Item Unit 01 Steel Pipe Scaffolding kg ### 0.48 800,160.00 02 Formwork - plywood m2 120,824.38 6.00 724,946.29 - s m2 375,574.63 - Item Unit 03 Reinforcement MT 10,689.00 95,880.00 ### Item Unit Qty. 04 Concrete pump car No's 2.00 128,500.00 257,000.00 05 No's 1.00 71,080.35 71,080.35 06 No's 1.00 84,919.35 84,919.35 Item No Total Estimated Qty. Unit Price (USD) Total Amount (USD) Item No Total Estimated Qty. Unit Price (RS) Total Amount (RS) Item No Unit Price (USD) Total Amount (USD) Tower Crane (second hand) Tower Crane (used) TC6015

description

DOC

Transcript of Imported Items

Page 1: Imported Items

Item Unit Remark

01 Steel Pipe Scaffolding kg 1,667,000.00 0.48 800,160.00

02 Formwork - plywood m2 120,824.38 6.00 724,946.29

- system formwork m2 375,574.63 -

Item Unit Unit Price (RS) Total Amount (RS) Remark

03 Reinforcement MT 10,689.00 95,880.00 1,024,861,320.00 Local Market Purchase (without NBT & VAT)

Item Unit Qty. Remark

04 Concrete pump car No's 2.00 128,500.00 257,000.00

05 No's 1.00 71,080.35 71,080.35

06 No's 1.00 84,919.35 84,919.35

Item No

TotalEstimated Qty.

Unit Price (USD)

Total Amount (USD)

without freight and insurance

without freight and insurance

without freight and insurance

Item No

TotalEstimated Qty.

Item No

Unit Price (USD)

Total Amount (USD)

without freight and insurance

Tower Crane (second hand) without freight and insurance

Tower Crane (used)TC6015 without freight and insurance

D5
BOQ Qty
D8
BOQ Qty
Page 2: Imported Items

Zone-A Form Work

Up to BL BL to GL GL to L1 L1 to L2 L2 to L3 L3 to L4 T1 T2

452.00 258.00 118,609.50 105,263.47

50.00 61.00 59.00 151.00 110.00

1,778.00 1,095.00 1,329.00 1,982.00 70.20

67.00 521.00 194.00 361.00 1,521.00

4,225.00 2,626.00 2,041.00 2,364.00 476.00

91.00 21.90 40.65 11.90 416.00

33.00 12.60 18.00 34.00 927.00

41.80 37.20 56.00 42.00 3,780.00

1.50 42.00 31.20 200.00 1,561.00

28.80 489.00 1,332.00 66.00 210.00 15.00 56.00 238.00 32.70 22.00 9.00 37.00 179.00 893.00 306.00 452.00 3.00 878.00 238.00 1,455.00 24.60 251.00 889.00 393.00 964.00

844.00 244.00 417.00 849.00

- 9,588.10 8,031.30 6,395.85 7,590.60 9,399.20 118,609.50 105,263.47

264,878.03

BOQ Total m2 483,297.53

4 time' can used, so devided 4, 120,824.38

Page 3: Imported Items

Zone-B Form Work Up to BL BL to GL GL to L1 L1 to L2 L2 to L3 L3 to L4 T3 T4

26.00 546.00 650.00 88.00 399.00 942.00 84,438.85 91,974.93

1,678.00 546.00 194.00 2,604.00 2,800.00 219.00

670.00 74.00 2,552.00 95.80 1,908.00 228.00

69.00 4,288.00 45.90 2,013.00 286.00 2,287.00

18.90 41.63 333.00 591.00 698.00

19.60 35.00 271.00 232.00 486.00

12.20 1,879.00 470.00 475.00 950.00

4.50 367.00 453.00 44.00 584.00

22.50 755.00 475.00 35.40 928.00

2,187.00 259.00 28.00 104.00 364.00 809.00 16.00 80.00 235.00 446.00 23.10 63.30 99.00 475.00 668.00 30.00 670.00 23.40 20.00 16.50

2,443.00 9,791.20 8,561.93 6,869.90 6,770.40 7,569.30 84,438.85 91,974.93

218,419.50

Page 4: Imported Items

Zone-A Up to BL BL to GL GL to L1 L1 to L2 L2 to L3 L3 to L4 T1 T2

108.20 73.60 67.80 151.90 3.40 1,133.60 1,679.00

77.00 76.40 38.30 136.20 29.00

0.80 16.70 1.80 2.10 6.20

11.40 0.50 16.10 15.70 6.30

22.00 1.10 9.10 3.80 72.60

4.20 5.10 1.90 2.60 543.40

70.70 15.00 59.70 88.00 268.00

4.00 8.00

4.50

65.60

- 294.30 262.50 194.70 400.30 936.90 1,133.60 1,679.00

4,901.30

BOQ Total MT 10,689.00

Page 5: Imported Items

Zone-B Up to BL BL to GL GL to L1 L1 to L2 L2 to L3 L3 to L4 T3 T4

518.90 17.10 10.20 71.60 147.80 197.40 1,284.30 1,354.30

396.30 88.30 63.60 115.90 163.80 395.20

13.70 179.20 123.90 54.60 2.80 88.90

5.60 7.10 19.80 3.50 59.20 22.80

63.80 53.80 46.90 11.60 7.30

1.90 3.30 12.20 1.40 2.00

58.80 77.70 0.90 8.70

13.70 13.80 0.60 1.80

0.60 1.10

934.50 430.50 367.20 306.20 386.60 724.10 1,284.30 1,354.30

5,787.70

Page 6: Imported Items

Page 106

Note

Note

Level 04 to Level 05

-4 Soffits of suspended slab m2 737

-3 Soffits of suspended slab, finished fairface m2 70

-2 Sides of suspended slab, 150mm high m 62

-1 Sides of suspended slab, 175mm high m 45

0 Sides of suspended slab, 200mm high m 180

1 Sides of drop, 50mm high m 6

2 Sides of drop, 75mm high m 56

3 Sides of drop, 300mm high m 65

4 Sides and soffits of attached and isolated beams m2 119

5 m2 22

6 Sides of steps, 150mm to 300mm high m 41

7 Sides of kerbs on slab m2 153

8 Sides of walls m2 836

9 Sides of walls, finished fairface m2 798

10 m2 366

Level 05 to Level 06

11 Soffits of suspended slab m2 732

12 Soffits of suspended slab, finished fairface m2 75

13 Sides of suspended slab, 150mm high m 62

14 Sides of suspended slab, 175mm high m 45

15 Sides of suspended slab, 200mm high m 180

16 Sides of drop, 50mm high m 6

17 Sides of drop, 75mm high m 56

18 Sides of drop, 300mm high m 65

19 Sides and soffits of attached and isolated beams m2 119

20 m2 22

21 Sides of steps, 150mm to 300mm high m 41

22 Sides of kerbs on slab m2 20

23 Sides of walls m2 549

24 Sides of walls, finished fairface m2 798

25 m2 366

Level 06 to Level 07

26 Soffits of suspended slab m2 732

27 Soffits of suspended slab, finished fairface m2 75

28 Sides of suspended slab, 150mm high m 62

29 Sides of suspended slab, 175mm high m 45

30 Sides of suspended slab, 200mm high m 180

31 Sides of drop, 50mm high m 6

32 Sides of drop, 75mm high m 56

33 Sides of drop, 300mm high m 65

34 Sides and soffits of attached and isolated beams m2 119

35 m2 22

36 Sides of steps, 150mm to 300mm high m 41

37 Sides of kerbs on slab m2 20

38 Sides of walls m2 549

39 Sides of walls, finished fairface m2 798

40 m2 366

Level 07 to Level 08

41 Soffits of suspended slab m2 732

42 Soffits of suspended slab, finished fairface m2 75

43 Sides of suspended slab, 150mm high m 62

44 Sides of suspended slab, 175mm high m 45

45 Sides of suspended slab, 200mm high m 180

46 Sides of drop, 50mm high m 6

47 Sides of drop, 75mm high m 56

48 Sides of drop, 300mm high m 65

49 Sides and soffits of attached and isolated beams m2 119

50 m2 22

51 Sides of steps, 150mm to 300mm high m 41

52 Sides of kerbs on slab m2 20

53 Sides of walls m2 549

54 Sides of walls, finished fairface m2 798

55 m2 366

Level 08 to Level 09

56 Soffits of suspended slab m2 732

57 Soffits of suspended slab, finished fairface m2 75

58 Sides of suspended slab, 150mm high m 62

59 Sides of suspended slab, 175mm high m 45

60 Sides of suspended slab, 200mm high m 180

61 Sides of drop, 50mm high m 6

62 Sides of drop, 75mm high m 56

63 Sides of drop, 300mm high m 65

64 Sides and soffits of attached and isolated beams m2 119

65 m2 22

66 Sides of steps, 150mm to 300mm high m 41

67 Sides of kerbs on slab m2 20

68 Sides of walls m2 549

69 Sides of walls, finished fairface m2 798

70 m2 366

Level 09 to Level 10

71 Soffits of suspended slab m2 732

72 Soffits of suspended slab, finished fairface m2 75

73 Sides of suspended slab, 150mm high m 62

74 Sides of suspended slab, 175mm high m 45

75 Sides of suspended slab, 200mm high m 180

76 Sides of drop, 50mm high m 6

77 Sides of drop, 75mm high m 56

78 Sides of drop, 300mm high m 65

79 Sides and soffits of attached and isolated beams m2 119

80 m2 22

81 Sides of steps, 150mm to 300mm high m 41

82 Sides of kerbs on slab m2 20

83 Sides of walls m2 549

84 Sides of walls, finished fairface m2 798

85 m2 366

Level 10 to Level 11

86 Soffits of suspended slab m2 732

87 Soffits of suspended slab, finished fairface m2 75

88 Sides of suspended slab, 150mm high m 62

89 Sides of suspended slab, 175mm high m 45

90 Sides of suspended slab, 200mm high m 180

91 Sides of drop, 50mm high m 6

92 Sides of drop, 75mm high m 56

93 Sides of drop, 300mm high m 65

94 Sides and soffits of attached and isolated beams m2 119

95 m2 22

96 Sides of steps, 150mm to 300mm high m 41

97 Sides of kerbs on slab m2 20

98 Sides of walls m2 549

99 Sides of walls, finished fairface m2 798

100 m2 366

Level 11 to Level 12

101 Soffits of suspended slab m2 732

102 Soffits of suspended slab, finished fairface m2 75

103 Sides of suspended slab, 150mm high m 62

104 Sides of suspended slab, 175mm high m 45

105 Sides of suspended slab, 200mm high m 180

106 Sides of drop, 50mm high m 6

107 Sides of drop, 75mm high m 56

108 Sides of drop, 300mm high m 65

109 Sides and soffits of attached and isolated beams m2 119

110 m2 22

111 Sides of steps, 150mm to 300mm high m 41

112 Sides of kerbs on slab m2 20

113 Sides of walls m2 549

114 Sides of walls, finished fairface m2 798

115 m2 366

Level 12 to Level 13

116 Soffits of suspended slab m2 732

117 Soffits of suspended slab, finished fairface m2 75

118 Sides of suspended slab, 150mm high m 62

Form work or props shall not remove until the concrete gains sufficient strength specified in relevant Standards under any circumstances.Form work rate shall include to inclined slab and sides as per Drawings & Specification

