PERFORMANCE OPTIMISATION
Improving controller effectiveness and operational productivity
– OBJECTIVES –
Introduction to a tool for
benchmarking control
performance from an operational
perspective
Show by case studies the areas that
we are finding to be weak across
the mining sector
Complete a quick exercise
to benchmark ourselves
as a group against the standard
WILL THE CHANGING ROLE OF OPERATORS MAKE CONTROL ROOM MANAGEMENT EASIER?
– –
[Photo courtesy BHP Billiton]
Measurement of control room performance may become harder as the traditional role of the operator changes
Whole ofSystem Remit
LessActive Control Predictive
Responsibilities
Process Control Optimisers
WILL THE CHANGING ROLE OF OPERATORS MAKE CONTROL ROOM MANAGEMENT EASIER?– TRENDS –
SENSORS
DATA INTEGRATION
DATA ANALYTICS
MATHEMATICS& ALGORITHMS
PREDICTIVE CAPABILITIES
4 ELEMENTS TO THE IMPRES CONTROL ROOM DIAGNOSTIC– DIAGNOSTIC –
Diagnostics process can rapidly identify hidden value
GOVERNANCE
DAILY PROCESSES FOCUS– DIAGNOSTIC –
Operating tactics are a large gap across most organisations
WHY FOCUS ON THE DAILY PROCESSES
Forefront of execution
High frequency of small – medium productivity decisions
Disconnection within the hierarchy
Highest impact on immediate productivity
• Diagnostic
MAJOR MINERCASE STUDY
APPROACH
4 WEEKSduration
19 PEOPLEengaged
4 CREWSengaged
GATHER &ANALYSE DATA
• Production data• Radio data• Email data• Leave data• Alarm data• Evidence to support findings
from interviews
COMPLETE DIAGNOSTIC
• Utilising ImpRes Control Room Diagnostic Tool
• Summarise findings• Rate maturity of individual
elements
PREPARE &DELIVER REPORT
• Summarise findings• Summarise improvement
ideas• Prioritise improvement
ideas• Present to key stakeholders
INTERVIEW INDIVIDUALS
• Location Controllers• Location Control
Leadership
CASE STUDY: MAJOR MINER
HIGH LEVEL OUTCOME FROM REVIEW
A score of 100% is Best Practice, a score of 50% is Average Practice and a score of 0% is very poor practice
Overall, the “Client” Control scored 59% which is just above Average Practice
At the Theme level, the “Client” Control has reasonably strong Systems (72%) however is only average for Governance and Processes (both 52%)
• Plans Reviewed• Operating Tactics & KPIs• Escalation Criteria• Disturbances & Interruptions• Field Communication
• Duties & Accountabilities• Clear Strategy
GOVERNANCE
• Performance Management• Current Attitude• Current Knowledge
• Alarm Management• Automation• CCTV• Software Speed
DAILY PROCESSES
SYSTEMS
PEOPLE
CASE STUDY: MAJOR MINER
• Other Communication• Logs• Trends• Improvement Plans• Handovers
• Oversight and Support• Workload Balance
• Current Relationships• Training Content• Training Assessment
• Location• Feel• HMI• Redundancy
HIGHER IN:• Systems
This is a common result across the industry…… … leading to significant opportunity to improve!
LOWER IN:• Governance• Daily Processes• People
DETAILED SUMMARY CASE STUDY: MAJOR MINER
MATURITY LEVEL 0 (SCORE 0)
• Large variation in how the CROs control the plant
• Large time periods sub-optimised• No tactics documented or reviewed• No Visual Management System (Dashboard)
MATURITY LEVEL 2 (SCORE 2)
• Visual Management System (Dashboard) exists with SMART KPIs
• Common operating tactics for major deviations, frequent bottlenecks and optimising tactics exists
• Common operating tactics are frequently reviewed by all CROs
• Common operating tactics are part of the CRO competency training
• Consistent feedback to CROs re: conformance to common operating tactics provided
MATURITY LEVEL 1 (SCORE 1)
• Some common operating tactics documented but likely not reviewed or followed
• Visual Management System (Dashboard) exists but is not effective
• Some tactics included as part of competency training
• Some feedback to CROs on conformance to tactics
THEME:DAILYPROCESSES
SUB-ELEMENT:OPERATINGTACTICS & KPIs
CASE STUDY: MAJOR MINER
0 75%25% 50%
INITAILLYHERE
38%
IMPROVEDTO
51%
DETAILED OUTPUT EXAMPLE: DAILY PROCESSES (OPERATING TACTICS & KPIS)
No operating tactics documented and when queried verbally got multiple different responses
KPIs are tracked at the Level 3 Visual Information Centre but Controllers don’t participate
No real-time dashboards
CRO operational often dictated to by the Site Supervisor
DETAILED OUTPUT EXAMPLE: DAILY PROCESSES (OPERATING TACTICS & KPIS) CASE STUDY: MAJOR MINER
“I don’t know”
HOW DO YOU KNOW IF YOUHAD A GOOD SHIFT?
