State Fiscal Year 2019 Cumulative External project payments (see detail report) 18,679,348.33 $ 25,676,325.68 $ Donor county distribution 17,620,764.45 $ 34,643,476.97 $ Total Infrastructure Maintenance Trust Fund disbursements 36,300,112.78 $ 60,319,802.65 $ Infrastructure Maintenance Trust Fund Disbursements Through September 30, 2018 The following is an overview of external project payments of the Infrastructure Maintenance Trust Fund by county along with project name, description, type and route. The "posting date" refers to the date the disbursement was recorded in the South Carolina State's accounting system (SCEIS). As required by SC Code Section 12-28-2740 (H), this annual distribution is paid to the donor counties who contribute to the County Transportation Program an amount in excess of what it receives under the allocation formula under subsection (A) to the total excess of all donor counties.

Transcript of IMTF Statement September 30, 2018

Page 1: IMTF Statement September 30, 2018

State Fiscal Year 2019 Cumulative

External project payments (see detail report) 18,679,348.33$ 25,676,325.68$

Donor county distribution 17,620,764.45$ 34,643,476.97$

Total Infrastructure Maintenance Trust Fund disbursements 36,300,112.78$ 60,319,802.65$

Infrastructure Maintenance Trust FundDisbursements Through

September 30, 2018

The following is an overview of external project payments of the Infrastructure Maintenance Trust Fund by county along with project name, description, type and route. The "posting date" refers to the date the

disbursement was recorded in the South Carolina State's accounting system (SCEIS).

As required by SC Code Section 12-28-2740 (H), this annual distribution is paid to the donor counties who contribute to the County Transportation Program an amount in excess of what it receives under the allocation formula under subsection (A) to the total excess of all donor counties.

Page 2: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor AmountAbbevilleP0368832018 Federal Aid Secondary Pavement ProgramFederal Aid Preservation in Abbeville County ‐ S‐ 114Preservation

2018‐08‐08 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 12,789.502018‐09‐17 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 65,526.18

P036883 Total 78,315.68

Abbeville Total 78,315.68

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

Page 1 of 38

Page 3: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

AikenP0325122018 Non‐Interstate NHS ProgramFederal Aid Rehabilitation in Aiken County ‐ SC 19, US 1Rehabilitation

2018‐08‐03 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 2,658.952018‐08‐21 Payment to Road & Bridge Contractors ATC SITE CONSTRUCTION LLC 78,353.04

P032512 Total 81,011.99

P0325302018 Federal Aid Secondary ProgramRehab in Aiken County ‐ S‐ 120, S‐ 1230, S‐ 1506, S‐ 177, S‐ 182, S‐ 197, S‐ 3, S‐ 406, S‐ 511, S‐ 567, S‐ 79Rehabilitation

2018‐08‐03 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 1,447.20P032530 Total 1,447.20

P037068US 1 Safety Improvements in Aiken CountySafety Improvements from Mile Point 19.0 to Mile Point 28.7 ‐ US 1Safety Improvement

2018‐06‐30 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 108,316.002018‐08‐16 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 5,133.25

P037068 Total 113,449.25

Aiken Total 195,908.44

Page 2 of 38

Page 4: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

AndersonP032566Non‐NHS Primary Pavement ProgramPreventative Maintenance in Anderson County ‐ SC 81, US 178Rehabilitation

2018‐09‐17 Payment to Road & Bridge Contractors ROGERS GROUP INC 42,538.01P032566 Total 42,538.01

P0368222018 Non‐Interstate NHS Preservation ProgramSCDOT Federal Aid Preservation in Anderson County ‐ US 76Preservation

2018‐03‐15 Engineering & Architectural Services DAVIS & FLOYD INC 427.622018‐07‐23 Payment to Road & Bridge Contractors KING ASPHALT INC 42,044.502018‐08‐21 Payment to Road & Bridge Contractors KING ASPHALT INC 589,804.392018‐09‐18 Payment to Road & Bridge Contractors KING ASPHALT INC 72,902.08

P036822 Total 705,178.59

P0368852018 Federal Aid Secondary Preservation ProgramFederal Aid Preservation in Anderson County ‐ S‐ 34Preservation

2018‐07‐23 Payment to Road & Bridge Contractors KING ASPHALT INC 125,176.222018‐08‐21 Payment to Road & Bridge Contractors KING ASPHALT INC 225,862.062018‐09‐18 Payment to Road & Bridge Contractors KING ASPHALT INC 6,889.00

P036885 Total 357,927.28

Anderson Total 1,105,643.88

Page 3 of 38

Page 5: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

Anderson, OconeeP037078SC 24 Safety Improvements in Oconee and Anderson CountiesSafety Improvements from US 76 (E. Main St.) to near SC 243 (Highway 243) ‐ SC 24Safety Improvement