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Page 7: Imported Items

Page 107

119 Sides of suspended slab, 175mm high m 45

120 Sides of suspended slab, 200mm high m 180

121 Sides of drop, 50mm high m 6

122 Sides of drop, 75mm high m 56

123 Sides of drop, 300mm high m 65

124 Sides and soffits of attached and isolated beams m2 119

125 m2 22

126 Sides of steps, 150mm to 300mm high m 41

127 Sides of kerbs on slab m2 20

128 Sides of walls m2 549

129 Sides of walls, finished fairface m2 798

130 m2 366

Level 13 to Level 14

131 Soffits of suspended slab m2 732

132 Soffits of suspended slab, finished fairface m2 75

133 Sides of suspended slab, 150mm high m 62

134 Sides of suspended slab, 175mm high m 45

135 Sides of suspended slab, 200mm high m 180

136 Sides of drop, 50mm high m 6

137 Sides of drop, 75mm high m 56

138 Sides of drop, 300mm high m 65

139 Sides and soffits of attached and isolated beams m2 119

140 m2 22

141 Sides of steps, 150mm to 300mm high m 41

142 Sides of kerbs on slab m2 20

143 Sides of walls m2 549

144 Sides of walls, finished fairface m2 798

145 m2 366

Level 14 to Level 15

146 Soffits of suspended slab m2 732

147 Soffits of suspended slab, finished fairface m2 75

148 Sides of suspended slab, 150mm high m 62

149 Sides of suspended slab, 175mm high m 45

150 Sides of suspended slab, 200mm high m 180

151 Sides of drop, 50mm high m 6

152 Sides of drop, 75mm high m 56

153 Sides of drop, 300mm high m 65

154 Sides and soffits of attached and isolated beams m2 119

155 m2 22

156 Sides of steps, 150mm to 300mm high m 41

157 Sides of kerbs on slab m2 20

158 Sides of walls m2 549

159 Sides of walls, finished fairface m2 798

160 m2 366

Level 15 to Level 16

161 Soffits of suspended slab m2 732

162 Soffits of suspended slab, finished fairface m2 75

163 Sides of suspended slab, 150mm high m 62

164 Sides of suspended slab, 175mm high m 45

165 Sides of suspended slab, 200mm high m 180

166 Sides of drop, 50mm high m 6

167 Sides of drop, 75mm high m 56

168 Sides of drop, 300mm high m 65

169 Sides and soffits of attached and isolated beams m2 119

170 m2 22

171 Sides of steps, 150mm to 300mm high m 41

172 Sides of kerbs on slab m2 20

173 Sides of walls m2 549

174 Sides of walls, finished fairface m2 798

175 m2 366

Level 16 to Level 17

176 Soffits of suspended slab m2 732

177 Soffits of suspended slab, finished fairface m2 75

178 Sides of suspended slab, 150mm high m 62

179 Sides of suspended slab, 175mm high m 45

180 Sides of suspended slab, 200mm high m 180

181 Sides of drop, 50mm high m 6

182 Sides of drop, 75mm high m 56

183 Sides of drop, 300mm high m 65

184 Sides and soffits of attached and isolated beams m2 119

185 m2 22

186 Sides of steps, 150mm to 300mm high m 41

187 Sides of kerbs on slab m2 20

188 Sides of walls m2 549

189 Sides of walls, finished fairface m2 798

190 m2 366

Level 17 to Level 18

191 Soffits of suspended slab m2 732

192 Soffits of suspended slab, finished fairface m2 75

193 Sides of suspended slab, 150mm high m 62

194 Sides of suspended slab, 175mm high m 45

195 Sides of suspended slab, 200mm high m 180

196 Sides of drop, 50mm high m 6

197 Sides of drop, 75mm high m 56

198 Sides of drop, 300mm high m 65

199 Sides and soffits of attached and isolated beams m2 119

200 m2 22

201 Sides of steps, 150mm to 300mm high m 41

202 Sides of kerbs on slab m2 20

203 Sides of walls m2 549

204 Sides of walls, finished fairface m2 798

205 m2 366

Level 18 to Level 19

206 Soffits of suspended slab m2 732

207 Soffits of suspended slab, finished fairface m2 75

208 Sides of suspended slab, 150mm high m 62

209 Sides of suspended slab, 175mm high m 45

210 Sides of suspended slab, 200mm high m 180

211 Sides of drop, 50mm high m 6

212 Sides of drop, 75mm high m 56

213 Sides of drop, 300mm high m 65

214 Sides and soffits of attached and isolated beams m2 119

215 m2 22

216 Sides of steps, 150mm to 300mm high m 41

217 Sides of kerbs on slab m2 20

218 Sides of walls m2 549

219 Sides of walls, finished fairface m2 798

220 m2 366

Level 19 to Level 20

221 Soffits of suspended slab m2 732

222 Soffits of suspended slab, finished fairface m2 75

223 Sides of suspended slab, 150mm high m 62

224 Sides of suspended slab, 175mm high m 45

225 Sides of suspended slab, 200mm high m 180

226 Sides of drop, 50mm high m 6

227 Sides of drop, 75mm high m 56

228 Sides of drop, 300mm high m 65

229 Sides of suspended slab, 200mm high m 119

230 Sides and soffits of attached and isolated beams m2 110

231 m2 22

232 Sides of steps, 150mm to 300mm high m 41

233 Sides of kerbs on slab m2 20

234 Sides of walls m2 549

235 Sides of walls, finished fairface m2 798

236 m2 366

Level 20 to Level 21

237 Soffits of suspended slab m2 747

238 Soffits of suspended slab, finished fairface m2 81

239 Sides of suspended slab, 150mm high m 36

240 Sides of suspended slab, 175mm high m 31

241 Sides of suspended slab, 200mm high m 143

242 Sides of drop, 75mm high m 66

243 Sides of drop, 300mm high m 85

244 Sides of suspended slab, exceeding 300mm high m2 90

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Page 8: Imported Items

Page 108

245 Sides and soffits of attached and isolated beams m2 125

246 m2 28

247 Sides of steps, 150mm to 300mm high m 48

248 Sides of kerbs on slab m2 20

249 Sides of walls m2 549

250 Sides of walls, finished fairface m2 798

251 m2 366

Level 21 to Level 22

252 Soffits of suspended slab m2 746

253 Soffits of suspended slab, finished fairface m2 81

254 Sides of suspended slab, 150mm high m 64

255 Sides of suspended slab, 175mm high m 111

256 Sides of suspended slab, 200mm high m 233

257 Sides of drop, 75mm high m 58

258 Sides of drop, 250mm high m 115

259 Sides of drop, 300mm high m 115

260 Sides and soffits of attached and isolated beams m2 139

261 m2 25

262 Sides of steps, 150mm to 300mm high m 53

263 Sides of kerbs on slab m2 24

264 Sides of walls m2 746

265 Sides of walls, finished fairface m2 711

266 m2 366

Level 22 to Level 23

267 Soffits of suspended slab m2 746

268 Soffits of suspended slab, finished fairface m2 81

269 Sides of suspended slab, 150mm high m 64

270 Sides of suspended slab, 175mm high m 111

271 Sides of suspended slab, 200mm high m 233

272 Sides of drop, 75mm high m 58

273 Sides of drop, 250mm high m 10

274 Sides of drop, 300mm high m 115

275 Sides and soffits of attached and isolated beams m2 139

276 m2 22

277 Sides of steps, 150mm to 300mm high m 41

278 Sides of kerbs on slab m2 19

279 Sides of walls m2 1,215

280 Sides of walls, finished fairface m2 711

281 m2 366

Level 23 to Level 24

282 Soffits of suspended slab m2 746

283 Soffits of suspended slab, finished fairface m2 81

284 Sides of suspended slab, 150mm high m 64

285 Sides of suspended slab, 175mm high m 111

286 Sides of suspended slab, 200mm high m 233

287 Sides of drop, 75mm high m 58

288 Sides of drop, 250mm high m 10

289 Sides of drop, 300mm high m 115

290 Sides and soffits of attached and isolated beams m2 139

291 m2 22

292 Sides of steps, 150mm to 300mm high m 41

293 Sides of kerbs on slab m2 19

294 Sides of walls m2 1,215

295 Sides of walls, finished fairface m2 711

296 m2 366

Level 24 to Level 25

297 Soffits of suspended slab m2 746

298 Soffits of suspended slab, finished fairface m2 81

299 Sides of suspended slab, 150mm high m 64

300 Sides of suspended slab, 175mm high m 111

301 Sides of suspended slab, 200mm high m 233

302 Sides of drop, 75mm high m 58

303 Sides of drop, 250mm high m 10

304 Sides of drop, 300mm high m 115

305 Sides and soffits of attached and isolated beams m2 139

306 m2 22

307 Sides of steps, 150mm to 300mm high m 41

308 Sides of kerbs on slab m2 19

309 Sides of walls m2 1,215

310 Sides of walls, finished fairface m2 711

311 m2 366

Level 25 to Level 26

312 Soffits of suspended slab m2 746

313 Soffits of suspended slab, finished fairface m2 81

314 Sides of suspended slab, 150mm high m 64

315 Sides of suspended slab, 175mm high m 111

316 Sides of suspended slab, 200mm high m 233

317 Sides of drop, 75mm high m 58

318 Sides of drop, 250mm high m 10

319 Sides of drop, 300mm high m 115

320 Sides and soffits of attached and isolated beams m2 139

321 m2 22

322 Sides of steps, 150mm to 300mm high m 41

323 Sides of kerbs on slab m2 19

324 Sides of walls m2 1,215

325 Sides of walls, finished fairface m2 711

326 m2 366

Level 26 to Level 27

327 Soffits of suspended slab m2 746

328 Soffits of suspended slab, finished fairface m2 81

329 Sides of suspended slab, 150mm high m 64

330 Sides of suspended slab, 175mm high m 111

331 Sides of suspended slab, 200mm high m 233

332 Sides of drop, 75mm high m 58

333 Sides of drop, 250mm high m 10

334 Sides of drop, 300mm high m 115

335 Sides and soffits of attached and isolated beams m2 139

336 m2 22

337 Sides of steps, 150mm to 300mm high m 41

338 Sides of kerbs on slab m2 19

339 Sides of walls m2 1,215

340 Sides of walls, finished fairface m2 711

341 m2 366

Level 27 to Level 28

342 Soffits of suspended slab m2 746

343 Soffits of suspended slab, finished fairface m2 81

344 Sides of suspended slab, 150mm high m 64

345 Sides of suspended slab, 175mm high m 111

346 Sides of suspended slab, 200mm high m 233

347 Sides of drop, 75mm high m 58

348 Sides of drop, 250mm high m 10

349 Sides of drop, 300mm high m 115

350 Sides and soffits of attached and isolated beams m2 139

351 m2 22

352 Sides of steps, 150mm to 300mm high m 41

353 Sides of kerbs on slab m2 19

354 Sides of walls m2 1,215

355 Sides of walls, finished fairface m2 711

356 m2 366

Level 28 to Level 29

357 Soffits of suspended slab m2 746

358 Soffits of suspended slab, finished fairface m2 81

359 Sides of suspended slab, 150mm high m 64

360 Sides of suspended slab, 175mm high m 111

361 Sides of suspended slab, 200mm high m 233

362 Sides of drop, 75mm high m 58

363 Sides of drop, 250mm high m 10

364 Sides of drop, 300mm high m 115

365 Sides and soffits of attached and isolated beams m2 139

366 m2 22

367 Sides of steps, 150mm to 300mm high m 41

368 Sides of kerbs on slab m2 19

369 Sides of walls m2 1,215

370 Sides of walls, finished fairface m2 711

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Page 9: Imported Items

Page 109

371 m2 366

Level 29 to Level 30

372 Soffits of suspended slab m2 746

373 Soffits of suspended slab, finished fairface m2 81

374 Sides of suspended slab, 150mm high m 64

375 Sides of suspended slab, 175mm high m 111

376 Sides of suspended slab, 200mm high m 233

377 Sides of drop, 75mm high m 58

378 Sides of drop, 250mm high m 10

379 Sides of drop, 300mm high m 115

380 Sides and soffits of attached and isolated beams m2 139

381 m2 22

382 Sides of steps, 150mm to 300mm high m 41

383 Sides of kerbs on slab m2 19

384 Sides of walls m2 1,215

385 Sides of walls, finished fairface m2 711

386 m2 366

Level 30 to Level 31

387 Soffits of suspended slab m2 746

388 Soffits of suspended slab, finished fairface m2 81

389 Sides of suspended slab, 150mm high m 64

390 Sides of suspended slab, 175mm high m 111

391 Sides of suspended slab, 200mm high m 233

392 Sides of drop, 75mm high m 58

393 Sides of drop, 250mm high m 10

394 Sides of drop, 300mm high m 115

395 Sides and soffits of attached and isolated beams m2 139

396 m2 22

397 Sides of steps, 150mm to 300mm high m 41

398 Sides of kerbs on slab m2 19

399 Sides of walls m2 1,215

400 Sides of walls, finished fairface m2 711

401 m2 366

Level 31 to Level 32

402 Soffits of suspended slab m2 746

403 Soffits of suspended slab, finished fairface m2 81

404 Sides of suspended slab, 150mm high m 64

405 Sides of suspended slab, 175mm high m 111

406 Sides of suspended slab, 200mm high m 233

407 Sides of drop, 75mm high m 58

408 Sides of drop, 250mm high m 10

409 Sides of drop, 300mm high m 115

410 Sides and soffits of attached and isolated beams m2 139

411 m2 22

412 Sides of steps, 150mm to 300mm high m 41

413 Sides of kerbs on slab m2 19

414 Sides of walls m2 1,215

415 Sides of walls, finished fairface m2 711

416 m2 366

Level 32 to Level 33

417 Soffits of suspended slab m2 746

418 Soffits of suspended slab, finished fairface m2 81

419 Sides of suspended slab, 150mm high m 64

420 Sides of suspended slab, 175mm high m 111

421 Sides of suspended slab, 200mm high m 233

422 Sides of drop, 75mm high m 58

423 Sides of drop, 250mm high m 10

424 Sides of drop, 300mm high m 115

425 Sides and soffits of attached and isolated beams m2 139

426 m2 22

427 Sides of steps, 150mm to 300mm high m 41

428 Sides of kerbs on slab m2 19

429 Sides of walls m2 1,215

430 Sides of walls, finished fairface m2 711

431 m2 366

Level 33 to Level 34

432 Soffits of suspended slab m2 746

433 Soffits of suspended slab, finished fairface m2 81

434 Sides of suspended slab, 150mm high m 64

435 Sides of suspended slab, 175mm high m 111

436 Sides of suspended slab, 200mm high m 233

437 Sides of drop, 75mm high m 58

438 Sides of drop, 250mm high m 10

439 Sides of drop, 300mm high m 112

440 Sides and soffits of attached and isolated beams m2 139

441 m2 22

442 Sides of steps, 150mm to 300mm high m 41

443 Sides of kerbs on slab m2 19

444 Sides of walls m2 1,215

445 Sides of walls, finished fairface m2 711

446 m2 366

Level 34 to Level 35

447 Soffits of suspended slab m2 746

448 Soffits of suspended slab, finished fairface m2 81

449 Sides of suspended slab, 150mm high m 64

450 Sides of suspended slab, 175mm high m 111

451 Sides of suspended slab, 200mm high m 233

452 Sides of drop, 75mm high m 58

453 Sides of drop, 250mm high m 10

454 Sides of drop, 300mm high m 115

455 Sides and soffits of attached and isolated beams m2 139

456 m2 22

457 Sides of steps, 150mm to 300mm high m 41

458 Sides of kerbs on slab m2 19

459 Sides of walls m2 1,215

460 Sides of walls, finished fairface m2 711

461 m2 366

Level 35 to Level 36

462 Soffits of suspended slab m2 746

463 Soffits of suspended slab, finished fairface m2 81

464 Sides of suspended slab, 150mm high m 64

465 Sides of suspended slab, 175mm high m 111

466 Sides of suspended slab, 200mm high m 233

467 Sides of drop, 75mm high m 58

468 Sides of drop, 250mm high m 10

469 Sides of drop, 300mm high m 115

470 Sides and soffits of attached and isolated beams m2 139

471 m2 22

472 Sides of steps, 150mm to 300mm high m 41

473 Sides of kerbs on slab m2 19

474 Sides of walls m2 1,215

475 Sides of walls, finished fairface m2 711

476 m2 366

Level 36 to Level 37

477 Soffits of suspended slab m2 746

478 Soffits of suspended slab, finished fairface m2 81

479 Sides of suspended slab, 150mm high m 64

480 Sides of suspended slab, 175mm high m 111

481 Sides of suspended slab, 200mm high m 233

482 Sides of drop, 75mm high m 58

483 Sides of drop, 250mm high m 10

484 Sides of drop, 300mm high m 115

485 Sides and soffits of attached and isolated beams m2 139

486 m2 22

487 Sides of steps, 150mm to 300mm high m 41

488 Sides of kerbs on slab m2 19

489 Sides of walls m2 1,215

490 Sides of walls, finished fairface m2 711

491 m2 366

Level 37 to Level 38

492 Soffits of suspended slab m2 746

493 Soffits of suspended slab, finished fairface m2 81

494 Sides of suspended slab, 150mm high m 64

495 Sides of suspended slab, 175mm high m 111

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Page 10: Imported Items

Page 110

496 Sides of suspended slab, 200mm high m 233

497 Sides of drop, 75mm high m 58

498 Sides of drop, 250mm high m 10

499 Sides of drop, 300mm high m 115

500 Sides and soffits of attached and isolated beams m2 139

501 m2 22

502 Sides of steps, 150mm to 300mm high m 41

503 Sides of kerbs on slab m2 19

504 Sides of walls m2 1,215

505 Sides of walls, finished fairface m2 711

506 m2 366

Level 38 to Level 39

507 Soffits of suspended slab m2 643

508 Soffits of suspended slab, finished fairface m2 81

509 Sides of suspended slab, 150mm high m 82

510 Sides of suspended slab, 175mm high m 49

511 Sides of suspended slab, 200mm high m 177

512 Sides of drop, 75mm high m 51

513 Sides of drop, 300mm high m 79

514 Sides and soffits of attached and isolated beams m2 117

515 m2 28

516 Sides of steps, 150mm to 300mm high m 48

517 Sides of kerbs on slab m2 19

518 Sides of walls m2 1,215

519 Sides of walls, finished fairface m2 711

520 m2 366

Level 39 to Level 40

521 Soffits of suspended slab m2 589

522 Soffits of suspended slab, finished fairface m2 81

523 Sides of suspended slab, 200mm high m 26

524 Sides of suspended slab, 250mm high m 56

525 Sides of suspended slab, 300mm high m 175

526 Sides of drop, 50mm high m 30

527 Sides of drop, 300mm high m 15

528 Sides and soffits of attached and isolated beams m2 99

529 Sides and soffits of slab beams m2 220

530 m2 28

531 Sides of steps, 150mm to 300mm high m 55

532 Sides of kerbs on slab m2 19

533 Sides of columns m2 45

534 Sides of walls m2 1,420

535 Sides of walls, finished fairface m2 711

536 m2 366

Level 40 to Level 41

537 Soffits of suspended slab m2 521

538 Soffits of suspended slab, finished fairface m2 11

539 Sides of suspended slab, 150mm high m 11

540 Sides of suspended slab, 200mm high m 40

541 Sides of suspended slab, 300mm high m 135

542 Sides of drop, 250mm high m 29

543 Sides of drop, 300mm high m 71

544 Sides and soffits of attached and isolated beams m2 180

545 m2 54

546 Sides of steps, 150mm to 300mm high m 102

547 Sides of kerbs on slab m2 9

548 Sides of attached and isolated columns m2 163

549 m2 630

550 Sides of walls, finished fairface m2 881

Level 41 to Roof Level

551 Soffits of suspended slab m2 455

552 Soffits of suspended slab, finished fairface m2 32

553 Sides of suspended slab, 200mm high m 10

554 Sides of suspended slab, 300mm high m 113

555 Sides of drop, 200mm high m 4

556 Sides of drop, 300mm high m 8

557 Sides and soffits of attached and isolated beams m2 80

558 m2 22

559 Sides of steps, 150mm to 300mm high m 41

560 Sides of kerbs on slab m2 30

561 Sides of attached and isolated columns m2 119

562 m2 1,135

563 Sides of walls, finished fairface m2 237

Above Roof Level

564 Soffits of suspended slab m2 235

565 Soffits of water tank cover slab m2 90

566 Sides of suspended slab, 300mm high m 107

567 Sides of suspended slab, 350mm high m 46

886a Sides and soffits of slab beams m2 62

886b m2 5

886c Sides of steps, 150mm to 300mm high m 13

886d Sides of kerbs on slab m2 38

886e Sides of walls, finished fairface m2 593

886f m2 365

Reinforcement

Level 04 to Level 05

568 A142 mesh for slab on filling m2 719

569 In suspended slab t 15.6

570 In attached and isolated beams t 4.0

571 In stairs including landing t 0.7

572 In kerbs on slab t 1.8

573 In core walls t 6.6

574 In structural walls t 18.5

Level 05 to Level 06

575 In suspended slab t 15.6

576 In attached and isolated beams t 4.0

577 In stairs including landing t 0.7

578 In kerbs on slab t 0.2

579 In core walls t 5.9

580 In structural walls t 16.0

Level 06 to Level 07

581 In suspended slab t 15.6

582 In attached and isolated beams t 4.0

583 In stairs including landing t 0.7

584 In kerbs on slab t 0.2

585 In core walls t 5.9

586 In structural walls t 16.0

587 In suspended slab t 15.6

588 In stairs including landing t 0.7

589 In core walls t 5.9

Level 08 to Level 09

590 In attached and isolated beams t 4.0

591 In kerbs on slab t 0.2

592 In structural walls t 16.0

593 In suspended slab t 15.6

594 In stairs including landing t 0.7

595 In core walls t 5.9

596 In suspended slab t 15.6

597 In stairs including landing t 0.7

598 In core walls t 5.9

Level 11 to Level 12

599 In attached and isolated beams t 4.0

600 In kerbs on slab t 0.2

601 In structural walls t 16.0

602 In suspended slab t 15.6

603 In stairs including landing t 0.7

604 In core walls t 5.9

605 In suspended slab t 15.6

606 In stairs including landing t 0.7

607 In core walls t 5.9

Level 14 to Level 15

608 In attached and isolated beams t 4.0

609 In kerbs on slab t 0.2

610 In structural walls t 16.0

611 In suspended slab t 15.6

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit, finished fairface

Sides of walls, finished fairface including forming groovs to external

Page 11: Imported Items

Page 111

612 In stairs including landing t 0.7

613 In core walls t 5.9

614 In suspended slab t 15.6

615 In stairs including landing t 0.7

616 In core walls t 5.9

Level 17 to Level 18

617 In attached and isolated beams t 4.0

618 In kerbs on slab t 0.2

619 In structural walls t 16.0

620 In suspended slab t 15.6

621 In stairs including landing t 0.7

622 In core walls t 5.9

623 In stairs including landing t 0.7

624 In core walls t 5.9

Level 20 to Level 21

625 In attached and isolated beams t 5.0

626 In kerbs on slab t 0.2

627 In structural walls t 16.0

628 In suspended slab t 16.2

629 In stairs including landing t 0.9

630 In core walls t 6.0

631 In suspended slab t 16.2

632 In stairs including landing t 0.7

633 In core walls t 6.9

Level 23 to Level 24

634 In attached and isolated beams t 4.3

635 In kerbs on slab t 0.2

636 In structural walls t 19.3

637 In suspended slab t 16.2

638 In stairs including landing t 0.7

639 In core walls t 6.9

640 In suspended slab t 16.2

641 In core walls t 6.9

Level 26 to Level 27

642 In attached and isolated beams t 4.3

643 In kerbs on slab t 0.2

644 In structural walls t 19.3

645 In suspended slab t 16.2

646 In stairs including landing t 0.7

647 In core walls t 6.9

648 In suspended slab t 16.2

649 In stairs including landing t 0.7

650 In core walls t 6.9

Level 29 to Level 30

651 In attached and isolated beams t 4.3

652 In kerbs on slab t 0.2

653 In structural walls t 19.3

654 In suspended slab t 16.2

655 In attached and isolated beams t 4.3

656 In stairs including landing t 0.7

657 In kerbs on slab t 0.2

658 In core walls t 6.9

659 In structural walls t 19.3

Level 34 to Level 35

660 In suspended slab t 16.2

661 In attached and isolated beams t 4.3

662 In stairs including landing t 0.7

663 In kerbs on slab t 0.2

664 In core walls t 6.9

665 In structural walls t 19.3

Level 35 to Level 36

666 In suspended slab t 16.2

667 In attached and isolated beams t 4.3

668 In stairs including landing t 0.7

669 In kerbs on slab t 0.2

670 In core walls t 6.9

671 In structural walls t 19.3

Level 36 to Level 37

672 In suspended slab t 16.2

673 In attached and isolated beams t 4.3

674 In stairs including landing t 0.7

675 In kerbs on slab t 0.2

676 In core walls t 6.9

Level 37 to Level 38

677 In suspended slab t 16.2

678 In attached and isolated beams t 4.3

679 In stairs including landing t 0.7

680 In kerbs on slab t 0.2

681 In core walls t 6.9

682 In structural walls t 19.3

Level 38 to Level 39

683 In suspended slab t 21.6

684 In attached and isolated beams t 3.5

685 In slab beams t 28.4

686 In stairs including landing t 0.9

687 In kerbs on slab t 0.2

688 In core walls t 6.9

689 In structural walls t 19.3

Level 39 to Level 40

690 In suspended slab t 22.1

691 In attached and isolated beams t 24.0

692 In stairs including landing t 0.9

693 In kerbs on slab t 0.2

694 In structural walls t 21.6

Level 40 to Level 41

695 In suspended slab t 17.6

696 In attached and isolated beams t 11.8

697 In stairs including landing t 1.9

698 In kerbs on slab t 0.1

699 In attached and isolated columns t 5.0

700 In core walls t 8.1

701 In structural walls t 13.9

Level 41 to Roof Level

702 In suspended slab t 13.3

703 In attached and isolated beams t 3.2

704 In stairs including landing t 0.7

705 In kerbs on slab t 0.3

706 In attached and isolated columns t 3.6

707 In core walls t 8.5

708 In structural walls t 8.8

Above Roof Level

709 In suspended slab t 7.4

710 In water tank cover slab t 2.5

711 In slab beams t 9.5

712 In kerbs on slab t 0.3

713 In stairs t 0.2

714 In core walls t 16.1

715 In structural walls t 1.5

Concrete Ancillaries

Pipe penetration

716 Item 1.00

717 Lintels; size 100 x 150mm m 1,249

718 Lintels; size 200 x 150mm m 141

Concrete Filling over insulation

719 Level 40 m2 42

720 Level 41 m2 183

721 On roof slab m2 586

722 In toilets at all levels m2 385

Concrete Ancillaries (Cont'd)

Joints

723 m 1,000.00

Pipe penetration through water retaining and water excluding slabs including approved bentonite water bar, approved bonding agent, etc. as per the detailed drawingRCC lintel including all necessary reinforcement, formwork and fixing in position in all floors as per the Drawings and specification

50mm tk. 1:3:6(20) concrete with galvanized steel wire mesh (3 50x50mm), 10mm tk. Expansion joints and sealed with an ∅approved sealant as per the detail drawings

75mm thick RCC slab for fixing of vanity/wash basins including all necessary concrete, reinforcement, formwork as per the Drawings and specification in to the following

Construction joint with compressible filler with sealant on top in RCC slabs including dowels etc. as per the typical detail drawings and specifications (Pro. Qty.)