“Each circuit achieved +100kt”
“I feel energised, happy and cheery & haven’t made any
mistakes”“dumped lots of trains”
DETAILED OUTPUT EXAMPLE: SYSTEMS (ALARM MANAGEMENT)
MATURITY LEVEL 0 (SCORE 0)
• Alarm system not used by Controllers• Alarm count is out of control• No alarm standard/philosophy exists
MATURITY LEVEL 2 (SCORE 2)
• Alarm system used frequently and effectively• Process in place to maintain alarm system• Alarm standard/philosophy exists and is
followed• Alarms below ANSI/ISA- 18.2-2009 limits
MATURITY LEVEL 1 (SCORE 1)
• Alarm standard/philosophy exists but is not followed
• Attempts are made to maintain alarm level• Alarm system used by Controllers on occasions
THEME:SYSTEMS
SUB-ELEMENT:ALARMMANAGEMENT
0 75%25% 50%
INITAILLYHERE
13%
IMPROVEDTO
55%
CASE STUDY: MAJOR MINER
DETAILED OUTPUT EXAMPLE: SYSTEMS (ALARM MANAGEMENT)
Inload Controller receives 9,000+ alarms per day and Outload Controller receives 4,000+ alarms per day
80% of alarms are generated by the Top 20% of alarms for Inload and Top 4% of alarms for Outload
Pages are not configured for Controller role
Alarm page not permanently displayed and hence rarely used
Alarm pages show all alarms rather than just the alarms that need an action
There are no audible alarms for critical alarms such as production trips
Alarm descriptions are vague and cant be easily interpreted by the Controllers
CASE STUDY: MAJOR MINER
improvement opportunities identified and scoped…
… TURNING THE IMPROVEMENT OPPORTUNITIES INTO RESULTSREF OPPORTUNITY PRIORITY
G1 Update & Circulate Port Controller Position Description JDIG2 Develop a Control Room Operator SWI for Standard Tasks PlanG3 Develop & Embed a Port Operating Strategy/Philosophy ExecuteG4 Develop Suite of SMART KPIs & Cascade PlanG5 Relocate Breakdown Process Control Engineers to IOC PlanG6 Review & Adjust Port Control Headcount PlanPr1 Develop Real-time Dashboard with Trends & TARPs ExecutePr2 Improve Email Management ExecutePr3 Automate Manual Data Entry ExecutePr4 Automate Generation of all A+ Delays ExecutePr5 Automate Generation of A+ Rate Losses & Trigger from PV not SP ExecutePr6 Automate Classification of A+ Train Change Over Delays PlanPr7 Implement an Electronic Shift Log PlanPr8 Develop and Embed a Continuous Improvement Tool/Process PlanPr9 Develop & Embed a Live Schedule Viewer Tool Plan
Pr10 Implement a Team Pre-Start Meeting ExecutePe1 Develop & Embed Training Material & Assessment PlanPe2 Develop a Standard Training Plan ExecutePe3 Build Formal Trainer/Assessor Capability in the Team PlanPe4 Develop and Embed a Training Simulator PlanPe5 Incorporate a Training Program that is Nationally Recognised PlanPe6 Increase Availability of Lunch Breaks PlanS1 Alarm Rationalisation and Sustaining Process PlanS2 Refresh the IOC Business Continuity Plan and Roll Out ExecuteS3 Improve Usability of HMI PlanS4 Automation of Stacker/Reclaimer Relocations ExecuteS5 Configure Dedicated Cimplicity Licenses for Port Control JDI
2712improvement projects completed
(including the dash-boarding)
CASE STUDY: MAJOR MINER
• Diagnostic
MID TIER MINERCASE STUDY
GAP 1 – GOVERNANCE; ALIGNMENT TO STRATEGY
KEY FINDINGS
Attitude and behaviours showed poor understanding
and alignment with organisational goals
“Drive it like I stole it”
“Kept in the dark”
CASE STUDY: MID-TIER MINER
Defined the principals of operation
Locked in improvement plans against the principles
Cascaded metrics and strategy…
THREE ALIGMENT ACTIONS CASE STUDY: MID-TIER MINER
TRANSPARENCY
UTILISING CONSTRAINTS
MINIMISING ERRORS
REDUCED VARIATION PLANNING PARAMETERS
IN SPEC
IMPROVEMENT PLANS
PRODUCTIVITY
GAP 2+ – DAILY PROCESSES
KEY FINDINGS
– Insufficient information to plan the shift
– Tactics did not exist – Maintenance consistently
used as excuse for poor performance
– KPIs not reflective of role– Trends not effectively utilised– Constraints not managed
