InCom WG 151(part II) (55.00 EUR) (198.00 EUR)...14 InCom WG 151(part II) (55.00 EUR) ‘Design of...

3
14 InCom WG 151(part II) (55.00 EUR) ‘Design of Lock Gates under Seismic Actions’ MarCom WG 152 (82.00 EUR) ‘Guidelines for Cruise Terminals’ RecCom WG 149 (Part II) (108.00 EUR) ‘Guidelines for Marina Design – part II’ MarCom WG 153 (195.00 EUR) ‘Recommendations for the Design and Assessment of Marine Oil and Petrochemical Terminals’ InCom WG 139 (198.00 EUR) ‘Values for Inland Waterways’ RecCom WG 149 (Part I) (52.00 EUR) ‘Guidelines for Marina Design – part I’ PUBLISHED IN 2016

Transcript of InCom WG 151(part II) (55.00 EUR) (198.00 EUR)...14 InCom WG 151(part II) (55.00 EUR) ‘Design of...

Page 1: InCom WG 151(part II) (55.00 EUR) (198.00 EUR)...14 InCom WG 151(part II) (55.00 EUR) ‘Design of Lock Gates under Seismic Actions’ MarCom WG 152 (82.00 EUR)‘Guidelines for Cruise

14

InCom WG 151(part II) (55.00 EUR)‘Design of Lock Gates under Seismic Actions’

MarCom WG 152 (82.00 EUR)‘Guidelines for Cruise Terminals’

RecCom WG 149 (Part II) (108.00 EUR)‘Guidelines for Marina Design – part II’

MarCom WG 153 (195.00 EUR)‘Recommendations for the Design and Assessment

of Marine Oil and Petrochemical Terminals’

InCom WG 139 (198.00 EUR)‘Values for Inland Waterways’

RecCom WG 149 (Part I) (52.00 EUR)‘Guidelines for Marina Design – part I’

PUBLISHED IN 2016

Page 2: InCom WG 151(part II) (55.00 EUR) (198.00 EUR)...14 InCom WG 151(part II) (55.00 EUR) ‘Design of Lock Gates under Seismic Actions’ MarCom WG 152 (82.00 EUR)‘Guidelines for Cruise

15

MarCom WG 172 (100.00 EUR)‘Design of Small to Mid-Scale Marine LNG Terminals including Bunkering’

MarCom WG 196 (195.00 EUR)‘Criteria for the Selection of Breakwater Types

and their Related Optimum Safety Levels’

YEARBOOK 2015

MarCom WG 162 (110.00 EUR)‘Recommendations for Increased Durability and

Service Life of New Marine Concrete Infrastructure’

Page 3: InCom WG 151(part II) (55.00 EUR) (198.00 EUR)...14 InCom WG 151(part II) (55.00 EUR) ‘Design of Lock Gates under Seismic Actions’ MarCom WG 152 (82.00 EUR)‘Guidelines for Cruise

16

All the PIANC Working Group Reports are available for free

for PIANC members on the Members Only site

Non-members of PIANC can purchase the PIANC Working Group Reports via:

http://www.pianc.org/technicalreportsbrowseall.php

TOP 10 Downloaded by PIANC Members

Yearbook 2013

1

2

3

4

5

6

7

8

9

10

419388380367348292285276218214

MarCom

RecCom

MarCom

RecCom

MarCom

InCom

MarCom

MarCom

MarCom

InCom

WG 152

WG 149/II

WG 153

WG 149/I

WG 144

WG 139

WG 172

WG 121

WG 196

WG 151/II

Guidelines for Cruise Terminals

Guidelines for Marina Design – Part II

Recommendations for the Design and Assessment of Marine Oil and Petrochemical Terminals

Guidelines for Marina Design – Part I

Classification of Soils and Rocks for the Maritime Dredging Process

Values for Inland Waterways

Design of Small to Mid-Scale Marine LNG Terminals including Bunkering

Harbour Approach Channels Design Guidelines

Criteria for the Selection of Breakwater Types and their Related Optimum Safety Levels

Design of Lock Gates under Seismic Actions

TOP 10 Bestsellers

1

2

3

4

5

6

7

8

9

10

MarCom

MarCom

RecCom

RecCom

RecCom

MarCom

MarCom

MarCom

MarCom

RecCom

Harbour Approach Channels Design Guidelines

Guidelines for Cruise Terminals

Guidelines for Marina Design – Part I

Guidelines for Marina Design – Part II

Catalogue of Prefabricated Marina Elements

Recommendations for the Design and Assessment of Marine Oil and Petrochemical Terminals

Guidelines for the Design of Fenders Systems: 2002

Floating Breakwaters – A Practical Guide for Design and Construction

Design and Maintenance of Container Terminal Pavements

Design and Operational Guidelines for Super Yacht Facilities

181818181614121110

8

WG 121

WG 152

WG 149/I

WG 149/II

WG 131

WG 153

WG 33

WG 13

WG 165

WG 134