Text
P
AutoCAD SHX Text
P-01
AutoCAD SHX Text
BYP
AutoCAD SHX Text
V
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
ET-2
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
P-02
AutoCAD SHX Text
BYP
AutoCAD SHX Text
V
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
B-01
AutoCAD SHX Text
B-02
AutoCAD SHX Text
CHEMICAL SHOT FEEDER.
AutoCAD SHX Text
RELIEF VALVE PIPE SIZE SHALL BE THE SAME SIZE AS OUTLET TO PRESSURE RELIEF VALVE (TYP.)
AutoCAD SHX Text
P-05
AutoCAD SHX Text
P-06
AutoCAD SHX Text
6" AFF MAX. (TYP.)
AutoCAD SHX Text
34" BALL VALVE WITH HOSE END CONNECTION AT LOW POINT OF PIPING. (TYP.)
AutoCAD SHX Text
PROVIDE SEISMIC RESTRAINS FOR EACH PIECE OF EQUIPMENT IN ACCORDANCE WITH DETAILS AND SPECIFICATION (TYP.)
AutoCAD SHX Text
6" HIGH HOUSEKEEPING PAD BOILERS.
AutoCAD SHX Text
PROVIDE CONNECTION TO BOILER IN ACCORDANCE WITH BOILER MANUFACTURER WRITTEN RECOMMENDATION. (TYP. FOR ALL PIPING)
AutoCAD SHX Text
BUTTERFLY VALVE (typ.)
AutoCAD SHX Text
2 1/2" HWS TO WEST ZONE
AutoCAD SHX Text
2 1/2" HWS TO EAST ZONE
AutoCAD SHX Text
2 1/2" HWR FROM WEST ZONE
AutoCAD SHX Text
2 1/2" HWR FROM EAST ZONE
AutoCAD SHX Text
EXISTING RELOCATED EXPANSION TANK
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NEW
AutoCAD SHX Text
NEW AIR SEPARATOR BELL & GOSSETT MODEL RL3
AutoCAD SHX Text
3" HWR
AutoCAD SHX Text
3" HWS
AutoCAD SHX Text
3" HWR
AutoCAD SHX Text
3" HWR
AutoCAD SHX Text
3" HWR
AutoCAD SHX Text
3"HWS
AutoCAD SHX Text
FILTER MODEL 'TF1' BY 'FERNOX'
AutoCAD SHX Text
P-03
AutoCAD SHX Text
BYP
AutoCAD SHX Text
V
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
P-04
AutoCAD SHX Text
BYP
AutoCAD SHX Text
V
AutoCAD SHX Text
F
AutoCAD SHX Text
D
AutoCAD SHX Text
FILTER MODEL 'TF1' BY 'FERNOX'
AutoCAD SHX Text
B
AutoCAD SHX Text
AB
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
AB
AutoCAD SHX Text
A
AutoCAD SHX Text
2" HWR
AutoCAD SHX Text
2" HWR
AutoCAD SHX Text
3" HWS
AutoCAD SHX Text
2 1/2"HWS
AutoCAD SHX Text
2 1/2"HWS
AutoCAD SHX Text
2 1/2"HWS
AutoCAD SHX Text
2 1/2"HWS
AutoCAD SHX Text
2" HWR
AutoCAD SHX Text
2" HWR
AutoCAD SHX Text
2"HWS
AutoCAD SHX Text
2"HWS
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
3"HWS
AutoCAD SHX Text
THERMOMETER (typ.)
AutoCAD SHX Text
BOILER ROOM PIPING DIAGRAM
CWilliams
Typewritten Text
1 07.24.20 FOR CONSTRUCTION