Page 12: Imported Items

Page 236

Formwork

Level 04 to Level 05

-4 Soffits of suspended slab m2 728

-3 Soffits of suspended slab, finished fairface m2 72

-2 Sides of suspended slab, 150mm high m 70

-1 Sides of suspended slab, 175mm high m 49

0 Sides of suspended slab, 200mm high m 151

1 Sides of drop, 50mm high m 58

2 Sides of drop, 300mm high m 66

3 Sides and soffits of attached and isolated beams m2 86

4 m2 22

5 Sides of steps, 150mm to 300mm high m 41

6 Sides of kerbs on slab m2 127

7 Sides of walls m2 638

8 Sides of walls, finished fairface m2 778

9 m2 353

Level 05 to Level 06

10 Soffits of suspended slab m2 724

11 Soffits of suspended slab, finished fairface m2 76

12 Sides of suspended slab, 150mm high m 70

13 Sides of suspended slab, 175mm high m 49

14 Sides of suspended slab, 200mm high m 151

15 Sides of drop, 50mm high m 58

16 Sides of drop, 300mm high m 66

17 Sides and soffits of attached and isolated beams m2 86

18 m2 22

19 Sides of steps, 150mm to 300mm high m 41

20 Sides of kerbs on slab m2 22

21 Sides of walls m2 624

22 Sides of walls, finished fairface m2 778

23 m2 353

Level 06 to Level 07

24 Soffits of suspended slab m2 724

25 Soffits of suspended slab, finished fairface m2 76

26 Sides of suspended slab, 150mm high m 70

27 Sides of suspended slab, 175mm high m 49

28 Sides of suspended slab, 200mm high m 151

29 Sides of drop, 50mm high m 58

30 Sides of drop, 300mm high m 66

31 Sides and soffits of attached and isolated beams m2 86

32 m2 22

33 Sides of steps, 150mm to 300mm high m 41

34 Sides of kerbs on slab m2 22

35 Sides of walls m2 624

36 Sides of walls, finished fairface m2 778

37 m2 353

Level 07 to Level 08

38 Soffits of suspended slab m2 724

39 Soffits of suspended slab, finished fairface m2 76

40 Sides of suspended slab, 150mm high m 70

41 Sides of suspended slab, 175mm high m 49

42 Sides of suspended slab, 200mm high m 151

43 Sides of drop, 50mm high m 58

44 Sides of drop, 300mm high m 66

45 Sides and soffits of attached and isolated beams m2 86

46 m2 22

47 Sides of steps, 150mm to 300mm high m 41

48 Sides of kerbs on slab m2 22

49 Sides of walls m2 624

50 Sides of walls, finished fairface m2 778

51 m2 353

Level 08 to Level 09

52 Soffits of suspended slab m2 724

53 Soffits of suspended slab, finished fairface m2 76

54 Sides of suspended slab, 150mm high m 70

55 Sides of suspended slab, 175mm high m 49

56 Sides of suspended slab, 200mm high m 151

57 Sides of drop, 50mm high m 58

58 Sides of drop, 300mm high m 66

59 Sides and soffits of attached and isolated beams m2 86

60 m2 22

61 Sides of steps, 150mm to 300mm high m 41

62 Sides of kerbs on slab m2 22

63 Sides of walls m2 624

64 Sides of walls, finished fairface m2 778

65 m2 353

Level 09 to Level 10

66 Soffits of suspended slab m2 724

67 Soffits of suspended slab, finished fairface m2 76

68 Sides of suspended slab, 150mm high m 70

69 Sides of suspended slab, 175mm high m 49

70 Sides of suspended slab, 200mm high m 151

71 Sides of drop, 50mm high m 58

72 Sides of drop, 300mm high m 66

73 Sides and soffits of attached and isolated beams m2 86

74 m2 22

75 Sides of steps, 150mm to 300mm high m 41

76 Sides of kerbs on slab m2 22

77 Sides of walls m2 624

78 Sides of walls, finished fairface m2 778

79 m2 353

Level 10 to Level 11

80 Soffits of suspended slab m2 724

81 Soffits of suspended slab, finished fairface m2 76

82 Sides of suspended slab, 150mm high m 70

83 Sides of suspended slab, 175mm high m 49

84 Sides of suspended slab, 200mm high m 151

85 Sides of drop, 50mm high m 58

86 Sides of drop, 300mm high m 66

87 Sides and soffits of attached and isolated beams m2 86

88 m2 22

89 Sides of steps, 150mm to 300mm high m 41

90 Sides of kerbs on slab m2 22

91 Sides of walls m2 624

92 Sides of walls, finished fairface m2 778

93 m2 353

Level 11 to Level 12

94 Soffits of suspended slab m2 724

95 Soffits of suspended slab, finished fairface m2 76

96 Sides of suspended slab, 150mm high m 70

97 Sides of suspended slab, 175mm high m 49

98 Sides of suspended slab, 200mm high m 151

99 Sides of drop, 50mm high m 58

100 Sides of drop, 300mm high m 66

101 Sides and soffits of attached and isolated beams m2 86

102 m2 22

103 Sides of steps, 150mm to 300mm high m 41

104 Sides of kerbs on slab m2 22

105 Sides of walls m2 624

106 Sides of walls, finished fairface m2 778

107 m2 353

Level 12 to Level 13

108 Soffits of suspended slab m2 724

109 Soffits of suspended slab, finished fairface m2 76

110 Sides of suspended slab, 150mm high m 70

111 Sides of suspended slab, 175mm high m 49

112 Sides of suspended slab, 200mm high m 151

113 Sides of drop, 50mm high m 58

114 Sides of drop, 300mm high m 66

115 Sides and soffits of attached and isolated beams m2 86

116 m2 22

117 Sides of steps, 150mm to 300mm high m 41

118 Sides of kerbs on slab m2 22

119 Sides of walls m2 624

120 Sides of walls, finished fairface m2 778

121 m2 353

Level 13 to Level 14

122 Soffits of suspended slab m2 724

123 Soffits of suspended slab, finished fairface m2 76

124 Sides of suspended slab, 150mm high m 70

125 Sides of suspended slab, 175mm high m 49

126 Sides of suspended slab, 200mm high m 151

127 Sides of drop, 50mm high m 58

128 Sides of drop, 300mm high m 66

129 Sides and soffits of attached and isolated beams m2 86

130 m2 22

131 Sides of steps, 150mm to 300mm high m 41

132 Sides of kerbs on slab m2 22

133 Sides of walls m2 624

134 Sides of walls, finished fairface m2 778

135 m2 353

Level 14 to Level 15

136 Soffits of suspended slab m2 724

137 Soffits of suspended slab, finished fairface m2 76

138 Sides of suspended slab, 150mm high m 70

139 Sides of suspended slab, 175mm high m 49

140 Sides of suspended slab, 200mm high m 151

141 Sides of drop, 50mm high m 58

142 Sides of drop, 300mm high m 66

143 Sides and soffits of attached and isolated beams m2 86

144 m2 22

145 Sides of steps, 150mm to 300mm high m 41

146 Sides of kerbs on slab m2 22

147 Sides of walls m2 624

148 Sides of walls, finished fairface m2 778

149 m2 353

Level 15 to Level 16

150 Soffits of suspended slab m2 724

151 Soffits of suspended slab, finished fairface m2 76

152 Sides of suspended slab, 150mm high m 70

153 Sides of suspended slab, 175mm high m 49

154 Sides of suspended slab, 200mm high m 151

155 Sides of drop, 50mm high m 58

156 Sides of drop, 300mm high m 66

157 Sides and soffits of attached and isolated beams m2 86

158 m2 22

159 Sides of steps, 150mm to 300mm high m 41

160 Sides of kerbs on slab m2 22

161 Sides of walls m2 624

162 Sides of walls, finished fairface m2 778

163 m2 353

Level 16 to Level 17

164 Soffits of suspended slab m2 724

165 Soffits of suspended slab, finished fairface m2 76

166 Sides of suspended slab, 150mm high m 70

167 Sides of suspended slab, 175mm high m 49

168 Sides of suspended slab, 200mm high m 151

169 Sides of drop, 50mm high m 58

170 Sides of drop, 300mm high m 66

171 Sides and soffits of attached and isolated beams m2 86

172 m2 22

173 Sides of steps, 150mm to 300mm high m 41

174 Sides of kerbs on slab m2 22

175 Sides of walls m2 624

176 Sides of walls, finished fairface m2 778

177 m2 353

Level 17 to Level 18

178 Soffits of suspended slab m2 724

179 Soffits of suspended slab, finished fairface m2 76

180 Sides of suspended slab, 150mm high m 70

181 Sides of suspended slab, 175mm high m 49

182 Sides of suspended slab, 200mm high m 151

183 Sides of drop, 50mm high m 58

184 Sides of drop, 300mm high m 66

185 Sides and soffits of attached and isolated beams m2 86

186 m2 22

187 Sides of steps, 150mm to 300mm high m 41

188 Sides of kerbs on slab m2 22

189 Sides of walls m2 624

190 Sides of walls, finished fairface m2 778

191 m2 353

Level 18 to Level 19

192 Soffits of suspended slab m2 724

193 Soffits of suspended slab, finished fairface m2 76

194 Sides of suspended slab, 150mm high m 70

195 Sides of suspended slab, 175mm high m 49

196 Sides of suspended slab, 200mm high m 151

197 Sides of drop, 50mm high m 58

198 Sides of drop, 300mm high m 66

199 Sides and soffits of attached and isolated beams m2 86

200 m2 22

201 Sides of steps, 150mm to 300mm high m 41

202 Sides of kerbs on slab m2 22

203 Sides of walls m2 624

204 Sides of walls, finished fairface m2 778

205 m2 353

Level 19 to Level 20

206 Soffits of suspended slab m2 724

207 Soffits of suspended slab, finished fairface m2 76

208 Sides of suspended slab, 150mm high m 70

209 Sides of suspended slab, 175mm high m 49

210 Sides of suspended slab, 200mm high m 151

211 Sides of drop, 50mm high m 58

212 Sides of drop, 300mm high m 66

213 Sides and soffits of attached and isolated beams m2 86

214 m2 22

215 Sides of steps, 150mm to 300mm high m 41

216 Sides of kerbs on slab m2 22

217 Sides of walls m2 624

218 Sides of walls, finished fairface m2 778

219 m2 353

Level 20 to Level 21

220 Soffits of suspended slab m2 725

221 Soffits of suspended slab, finished fairface m2 76

222 Sides of suspended slab, 150mm high m 42

223 Sides of suspended slab, 175mm high m 32

224 Sides of suspended slab, 200mm high m 129

225 Sides of drop, 50mm high m 43

226 Sides of drop, 300mm high m 83

227 Sides of suspended slab, exceeding 300mm high m2 78

228 Sides and soffits of attached and isolated beams m2 123

229 m2 28

230 Sides of steps, 150mm to 300mm high m 48

231 Sides of kerbs on slab m2 22

232 Sides of walls m2 624

233 Sides of walls, finished fairface m2 778

234 m2 353

Level 21 to Level 22

235 Soffits of suspended slab m2 691

236 Soffits of suspended slab, finished fairface m2 80

237 Sides of suspended slab, 150mm high m 46

238 Sides of suspended slab, 175mm high m 45

239 Sides of suspended slab, 200mm high m 190

240 Sides of drop, 75mm high m 50

241 Sides of drop, 300mm high m 84

242 Sides and soffits of attached and isolated beams m2 127

243 m2 25

244 Sides of steps, 150mm to 300mm high m 53

245 Sides of kerbs on slab m2 21

246 Sides of walls m2 762

247 Sides of walls, finished fairface m2 735

248 m2 353

Level 22 to Level 23

249 Soffits of suspended slab m2 691

250 Soffits of suspended slab, finished fairface m2 80

251 Sides of suspended slab, 150mm high m 46

252 Sides of suspended slab, 175mm high m 45

253 Sides of suspended slab, 200mm high m 190

254 Sides of drop, 75mm high m 50

255 Sides of drop, 300mm high m 84

256 Sides and soffits of attached and isolated beams m2 127

257 m2 22

258 Sides of steps, 150mm to 300mm high m 41

259 Sides of kerbs on slab m2 21

260 Sides of walls m2 798

261 Sides of walls, finished fairface m2 735

262 m2 353

Level 23 to Level 24

263 Soffits of suspended slab m2 691

264 Soffits of suspended slab, finished fairface m2 80

265 Sides of suspended slab, 150mm high m 46

266 Sides of suspended slab, 175mm high m 45

267 Sides of suspended slab, 200mm high m 190

268 Sides of drop, 75mm high m 50

269 Sides of drop, 300mm high m 84

270 Sides and soffits of attached and isolated beams m2 127

271 m2 22

272 Sides of steps, 150mm to 300mm high m 41

273 Sides of kerbs on slab m2 21

274 Sides of walls m2 798

275 Sides of walls, finished fairface m2 735

276 m2 353

Level 24 to Level 25

277 Soffits of suspended slab m2 691

278 Soffits of suspended slab, finished fairface m2 80

279 Sides of suspended slab, 150mm high m 46

280 Sides of suspended slab, 175mm high m 45

281 Sides of suspended slab, 200mm high m 190

282 Sides of drop, 75mm high m 50

283 Sides of drop, 300mm high m 84

284 Sides and soffits of attached and isolated beams m2 127

285 m2 22

286 Sides of steps, 150mm to 300mm high m 41

287 Sides of kerbs on slab m2 21

288 Sides of walls m2 798

289 Sides of walls, finished fairface m2 735

290 m2 353

Level 25 to Level 26

291 Soffits of suspended slab m2 691

292 Soffits of suspended slab, finished fairface m2 80

293 Sides of suspended slab, 150mm high m 46

294 Sides of suspended slab, 175mm high m 45

295 Sides of suspended slab, 200mm high m 190

296 Sides of drop, 75mm high m 50

297 Sides of drop, 300mm high m 84

298 Sides and soffits of attached and isolated beams m2 127

299 m2 22

300 Sides of steps, 150mm to 300mm high m 41

301 Sides of kerbs on slab m2 21

302 Sides of walls m2 798

303 Sides of walls, finished fairface m2 735

304 m2 353

Level 26 to Level 27

305 Soffits of suspended slab m2 691

306 Soffits of suspended slab, finished fairface m2 80

307 Sides of suspended slab, 150mm high m 46

308 Sides of suspended slab, 175mm high m 45

309 Sides of suspended slab, 200mm high m 190

310 Sides of drop, 75mm high m 50

311 Sides of drop, 300mm high m 84

312 Sides and soffits of attached and isolated beams m2 127

313 m2 22

314 Sides of steps, 150mm to 300mm high m 41

315 Sides of kerbs on slab m2 21

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Page 13: Imported Items

Page 237

316 Sides of walls m2 798

317 Sides of walls, finished fairface m2 735

318 m2 353

Level 27 to Level 28

319 Soffits of suspended slab m2 691

320 Soffits of suspended slab, finished fairface m2 80

321 Sides of suspended slab, 150mm high m 46

322 Sides of suspended slab, 175mm high m 45

323 Sides of suspended slab, 200mm high m 190

324 Sides of drop, 75mm high m 50

325 Sides of drop, 300mm high m 84

326 Sides and soffits of attached and isolated beams m2 127

327 m2 22

328 Sides of steps, 150mm to 300mm high m 41

329 Sides of kerbs on slab m2 21

330 Sides of walls m2 798

331 Sides of walls, finished fairface m2 735

332 m2 353

Level 28 to Level 29

333 Soffits of suspended slab m2 691

334 Soffits of suspended slab, finished fairface m2 80

335 Sides of suspended slab, 150mm high m 46

336 Sides of suspended slab, 175mm high m 45

337 Sides of suspended slab, 200mm high m 190

338 Sides of drop, 75mm high m 50

339 Sides of drop, 300mm high m 84

340 Sides and soffits of attached and isolated beams m2 127

341 m2 22

342 Sides of steps, 150mm to 300mm high m 41

343 Sides of kerbs on slab m2 21

344 Sides of walls m2 798

345 Sides of walls, finished fairface m2 735

346 m2 353

Level 29 to Level 30

347 Soffits of suspended slab m2 691

348 Soffits of suspended slab, finished fairface m2 80

349 Sides of suspended slab, 150mm high m 46

350 Sides of suspended slab, 175mm high m 45

351 Sides of suspended slab, 200mm high m 190

352 Sides of drop, 75mm high m 50

353 Sides of drop, 300mm high m 84

354 Sides and soffits of attached and isolated beams m2 127

355 m2 22

356 Sides of steps, 150mm to 300mm high m 41

357 Sides of kerbs on slab m2 21

358 Sides of walls m2 798

359 Sides of walls, finished fairface m2 735

360 m2 353

Level 30 to Level 31

361 Soffits of suspended slab m2 691

362 Soffits of suspended slab, finished fairface m2 80

363 Sides of suspended slab, 150mm high m 46

364 Sides of suspended slab, 175mm high m 45

365 Sides of suspended slab, 200mm high m 190

366 Sides of drop, 75mm high m 50

367 Sides of drop, 300mm high m 84

368 Sides and soffits of attached and isolated beams m2 127

369 m2 22

370 Sides of steps, 150mm to 300mm high m 41

371 Sides of kerbs on slab m2 21

372 Sides of walls m2 798

373 Sides of walls, finished fairface m2 735

374 m2 353

Level 31 to Level 32

375 Soffits of suspended slab m2 691

376 Soffits of suspended slab, finished fairface m2 80

377 Sides of suspended slab, 150mm high m 46

378 Sides of suspended slab, 175mm high m 45

379 Sides of suspended slab, 200mm high m 190

380 Sides of drop, 75mm high m 50

381 Sides of drop, 300mm high m 84

382 Sides and soffits of attached and isolated beams m2 127

383 m2 22

384 Sides of steps, 150mm to 300mm high m 41

385 Sides of kerbs on slab m2 21

386 Sides of walls m2 798

387 Sides of walls, finished fairface m2 735

388 m2 353

Level 32 to Level 33

389 Soffits of suspended slab m2 691

390 Soffits of suspended slab, finished fairface m2 80

391 Sides of suspended slab, 150mm high m 46

392 Sides of suspended slab, 175mm high m 45

393 Sides of suspended slab, 200mm high m 190

394 Sides of drop, 75mm high m 50

395 Sides of drop, 300mm high m 84

396 Sides and soffits of attached and isolated beams m2 127

397 m2 22

398 Sides of steps, 150mm to 300mm high m 41

399 Sides of kerbs on slab m2 21

400 Sides of walls m2 798

401 Sides of walls, finished fairface m2 735

402 m2 353

Level 33 to Level 34

403 Soffits of suspended slab m2 691

404 Soffits of suspended slab, finished fairface m2 80

405 Sides of suspended slab, 150mm high m 46

406 Sides of suspended slab, 175mm high m 45

407 Sides of suspended slab, 200mm high m 190

408 Sides of drop, 75mm high m 50

409 Sides of drop, 300mm high m 84

410 Sides and soffits of attached and isolated beams m2 127

411 m2 22

412 Sides of steps, 150mm to 300mm high m 41

413 Sides of kerbs on slab m2 21

414 Sides of walls m2 798

415 Sides of walls, finished fairface m2 735

416 m2 353

Level 34 to Level 35

417 Soffits of suspended slab m2 691

418 Soffits of suspended slab, finished fairface m2 80

419 Sides of suspended slab, 150mm high m 46

420 Sides of suspended slab, 175mm high m 45

421 Sides of suspended slab, 200mm high m 190

422 Sides of drop, 75mm high m 50

423 Sides of drop, 300mm high m 84

424 Sides and soffits of attached and isolated beams m2 127

425 m2 22

426 Sides of steps, 150mm to 300mm high m 41

427 Sides of kerbs on slab m2 21

428 Sides of walls m2 798

429 Sides of walls, finished fairface m2 735

430 m2 353

Level 35 to Level 36

431 Soffits of suspended slab m2 691

432 Soffits of suspended slab, finished fairface m2 80

433 Sides of suspended slab, 150mm high m 46

434 Sides of suspended slab, 175mm high m 45

435 Sides of suspended slab, 200mm high m 190

436 Sides of drop, 75mm high m 50

437 Sides of drop, 300mm high m 84

438 Sides and soffits of attached and isolated beams m2 127

439 m2 22

440 Sides of steps, 150mm to 300mm high m 41

441 Sides of kerbs on slab m2 21

442 Sides of walls m2 798

443 Sides of walls, finished fairface m2 735

444 m2 353

Level 36 to Level 37

445 Soffits of suspended slab m2 691

446 Soffits of suspended slab, finished fairface m2 80

447 Sides of suspended slab, 150mm high m 46

448 Sides of suspended slab, 175mm high m 45

449 Sides of suspended slab, 200mm high m 190

450 Sides of drop, 75mm high m 50

451 Sides of drop, 300mm high m 84

452 Sides and soffits of attached and isolated beams m2 127

453 m2 22

454 Sides of steps, 150mm to 300mm high m 41

455 Sides of kerbs on slab m2 21

456 Sides of walls m2 798

457 Sides of walls, finished fairface m2 735

458 m2 353

Level 37 to Level 38

459 Soffits of suspended slab m2 691

460 Soffits of suspended slab, finished fairface m2 80

461 Sides of suspended slab, 150mm high m 46

462 Sides of suspended slab, 175mm high m 45

463 Sides of suspended slab, 200mm high m 190

464 Sides of drop, 75mm high m 50

465 Sides of drop, 300mm high m 84

466 Sides and soffits of attached and isolated beams m2 127

467 m2 22

468 Sides of steps, 150mm to 300mm high m 41

469 Sides of kerbs on slab m2 21

470 Sides of walls m2 798

471 Sides of walls, finished fairface m2 735

472 m2 353

Level 38 to Level 39

473 Soffits of suspended slab m2 627

474 Soffits of suspended slab, finished fairface m2 80

475 Sides of suspended slab, 150mm high m 14

476 Sides of suspended slab, 200mm high m 66

477 Sides of drop & slab sides, 300mm high m 305

478 Sides and soffits of attached and isolated beams m2 120

479 Sides and soffits of slab beams m2 87

480 m2 28

481 Sides of steps, 150mm to 300mm high m 48

482 Sides of kerbs on slab m2 21

483 Sides of walls m2 798

484 Sides of walls, finished fairface m2 735

485 m2 353

Level 39 to Level 40

486 Soffits of suspended slab m2 385

487 Soffits of suspended slab, finished fairface m2 15

488 Sides of suspended slab, 150mm high m 10

489 Sides of suspended slab, 200mm high m 60

490 Sides of suspended slab, 300mm high m 110

491 Sides of drop, 250mm high m 14

492 Sides of drop, 300mm high m 46

493 Sides and soffits of attached and isolated beams m2 98

494 Sides and soffits of slab beams m2 50

495 m2 57

496 Sides of steps, 150mm to 300mm high m 108

497 Sides of kerbs on slab m2 44

498 Sides of columns m2 98

499 m2 1,360

500 Sides of walls, finished fairface m2 422

Level 40 to Level 41

501 Soffits of suspended slab m2 422

502 Soffits of suspended slab, finished fairface m2 39

503 Sides of suspended slab, 200mm high m 98

504 Sides of suspended slab, 300mm high m 116

505 Sides of drop, 250mm high m 10

506 Sides of drop, 300mm high m 15

507 Sides and soffits of attached and isolated beams m2 100

508 Sides and soffits of slab beams m2 40

509 m2 27

510 Sides of steps, 150mm to 300mm high m 53

511 Sides of kerbs on slab m2 18

512 m2 64

513 m2 253

514 Sides of walls, finished fairface m2 409

Level 41 to Roof Level

515 Soffits of suspended slab m2 137

516 Sides of suspended slab, 300mm high m 25

517 Sides of suspended slab, 350mm high m 45

518 Sides and soffits of attached and isolated beams m2 26

519 Sides of kerbs on slab m2 41

832a m2 15

832b Sides of walls, finished fairface m2 405

832c m2 143

Above Roof Level

832d Soffits of water tank cover slab m2 100

832e Sides of water tank cover slab, 300mm high m 46

832f Sides of walls, finished fairface m2 245

832g m2 185

Reinforcement

Level 04 to Level 05

520 A142 mesh for slab on filling m2 680

521 In suspended slab t 15.3

522 In attached and isolated beams t 3.6

523 In stairs including landing t 0.7

524 In kerbs on slab t 1.1

525 In core walls t 5.6

526 In structural walls t 16.9

Level 05 to Level 06

527 In suspended slab t 15.3

528 In attached and isolated beams t 3.6

529 In stairs including landing t 0.7

530 In kerbs on slab t 0.2

531 In core walls t 5.9

532 In structural walls t 16.3

Level 06 to Level 07

533 In suspended slab t 15.3

534 In attached and isolated beams t 3.6

535 In stairs including landing t 0.7

536 In kerbs on slab t 0.2

537 In core walls t 5.9

538 In structural walls t 16.3

Level 07 to Level 08

539 In suspended slab t 15.3

540 In attached and isolated beams t 3.6

541 In stairs including landing t 0.7

542 In kerbs on slab t 0.2

543 In core walls t 5.9

544 In structural walls t 16.3

Level 08 to Level 09

545 In suspended slab t 15.3

546 In attached and isolated beams t 3.6

547 In stairs including landing t 0.7

548 In kerbs on slab t 0.2

549 In core walls t 5.9

550 In structural walls t 16.3

Level 09 to Level 10

551 In suspended slab t 15.3

552 In attached and isolated beams t 3.6

553 In stairs including landing t 0.7

554 In kerbs on slab t 0.2

555 In core walls t 5.9

556 In structural walls t 16.3

Level 10 to Level 11

557 In suspended slab t 15.3

558 In attached and isolated beams t 3.6

559 In stairs including landing t 0.7

560 In kerbs on slab t 0.2

561 In core walls t 5.9

562 In structural walls t 16.3

Level 11 to Level 12

563 In suspended slab t 15.3

564 In attached and isolated beams t 3.6

565 In stairs including landing t 0.7

566 In kerbs on slab t 0.2

567 In core walls t 5.9

568 In structural walls t 16.3

Level 12 to Level 13

569 In suspended slab t 15.3

570 In attached and isolated beams t 3.6

571 In stairs including landing t 0.7

572 In kerbs on slab t 0.2

573 In core walls t 5.9

574 In structural walls t 16.3

Level 13 to Level 14

575 In suspended slab t 15.3

576 In attached and isolated beams t 3.6

577 In stairs including landing t 0.7

578 In kerbs on slab t 0.2

579 In core walls t 5.9

580 In structural walls t 16.3

Level 14 to Level 15

581 In suspended slab t 15.3

582 In attached and isolated beams t 3.6

583 In stairs including landing t 0.7

584 In kerbs on slab t 0.2

585 In core walls t 5.9

586 In structural walls t 16.3

Level 15 to Level 16

587 In suspended slab t 15.3

588 In attached and isolated beams t 3.6

589 In stairs including landing t 0.7

590 In kerbs on slab t 0.2

591 In core walls t 5.9

592 In structural walls t 16.3

Level 16 to Level 17

593 In suspended slab t 15.3

594 In attached and isolated beams t 3.6

595 In stairs including landing t 0.7

596 In kerbs on slab t 0.2

597 In core walls t 5.9

598 In structural walls t 16.3

Level 17 to Level 18

599 In suspended slab t 15.3

600 In attached and isolated beams t 3.6

601 In stairs including landing t 0.7

602 In kerbs on slab t 0.2

603 In core walls t 5.9

604 In structural walls t 16.3

Level 18 to Level 19

605 In suspended slab t 15.3

606 In attached and isolated beams t 3.6

607 In stairs including landing t 0.7

608 In kerbs on slab t 0.2

609 In core walls t 5.9

610 In structural walls t 16.3

Level 19 to Level 20

611 In suspended slab t 15.3

612 In attached and isolated beams t 3.6

613 In stairs including landing t 0.7

614 In kerbs on slab t 0.2

615 In core walls t 5.9

616 In structural walls t 16.3

Level 20 to Level 21

617 In suspended slab t 33.2

618 In attached and isolated beams t 5.5

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing, finished fairface

Sides of attached and isolated columns (irrespective of height and sectional area)Sides of walls, finished fairface including forming groovs to external

Sides of attached and isolated columns (irrespective of height and sectional area)