“I’m old school”
“Maintenance problem”
CASE STUDY: MID-TIER MINER
Insufficient information to plan the shift
Tactics did not exist
Maintenance consistently used as excuse for poor performance
KPIs not reflective of role
Trends not effectively utilised
Constraints not managed
5 ACTIONS TO IMPROVE DAILY PROCESSES CASE STUDY: MID-TIER MINER
Shift to shift variation
Long periods sub optimised (holding them back)
49%
OF THE TIME AT SELF IMPOSED
“TARGET”
Control Room Workflow
5:30
-6:3
0AM
16:3
0-17
:30
17:3
0-18
:30
6:30
-7:3
018
:30-
19:3
08:
30-1
6:30
7:30
-8:3
0
Future State
Legend
Control Room Handover
Informal Meeting
Standing Instructions
Daily Instructions from Mets
Communication Whiteboard
SOPs
6:30 Control Room Tactics Meeting
Control Room Handover
Operating plan developed
Control room log
Operating plan confirmed
Operating plan adjusted
Plant data
Plant data
Plant data
CRO
CRO
CROMets
Control room log
Communication Whiteboard
Operating plan developed Plant dataCRO
Control Room Briefing
Operating plan confirmed
Plant dataCRO
Document
Data
Decision
5:30 Supervisors Meeting
Equipment StatusPlanned Maint.
ResourcesOperational Plan
Supervisor, Coordinator
6:00 Production Tool Box
7:30 Cross-function plan review
Formal Meeting
Standing Instructions
SOPs
17:30 Supervisors Meeting
Briefing information
18:00 Tool Box
Supervisor
Adhoc plan adjustments Plant dataCRO
Informal interactions with
mets and supervisors
Trend Reviews
Data Analysis
Mets
Mets
Immediate information
for CROSupervisor
Documented plan
TrendsParametersOre Types
6:00 Met Toolbox
-Breakdowns and containment-Planned Maintenance-Plant operational is sues
Trend Reviews Mets Mets
Downtime analysis
SupervisorInformal interaction
with supervisor
Plan adjustments
17:00 Control Room Tactics Review
Documented plan
Immediate information
for CRO
-Breakdowns and containment-Planned Maintenance-Plant operational is sues
Supervisor
Mets
Supervisor, Mets
Control Room Sphere
IMPROVEMENT PROJECTS
UTILISING CONSTRAINTS
MINIMISING ERRORS
REDUCED VARIATION
PLANNING
PARAMETERS IN SPEC 1. Information
converge to CRO
4. Constraint tracking
2. Tactics meetings
3. Trends revamp
5. SOPs and Response Plans
HARD WIRING TACTICS DEVELOPMENT INTO THEIR DAY…Control Room Workflow
5:30
-8:0
0AM
16:3
0-17
:30
17:3
0-18
:30
8:00
-9:0
018
:30-
19:3
09:
00-1
6:30
Current State
Control Room Handover
Standing Instructions
Daily Instructions from Mets
Communication Whiteboard
SOPs
Control Room Briefing
Control Room Handover
Operating plan developed
Control room log
Operating plan confirmed
Operating plan adjusted
Plant data
Plant data
Plant data
CRO
CRO
Control room log
Communication Whiteboard Operating plan
developed Plant data
CRO
Control Room Briefing
Operating plan confirmed Plant data
CRO
CRO
5:30 Supervisors Meeting
Briefing information
Supervisor
6:00 Tool Box
7:30 Downtime Review
Standing Instructions
SOPs
17:30 Supervisors Meeting
Briefing information
Supervisor
18:00 Tool Box
Adhoc plan adjustments Plant data
Informal interactions with
mets and supervisors
Trend Reviews
Data Analysis
Immediate information
for CRO
Legend
Informal Meeting
Document
Data
Decision
Formal Meeting
Control Room Workflow
5:30
-6:3
0AM
16:3
0-17
:30
17:3
0-18
:30
6:30
-7:3
018
:30-
19:3
08:
30-1
6:30
7:30
-8:3
0
Future State
Legend
Control Room Handover
Informal Meeting
Standing Instructions
Daily Instructions from Mets
Communication Whiteboard
SOPs
6:30 Control Room Tactics Meeting
Control Room Handover
Operating plan developed
Control room log
Operating plan confirmed
Operating plan adjusted
Plant data
Plant data
Plant data
CRO
CRO
CROMets
Control room log
Communication Whiteboard
Operating plan developed Plant dataCRO
Control Room Briefing
Operating plan confirmed
Plant dataCRO
Document
Data
Decision
5:30 Supervisors Meeting
Equipment StatusPlanned Maint.