2018‐05‐14 Printing, Binding, Advertising UPSTATE NEWSPAPER INC 41.102018‐06‐11 Engineering & Architectural Services INDEPENDENT MAPPING CONSULTANTS INC 36,077.172018‐07‐20 Engineering & Architectural Services GPI GEOSPATIAL INC 3,579.112018‐07‐26 Engineering & Architectural Services GPI GEOSPATIAL INC 4,033.252018‐09‐19 Engineering & Architectural Services GPI GEOSPATIAL INC 11,272.52

P037078 Total 55,003.15

Anderson, Oconee Total 55,003.15

Page 4 of 38

Page 6: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

BerkeleyP0322962018 Secondary Pavement Improvement ProgramNon‐Federal Aid Resurfacing in Berkeley County ‐ S‐ 317, S‐ 339, S‐ 403, S‐ 485, S‐ 495, S‐ 50, S‐ 748, S‐ 810Rehabilitation

2018‐06‐26 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 871,189.832018‐06‐30 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 473,472.952018‐08‐17 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 27,307.352018‐09‐24 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 157,834.94

P032296 Total 1,529,805.07

P0336682018 Federal Aid Secondary ProgramFederal Aid Reconstruction/Rehabilitation in Berkeley County ‐ S‐ 59Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 38,033.332018‐08‐13 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 201,770.612018‐09‐21 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 4,016.67

P033668 Total 243,820.61

P0347062018 Non‐ NHS Primary ProgramFederal Aid Reconstruction/Rehabilitation in Berkeley County ‐ SC 402Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 38,033.342018‐08‐13 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 36,900.012018‐09‐21 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 4,016.67

P034706 Total 78,950.02

P037071US 17 Alt Safety Project in Berkeley CountySafety Improvements from near SC 402 to near L‐665 (Coggeshall Rd) ‐ US 17 ALTSafety Improvement

2018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 15,867.042018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 6,837.342018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 10,316.302018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (10,316.30)

P037071 Total 22,704.38

Page 5 of 38

Page 7: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

P037072SC 6 Safety Improvements in Berkeley CountySafety Improvements from near S‐59 (County Line Rd.) to near L‐2901 (Mikey Rd.) ‐ SC 6Safety Improvement

2018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 16,181.242018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 6,972.722018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 10,520.582018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (10,520.58)

P037072 Total 23,153.96

P0371542018 Non‐Interstate NHS Preservation ProgramPreservation in Berkeley County ‐ Crack Seal ‐ US 52Preservation

2018‐06‐26 Highway Maintenance Contracts REMAC  INC 37,859.40P037154 Total 37,859.40

Berkeley Total 1,936,293.44

Page 6 of 38

Page 8: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

CharlestonP0347242018 NHS Secondary ProgramFederal Aid Reconstruction/Rehabilitation in Charleston County ‐ S‐ 13Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 135,808.212018‐08‐13 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 709,543.002018‐09‐21 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 91,754.31

P034724 Total 937,105.52

P0371552018 Non‐Interstate NHS Preservation ProgramPreservation in Charleston County ‐ Crack Seal ‐ SC 61, SC 7Preservation

2018‐06‐26 Highway Maintenance Contracts REMAC  INC 23,854.50P037155 Total 23,854.50

Charleston Total 960,960.02

Page 7 of 38

Page 9: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

CherokeeP037082US 29 Safety Improvements in Cherokee CountySafety Improvements from Spartanburg/Cherokee County Line to near S‐307 (Morgan Dr.) ‐ US 29Safety Improvement

2018‐05‐14 Printing, Binding, Advertising THE CHEROKEE CHRONICLE INC 41.502018‐05‐14 Printing, Binding, Advertising THE GAFFNEY LEDGER INC 68.252018‐05‐31 Printing, Binding, Advertising HERALD‐JOURNAL 76.792018‐06‐11 Engineering & Architectural Services INDEPENDENT MAPPING CONSULTANTS INC 25,458.912018‐07‐20 Engineering & Architectural Services GPI GEOSPATIAL INC 3,207.072018‐07‐26 Engineering & Architectural Services GPI GEOSPATIAL INC 3,053.252018‐09‐19 Engineering & Architectural Services GPI GEOSPATIAL INC 24,504.26

P037082 Total 56,410.03

Cherokee Total 56,410.03

Page 8 of 38

Page 10: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

ChesterfieldP0323242018 Non‐Federal Aid ProgramNon‐Federal Aid Resurfacing in Chesterfield County ‐ S‐ 103, S‐ 105, S‐ 136, S‐ 274, S‐ 601, S‐ 68Resurfacing

