CDP Reporting Workshop Istanbul, 27 February 2010 Presentation by: Alicia Ayars
IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith,...
-
Upload
kelsi-coppage -
Category
Documents
-
view
213 -
download
1
Transcript of IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith,...
IN GOD’S HANDSSERVICE CAMP
2013Attended by
Ruth, Barb, Carrie, Gilda, Patty, MarthaKarl, Keith, Paul R., Ayars
Parker, Kevin, James, Hunterand Chaplain, Jane
JUNE 17 -21, 2013
“Let each of youLook not to your
own interests,But to the interests
of others.”
GOOD FELLOWSHIP ROOMSince it was raining at 8:00 AM, plans were
discussed early Monday morning
Mr. & Mrs. Curtiss’ Home
Build a handicapped ramp & deckReplace the rotten boards on the shed
Paint the new boards on the shedPaint the windows
Paint the cinder blocks around the house
The Curtiss’ home before we began
Karl scraped the siding before it needed to be painted.
Gilda paints
Carrie mostly paints the building
Meanwhile, the fellas are working on the old steps.
Ruth and Carrie give the shed a coat of paint.
Lunch break with Jane bringing us the message.
Posts were set in concrete and made level.
James supervises the mixing of the concrete.
Painters clean up the brushes, but not themselves.
Karl replaces the trim on the shed.
Building the supports for the deck and ramp
Putting the decking down
Keith and James creating the ramp
James testing out the deck while Gilda and others watch.
Carrie painting the foundation
Ruth found it necessary to trim the bushes before painting the foundation.
Karl & Kevin measuring to replace boards.
Putting the decking down.
Using their feet to hold boards in place
Parker & Keith setting the rest of the ramp.
Getting ready to put on the railings
Ruth, Kevin, & Martha finishing the ramp.
The decks and ramps finished.
Parker & Keith measure for the railings
Gilda painting under the eaves
Cutting the boards to fit properly
Ayars making adjustments underneath the deck
Creating the steps that go toward Mr. Curtiss’ workshop
Sue Anne dropped by for a visit
Ms. Mayflower’s Home
Gutters on the back of her house
Covered the eaves on the porch we built two years ago
Placed flex hoses and splash guards
Materials ready for the other site
Kevin takes a nap while waiting for the homeowner.
Gutters put up and drain pipes set in place
Work began at the second site
Kevin and Karl placing the gutters
Flex hoses are attached to the downspouts
Splash guards are placed on others.
Finished job
A visit to the Charles City dump to get rid of our site trash
Project finished
In front of the newly painted shed
Ms. Brown’s house
August 22, 23, & 25 & 30
Ruth AdamsKevin Cornelius
Keith FuhrmeisterAyars Lore
Martha Martin
Two full days & two part days
Remove everything from her enclosed porch.Pull out the flooring.
Replace the floor joists.Cleaned the furniture, including freezer
Repair the washer connectionsReplace the sub-floor & floorRepair & replace ceiling tiles
“Hand me one of
those…..”
Measuring and setting the joists
for the floor.
Tools ready to be used in repairing the
floor.
Ruth standing next to a recently
cleaned door.
Painting the Education Wing
September 3 – 4 – 5Take everything off the walls of the hall
Paint the entire hall, including doorway trimsPaint Primary Classroom
Paint Mary Minter ClassroomPaint lower half of Good Fellowship Room
Replace switch plates overall
Karl prepares the hall to be painted.
Painting the hall
Finishing touches and clean-up
THANK YOU
CONGREGATION FOR THE FUNDINGPAINTERS:
Ruth Adams Marian Davis Paul Davis Karl Dydak
Ayars Lore Barbara LoreMartha Martin