    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    Inception Report

    The undersigned visited the ATS meadows, Dera Bassi Punjab, site on 16thNov.

    201., the visit was assisted b! "r. Nimrat Pa# Singh, Senior "anager$Pur%hase &

    Pro%urement ATS 'rou(. )o##owings are the *indings o* the same.

    Des%ri(tion o* s%heme+ Designed *or 0 -D based on "BB/

    Ph!si%a# observation

    o#or o* water B#a%ish gra! (#ease re*er to Photo gra(h3

    Sme## T!(i%a# o* sewer Putre*a%tion

    indi%ation ess o* o4!gen in treatment

  • 8/12/2019 Inception Report ATS

    2/8

    2

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    Location Finings Impact Remey !Action Status

    Bar s%reen+ 1. 5n P#a%es Ni# Not reuired

    Sum( 2. 5n (#a%e

    . Si7e 2.89 2.8 e**e%tive

    de(th 1. "

    8. a(a%it! :.68 u "

    euiva#ent to more than

    20 "in.

    ;4%eeding

    reuirement

    Not reuired

    < & ' tra( . 5n P#a%e

    Rev. -0 `date 19-11-2013

  • 8/12/2019 Inception Report ATS

    3/8

    3

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    ;ua#i7ation

    Tan

    6. 5n P#a%e

    =. Si7e.6.098.0 9 8.0 "0. " *ree board3 or

    >6 -

    :. ?/T @ 6.: ?r *or 0

    -D *#ow rate

    >. "i4ing B! Air

    10. Pum( 2 Nos.

    11.

  • 8/12/2019 Inception Report ATS

    4/8

    4

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    Aeration

    Tan

    1. 5n P#a%e

    16. Si7e 6.098.0 9 8.0 "0. " *ree board3 or

    >6 -

    1=. ?/T @ 6.: ?r.*or 0

    -D *#ow rate

    hambers+ Sing#e

    1:. Air B#owers 2 Nos.

    1>.

  • 8/12/2019 Inception Report ATS

    5/8

    5

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    %a#%u#ated as No dwg.

    was avai#ab#e at the

    site.

    28. 5t is evident in

    Photogra(h Bubb#e si7e

    are bigger than 0. mm

    2. Air transmitting #ine is

    over heated

    in%reasing the tem(.

    ith (resent s!stem

    -ajd. nitrogen remova#

    is a tough (ro(osition

    a%hieve reuired

    Nitri*i%ation

    $denitri*i%ationin (resent

    aeration tan

    on#!.

    Tubesett#er

    26. 5n (#a%e

    2=. Si7e . 9 .0 9 2.0

    "

    2:. S#udge re%!%#ing is

    missing

    Si7e "eeting thereuirement

    annot maintain

    reuired "SS during

    o(eration

    No a%tionreuired.

  • 8/12/2019 Inception Report ATS

    6/8

    6

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    h#orine

    ontra%t

    Tan

    2>. 5n P#a%e

    0. Si7e 2. 9 2. 9 2..0

    " 0. " *ree board3

    or 1.62 -

    1. ?/T @ 1.0= ?r.*or 0-D *#ow rate

    2. h#orine & dosing

    s!stem is missing

    Tan "eeting the

    reuirement but no

    %h#orine thus no

    disin*e%tion %an

    %reate havo%

    No disin*e%tion

    at (resent thus

    need immediate

    %orre%tion

    needed

    Rev. -0 `date 19-11-2013

  • 8/12/2019 Inception Report ATS

    7/8

    7

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    S#udge

    hand#ing

    . )i#ter bags are

    (rovided.

    Does not meet the

    norms

    Need s#udge

    dr!ing bed.

    S#udge dr!ing

    beds with 1. 9

    1. 9 2 in three

    no are reuired

    )i#tration 8. Sand & A) does not

    have (ressure 'uage

    . )i#tration (um(s

    Thus having ver! #ess

    re#iabi#it! o*

    o(eration

    Dosed not mat%h the

    reuired *#ow rates

    Pressure gauge

    needs to *itted

    Pro(er (um(s

    are reuired

    meeting

    *o##owing 18.6

    -Chr 2 m

    head.

    Rev. -0 `date 19-11-2013

  • 8/12/2019 Inception Report ATS

    8/8

    8

    Inception Report of Sewage Treatment facility at ATS projects At Dera

    Bassi, Punjab

    2013

    As seen and ana#!7ed b!

    Dinar Sa4ena

    Chartered Engineer (India); M/128465/1M.I.E., C. Eng., FIPHE, PGDM,E.M.. !"dit#r (IEM!, $.%.)

    Rev. -0 `date 19-11-2013