2018‐09‐20 Payment to Road & Bridge Contractors LYNCHES RIVER CONTRACTING INC 1,108,429.152018‐09‐30 Payment to Road & Bridge Contractors Pmt Rd & Brdg Contr 371,999.62

P032324 Total 1,480,428.77

P0324842018 Federal Aid Secondary Preservation ProgramSCDOT Preservation in Chesterfield County ‐ S‐ 600Preservation

2018‐06‐30 Payment to Road & Bridge Contractors LITTLEFIELD CONSTRUCTION COMPANY 45,796.262018‐09‐20 Payment to Road & Bridge Contractors LITTLEFIELD CONSTRUCTION COMPANY 52,741.99

P032484 Total 98,538.25

Chesterfield Total 1,578,967.02

Page 9 of 38

Page 11: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

Chesterfield, LancasterP037085SC 9 Safety Improvements in Lancaster and Chesterfield CountiesSafety Improvements from near S‐36 (Potter Rd.) to near US 601 (Highway 601 S.) ‐ SC 9Safety Improvement

2018‐06‐27 Printing, Binding, Advertising THE LANCASTER NEWS 220.152018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 37,051.132018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 23,305.77

P037085 Total 60,577.05

Chesterfield, Lancaster Total 60,577.05

Page 10 of 38

Page 12: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

ColletonP037079SC 64 Safety Improvements in Colleton CountySafety Improvements from near S‐598 (Henry St.) to US 17 (Ace Basin Pkwy.) ‐ SC 64Safety Improvement

2018‐05‐14 Printing, Binding, Advertising WALTERBORO NEWSPAPERS INC 20.252018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 32,739.152018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 20,593.46

P037079 Total 53,352.86

P037081SC 303 Safety Improvements in Colleton CountySafety Improvements from US 17 (Ace Basin Pkwy.) to near S‐59 (Rivers St.) ‐ SC 303Safety Improvement

2018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 18,380.632018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 7,920.472018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 11,950.562018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (11,950.56)

P037081 Total 26,301.10

Colleton Total 79,653.96

Page 11 of 38

Page 13: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

DarlingtonP032400Non‐Interstate NHS Primary  Pavement Improvement ProgramFederal Aid FHWA Preventative Maintenance in Darlington County ‐ SC 34Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors CR JACKSON INC 28,489.502018‐08‐09 Payment to Road & Bridge Contractors CR JACKSON INC 22,530.50

P032400 Total 51,020.00

P033579FA Secondary Pavement Improvement ProgramFederal Aid FHWA Preventative Maintenance in Darlington County ‐ S‐ 23Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors CR JACKSON INC 152,339.642018‐08‐09 Payment to Road & Bridge Contractors CR JACKSON INC 711,497.702018‐09‐07 Engineering & Architectural Services RS&H, INC. 5,418.502018‐09‐18 Engineering & Architectural Services RS&H, INC. 10,739.772018‐09‐20 Payment to Road & Bridge Contractors CR JACKSON INC 100,279.22

P033579 Total 980,274.83

Darlington Total 1,031,294.83

Page 12 of 38

Page 14: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

DillonP032401Non‐Interstate NHS Primary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Dillon County ‐ SC 38Rehabilitation

2018‐09‐26 Payment to Road & Bridge Contractors PALMETTO CORP 77,350.00P032401 Total 77,350.00

P0336232018 Non‐Interstate NHS Preservation ProgramPreservation in Dillon County ‐ SC 38Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 41,658.37P033623 Total 41,658.37

P0336312018 Non‐NHS Primary Preservation ProgramPreservation in Dillon County ‐ SC 41Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 188,322.95P033631 Total 188,322.95

P033580FA Secondary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Dillon County ‐ S‐ 130, S‐ 39, S‐ 78Rehabilitation

2018‐09‐26 Payment to Road & Bridge Contractors PALMETTO CORP 600,638.45P033580 Total 600,638.45

P0336392018 Federal Aid Secondary Preservation ProgramPreservation in Dillon County ‐ S‐ 48Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 186,478.71P033639 Total 186,478.71

Dillon Total 1,094,448.48

Page 13 of 38

Page 15: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

DorchesterP0323012018 Non‐Federal Aid ProgramNon‐Federal Aid Resurfacing in Dorchester County ‐ S‐ 155, S‐ 186, S‐ 188, S‐ 197, S‐ 208, S‐ 357Rehabilitation

2018‐06‐26 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 349,516.492018‐06‐30 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 526,492.412018‐08‐17 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 193,209.352018‐09‐24 Payment to Road & Bridge Contractors SANDERS BROTHERS CONST CO INC 41,091.78