Sides of walls, finished fairface including forming groovs to external

Sides of walls, finished fairface including forming groovs to external

Page 14: Imported Items

Page 238

619 In stairs including landing t 0.9

620 In kerbs on slab t 0.2

621 In core walls t 5.9

622 In structural walls t 16.3

Level 21 to Level 22

623 In suspended slab t 15.2

624 In attached and isolated beams t 4.7

625 In stairs including landing t 0.9

626 In kerbs on slab t 0.2

627 In core walls t 6.6

628 In structural walls t 17.0

Level 22 to Level 23

629 In suspended slab t 15.2

630 In attached and isolated beams t 4.7

631 In stairs including landing t 0.7

632 In kerbs on slab t 0.2

633 In core walls t 6.4

634 In structural walls t 17.6

Level 23 to Level 24

635 In suspended slab t 15.2

636 In attached and isolated beams t 4.7

637 In stairs including landing t 0.7

638 In kerbs on slab t 0.2

639 In core walls t 6.4

640 In structural walls t 17.6

Level 24 to Level 25

641 In suspended slab t 15.2

642 In attached and isolated beams t 4.7

643 In stairs including landing t 0.7

644 In kerbs on slab t 0.2

645 In core walls t 6.4

646 In structural walls t 17.6

Level 25 to Level 26

647 In suspended slab t 15.2

648 In attached and isolated beams t 4.7

649 In stairs including landing t 0.7

650 In kerbs on slab t 0.2

651 In core walls t 6.4

652 In structural walls t 17.6

Level 26 to Level 27

653 In suspended slab t 15.2

654 In attached and isolated beams t 4.7

655 In stairs including landing t 0.7

656 In kerbs on slab t 0.2

657 In core walls t 6.4

658 In structural walls t 17.6

Level 27 to Level 28

659 In suspended slab t 15.2

660 In attached and isolated beams t 4.7

661 In stairs including landing t 0.7

662 In kerbs on slab t 0.2

663 In core walls t 6.4

664 In structural walls t 17.6

Level 28 to Level 29

665 In suspended slab t 15.2

666 In attached and isolated beams t 4.7

667 In stairs including landing t 0.7

668 In kerbs on slab t 0.2

669 In core walls t 6.4

670 In structural walls t 17.6

Level 29 to Level 30

671 In suspended slab t 15.2

672 In attached and isolated beams t 4.7

673 In stairs including landing t 0.7

674 In kerbs on slab t 0.2

675 In core walls t 6.4

676 In structural walls t 17.6

Level 30 to Level 31

677 In suspended slab t 15.2

678 In attached and isolated beams t 4.7

679 In stairs including landing t 0.7

680 In kerbs on slab t 0.2

681 In core walls t 6.4

682 In structural walls t 17.6

Level 31 to Level 32

683 In suspended slab t 15.2

684 In attached and isolated beams t 4.7

685 In stairs including landing t 0.7

686 In kerbs on slab t 0.2

687 In core walls t 6.4

688 In structural walls t 17.6

Level 32 to Level 33

689 In suspended slab t 15.2

690 In attached and isolated beams t 4.7

691 In stairs including landing t 0.7

692 In kerbs on slab t 0.2

693 In core walls t 6.4

694 In structural walls t 17.6

Level 33 to Level 34

695 In suspended slab t 15.2

696 In attached and isolated beams t 4.7

697 In stairs including landing t 0.7

698 In kerbs on slab t 0.2

699 In core walls t 6.4

700 In structural walls t 17.6

Level 34 to Level 35

701 In suspended slab t 15.2

702 In attached and isolated beams t 4.7

703 In stairs including landing t 0.7

704 In kerbs on slab t 0.2

705 In core walls t 6.4

706 In structural walls t 17.6

Level 35 to Level 36

707 In suspended slab t 15.2

708 In attached and isolated beams t 4.7

709 In stairs including landing t 0.7

710 In kerbs on slab t 0.2

711 In core walls t 6.4

712 In structural walls t 17.6

Level 36 to Level 37

713 In suspended slab t 15.2

714 In attached and isolated beams t 4.7

715 In stairs including landing t 0.7

716 In kerbs on slab t 0.2

717 In core walls t 6.4

718 In structural walls t 17.6

Level 37 to Level 38

719 In suspended slab t 15.2

720 In attached and isolated beams t 4.7

721 In stairs including landing t 0.7

722 In kerbs on slab t 0.2

723 In core walls t 6.4

724 In structural walls t 17.6

Level 38 to Level 39

725 In suspended slab t 23.8

726 In attached and isolated beams t 6.0

727 In slab beams t 10.5

728 In stairs including landing t 0.9

729 In kerbs on slab t 0.3

730 In core walls t 6.4

731 In structural walls t 17.6

Level 39 to Level 40

732 In suspended slab t 10.5

733 In attached and isolated beams t 3.5

734 In slab beams t 6.3

735 In stairs including landing t 1.8

736 In kerbs on slab t 0.3

737 In attached and isolated columns t 3.3

738 In core walls t 7.7

739 In structural walls t 13.5

Level 40 to Level 41

740 In suspended slab t 13.8

741 In attached and isolated beams t 5.6

742 In slab beams t 3.9

743 In stairs including landing t 0.9

744 In kerbs on slab t 0.2

745 In attached and isolated columns t 2.2

746 In core walls t 7.5

747 In structural walls t 9.7

Level 41 to Roof Level

748 In suspended slab t 4.8

749 In attached and isolated beams t 2.1

750 In kerbs on slab t 0.3

751 In attached and isolated columns t 0.8

752 In core walls t 7.6

753 In structural walls t 1.1

Above Roof Level

754 In water tank cover slab t 2.8

755 In structural walls t 6.5

756 In kerbs on slab t 0.2

Concrete Ancillaries

Pipe penetration

757 Item 1.00

758 Lintels; size 100 x 150mm m 1,342

759 Lintels; size 200 x 150mm m 152

760 In toilets at all levels m2 348

Concrete Filling over insulation

761 Level 39 m2 191

762 Level 40 m2 112

763 On roof slab m2 415

Joints

764 m 1,000.00

Pipe penetration through water retaining and water excluding slabs including approved bentonite water bar, approved bonding agent, etc. as per the detailed drawingRCC lintel including all necessary reinforcement, formwork and fixing in position in all floors as per the Drawings and specification

75mm thick RCC slab for fixing of vanity/wash basins including all necessary concrete, reinforcement, formwork as per the Drawings and specification in to the following

50mm tk. 1:3:6(20) concrete with galvanized steel wire mesh (3 50x50mm), 10mm tk. Expansion joints and sealed with an ∅approved sealant as per the detail drawings

Construction joint with compressible filler with sealant on top in RCC slabs including dowels etc. as per the typical detail drawings and specifications (Pro. Qty.)

Page 15: Imported Items

Page 1

CONCRETE WORKS (Cont'd)