ResourcesOperational Plan
Supervisor, Coordinator
6:00 Production Tool Box
7:30 Cross-function plan review
Formal Meeting
Standing Instructions
SOPs
17:30 Supervisors Meeting
Briefing information
18:00 Tool Box
Supervisor
Adhoc plan adjustments Plant dataCRO
Informal interactions with
mets and supervisors
Trend Reviews
Data Analysis
Mets
Mets
Immediate information
for CROSupervisor
Documented plan
TrendsParametersOre Types
6:00 Met Toolbox
-Breakdowns and containment-Planned Maintenance-Plant operational issues
Trend Reviews Mets Mets
Downtime analysis
Supervisor Informal interaction with supervisor
Plan adjustments
17:00 Control Room Tactics Review
Documented plan
Immediate information
for CRO
-Breakdowns and containment-Planned Maintenance-Plant operational issues
Supervisor
Mets
Supervisor, Mets
Control Room Sphere
TACTICSREVIEW
DOCUMENTED TACTICS
CURRENT STATE FUTURE STATE
Converged information to the key
action taker
CASE STUDY: MID TIER MINER
CASE STUDY: MID TIER MINER TARA STILL TO DO SLIDE
PROVIDING THE TOOLS & INFORMATIONTO DEVELOP ROBUST TACTICS…
TACTICS ARE THE PLANNED ACTIONS THAT WILL EXECUTE THE STRATEGY CONSIDERING ALL
THE INPUTS
TACTICSWhat actions
we are going to take to execute the strategy?
FEED TYPESEQUIPMENT
STATUS
PARAMETERS
OPERATIONAL PLANS
PLANNED MAINTENANCE
CONSTRAINTS
RESOURCES4 field operators
off sick?
Shovel digging next to ore boundary?
Filter breakdown, thickener sliming?
Conc grade high, cyclone pressures are low and HPGRs are skewing?
Emptying tanks?HPGR shutdown commencing 6am?
Tailings disposal preventing us from adding
more tonnes?
FORUM TO CONVERGE INFORMATION... CASE STUDY: MID TIER MINER
Traceability
Collaborative and promote peer learning
Closing the loop through real time feedback and conformance measures
TIME
IMPA
CT
TACTICS COMMUNICATION MININUM VIABLE PRODUCT
SOFTWARE BASED TACTICSWITH TOUCH SCREEN
WHAT are the conditions / issues / requirements?
TACTICSHow should we
operate the plant?
PARKING LOTKeep issues that don’t require
tactics in the parking lot to reduce noise
OUTCOMES CASE STUDY: MID-TIER MINER
MEAN TIMEbetween major tonnage drops
18% 22%
Average dailyTHROUGHPUT RATEper operating hour
• Diagnostic
BENCHMARKAGAINST OUR “TACTICS”
WHERE ARE YOU?
Open group map via this address
Think about your control room or if you don’t usually work in one as your day job then think about the last control room you have intimate knowledge of.
Enter a score for each of the questions.
Fill it out over lunch and we’ll keep the aggregated score on the board.
– WHAT ARE WE GOING TO DO? –
BENCHMARK56
– ABOUT US –
+61 (8) 9325 [email protected]
REACH OUTWE’D LOVE TO HEAR FROM YOU!
THANKYOU
+61 (8) 6161 [email protected]
WANTMORE INFORMATION?