P032301 Total 1,110,310.03

P037073US 17 Alt Safety Improvements in Dorchester CountySafety Improvements from Colleton/Dorchester County Line to near L‐163 (Summers Dr.) ‐ US 17 ALTSafety Improvement

2018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 14,296.042018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 6,160.372018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 9,294.882018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (9,294.88)

P037073 Total 20,456.41

Dorchester Total 1,130,766.44

Page 14 of 38

Page 16: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

EdgefieldP0319962017 Primary Improvement Program (Edgefield US 25)Primary Improvements in Edgefield County ‐ US 25Rehabilitation

2018‐08‐15 Payment to Road & Bridge Contractors ATC SITE CONSTRUCTION LLC 46,351.132018‐08‐23 Payment to Road & Bridge Contractors Pmt Rd & Brdg Contr 28,670.57

P031996 Total 75,021.70

P0368822018 Federal Aid Secondary Pavement  ProgramFederal Aid Preservation in Edgefield County ‐ S‐ 35Preservation

2018‐08‐08 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 13,265.502018‐09‐17 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 87,798.48

P036882 Total 101,063.98

Edgefield Total 176,085.68

Page 15 of 38

Page 17: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

GeorgetownP037080US 17 Safety Improvements in Georgetown CountySafety Improvements from near S‐832 (Marina Dr.) to near S‐759 (Waterford Rd.) ‐ US 17Safety Improvement

2018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 11,625.352018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 5,009.532018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 7,558.482018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (7,558.48)

P037080 Total 16,634.88

Georgetown Total 16,634.88

Page 16 of 38

Page 18: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

GreenvilleP032233Non‐Interstate NHS Pavement ProgramNHS Preventative Maintenance in Greenville County ‐ SC 183, US 123, US 25, US 29Rehabilitation

2018‐04‐11 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 302,229.702018‐05‐18 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 1,065,783.252018‐06‐30 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 111,207.202018‐09‐10 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 42,000.00

P032233 Total 1,521,220.15

P0323522018 Non‐NHS Primary Program (Greenville US 25)Rehab in Greenville County ‐ US 25Rehabilitation

2018‐06‐30 Contractual Agreements with Gov't/Non‐Profit Entity CONTR‐GOVT/NONPRFIT 0.002018‐06‐30 Contractual Agreements with Gov't/Non‐Profit Entity DEPT OF PUBLIC SAFETY 1,556.502018‐08‐08 Payment to Road & Bridge Contractors ROGERS GROUP INC 232,971.712018‐09‐10 Payment to Road & Bridge Contractors ROGERS GROUP INC 802,447.56

P032352 Total 1,036,975.77

P032568FA Secondary Pavement ProgramPreventative Maintenance in Greenville County ‐ S‐ 149Rehabilitation

2018‐08‐23 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 327,153.832018‐09‐10 Payment to Road & Bridge Contractors SLOAN CONSTRUCTION 248,226.26

P032568 Total 575,380.09

P037074US 25 Safety Improvements in Greenville CountySafety Improvements from near L‐346 (Belvue School Rd.) to North Carolina State Line ‐ US 25Safety Improvement

2018‐05‐14 Printing, Binding, Advertising COMMUNITY JOURNALS LLC 46.802018‐06‐11 Engineering & Architectural Services INDEPENDENT MAPPING CONSULTANTS INC 29,142.802018‐07‐20 Engineering & Architectural Services GPI GEOSPATIAL INC 3,263.192018‐07‐26 Engineering & Architectural Services GPI GEOSPATIAL INC 3,474.142018‐09‐19 Engineering & Architectural Services GPI GEOSPATIAL INC 34,596.50

P037074 Total 70,523.43

Greenville Total 3,204,099.44

Page 17 of 38

Page 19: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

GreenwoodP0303772017 Federal Aid Primary Program2017 Federal Aid Rehabilitation in Greenwood County ‐ US 221Rehabilitation

2018‐06‐18 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 332,133.00P030377 Total 332,133.00

Greenwood Total 332,133.00

Page 18 of 38

Page 20: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

HorryP037075US 701 Safety Improvements in Horry CountySafety Improvements from the Georgetown/Horry County Line to near L‐435 (Copperhead Rd.) ‐ US 701Safety Improvement

2018‐04‐13 Printing, Binding, Advertising THE HORRY INDEPENDENT 49.502018‐05‐14 Printing, Binding, Advertising WACCAMAW PUBLISHERS 49.502018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 16,181.242018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 6,972.722018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 10,520.582018‐08‐20 Printing, Binding, Advertising THE SUN NEWS 146.892018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (10,520.58)