Formwork

Level 04 to Level 05

-5 Soffits of suspended slab m2 546

-4 Soffits of suspended slab; finished fairface m2 77

-3 Sides of suspended slab, 50mm high m 24

-2 Sides of suspended slab, 150mm high m 100

-1 Sides of suspended slab, 175mm high m 38

0 Sides of suspended slab, 200mm high m 142

1 Sides of suspended slab, 300mm high m 48

2 Sides and soffits of attached and isolated beams m2 95

3 m2 14

4 Sides of steps, 150mm to 300mm high m 40

5 Sides of walls m2 527

6 Sides of walls; finished fairface m2 638

7 m2 343

8 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 05 to Level 06

9 Soffits of suspended slab m2 543

10 Soffits of suspended slab; finished fairface m2 80

11 Sides of suspended slab, 50mm high m 24

12 Sides of suspended slab, 150mm high m 100

13 Sides of suspended slab, 175mm high m 38

14 Sides of suspended slab, 200mm high m 142

15 Sides of suspended slab, 300mm high m 48

16 Sides and soffits of attached and isolated beams m2 95

17 m2 14

18 Sides of steps, 150mm to 300mm high m 40

19 Sides of walls m2 439

20 Sides of walls; finished fairface m2 638

21 m2 343

22 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 06 to Level 07

23 Soffits of suspended slab m2 543

24 Soffits of suspended slab; finished fairface m2 80

25 Sides of suspended slab, 50mm high m 24

26 Sides of suspended slab, 150mm high m 100

27 Sides of suspended slab, 175mm high m 38

28 Sides of suspended slab, 200mm high m 142

29 Sides of suspended slab, 300mm high m 48

30 Sides and soffits of attached and isolated beams m2 95

31 m2 14

32 Sides of steps, 150mm to 300mm high m 40

33 Sides of walls m2 439

34 Sides of walls; finished fairface m2 638

35 m2 343

36 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 07 to Level 08

37 Soffits of suspended slab m2 543

38 Soffits of suspended slab; finished fairface m2 80

39 Sides of suspended slab, 50mm high m 24

40 Sides of suspended slab, 150mm high m 100

41 Sides of suspended slab, 175mm high m 38

42 Sides of suspended slab, 200mm high m 142

43 Sides of suspended slab, 300mm high m 48

44 Sides and soffits of attached and isolated beams m2 95

45 m2 14

46 Sides of steps, 150mm to 300mm high m 40

47 Sides of walls m2 439

48 Sides of walls; finished fairface m2 638

49 m2 343

50 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 08 to Level 09

51 Soffits of suspended slab m2 543

52 Soffits of suspended slab; finished fairface m2 80

53 Sides of suspended slab, 50mm high m 24

54 Sides of suspended slab, 150mm high m 100

55 Sides of suspended slab, 175mm high m 38

56 Sides of suspended slab, 200mm high m 142

57 Sides of suspended slab, 300mm high m 48

58 Sides and soffits of attached and isolated beams m2 95

59 m2 14

60 Sides of steps, 150mm to 300mm high m 40

61 Sides of walls m2 439

62 Sides of walls; finished fairface m2 638

63 m2 343

64 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 09 to Level 10

65 Soffits of suspended slab m2 543

66 Soffits of suspended slab; finished fairface m2 80

67 Sides of suspended slab, 50mm high m 23

68 Sides of suspended slab, 150mm high m 100

69 Sides of suspended slab, 175mm high m 38

70 Sides of suspended slab, 200mm high m 142

71 Sides of suspended slab, 300mm high m 48

72 Sides and soffits of attached and isolated beams m2 95

73 m2 14

74 Sides of steps, 150mm to 300mm high m 40

75 Sides of walls m2 439

76 Sides of walls; finished fairface m2 638

77 m2 343

78 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 10 to Level 11

79 Soffits of suspended slab m2 543

80 Soffits of suspended slab; finished fairface m2 80

81 Sides of suspended slab, 50mm high m 23

82 Sides of suspended slab, 150mm high m 100

83 Sides of suspended slab, 175mm high m 38

84 Sides of suspended slab, 200mm high m 142

85 Sides of suspended slab, 300mm high m 48

86 Sides and soffits of attached and isolated beams m2 95

87 m2 14

88 Sides of steps, 150mm to 300mm high m 40

89 Sides of walls m2 439

90 Sides of walls; finished fairface m2 638

91 m2 343

92 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 11 to Level 12

93 Soffits of suspended slab m2 543

94 Soffits of suspended slab; finished fairface m2 80

95 Sides of suspended slab, 50mm high m 23

96 Sides of suspended slab, 150mm high m 100

97 Sides of suspended slab, 175mm high m 38

98 Sides of suspended slab, 200mm high m 142

99 Sides of suspended slab, 300mm high m 48

100 Sides and soffits of attached and isolated beams m2 95

101 m2 14

102 Sides of steps, 150mm to 300mm high m 40

103 Sides of walls m2 439

104 Sides of walls; finished fairface m2 638

105 m2 343

106 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 12 to Level 13

107 Soffits of suspended slab m2 543

108 Soffits of suspended slab; finished fairface m2 80

109 Sides of suspended slab, 50mm high m 23

110 Sides of suspended slab, 150mm high m 100

111 Sides of suspended slab, 175mm high m 38

112 Sides of suspended slab, 200mm high m 142

113 Sides of suspended slab, 300mm high m 48

114 Sides and soffits of attached and isolated beams m2 95

115 m2 14

116 Sides of steps, 150mm to 300mm high m 40

117 Sides of walls m2 439

118 Sides of walls; finished fairface m2 638

119 m2 343

120 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 13 to Level 14

121 Soffits of suspended slab m2 543

122 Soffits of suspended slab; finished fairface m2 80

123 Sides of suspended slab, 50mm high m 23

124 Sides of suspended slab, 150mm high m 100

125 Sides of suspended slab, 175mm high m 38

126 Sides of suspended slab, 200mm high m 142

127 Sides of suspended slab, 300mm high m 48

128 Sides and soffits of attached and isolated beams m2 95

129 m2 14

130 Sides of steps, 150mm to 300mm high m 40

131 Sides of walls m2 439

132 Sides of walls; finished fairface m2 638

133 m2 343

134 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 14 to Level 15

135 Soffits of suspended slab m2 543

136 Soffits of suspended slab; finished fairface m2 80

137 Sides of suspended slab, 50mm high m 23

138 Sides of suspended slab, 150mm high m 100

139 Sides of suspended slab, 175mm high m 38

140 Sides of suspended slab, 200mm high m 142

141 Sides of suspended slab, 300mm high m 48

142 Sides and soffits of attached and isolated beams m2 95

143 m2 14

144 Sides of steps, 150mm to 300mm high m 40

145 Sides of walls m2 439

146 Sides of walls; finished fairface m2 638

147 m2 343

148 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 15 to Level 16

149 Soffits of suspended slab m2 543

150 Soffits of suspended slab; finished fairface m2 80

151 Sides of suspended slab, 50mm high m 23

152 Sides of suspended slab, 150mm high m 100

153 Sides of suspended slab, 175mm high m 38

154 Sides of suspended slab, 200mm high m 142

155 Sides of suspended slab, 300mm high m 48

156 Sides and soffits of attached and isolated beams m2 95

157 m2 14

158 Sides of steps, 150mm to 300mm high m 40

159 Sides of walls m2 439

160 Sides of walls; finished fairface m2 638

161 m2 343

162 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 16 to Level 17

163 Soffits of suspended slab m2 543

164 Soffits of suspended slab; finished fairface m2 80

165 Sides of suspended slab, 50mm high m 23

166 Sides of suspended slab, 150mm high m 100

167 Sides of suspended slab, 175mm high m 38

168 Sides of suspended slab, 200mm high m 142

169 Sides of suspended slab, 300mm high m 48

170 Sides and soffits of attached and isolated beams m2 95

171 m2 14

172 Sides of steps, 150mm to 300mm high m 40

173 Sides of walls m2 439

174 Sides of walls; finished fairface m2 638

175 m2 343

176 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 17 to Level 18

177 Soffits of suspended slab m2 543

178 Soffits of suspended slab; finished fairface m2 80

179 Sides of suspended slab, 50mm high m 23

180 Sides of suspended slab, 150mm high m 100

181 Sides of suspended slab, 175mm high m 38

182 Sides of suspended slab, 200mm high m 142

183 Sides of suspended slab, 300mm high m 48

184 Sides and soffits of attached and isolated beams m2 95

185 m2 14

186 Sides of steps, 150mm to 300mm high m 40

187 Sides of walls m2 439

188 Sides of walls; finished fairface m2 638

189 m2 343

190 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 18 to Level 19

191 Soffits of suspended slab m2 543

192 Soffits of suspended slab; finished fairface m2 80

193 Sides of suspended slab, 50mm high m 23

194 Sides of suspended slab, 150mm high m 100

195 Sides of suspended slab, 175mm high m 38

196 Sides of suspended slab, 200mm high m 142

197 Sides of suspended slab, 300mm high m 48

198 Sides and soffits of attached and isolated beams m2 95

199 m2 14

200 Sides of steps, 150mm to 300mm high m 40

201 Sides of walls m2 439

202 Sides of walls; finished fairface m2 638

203 m2 343

204 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 19 to Level 20

205 Soffits of suspended slab m2 543

206 Soffits of suspended slab; finished fairface m2 80

207 Sides of suspended slab, 50mm high m 23

208 Sides of suspended slab, 150mm high m 100

209 Sides of suspended slab, 175mm high m 38

210 Sides of suspended slab, 200mm high m 142

211 Sides of suspended slab, 300mm high m 48

212 Sides and soffits of attached and isolated beams m2 95

213 m2 14

214 Sides of steps, 150mm to 300mm high m 40

215 Sides of walls m2 439

216 Sides of walls; finished fairface m2 638

217 m2 343

218 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 20 to Level 21

219 Soffits of suspended slab m2 534

220 Soffits of suspended slab; finished fairface m2 80

221 Sides of suspended slab, 50mm high m 23

222 Sides of suspended slab, 150mm high m 100

223 Sides of suspended slab, 175mm high m 38

224 Sides of suspended slab, 200mm high m 142

225 Sides of suspended slab, 300mm high m 48

226 Sides and soffits of attached and isolated beams m2 97

227 m2 14

228 Sides of steps, 150mm to 300mm high m 40

229 Sides of walls m2 439

230 Sides of walls; finished fairface m2 638

231 m2 343

232 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 21 to Level 22

233 Soffits of suspended slab m2 534

234 Soffits of suspended slab; finished fairface m2 80

235 Sides of suspended slab, 50mm high m 23

236 Sides of suspended slab, 150mm high m 100

237 Sides of suspended slab, 175mm high m 38

238 Sides of suspended slab, 200mm high m 142

239 Sides of suspended slab, 300mm high m 48

240 Sides and soffits of attached and isolated beams m2 97

241 m2 14

242 Sides of steps, 150mm to 300mm high m 40

243 Sides of walls m2 439

244 Sides of walls; finished fairface m2 638

245 m2 343

246 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 22 to Level 23

247 Soffits of suspended slab m2 534

248 Soffits of suspended slab; finished fairface m2 80

249 Sides of suspended slab, 50mm high m 23

250 Sides of suspended slab, 150mm high m 100

251 Sides of suspended slab, 175mm high m 38

252 Sides of suspended slab, 200mm high m 142

253 Sides of suspended slab, 300mm high m 48

254 Sides and soffits of attached and isolated beams m2 97

255 m2 14

256 Sides of steps, 150mm to 300mm high m 40

257 Sides of walls m2 439

258 Sides of walls; finished fairface m2 638

259 m2 343

260 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 23 to Level 24

261 Soffits of suspended slab m2 534

262 Soffits of suspended slab; finished fairface m2 80

263 Sides of suspended slab, 50mm high m 23

264 Sides of suspended slab, 150mm high m 100

265 Sides of suspended slab, 175mm high m 38

266 Sides of suspended slab, 200mm high m 142

267 Sides of suspended slab, 300mm high m 48

268 Sides and soffits of attached and isolated beams m2 97

269 m2 14

270 Sides of steps, 150mm to 300mm high m 40

271 Sides of walls m2 439

272 Sides of walls; finished fairface m2 638

273 m2 343

274 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 24 to Level 25

275 Soffits of suspended slab m2 534

276 Soffits of suspended slab; finished fairface m2 80

277 Sides of suspended slab, 50mm high m 23

278 Sides of suspended slab, 150mm high m 100

279 Sides of suspended slab, 175mm high m 38

280 Sides of suspended slab, 200mm high m 142

281 Sides of suspended slab, 300mm high m 48

282 Sides and soffits of attached and isolated beams m2 97

283 m2 14

284 Sides of steps, 150mm to 300mm high m 40

285 Sides of walls m2 439

286 Sides of walls; finished fairface m2 638

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Page 16: Imported Items

Page 2

287 m2 343

288 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 25 to Level 26

289 Soffits of suspended slab m2 534

290 Soffits of suspended slab; finished fairface m2 80

291 Sides of suspended slab, 50mm high m 23

292 Sides of suspended slab, 150mm high m 100

293 Sides of suspended slab, 175mm high m 38

294 Sides of suspended slab, 200mm high m 142

295 Sides of suspended slab, 300mm high m 48

296 Sides and soffits of attached and isolated beams m2 97

297 m2 14

298 Sides of steps, 150mm to 300mm high m 40

299 Sides of walls m2 439

300 Sides of walls; finished fairface m2 638

301 m2 343

302 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 26 to Level 27

303 Soffits of suspended slab m2 534

304 Soffits of suspended slab; finished fairface m2 80

305 Sides of suspended slab, 50mm high m 23

306 Sides of suspended slab, 150mm high m 100

307 Sides of suspended slab, 175mm high m 38

308 Sides of suspended slab, 200mm high m 142

309 Sides of suspended slab, 300mm high m 48

310 Sides and soffits of attached and isolated beams m2 97

311 m2 14

312 Sides of steps, 150mm to 300mm high m 40

313 Sides of walls m2 439

314 Sides of walls; finished fairface m2 638

315 m2 343

316 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 27 to Level 28

317 Soffits of suspended slab m2 534

318 Soffits of suspended slab; finished fairface m2 80

319 Sides of suspended slab, 50mm high m 23

320 Sides of suspended slab, 150mm high m 100

321 Sides of suspended slab, 175mm high m 38

322 Sides of suspended slab, 200mm high m 142

323 Sides of suspended slab, 300mm high m 48

324 Sides and soffits of attached and isolated beams m2 97

325 m2 14

326 Sides of steps, 150mm to 300mm high m 40

327 Sides of walls m2 439

328 Sides of walls; finished fairface m2 638

329 m2 343

330 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 28 to Level 29

331 Soffits of suspended slab m2 534

332 Soffits of suspended slab; finished fairface m2 80

333 Sides of suspended slab, 50mm high m 23

334 Sides of suspended slab, 150mm high m 100

335 Sides of suspended slab, 175mm high m 38

336 Sides of suspended slab, 200mm high m 142

337 Sides of suspended slab, 300mm high m 48

338 Sides and soffits of attached and isolated beams m2 97

339 m2 14

340 Sides of steps, 150mm to 300mm high m 40

341 Sides of walls m2 439

342 Sides of walls; finished fairface m2 638

343 m2 343

344 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 29 to Level 30

345 Soffits of suspended slab m2 534

346 Soffits of suspended slab; finished fairface m2 80

347 Sides of suspended slab, 50mm high m 23

348 Sides of suspended slab, 150mm high m 100

349 Sides of suspended slab, 175mm high m 38

350 Sides of suspended slab, 200mm high m 142

351 Sides of suspended slab, 300mm high m 48

352 Sides and soffits of attached and isolated beams m2 97

353 m2 14

354 Sides of steps, 150mm to 300mm high m 40

355 Sides of walls m2 439

356 Sides of walls; finished fairface m2 638

357 m2 343

358 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 30 to Level 31

359 Soffits of suspended slab m2 534

360 Soffits of suspended slab; finished fairface m2 80

361 Sides of suspended slab, 50mm high m 23

362 Sides of suspended slab, 150mm high m 100

363 Sides of suspended slab, 175mm high m 38

364 Sides of suspended slab, 200mm high m 142

365 Sides of suspended slab, 300mm high m 48

366 Sides and soffits of attached and isolated beams m2 97

367 m2 14

368 Sides of steps, 150mm to 300mm high m 40

369 Sides of walls m2 439

370 Sides of walls; finished fairface m2 638

371 m2 343

372 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 31 to Level 32

373 Soffits of suspended slab m2 534

374 Soffits of suspended slab; finished fairface m2 80

375 Sides of suspended slab, 50mm high m 23

376 Sides of suspended slab, 150mm high m 100

377 Sides of suspended slab, 175mm high m 38

378 Sides of suspended slab, 200mm high m 142

379 Sides of suspended slab, 300mm high m 48

380 Sides and soffits of attached and isolated beams m2 97

381 m2 14

382 Sides of steps, 150mm to 300mm high m 40

383 Sides of walls m2 439

384 Sides of walls; finished fairface m2 638

385 m2 343

386 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 32 to Level 33

387 Soffits of suspended slab m2 534

388 Soffits of suspended slab; finished fairface m2 80

389 Sides of suspended slab, 50mm high m 23

390 Sides of suspended slab, 150mm high m 100

391 Sides of suspended slab, 175mm high m 38

392 Sides of suspended slab, 200mm high m 142

393 Sides of suspended slab, 300mm high m 48

394 Sides and soffits of attached and isolated beams m2 97

395 m2 14

396 Sides of steps, 150mm to 300mm high m 40

397 Sides of walls m2 439

398 Sides of walls; finished fairface m2 638

399 m2 343

400 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 33 to Level 34

401 Soffits of suspended slab m2 534

402 Soffits of suspended slab; finished fairface m2 80

403 Sides of suspended slab, 50mm high m 23

404 Sides of suspended slab, 150mm high m 100

405 Sides of suspended slab, 175mm high m 38

406 Sides of suspended slab, 200mm high m 142

407 Sides of suspended slab, 300mm high m 48

408 Sides and soffits of attached and isolated beams m2 97

409 m2 14

410 Sides of steps, 150mm to 300mm high m 40

411 Sides of walls m2 439

412 Sides of walls; finished fairface m2 638

413 m2 343

414 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 34 to Level 35

415 Soffits of suspended slab m2 534

416 Soffits of suspended slab; finished fairface m2 80

417 Sides of suspended slab, 50mm high m 23

418 Sides of suspended slab, 150mm high m 100

419 Sides of suspended slab, 175mm high m 38

420 Sides of suspended slab, 200mm high m 142

421 Sides of suspended slab, 300mm high m 48

422 Sides and soffits of attached and isolated beams m2 97

423 m2 14

424 Sides of steps, 150mm to 300mm high m 40

425 Sides of walls m2 439

426 Sides of walls; finished fairface m2 638

427 m2 343

428 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 35 to Level 36

429 Soffits of suspended slab m2 534

430 Soffits of suspended slab; finished fairface m2 80

431 Sides of suspended slab, 50mm high m 23

432 Sides of suspended slab, 150mm high m 100

433 Sides of suspended slab, 175mm high m 38

434 Sides of suspended slab, 200mm high m 142

435 Sides of suspended slab, 300mm high m 48

436 Sides and soffits of attached and isolated beams m2 97

437 m2 14

438 Sides of steps, 150mm to 300mm high m 40

439 Sides of walls m2 439

440 Sides of walls; finished fairface m2 638

441 m2 343

442 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 36 to Level 37

443 Soffits of suspended slab m2 534

444 Soffits of suspended slab; finished fairface m2 80

445 Sides of suspended slab, 50mm high m 23

446 Sides of suspended slab, 150mm high m 100

447 Sides of suspended slab, 175mm high m 38

448 Sides of suspended slab, 200mm high m 142

449 Sides of suspended slab, 300mm high m 48

450 Sides and soffits of attached and isolated beams m2 97

451 m2 14

452 Sides of steps, 150mm to 300mm high m 40

453 Sides of walls m2 439

454 Sides of walls; finished fairface m2 638

455 m2 343

456 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 37 to Level 38

457 Soffits of suspended slab m2 534

458 Soffits of suspended slab; finished fairface m2 80

459 Sides of suspended slab, 50mm high m 23

460 Sides of suspended slab, 150mm high m 100

461 Sides of suspended slab, 175mm high m 38

462 Sides of suspended slab, 200mm high m 142

463 Sides of suspended slab, 300mm high m 48

464 Sides and soffits of attached and isolated beams m2 97

465 m2 14

466 Sides of steps, 150mm to 300mm high m 40

467 Sides of walls m2 439

468 Sides of walls; finished fairface m2 638

469 m2 343

470 Sides of kerbs on slab m2 58

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 38 to Level 39

471 Soffits of suspended slab m2 434

472 Soffits of suspended slab; finished fairface m2 80

780 Sides of suspended slab, 175mm high m 35

781 Sides of suspended slab, 200mm high m 46

783 Sides of suspended slab, 300mm high m 140

784 Sides and soffits of attached and isolated beams m2 467

785 m2 14

786 Sides of steps, 150mm to 300mm high m 40

787 Sides of walls m2 439

788 Sides of walls; finished fairface m2 638

789 m2 343

790 Sides of kerbs on slab m2 59

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 39 to Level 40

485 Soffits of suspended slab m2 338

486 Soffits of suspended slab; finished fairface m2 8

487 Sides of suspended slab, 150mm high m 8

488 Sides of suspended slab, 200mm high m 25

489 Sides of suspended slab, 300mm high m 146

490 m2 176

491 m2 32

492 Sides of steps, 150mm to 300mm high m 85

493 m2 528

494 Sides of walls; finished fairface m2 692

495 Sides of kerbs on slab m2 36

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 40 to Level 41

496 Soffits of suspended slab m2 63

497 Soffits of suspended slab; finished fairface m2 28

498 Sides of suspended slab, 200mm high m 2

499 Sides of suspended slab, 300mm high m 166

500 Sides and soffits of attached and isolated beams m2 125

501 m2 14

502 Sides of steps, 150mm to 300mm high m 38

503 m2 443

504 Sides of walls; finished fairface m2 647

505 Sides of kerbs on slab m2 16

CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 41 to Roof Level

506 Soffits of suspended slab m2 115

507 Sides of suspended slab, 275mm high m 61

813a Sides and soffits of attached and isolated beams m2 3

814 m2 8

815 Sides of steps, 150mm to 300mm high m 18

816 Sides of walls; finished fairface m2 200

817 m2 164

817a Sides of kerbs on slab m2 17

Above Roof Level

817b Soffits of water tank cover slab m2 60

817c Sides of suspended slab, 300mm high m 32

817d Sides of kerbs on slab m2 13

817e Sides of walls; finished fairface m2 260

CONCRETE WORKS (Cont'd)

Reinforcement

Level 04 to Level 05

512 A142 mesh for slab on filling m2 390

513 In suspended slab t 11.50

514 In attached and isolated beams t 3.20

515 In stairs including landing & attached beam t 0.60

516 In core walls t 6.50

517 In structural walls t 12.70

518 In kerbs on slab t 0.40

Level 05 to Level 06

519 In suspended slab t 11.50

520 In attached and isolated beams t 3.20

521 In stairs including landing & attached beam t 0.60

522 In core walls t 6.10

523 In structural walls t 12.40

524 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 06 to Level 07

525 In suspended slab t 11.50

526 In attached and isolated beams t 3.20

527 In stairs including landing & attached beam t 0.60

528 In core walls t 6.10

529 In structural walls t 12.40

530 In kerbs on slab t 0.40

Level 07 to Level 08

531 In suspended slab t 11.50

532 In attached and isolated beams t 3.20

533 In stairs including landing & attached beam t 0.60

534 In core walls t 6.10

535 In structural walls t 12.40

536 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 08 to Level 09

537 In suspended slab t 11.50

538 In attached and isolated beams t 3.20

539 In stairs including landing & attached beam t 0.60

540 In core walls t 6.10

541 In structural walls t 12.40

542 In kerbs on slab t 0.40

Level 09 to Level 10

543 In suspended slab t 11.50

544 In attached and isolated beams t 3.20

545 In stairs including landing & attached beam t 0.60

546 In core walls t 6.10

547 In structural walls t 12.40

548 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 10 to Level 11

549 In suspended slab t 11.50

550 In attached and isolated beams t 3.20

551 In stairs including landing & attached beam t 0.60

552 In core walls t 6.10

553 In structural walls t 12.40

554 In kerbs on slab t 0.40

Level 11 to Level 12

555 In suspended slab t 11.50

556 In attached and isolated beams t 3.20

557 In stairs including landing & attached beam t 0.60

558 In core walls t 6.10

559 In structural walls t 12.40

560 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 12 to Level 13

561 In suspended slab t 11.50

562 In attached and isolated beams t 3.20

563 In stairs including landing & attached beam t 0.60

564 In core walls t 6.10

565 In structural walls t 12.40

566 In kerbs on slab t 0.40

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of attached and isolated beams and slab beamsSides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Page 17: Imported Items

