Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT Office of Aviation October 30, 2018

Transcript of Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into...

Page 1: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Incorporating GIS into the Airport Inspection Process

Adam French, MPA

Chief Airport Inspector, INDOT Office of Aviation

October 30, 2018

Page 2: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

INDOT Office of Aviation Staff• Jim Stark, Multi Modal Division Director (Aviation, Rail, Transit, Freight)

• Marty Blake, Manager

• Michael Buening, Chief Airport Engineer

• Marcus Dial, Aviation Planner

• Adam French, Chief Airport Inspector

• James Kinder, Program Manager

• Cora Nieman, Aviation Specialist

Page 3: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

INDOT Office of Aviation Functions• Aviation Engineering & Planning Assistance

• Airport Capital Improvement Planning & Grant Administration

• Airport Pavement Condition Inspections

• Tall Structure Permitting

• Noise Sensitive Permitting

• Aircraft Traffic Counting

• Airport Certification & Inspections

Page 4: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Indiana Airports - How many???

Public-Use Airports

Private-use Airports

Page 5: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Indiana Administrative Code (IAC)• 105 IAC Article 3 – Airport Operating Requirements

• Lists the minimum requirements to establish and operate a public-use airport

• Requires that each public-use airport receive an annual inspection to ensure:• 24-hr Telephone

• Operating Rules & Regulations

• Runway Markings (numbering and centerline)

• Operating Runway, Taxiway, & Wind Indicator Lights

(if open for nighttime operations)

• Crop Free Zone

• Runway Length & Width Requirements

• Runway Safety Area Clearance Requirements

• Runway Approach Clearance Requirements

Page 6: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Runway Length & Width(2,000’ x 40’ Minimum)

Page 7: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Runway Safety Area(75’ Left & Right of Centerline)

Page 8: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Runway to Taxiway(100’ Minimum)

Page 9: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Runway to Aircraft Parking(125’ Minimum)

Page 10: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Runway to Building(150’ Minimum)

Page 11: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist• Runway Approach Surface

• Width at Runway End: 150 Feet

• Width 4,000 Feet from Runway End: 350 Feet

• A clear 20:1 Approach Ratio

150’ 350’

Page 12: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Airport Inspection Checklist

Page 13: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface• Determining 20:1 Clearance

• TruPulse 360 Range Finder

• 3° Maximum Angle (≈20:1 Slope)

Page 14: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface• Determining 20:1 Clearance

• TruPulse 360 Range Finder

• 3° Maximum Angle (≈20:1 Slope)

Page 15: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Easy

Page 16: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Easy

Page 17: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Hmmm…

Page 18: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Hmmm…

Page 19: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Incorporating GISExample #1: Indianapolis

Metropolitan Airport

Page 20: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #1: Indianapolis Metropolitan Airport1. Identify each runway end’s coordinates

(latitude/longitude)

Page 21: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #1: Indianapolis Metropolitan Airport2. Create shapefile of runway end coordinates using Absolute X, Y

Page 22: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #1: Indianapolis Metropolitan Airport3. Create 2D shapefile (polyline) of Approach Surface

Page 23: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #1: Indianapolis Metropolitan Airport4. Convert Approach Surface shapefile into .KML file

Page 24: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #1: Indianapolis Metropolitan Airport5. Upload .KML file into mapping apps

Page 25: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Runway Approach Surface – Incorporating GIS

Example #2: Smith Field Airport

Page 26: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport1. Build LAS Dataset using the State’s LiDAR data

Smith Field Airport

Page 27: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport2. Examine LAS Dataset Profile View

Page 28: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport2. Examine LAS Dataset Profile View

Page 29: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport2. Examine LAS Dataset Profile View

Page 30: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport• Determining 20:1 Clearance

• Distance from End of Runway / 20 = Maximum Allowable Object Height

Page 31: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Model)

Page 32: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Model)

Page 33: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Model)

Page 34: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Moel)

Page 35: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Moel)

Page 36: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Moel)

Page 37: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Moel)

Page 38: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

Example #2: Smith Field Airport (3D Model)

Page 39: Incorporating GIS into the Airport Inspection Process Day Presentation... · Incorporating GIS into the Airport Inspection Process Adam French, MPA Chief Airport Inspector, INDOT

THANK YOU!!!CONTACT

Adam French – INDOT Office of Aviation

(317) 232-1477

[email protected]

www.aviation.indot.in.gov