P037075 Total 23,399.85

P037084SC 90 Safety Improvements in Horry CountySafety Improvements from near SC 22 (Highway 22) to near SC 31 Connector (Robert Edge Pkwy.) ‐ SC 90Safety Improvement

2018‐05‐14 Printing, Binding, Advertising NORTH MYRTLE BEACH TIMES 96.002018‐06‐06 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 11,468.252018‐06‐30 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 4,941.832018‐07‐26 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC 7,456.332018‐08‐20 Printing, Binding, Advertising THE SUN NEWS 142.542018‐08‐29 Engineering & Architectural Services MA ENGINEERING CONSULTANTS INC (7,456.33)

P037084 Total 16,648.62

Horry Total 40,048.47

Page 19 of 38

Page 21: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

JasperP0317462017 Statewide NHS Program (Jasper US 321)Rehabilitation in Jasper Couty ‐ US 321Rehabilitation

2018‐04‐13 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 234,830.502018‐05‐17 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 155,508.502018‐07‐19 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 349,638.842018‐08‐01 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 55,782.542018‐09‐20 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 730,655.41

P031746 Total 1,526,415.79

P037076US 321 Safety Improvements in Jasper CountySafety Improvements from near US 17 (Whyte Hardee Blvd.) to near the Jasper/Hampton County Line ‐ US 321Safety Improvement

2018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 2,874.662018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 1,808.21

P037076 Total 4,682.87

P0371582018 Non‐NHS Primary Preservation Program Preservation in Jasper County ‐ Crack Seal ‐ US 17Preservation

2018‐06‐26 Highway Maintenance Contracts REMAC  INC 50,838.30P037158 Total 50,838.30

P030260I‐95 SB over Bagshaw SwampBridge Replacement I‐95 over Bagshaw SwampBridge Replacement

2018‐08‐10 Printing, Binding, Advertising JASPER CNTY SUN 49.202018‐08‐14 Printing, Binding, Advertising JASPER CNTY SUN 48.602018‐08‐15 Engineering & Architectural Services INFRASTRUCTURE CONSULTING & 1,800.732018‐09‐20 Engineering & Architectural Services INFRASTRUCTURE CONSULTING & 4,247.09

P030260 Total 6,145.62

Jasper Total 1,588,082.58

Page 20 of 38

Page 22: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

KershawP0336772018 Non‐NHS Primary Program2018  Kershaw Primary Rehab ‐ SC 261Rehabilitation

2018‐09‐06 Payment to Road & Bridge Contractors CR JACKSON INC 27,650.01P033677 Total 27,650.01

P0367772018 Federal Aid Secondary ProgramFederal Aid Secondary Preservation in Kershaw County ‐ S‐ 87Preservation

2018‐08‐15 Payment to Road & Bridge Contractors EVERETT DYKES GRASSING CO INC 66,670.642018‐09‐20 Payment to Road & Bridge Contractors EVERETT DYKES GRASSING CO INC 19,984.59

P036777 Total 86,655.23

P0336782018 Federal Ad Secondary Program2018  Kershaw Secondary Rehab ‐ S‐ 15, S‐ 217, S‐ 542Rehabilitation

2018‐09‐06 Payment to Road & Bridge Contractors CR JACKSON INC 28,169.75P033678 Total 28,169.75

Kershaw Total 142,474.99

Page 21 of 38

Page 23: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

Kershaw, SumterP037062US 521 Safety Improvements in Sumter and Kershaw CountySafety Improvements from near L‐1025 (Brabham Drive) to near SC 2611 (Boykin Rd.) ‐ US 521Safety Improvement

2018‐05‐14 Printing, Binding, Advertising CHRONICLE INDEPENDENT 245.702018‐05‐14 Printing, Binding, Advertising OSTEEN PUBLISHING COMPANY 77.202018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 20,282.302018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 12,757.90

P037062 Total 33,363.10

Kershaw, Sumter Total 33,363.10

Page 22 of 38

Page 24: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

LancasterP0324862018 Federal Aid Secondary Preservation ProgramSCDOT Preservation in Lancaster County ‐ S‐ 755Preservation

2018‐06‐30 Payment to Road & Bridge Contractors LITTLEFIELD CONSTRUCTION COMPANY 18,195.862018‐09‐20 Payment to Road & Bridge Contractors LITTLEFIELD CONSTRUCTION COMPANY 34,100.13

P032486 Total 52,295.99

Lancaster Total 52,295.99

Page 23 of 38

Page 25: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

LaurensP037083US 221 Safety Improvements in Laurens CountySafety Improvements from Greenwood / Laurens County Line to near SC 39 (Highway 39) ‐ US 221Safety Improvement