Page 3

Level 13 to Level 14

567 In suspended slab t 11.50

568 In attached and isolated beams t 3.20

569 In stairs including landing & attached beam t 0.60

570 In core walls t 6.10

571 In structural walls t 12.40

572 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 14 to Level 15

573 In suspended slab t 11.50

574 In attached and isolated beams t 3.20

575 In stairs including landing & attached beam t 0.60

576 In core walls t 6.10

577 In structural walls t 12.40

578 In kerbs on slab t 0.40

Level 15 to Level 16

579 In suspended slab t 11.50

580 In attached and isolated beams t 3.20

581 In stairs including landing & attached beam t 0.60

582 In core walls t 6.10

583 In structural walls t 12.40

584 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 16 to Level 17

585 In suspended slab t 11.50

586 In attached and isolated beams t 3.20

587 In stairs including landing & attached beam t 0.60

588 In core walls t 6.10

589 In structural walls t 12.40

590 In kerbs on slab t 0.40

Level 17 to Level 18

591 In suspended slab t 11.50

592 In attached and isolated beams t 3.20

593 In stairs including landing & attached beam t 0.60

594 In core walls t 6.10

595 In structural walls t 12.40

596 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 18 to Level 19

597 In suspended slab t 11.50

598 In attached and isolated beams t 3.20

599 In stairs including landing & attached beam t 0.60

600 In core walls t 6.10

601 In structural walls t 12.40

602 In kerbs on slab t 0.40

Level 19 to Level 20

603 In suspended slab t 11.50

604 In attached and isolated beams t 3.20

605 In stairs including landing & attached beam t 0.60

606 In core walls t 6.10

607 In structural walls t 12.40

608 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 20 to Level 21

609 In suspended slab t 11.30

610 In attached and isolated beams t 3.20

611 In stairs including landing & attached beam t 0.60

612 In core walls t 6.10

613 In structural walls t 12.40

614 In kerbs on slab t 0.40

Level 21 to Level 22

615 In suspended slab t 11.30

616 In attached and isolated beams t 3.20

617 In stairs including landing & attached beam t 0.60

618 In core walls t 6.10

619 In structural walls t 12.40

620 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 22 to Level 23

621 In suspended slab t 11.30

622 In attached and isolated beams t 3.20

623 In stairs including landing & attached beam t 0.60

624 In core walls t 6.10

625 In structural walls t 12.40

626 In kerbs on slab t 0.40

Level 23 to Level 24

627 In suspended slab t 11.30

628 In attached and isolated beams t 3.20

629 In stairs including landing & attached beam t 0.60

630 In core walls t 6.10

631 In structural walls t 12.40

632 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 24 to Level 25

633 In suspended slab t 11.30

634 In attached and isolated beams t 3.20

635 In stairs including landing & attached beam t 0.60

636 In core walls t 6.10

637 In structural walls t 12.40

638 In kerbs on slab t 0.40

Level 25 to Level 26

639 In suspended slab t 11.30

640 In attached and isolated beams t 3.20

641 In stairs including landing & attached beam t 0.60

642 In core walls t 6.10

643 In structural walls t 12.40

644 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 26 to Level 27

645 In suspended slab t 11.30

646 In attached and isolated beams t 3.20

647 In stairs including landing & attached beam t 0.60

648 In core walls t 6.10

649 In structural walls t 12.40

650 In kerbs on slab t 0.40

Level 27 to Level 28

651 In suspended slab t 11.30

652 In attached and isolated beams t 3.20

653 In stairs including landing & attached beam t 0.60

654 In core walls t 6.10

655 In structural walls t 12.40

656 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 28 to Level 29

657 In suspended slab t 11.30

658 In attached and isolated beams t 3.20

659 In stairs including landing & attached beam t 0.60

660 In core walls t 6.10

661 In structural walls t 12.40

662 In kerbs on slab t 0.40

Level 29 to Level 30

663 In suspended slab t 11.30

664 In attached and isolated beams t 3.20

665 In stairs including landing & attached beam t 0.60

666 In core walls t 6.10

667 In structural walls t 12.40

668 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 30 to Level 31

669 In suspended slab t 11.30

670 In attached and isolated beams t 3.20

671 In stairs including landing & attached beam t 0.60

672 In core walls t 6.10

673 In structural walls t 12.40

674 In kerbs on slab t 0.40

Level 31 to Level 32

675 In suspended slab t 11.30

676 In attached and isolated beams t 3.20

677 In stairs including landing & attached beam t 0.60

678 In core walls t 6.10

679 In structural walls t 12.40

680 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 32 to Level 33

681 In suspended slab t 11.30

682 In attached and isolated beams t 3.20

683 In stairs including landing & attached beam t 0.60

684 In core walls t 6.10

685 In structural walls t 12.40

686 In kerbs on slab t 0.40

Level 33 to Level 34

687 In suspended slab t 11.30

688 In attached and isolated beams t 3.20

689 In stairs including landing & attached beam t 0.60

690 In core walls t 6.10

691 In structural walls t 12.40

692 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 34 to Level 35

693 In suspended slab t 11.30

694 In attached and isolated beams t 3.20

695 In stairs including landing & attached beam t 0.60

696 In core walls t 6.10

697 In structural walls t 12.40

698 In kerbs on slab t 0.40

Level 35 to Level 36

699 In suspended slab t 11.30

700 In attached and isolated beams t 3.20

701 In stairs including landing & attached beam t 0.60

702 In core walls t 6.10

703 In structural walls t 12.40

704 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 36 to Level 37

705 In suspended slab t 11.30

706 In attached and isolated beams t 3.20

707 In stairs including landing & attached beam t 0.60

708 In core walls t 6.10

709 In structural walls t 12.40

710 In kerbs on slab t 0.40

Level 37 to Level 38

711 In suspended slab t 11.30

712 In attached and isolated beams t 3.20

713 In stairs including landing & attached beam t 0.60

714 In core walls t 6.10

715 In structural walls t 12.40

716 In kerbs on slab t 0.40

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 38 to Level 39

717 In suspended slab t 13.90

1023a In slab beams t 15.80

1024 In attached and isolated beams t 1.80

1025 In stairs including landing & attached beam t 0.60

1026 In core walls t 6.10

1027 In structural walls t 12.40

1028 In kerbs on slab t 0.40

Level 39 to Level 40

1029 In suspended slab t 10.20

1029a In slab beams t 3.70

1030 In attached and isolated beams t 2.10

1031 In stairs including landing & attached beam t 1.20

1032 In core walls t 6.40

1033 In structural walls t 9.40

1034 In kerbs on slab t 0.20

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 40 to Level 41

729 In suspended slab t 3.3

730 In attached and isolated beams t 3.9

731 In stairs including landing & attached beam t 0.6

732 In core walls t 7.1

733 In structural walls t 7.8

734 In kerbs on slab t 0.2

Level 41 to Roof Level

735 In suspended slab t 3.1

1041a In attached and isolated beams t 3.5

1042 In stairs including landing & attached beam t 0.3

1043 In core walls t 2.1

1044 In structural walls t 2.6

739 In kerbs on slab t 0.1

Above Roof Level

740 In suspended slab t 1.6

741 In kerbs on slab t 0.1

742 In structural walls t 3.9

CONCRETE WORKS (Cont'd)

Concrete Ancillaries

743 Item 1.0

744 Lintels; size 100 x 100mm m 469

745 Lintels; size 200 x 100mm m 4

Concrete Filling over insulation

746 Level 40 m2 49

747 Level 41 m2 459

748 On roof slab m2 646

749 In toilets at all levels m2 242

Joints

750 m 750.00

Pipe penetration through water retaining and water excluding slabs including approved bentonite water bar, approved bonding agent, etc. as per the detailed drawingRCC lintel including all necessary reinforcement, formwork and fixing in position in all floors as per the Drawings and specification

50mm tk. 1:3:6(20) concrete with galvanized steel wire mesh (3 50x50mm), 10mm tk. Expansion joints and sealed with ∅an approved sealant as per the detail drawings

75mm thick RCC slab for fixing of vanity/wash basins including all necessary concrete, reinforcement, formwork as per the Drawings and specification in to the following

Construction joint with compressible filler with sealant on top in RCC slabs including dowels etc. as per the typical detail drawings and specifications (Pro. Qty.)

