IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

11

description

HORIZONTAL AND VERTICAL INTEGRATION PERSPECTIVES IN ICZM ADMINISTRATION MODELS : SMAP III GOKOVA EXAMPLE 29- 30 JUNE 2009 SMAPIII REGIONAL SEMINAR MARSEILLES Prof. Dr. Atila Yücel SMAPIII Gokova Project Coordinator. IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: - PowerPoint PPT Presentation

Transcript of IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

Page 1: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS
Page 2: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

HORIZONTAL AND VERTICAL INTEGRATION PERSPECTIVES IN ICZM ADMINISTRATION MODELS :

SMAP III GOKOVA EXAMPLE 29- 30 JUNE 2009

SMAPIII REGIONAL SEMINAR

MARSEILLES

• Prof. Dr. Atila Yücel

SMAPIII Gokova Project Coordinator

Page 3: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION:

-IS A VITAL ELEMENT FOR SUCCESS

-IS A PLANNED ACTIVITY

-SHOULD BE CAREFULLY STRUCTURED IN THE PROJECT PROPOSAL

-ALL LEVELS SHOULD BE INCLUDED AS PARTNERS OF THE PROJECT

-PROJECT SHOULD BE MANAGED WITH INTEGRATION IN MIND

INTEGRATION IN MANAGEMENT MODELS INTEGRATION IN MANAGEMENT MODELS

Page 4: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

SETTING FOR INTEGRATION

-During the execution of the Gokova Project an Advisory Committee made of a larger participation of offices of the partners plus all the local stakeholders was operational. This Advisory Committee met every month to discuss a specific problematic issue of the region. Altogether 27 meetings were held throughout the Project. This Committee formed a good basis for horizontal integration.

.

Page 5: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

SETTING FOR INTEGRATION

-However there was no means for a vertical integration. With the change in management of the Project an Executive Board was formed consisting of the high level representatives of the Partners namely Muğla Governorate (one vice governor), Ula Sub- Governorate (the sub-governor himself), Akyaka Mayorship (the Mayor himself) and EPASA representative (vice director of Koycegiz office). This Board held meetings almost every week to discuss and review the technical findings and administrative issues related to the region. The results were reported to higher levels periodically.

Page 6: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

SETTING FOR INTEGRATION

• These two seperate levels of Boards helped considerably in reaching satisfactory levels of commitments and both vertical and horizontal integration for implementation of the ICZM and Action Plan.

Page 7: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

HORIZONTAL INTEGRATION IN GOKOVA ICZM ADMINISTRATION MODEL

HORIZONTAL INTEGRATION IN GOKOVA ICZM ADMINISTRATION MODEL

LOCAL STAKEHOLDERSAKYAKA

MUNICIPALITY

SUB-GOVERNORATEOF ULA

Page 8: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

.

VERTICAL INTEGRATIONVERTICAL INTEGRATION

MINISTRY OF THE ENVIRONMENT

MUĞLAGOVERNORATE

NATIONAL LEVEL

REGIONAL LEVEL

LOCAL LEVELSUB-GOVERNORATE

OF ULA

ENVIRONMENT PROTECTIONAGENCY forSPECIAL AREAS

Page 9: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

ADMINISTRATION MODEL FOR GOKOVAADMINISTRATION MODEL FOR GOKOVA

MINISTRY OF ENVIRONMENTLOCAL ENVIRONMENT BOARD

(HEADED BY MUĞLA GOVERNOR)

PROVINCIAL LEVEL (REGIONAL)

ULA ICZM ADMINISTRATIVE BOARD(HEADED BY ULA SUBGOVERNOR)

DISTRICT LEVEL (LOCAL)

ULA SUBGOVERNOREXECUTION OF DECISIONS

Page 10: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

PRESENT STATUS

• ICZMA Plan has been presented to partners and local stakeholders.

• In order to start the implementation of the Plan financial means must be enabled.

• As stated in the ICZMA Plan a new legislation is needed to be able to initiate a budget.

• New projects and sources are needed to finance the implementation process.

Page 11: IN ANY MANAGEMENT MODEL, VERTICAL AND HORIZONTAL INTEGRATION: -IS A VITAL ELEMENT FOR SUCCESS

THANKS FOR LISTENING