2018‐05‐14 Printing, Binding, Advertising ADVERTISER PRINTING CO INC 132.002018‐06‐11 Engineering & Architectural Services INDEPENDENT MAPPING CONSULTANTS INC 19,836.892018‐07‐20 Engineering & Architectural Services GPI GEOSPATIAL INC 3,207.072018‐07‐26 Engineering & Architectural Services GPI GEOSPATIAL INC 5,383.212018‐09‐19 Engineering & Architectural Services GPI GEOSPATIAL INC 13,804.34

P037083 Total 42,363.51

Laurens Total 42,363.51

Page 24 of 38

Page 26: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

LeeP0336812018 Non‐NHS Primary ProgramNon‐NHS Rehabilitation in Lee County ‐ SC 441, SC 527Rehabilitation

2018‐09‐06 Payment to Road & Bridge Contractors CR JACKSON INC 39,010.00P033681 Total 39,010.00

P0336822018 Federal Aid Secondary Program2018  Lee Secondary Rehab ‐ S‐ 28Rehabilitation

2018‐09‐06 Payment to Road & Bridge Contractors CR JACKSON INC 26,468.75P033682 Total 26,468.75

P0367812018 Non‐NHS Primary Preservation ProgramSCDOT Federal Aid Preservation in Lee County ‐ US 76Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 367,323.74P036781 Total 367,323.74

P0367822018 Federal Aid Secondary Preservation ProgramSCDOT Federal Aid Preservation in Lee County ‐ S‐ 111Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 98,832.47P036782 Total 98,832.47

Lee Total 531,634.96

Page 25 of 38

Page 27: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

LexingtonP037070SC 302 Safety Improvements in Lexington CountySafety Improvements from MP 0.0 to MP 14.9 ‐ SC 302Safety Improvement

2018‐08‐21 Payment to Road & Bridge Contractors ATC SITE CONSTRUCTION LLC 186,657.00P037070 Total 186,657.00

Lexington Total 186,657.00

Page 26 of 38

Page 28: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

MarionP0336432018 Federal Aid Secondary Preservation ProgramPreservation in Marion County ‐ S‐ 25Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 173,795.90P033643 Total 173,795.90

P0336352018 Non‐NHS Primary Preservation ProgramPreservation in Marion County ‐ SC 41, US 501 BUSPreservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 209,005.25P033635 Total 209,005.25

P032405Non‐Interstate NHS Primary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Marion County ‐ US 501Rehabilitation

2018‐09‐26 Payment to Road & Bridge Contractors PALMETTO CORP 79,248.40P032405 Total 79,248.40

P0336272018 Non‐Interstate NHS Preservation ProgramPreservation in Marion County ‐ US 76Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 37,830.41P033627 Total 37,830.41

P033584Federal Aid Secondary Pavement  ProgramFederal Aid FHWA Preventative Maintenance in Marion County ‐ S‐ 19Rehabilitation

2018‐09‐26 Payment to Road & Bridge Contractors PALMETTO CORP 611,612.84P033584 Total 611,612.84

Marion Total 1,111,492.80

Page 27 of 38

Page 29: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

MarlboroP032406Non‐Interstate NHS Primary ProgramFederal Aid FHWA Preventative Maintenance in Marlboro County ‐ SC 38Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors CR JACKSON INC 27,937.502018‐08‐09 Payment to Road & Bridge Contractors CR JACKSON INC 23,945.002018‐09‐07 Engineering & Architectural Services RS&H, INC. 309.36

P032406 Total 52,191.86

P033585Federal Aid Secondary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Marlboro County ‐ S‐ 50Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors CR JACKSON INC 27,937.502018‐08‐09 Payment to Road & Bridge Contractors CR JACKSON INC 529,663.672018‐09‐07 Engineering & Architectural Services RS&H, INC. 262.002018‐09‐18 Engineering & Architectural Services RS&H, INC. 5,686.52

P033585 Total 563,549.69

Marlboro Total 615,741.55

Page 28 of 38

Page 30: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

McCormickP0367962018 Federal Aid Secondary Preservation ProgramSCDOT Federal Aid Preservation in McCormick County ‐ S‐ 22Preservation

2018‐08‐08 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 13,265.502018‐09‐17 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 16,470.00

P036796 Total 29,735.50

McCormick Total 29,735.50

Page 29 of 38

Page 31: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

NewberryP032456Non‐NHS Primary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Newberry County ‐ US 176Rehabilitation

2018‐05‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 230,454.392018‐06‐12 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 61,384.512018‐06‐18 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 5,775.212018‐06‐30 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 2,520.002018‐08‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 22,000.002018‐08‐30 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 1,763.92