Page 18: Imported Items

Page 142

F CONCRETE WORKS (Cont'd)Formwork

Level 04 to Level 05

-2 Soffits of suspended slab m2 558

-1 Soffits of suspended slab; finished fairface m2 71

0 Sides of suspended slab, 50mm high m 3

1 Sides of suspended slab, 75mm high m 24

2 Sides of suspended slab, 150mm high m 38

3 Sides of suspended slab, 175mm high m 40

4 Sides of suspended slab, 200mm high m 169

5 Sides of suspended slab, 300mm high m 48

6 Sides and soffits of attached and isolated beams m2 102

7 m2 12

8 Sides of steps, 150mm to 300mm high m 34

9 Sides of walls m2 521

10 Sides of walls; finished fairface m2 703

11 m2 341

12 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 05 to Level 06

13 Soffits of suspended slab m2 559

14 Soffits of suspended slab; finished fairface m2 70

15 Sides of suspended slab, 50mm high m 3

16 Sides of suspended slab, 75mm high m 24

17 Sides of suspended slab, 150mm high m 38

18 Sides of suspended slab, 175mm high m 40

19 Sides of suspended slab, 200mm high m 169

20 Sides of suspended slab, 300mm high m 48

21 Sides and soffits of attached and isolated beams m2 102

22 m2 12

23 Sides of steps, 150mm to 300mm high m 34

24 Sides of walls m2 521

25 Sides of walls; finished fairface m2 703

26 m2 341

27 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 06 to Level 07

28 Soffits of suspended slab m2 559

29 Soffits of suspended slab; finished fairface m2 70

30 Sides of suspended slab, 50mm high m 3

31 Sides of suspended slab, 75mm high m 24

32 Sides of suspended slab, 150mm high m 38

33 Sides of suspended slab, 175mm high m 40

34 Sides of suspended slab, 200mm high m 169

35 Sides of suspended slab, 300mm high m 48

36 Sides and soffits of attached and isolated beams m2 102

37 m2 12

38 Sides of steps, 150mm to 300mm high m 34

39 Sides of walls m2 521

40 Sides of walls; finished fairface m2 703

41 m2 341

42 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 07 to Level 08

43 Soffits of suspended slab m2 559

44 Soffits of suspended slab; finished fairface m2 70

45 Sides of suspended slab, 50mm high m 3

46 Sides of suspended slab, 75mm high m 24

47 Sides of suspended slab, 150mm high m 38

48 Sides of suspended slab, 175mm high m 40

49 Sides of suspended slab, 200mm high m 169

50 Sides of suspended slab, 300mm high m 48

51 Sides and soffits of attached and isolated beams m2 102

52 m2 12

53 Sides of steps, 150mm to 300mm high m 34

54 Sides of walls m2 521

55 Sides of walls; finished fairface m2 703

56 m2 341

57 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 08 to Level 09

58 Soffits of suspended slab m2 559

59 Soffits of suspended slab; finished fairface m2 70

60 Sides of suspended slab, 50mm high m 3

61 Sides of suspended slab, 75mm high m 24

62 Sides of suspended slab, 150mm high m 38

63 Sides of suspended slab, 175mm high m 40

64 Sides of suspended slab, 200mm high m 169

65 Sides of suspended slab, 300mm high m 48

66 Sides and soffits of attached and isolated beams m2 102

67 m2 12

68 Sides of steps, 150mm to 300mm high m 34

69 Sides of walls m2 521

70 Sides of walls; finished fairface m2 703

71 m2 341

72 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 09 to Level 10

73 Soffits of suspended slab m2 559

74 Soffits of suspended slab; finished fairface m2 70

75 Sides of suspended slab, 50mm high m 3

76 Sides of suspended slab, 75mm high m 24

77 Sides of suspended slab, 150mm high m 38

78 Sides of suspended slab, 175mm high m 40

79 Sides of suspended slab, 200mm high m 169

80 Sides of suspended slab, 300mm high m 48

81 Sides and soffits of attached and isolated beams m2 102

82 m2 12

83 Sides of steps, 150mm to 300mm high m 34

84 Sides of walls m2 521

85 Sides of walls; finished fairface m2 703

86 m2 341

87 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 10 to Level 11

88 Soffits of suspended slab m2 559

89 Soffits of suspended slab; finished fairface m2 70

90 Sides of suspended slab, 50mm high m 3

91 Sides of suspended slab, 75mm high m 24

92 Sides of suspended slab, 150mm high m 38

93 Sides of suspended slab, 175mm high m 40

94 Sides of suspended slab, 200mm high m 169

95 Sides of suspended slab, 300mm high m 48

96 Sides and soffits of attached and isolated beams m2 102

97 m2 12

98 Sides of steps, 150mm to 300mm high m 34

99 Sides of walls m2 521

100 Sides of walls; finished fairface m2 703

101 m2 341

102 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 11 to Level 12

103 Soffits of suspended slab m2 559

104 Soffits of suspended slab; finished fairface m2 70

105 Sides of suspended slab, 50mm high m 3

106 Sides of suspended slab, 75mm high m 24

107 Sides of suspended slab, 150mm high m 38

108 Sides of suspended slab, 175mm high m 40

109 Sides of suspended slab, 200mm high m 169

110 Sides of suspended slab, 300mm high m 48

111 Sides and soffits of attached and isolated beams m2 102

112 m2 12

113 Sides of steps, 150mm to 300mm high m 34

114 Sides of walls m2 521

115 Sides of walls; finished fairface m2 703

116 m2 341

117 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 12 to Level 13

118 Soffits of suspended slab m2 559

119 Soffits of suspended slab; finished fairface m2 70

120 Sides of suspended slab, 50mm high m 3

121 Sides of suspended slab, 75mm high m 24

122 Sides of suspended slab, 150mm high m 38

123 Sides of suspended slab, 175mm high m 40

124 Sides of suspended slab, 200mm high m 169

125 Sides of suspended slab, 300mm high m 48

126 Sides and soffits of attached and isolated beams m2 102

127 m2 12

128 Sides of steps, 150mm to 300mm high m 34

129 Sides of walls m2 521

130 Sides of walls; finished fairface m2 703

131 m2 341

132 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 13 to Level 14

133 Soffits of suspended slab m2 559

134 Soffits of suspended slab; finished fairface m2 70

135 Sides of suspended slab, 50mm high m 3

136 Sides of suspended slab, 75mm high m 24

137 Sides of suspended slab, 150mm high m 38

138 Sides of suspended slab, 175mm high m 40

139 Sides of suspended slab, 200mm high m 169

140 Sides of suspended slab, 300mm high m 48

141 Sides and soffits of attached and isolated beams m2 102

142 m2 12

143 Sides of steps, 150mm to 300mm high m 34

144 Sides of walls m2 521

145 Sides of walls; finished fairface m2 703

146 m2 341

147 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 14 to Level 15

148 Soffits of suspended slab m2 559

149 Soffits of suspended slab; finished fairface m2 70

150 Sides of suspended slab, 50mm high m 3

151 Sides of suspended slab, 75mm high m 24

152 Sides of suspended slab, 150mm high m 38

153 Sides of suspended slab, 175mm high m 40

154 Sides of suspended slab, 200mm high m 169

155 Sides of suspended slab, 300mm high m 48

156 Sides and soffits of attached and isolated beams m2 102

157 m2 12

158 Sides of steps, 150mm to 300mm high m 34

159 Sides of walls m2 521

160 Sides of walls; finished fairface m2 703

161 m2 341

162 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 15 to Level 16

163 Soffits of suspended slab m2 559

164 Soffits of suspended slab; finished fairface m2 70

165 Sides of suspended slab, 50mm high m 3

166 Sides of suspended slab, 75mm high m 24

167 Sides of suspended slab, 150mm high m 38

168 Sides of suspended slab, 175mm high m 40

169 Sides of suspended slab, 200mm high m 169

170 Sides of suspended slab, 300mm high m 48

171 Sides and soffits of attached and isolated beams m2 102

172 m2 12

173 Sides of steps, 150mm to 300mm high m 34

174 Sides of walls m2 521

175 Sides of walls; finished fairface m2 703

176 m2 341

177 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 16 to Level 17

178 Soffits of suspended slab m2 559

179 Soffits of suspended slab; finished fairface m2 70

180 Sides of suspended slab, 50mm high m 3

181 Sides of suspended slab, 75mm high m 24

182 Sides of suspended slab, 150mm high m 38

183 Sides of suspended slab, 175mm high m 40

184 Sides of suspended slab, 200mm high m 169

185 Sides of suspended slab, 300mm high m 48

186 Sides and soffits of attached and isolated beams m2 102

187 m2 12

188 Sides of steps, 150mm to 300mm high m 34

189 Sides of walls m2 521

190 Sides of walls; finished fairface m2 703

191 m2 341

192 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 17 to Level 18

193 Soffits of suspended slab m2 559

194 Soffits of suspended slab; finished fairface m2 70

195 Sides of suspended slab, 50mm high m 3

196 Sides of suspended slab, 75mm high m 24

197 Sides of suspended slab, 150mm high m 38

198 Sides of suspended slab, 175mm high m 40

199 Sides of suspended slab, 200mm high m 169

200 Sides of suspended slab, 300mm high m 48

201 Sides and soffits of attached and isolated beams m2 102

202 m2 12

203 Sides of steps, 150mm to 300mm high m 34

204 Sides of walls m2 521

205 Sides of walls; finished fairface m2 703

206 m2 341

207 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 18 to Level 19

208 Soffits of suspended slab m2 559

209 Soffits of suspended slab; finished fairface m2 70

210 Sides of suspended slab, 50mm high m 3

211 Sides of suspended slab, 75mm high m 24

212 Sides of suspended slab, 150mm high m 38

213 Sides of suspended slab, 175mm high m 40

214 Sides of suspended slab, 200mm high m 169

215 Sides of suspended slab, 300mm high m 48

216 Sides and soffits of attached and isolated beams m2 102

217 m2 12

218 Sides of steps, 150mm to 300mm high m 34

219 Sides of walls m2 521

220 Sides of walls; finished fairface m2 703

221 m2 341

222 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 19 to Level 20

223 Soffits of suspended slab m2 559

224 Soffits of suspended slab; finished fairface m2 70

225 Sides of suspended slab, 50mm high m 3

226 Sides of suspended slab, 75mm high m 24

227 Sides of suspended slab, 150mm high m 38

228 Sides of suspended slab, 175mm high m 40

229 Sides of suspended slab, 200mm high m 169

230 Sides of suspended slab, 300mm high m 48

231 Sides and soffits of attached and isolated beams m2 102

232 m2 12

233 Sides of steps, 150mm to 300mm high m 34

234 Sides of walls m2 521

235 Sides of walls; finished fairface m2 703

236 m2 341

237 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 20 to Level 21

238 Soffits of suspended slab m2 550

239 Soffits of suspended slab; finished fairface m2 70

240 Sides of suspended slab, 75mm high m 22

241 Sides of suspended slab, 150mm high m 29

242 Sides of suspended slab, 175mm high m 40

243 Sides of suspended slab, 200mm high m 189

244 Sides of suspended slab, 300mm high m 50

245 Sides and soffits of attached and isolated beams m2 98

246 m2 12

247 Sides of steps, 150mm to 300mm high m 34

248 Sides of walls m2 521

249 Sides of walls; finished fairface m2 703

250 m2 341

251 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 21 to Level 22

252 Soffits of suspended slab m2 543

253 Soffits of suspended slab; finished fairface m2 72

254 Sides of suspended slab, 75mm high m 23

255 Sides of suspended slab, 175mm high m 40

256 Sides of suspended slab, 200mm high m 219

257 Sides of suspended slab, 300mm high m 50

258 Sides and soffits of attached and isolated beams m2 98

259 m2 12

260 Sides of steps, 150mm to 300mm high m 34

261 Sides of walls m2 540

262 Sides of walls; finished fairface m2 703

263 m2 341

264 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 22 to Level 23

265 Soffits of suspended slab m2 543

266 Soffits of suspended slab; finished fairface m2 72

267 Sides of suspended slab, 75mm high m 23

268 Sides of suspended slab, 175mm high m 40

269 Sides of suspended slab, 200mm high m 219

270 Sides of suspended slab, 300mm high m 50

271 Sides and soffits of attached and isolated beams m2 98

272 m2 12

273 Sides of steps, 150mm to 300mm high m 34

274 Sides of walls m2 506

275 Sides of walls; finished fairface m2 703

276 m2 341

277 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 23 to Level 24

278 Soffits of suspended slab m2 543

279 Soffits of suspended slab; finished fairface m2 72

280 Sides of suspended slab, 75mm high m 23

281 Sides of suspended slab, 175mm high m 40

282 Sides of suspended slab, 200mm high m 219

283 Sides of suspended slab, 300mm high m 50

284 Sides and soffits of attached and isolated beams m2 98

285 m2 12

286 Sides of steps, 150mm to 300mm high m 34

287 Sides of walls m2 506

288 Sides of walls; finished fairface m2 703

289 m2 341

290 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 24 to Level 25

291 Soffits of suspended slab m2 543

292 Soffits of suspended slab; finished fairface m2 72

293 Sides of suspended slab, 75mm high m 23

294 Sides of suspended slab, 175mm high m 40

295 Sides of suspended slab, 200mm high m 219

296 Sides of suspended slab, 300mm high m 50

297 Sides and soffits of attached and isolated beams m2 98

298 m2 12

299 Sides of steps, 150mm to 300mm high m 34

300 Sides of walls m2 506

301 Sides of walls; finished fairface m2 703

302 m2 341

303 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 25 to Level 26

304 Soffits of suspended slab m2 543

305 Soffits of suspended slab; finished fairface m2 72

306 Sides of suspended slab, 75mm high m 23

307 Sides of suspended slab, 175mm high m 40

308 Sides of suspended slab, 200mm high m 219

309 Sides of suspended slab, 300mm high m 50

310 Sides and soffits of attached and isolated beams m2 98

311 m2 12

312 Sides of steps, 150mm to 300mm high m 34

313 Sides of walls m2 506

314 Sides of walls; finished fairface m2 703

315 m2 341

316 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 26 to Level 27

317 Soffits of suspended slab m2 543

318 Soffits of suspended slab; finished fairface m2 72

319 Sides of suspended slab, 75mm high m 23

320 Sides of suspended slab, 175mm high m 40

321 Sides of suspended slab, 200mm high m 219

322 Sides of suspended slab, 300mm high m 50

323 Sides and soffits of attached and isolated beams m2 98