P032456 Total 323,898.03

P0368272018 Federal Aid Secondary Preservation ProgramSCDOT Federal Aid Preservation in Newberry County ‐ S‐ 28Preservation

2018‐08‐08 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 13,469.502018‐09‐17 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 90,838.35

P036827 Total 104,307.85

Newberry Total 428,205.88

Page 30 of 38

Page 32: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

OconeeP032308Non‐Interstate NHS Pavement ProgramNHS FHWA Preventative Maintenance in Oconee County ‐ US 76Rehabilitation

2018‐08‐10 Payment to Road & Bridge Contractors KING ASPHALT INC 294,356.232018‐09‐20 Payment to Road & Bridge Contractors KING ASPHALT INC 751,379.00

P032308 Total 1,045,735.23

P032415Non‐Interstate NHS Pavement ProgramFederal Aid FHWA Preventative Maintenance in Oconee County ‐ US 123Rehabilitation

2018‐08‐10 Payment to Road & Bridge Contractors KING ASPHALT INC 142,091.742018‐09‐20 Payment to Road & Bridge Contractors KING ASPHALT INC 382,800.25

P032415 Total 524,891.99

Oconee Total 1,570,627.22

Page 31 of 38

Page 33: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

OrangeburgP0304862017 NHS Federal Aid Primary Program (Orangeburg US 78)2017 NHS Federal Aid Rehabilitation in Orangeburg County ‐ US 78Resurfacing

2018‐06‐30 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 425,565.88P030486 Total 425,565.88

P0320572017 State Funded Primary Improvement Program (Orangeburg SC 4)Primary Improvement (Safety) in Orangeburg County ‐ SC 4Rehabilitation

2018‐07‐19 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 1,023,106.302018‐08‐10 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 81,394.41

P032057 Total 1,104,500.71

P0368162018 Non‐NHS Primary Program (Orangeburg SC 4)Rehab in Orangeburg County ‐ SC 3 BUS, SC 4Rehabilitation

2018‐09‐21 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 55,977.51P036816 Total 55,977.51

Orangeburg Total 1,586,044.10

Page 32 of 38

Page 34: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

PickensP032416Non‐Interstate NHS Pavement ProgramFederal Aid FHWA Preventative Maintenance in Pickens County ‐ US 123Rehabilitation

2018‐06‐30 Payment to Road & Bridge Contractors KING ASPHALT INC 157,057.102018‐08‐06 Payment to Road & Bridge Contractors KING ASPHALT INC 12,500.00

P032416 Total 169,557.10

P0325002018 Federal Aid Secondary ProgramFederal Aid Secondary Reconstruction in Pickens County ‐ S‐ 160Reconstruction

2018‐09‐06 Payment to Road & Bridge Contractors KING ASPHALT INC 41,128.00P032500 Total 41,128.00

Pickens Total 210,685.10

Page 33 of 38

Page 35: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

RichlandP0367692018 Non‐Interstate NHS Preservation ProgramPreservation in Richland County ‐ US 1, US 21 CONPreservation

2018‐08‐27 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 73,068.012018‐09‐24 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 41,560.34

P036769 Total 114,628.35

P0367702018 Non‐NHS Primary Preservation ProgramSCDOT Preservation in Richland County ‐ SC 12Preservation

2018‐08‐27 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 88,309.122018‐09‐24 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 34,629.54

P036770 Total 122,938.66

P036809US 76 Safety Improvements in Richland CountySafety Improvements from near SC 769 (Congaree Rd.) to near US 601 (McCord's Ferry Rd.) ‐ US 76Safety Improvement

2018‐05‐14 Printing, Binding, Advertising OSTEEN PUBLISHING COMPANY 79.102018‐05‐18 Printing, Binding, Advertising THE STATE NEWSPAPER 556.072018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 41,388.672018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 26,034.14

P036809 Total 68,057.98

P0367712018 Federal Aid Secondary Preservation ProgramSCDOT Federal Aid Preservation in Richland County ‐ S‐ 129, S‐ 217Preservation

2018‐08‐27 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 73,067.982018‐09‐24 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 241,705.28

P036771 Total 314,773.26

Richland Total 620,398.25

Page 34 of 38

Page 36: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

SaludaP031956Non‐NHS Primary Pavement  Program (Saluda SC 121)Federal Aid FHWA Preventative Maintenance in Saluda County ‐ SC 121Rehabilitation

2018‐05‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 60,500.002018‐06‐12 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 50,000.002018‐06‐30 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 7,775.632018‐08‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 1,106,829.122018‐08‐29 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 9,462.172018‐08‐30 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 1,015.922018‐09‐06 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 64,926.89

P031956 Total 1,300,509.73

P032503Non‐NHS Primary Pavement ProgramFederal Aid FHWA Preventative Maintenance in Saluda County. ‐ SC 121Rehabilitation

2018‐05‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 60,500.012018‐06‐12 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 85,120.012018‐06‐30 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 26,632.252018‐08‐14 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 63,995.002018‐08‐29 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 6,199.432018‐08‐30 Engineering & Architectural Services MICHAEL BAKER INTERNATIONAL INC 9,711.412018‐09‐06 Payment to Road & Bridge Contractors SATTERFIELD CONSTRUCTION CO INC 16,388.25

P032503 Total 268,546.36

Saluda Total 1,569,056.09

Page 35 of 38

Page 37: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

SumterP0367782018 Non‐Interstate NHS Preservation Program (Sumter US 76)NHS Preservation in Sumter County/ Rural Safety Rte ‐ US 76Preservation

2018‐06‐30 Payment to Road & Bridge Contractors LYNCHES RIVER CONTRACTING INC 357,882.772018‐08‐08 Payment to Road & Bridge Contractors LYNCHES RIVER CONTRACTING INC 626,096.392018‐09‐10 Payment to Road & Bridge Contractors LYNCHES RIVER CONTRACTING INC 56,196.19

P036778 Total 1,040,175.35

P0367792018 Non‐Interstate NHS Preservation ProgramSCDOT Preservation in Sumter County ‐ US 378Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 309,713.71P036779 Total 309,713.71

P036852US 76 ‐ Safety Improvements in Sumter CountySafety Improvement from MP 0.000 (Richland County Line) to approx. MP 7.8 near SC 441 ‐ US 76Safety Improvement

2018‐05‐14 Printing, Binding, Advertising OSTEEN PUBLISHING COMPANY 79.102018‐05‐14 Printing, Binding, Advertising SHAW NEWS 322.202018‐07‐16 Engineering & Architectural Services QUANTUM SPATIAL INC 25,367.252018‐08‐22 Engineering & Architectural Services QUANTUM SPATIAL INC 15,956.42

P036852 Total 41,724.97

P0367802018 Federal Aid Secondary ProgramSCDOT Federal Aid Preservation in Sumter County ‐ S‐ 1074Preservation

2018‐09‐18 Payment to Road & Bridge Contractors CR JACKSON INC 245,823.79P036780 Total 245,823.79

Sumter Total 1,637,437.82

Page 36 of 38

Page 38: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

YorkP0324762018 Non‐Interstate NHS Preservation ProgramSCDOT Federal Aid Preservation in York County ‐ SC 161Preservation

2018‐09‐27 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 112,414.15P032476 Total 112,414.15

P037077SC 72 Safety Improvements in York CountySafety Improvements from the Chester/York County Line to near SC 324 (Highway 324 E.) ‐ SC 72Safety Improvement

2018‐06‐11 Engineering & Architectural Services INDEPENDENT MAPPING CONSULTANTS INC 19,430.892018‐07‐20 Engineering & Architectural Services GPI GEOSPATIAL INC 2,016.112018‐07‐26 Engineering & Architectural Services GPI GEOSPATIAL INC 3,226.802018‐09‐19 Engineering & Architectural Services GPI GEOSPATIAL INC 37,743.79

P037077 Total 62,417.59

P0324812018 Non‐Interstate NHS  Preservation ProgramSCDOT Preservation in York County ‐ SC 161, SC 322Preservation

2018‐09‐27 Payment to Road & Bridge Contractors THE LANE CONSTRUCTION CORPORATION 361,864.55P032481 Total 361,864.55

York Total 536,696.29

Page 37 of 38

Page 39: IMTF Statement September 30, 2018

County & Project Description Posting Date Expense Description Vendor Amount

Infrastructure Maintenance Trust FundCumulative Project Spending through September 30, 2018

Multi‐CountyP0371832019 Pavement Program ‐ Preliminary EngineeringProject for the preparation of plans for Non‐Interstate pavement programs.Administration

2018‐05‐09 Engineering & Architectural Services HDR ENGINEERING INC OF THE CAROLI 14,120.632018‐06‐15 Engineering & Architectural Services HDR ENGINEERING INC OF THE CAROLI 12,939.032018‐08‐03 Engineering & Architectural Services HDR ENGINEERING INC OF THE CAROLI 11,477.332018‐08‐10 Engineering & Architectural Services HDR ENGINEERING INC OF THE CAROLI 11,552.07

P037183 Total 50,089.06

Multi‐County Total 50,089.06Grand Total 25,676,325.68