324 m2 12

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Page 19: Imported Items

Page 143

325 Sides of steps, 150mm to 300mm high m 34

326 Sides of walls m2 506

327 Sides of walls; finished fairface m2 703

328 m2 341

329 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 27 to Level 28

330 Soffits of suspended slab m2 543

331 Soffits of suspended slab; finished fairface m2 72

332 Sides of suspended slab, 75mm high m 23

333 Sides of suspended slab, 175mm high m 40

334 Sides of suspended slab, 200mm high m 219

335 Sides of suspended slab, 300mm high m 50

336 Sides and soffits of attached and isolated beams m2 98

337 m2 12

338 Sides of steps, 150mm to 300mm high m 34

339 Sides of walls m2 506

340 Sides of walls; finished fairface m2 703

341 m2 341

342 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 28 to Level 29

343 Soffits of suspended slab m2 543

344 Soffits of suspended slab; finished fairface m2 72

345 Sides of suspended slab, 75mm high m 23

346 Sides of suspended slab, 175mm high m 40

347 Sides of suspended slab, 200mm high m 219

348 Sides of suspended slab, 300mm high m 50

349 Sides and soffits of attached and isolated beams m2 98

350 m2 12

351 Sides of steps, 150mm to 300mm high m 34

352 Sides of walls m2 506

353 Sides of walls; finished fairface m2 703

354 m2 341

355 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 29 to Level 30

356 Soffits of suspended slab m2 543

357 Soffits of suspended slab; finished fairface m2 72

358 Sides of suspended slab, 75mm high m 23

359 Sides of suspended slab, 175mm high m 40

360 Sides of suspended slab, 200mm high m 219

361 Sides of suspended slab, 300mm high m 50

362 Sides and soffits of attached and isolated beams m2 98

363 m2 12

364 Sides of steps, 150mm to 300mm high m 34

365 Sides of walls m2 506

366 Sides of walls; finished fairface m2 703

367 m2 341

368 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 30 to Level 31

369 Soffits of suspended slab m2 543

370 Soffits of suspended slab; finished fairface m2 72

371 Sides of suspended slab, 75mm high m 23

372 Sides of suspended slab, 175mm high m 40

373 Sides of suspended slab, 200mm high m 219

374 Sides of suspended slab, 300mm high m 50

375 Sides and soffits of attached and isolated beams m2 98

376 m2 12

377 Sides of steps, 150mm to 300mm high m 34

378 Sides of walls m2 506

379 Sides of walls; finished fairface m2 703

380 m2 341

381 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 31 to Level 32

382 Soffits of suspended slab m2 543

383 Soffits of suspended slab; finished fairface m2 72

384 Sides of suspended slab, 75mm high m 23

385 Sides of suspended slab, 175mm high m 40

386 Sides of suspended slab, 200mm high m 219

387 Sides of suspended slab, 300mm high m 50

388 Sides and soffits of attached and isolated beams m2 98

389 m2 12

390 Sides of steps, 150mm to 300mm high m 34

391 Sides of walls m2 506

392 Sides of walls; finished fairface m2 703

393 m2 341

394 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 32 to Level 33

395 Soffits of suspended slab m2 543

396 Soffits of suspended slab; finished fairface m2 72

397 Sides of suspended slab, 75mm high m 23

398 Sides of suspended slab, 175mm high m 40

399 Sides of suspended slab, 200mm high m 219

400 Sides of suspended slab, 300mm high m 50

401 Sides and soffits of attached and isolated beams m2 98

402 m2 12

403 Sides of steps, 150mm to 300mm high m 34

404 Sides of walls m2 506

405 Sides of walls; finished fairface m2 703

406 m2 341

407 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 33 to Level 34

408 Soffits of suspended slab m2 543

409 Soffits of suspended slab; finished fairface m2 72

410 Sides of suspended slab, 75mm high m 23

411 Sides of suspended slab, 175mm high m 40

412 Sides of suspended slab, 200mm high m 219

413 Sides of suspended slab, 300mm high m 50

414 Sides and soffits of attached and isolated beams m2 98

415 m2 12

416 Sides of steps, 150mm to 300mm high m 34

417 Sides of walls m2 506

418 Sides of walls; finished fairface m2 703

419 m2 341

420 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 34 to Level 35

421 Soffits of suspended slab m2 543

422 Soffits of suspended slab; finished fairface m2 72

423 Sides of suspended slab, 75mm high m 23

424 Sides of suspended slab, 175mm high m 40

425 Sides of suspended slab, 200mm high m 219

426 Sides of suspended slab, 300mm high m 50

427 Sides and soffits of attached and isolated beams m2 98

428 m2 12

429 Sides of steps, 150mm to 300mm high m 34

430 Sides of walls m2 506

431 Sides of walls; finished fairface m2 703

432 m2 341

433 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 35 to Level 36

434 Soffits of suspended slab m2 543

435 Soffits of suspended slab; finished fairface m2 72

436 Sides of suspended slab, 75mm high m 23

437 Sides of suspended slab, 175mm high m 40

438 Sides of suspended slab, 200mm high m 219

439 Sides of suspended slab, 300mm high m 50

440 Sides and soffits of attached and isolated beams m2 98

441 m2 12

442 Sides of steps, 150mm to 300mm high m 34

443 Sides of walls m2 506

444 Sides of walls; finished fairface m2 703

445 m2 341

446 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 36 to Level 37

447 Soffits of suspended slab m2 543

448 Soffits of suspended slab; finished fairface m2 72

449 Sides of suspended slab, 75mm high m 23

450 Sides of suspended slab, 175mm high m 40

451 Sides of suspended slab, 200mm high m 219

452 Sides of suspended slab, 300mm high m 50

453 Sides and soffits of attached and isolated beams m2 98

454 m2 12

455 Sides of steps, 150mm to 300mm high m 34

456 Sides of walls m2 506

457 Sides of walls; finished fairface m2 703

458 m2 341

459 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 37 to Level 38

460 Soffits of suspended slab m2 543

461 Soffits of suspended slab; finished fairface m2 72

462 Sides of suspended slab, 75mm high m 23

463 Sides of suspended slab, 175mm high m 40

464 Sides of suspended slab, 200mm high m 219

465 Sides of suspended slab, 300mm high m 50

466 Sides and soffits of attached and isolated beams m2 98

467 m2 12

468 Sides of steps, 150mm to 300mm high m 34

469 Sides of walls m2 506

470 Sides of walls; finished fairface m2 703

471 m2 341

472 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 38 to Level 39

473 Soffits of suspended slab m2 549

474 Soffits of suspended slab; finished fairface m2 70

475 Sides of suspended slab, 75mm high m 28

476 Sides of suspended slab, 150mm high m 57

477 Sides of suspended slab, 175mm high m 40

478 Sides of suspended slab, 200mm high m 147

479 Sides of suspended slab, 300mm high m 44

480 Sides and soffits of attached and isolated beams m2 106

481 m2 12

482 Sides of steps, 150mm to 300mm high m 34

483 Sides of walls m2 847

484 Sides of walls; finished fairface m2 710

485 m2 341

486 Sides of kerbs on slab m2 56

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 39 to Level 40

487 Soffits of suspended slab m2 476

488 Soffits of suspended slab; finished fairface m2 70

489 Sides of suspended slab, 150mm high m 12

785a Sides of suspended slab, 175mm high m 30

490 Sides of suspended slab, 200mm high m 36

491 Sides of suspended slab, 300mm high m 149

492 Sides of suspended slab, 550mm high m 8

493 Sides of suspended slab, 600mm high m 7

494 m2 308

495 m2 40

496 Sides of steps, 150mm to 300mm high m 78

497 Sides of walls m2 481

498 Sides of walls; finished fairface m2 703

499 m2 341

500 Sides of kerbs on slab m2 69

F CONCRETE WORKS (Cont'd)

Formwork (Cont'd)

Level 40 to Level 41

501 Soffits of suspended slab m2 361

502 Soffits of suspended slab; finished fairface m2 31

503 Sides of suspended slab, 75mm high m 7

504 Sides of suspended slab, 150mm high m 15

505 Sides of suspended slab, 250mm high m 4

506 Sides of suspended slab, 300mm high m 206

507 Sides and soffits of attached and isolated beams m2 149

508 m2 12

509 Sides of steps, 150mm to 300mm high m 34

510 m2 522

511 Sides of walls; finished fairface m2 711

512 Sides of kerbs on slab m2 27

F CONCRETE WORKS (Cont'd)Formwork (Cont'd)

Level 41 to Roof Level

513 Soffits of suspended slab m2 520

514 Soffits of suspended slab; finished fairface m2 30

515 Sides of suspended slab, 200mm high m 107

516 Sides of suspended slab, 275mm high m 49

517 Sides and soffits of attached and isolated beams m2 89

518 m2 12

519 Sides of steps, 150mm to 300mm high m 34

520 m2 579

521 Sides of walls; finished fairface m2 596

522 Sides of kerbs on slab m2 11

Over Roof Level

523 Soffits of suspended slab m2 163

524 Sides of suspended slab, 300mm high m 77

525 Sides of suspended slab, 350mm high m 27

822 Sides of walls, finished fairface m2 117

822a m2 117

822b Sides of kerbs on slab m2 32

F CONCRETE WORKS (Cont'd)Reinforcement

Level 04 to Level 05

527 A142 mesh for slab on filling m2 642

528 In suspended slab t 12.2

529 In attached and isolated beams t 3.6

530 In stairs including landing t 0.5

531 In core walls t 5.9

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

532 In structural walls t 13.2

533 In kerbs on slab t 0.4

Level 05 to Level 06

534 In suspended slab t 12.2

535 In attached and isolated beams t 3.6

536 In stairs including landing t 0.5

537 In core walls t 3.8

538 In structural walls t 14.8

539 In kerbs on slab t 0.4

Level 06 to Level 07

540 In suspended slab t 12.2

541 In attached and isolated beams t 3.6

542 In stairs including landing t 0.5

543 In core walls t 3.8

544 In structural walls t 14.8

545 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of attached and isolated beams and slab beamsSides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides and soffits of staircase including sloping soffit and mid landing; finished fairface

Sides of walls, finished fairface including forming groovs to external

Sides of walls, finished fairface including forming groovs to external

Page 20: Imported Items

Page 144

Level 07 to Level 08

546 In suspended slab t 12.2

547 In attached and isolated beams t 3.6

548 In stairs including landing t 0.5

549 In core walls t 3.8

550 In structural walls t 14.8

551 In kerbs on slab t 0.4

Level 08 to Level 09

552 In suspended slab t 12.2

553 In attached and isolated beams t 3.6

554 In stairs including landing t 0.5

555 In core walls t 3.8

556 In structural walls t 14.8

557 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 09 to Level 10

558 In suspended slab t 12.2

559 In attached and isolated beams t 3.6

560 In stairs including landing t 0.5

561 In core walls t 3.8

562 In structural walls t 14.8

563 In kerbs on slab t 0.4

Level 10 to Level 11

564 In suspended slab t 12.2

565 In attached and isolated beams t 3.6

566 In stairs including landing t 0.5

567 In core walls t 3.8

568 In structural walls t 14.8

569 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 11 to Level 12

570 In suspended slab t 12.2

571 In attached and isolated beams t 3.6

572 In stairs including landing t 0.5

573 In core walls t 3.8

574 In structural walls t 14.8

575 In kerbs on slab t 0.4

Level 12 to Level 13

576 In suspended slab t 12.2

577 In attached and isolated beams t 3.6

578 In stairs including landing t 0.5

579 In core walls t 3.8

580 In structural walls t 14.8

581 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 13 to Level 14

582 In suspended slab t 12.2

583 In attached and isolated beams t 3.6

584 In stairs including landing t 0.5

585 In core walls t 3.8

586 In structural walls t 14.8

587 In kerbs on slab t 0.4

Level 14 to Level 15

588 In suspended slab t 12.2

589 In attached and isolated beams t 3.6

590 In stairs including landing t 0.5

591 In core walls t 3.8

592 In structural walls t 14.8

593 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 15 to Level 16

594 In suspended slab t 12.2

595 In attached and isolated beams t 3.6

596 In stairs including landing t 0.5

597 In core walls t 3.8

598 In structural walls t 14.8

599 In kerbs on slab t 0.4

Level 16 to Level 17

600 In suspended slab t 12.2

601 In attached and isolated beams t 3.6

602 In stairs including landing t 0.5

603 In core walls t 3.8

604 In structural walls t 14.8

605 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 17 to Level 18

606 In suspended slab t 12.2

607 In attached and isolated beams t 3.6

608 In stairs including landing t 0.5

609 In core walls t 3.8

610 In structural walls t 14.8

611 In kerbs on slab t 0.4

Level 18 to Level 19

612 In suspended slab t 12.2

613 In attached and isolated beams t 3.6

614 In stairs including landing t 0.5

615 In core walls t 3.8

616 In structural walls t 14.8

617 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 19 to Level 20

618 In suspended slab t 12.2

619 In attached and isolated beams t 3.6

620 In stairs including landing t 0.5

621 In core walls t 3.8

622 In structural walls t 14.8

623 In kerbs on slab t 0.4

Level 20 to Level 21

624 In suspended slab t 12.2

625 In attached and isolated beams t 3.2

626 In stairs including landing t 0.5

627 In core walls t 3.8

628 In structural walls t 14.8

629 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 21 to Level 22

630 In suspended slab t 12.6

631 In attached and isolated beams t 3.2

632 In stairs including landing t 0.5

633 In core walls t 3.8

634 In structural walls t 14.9

635 In kerbs on slab t 0.4

Level 22 to Level 23

636 In suspended slab t 12.6

637 In attached and isolated beams t 3.2

638 In stairs including landing t 0.5

639 In core walls t 3.8

640 In structural walls t 14.6

641 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 23 to Level 24

642 In suspended slab t 12.6

643 In attached and isolated beams t 3.2

644 In stairs including landing t 0.5

645 In core walls t 3.8

646 In structural walls t 14.6

647 In kerbs on slab t 0.4

Level 24 to Level 25

648 In suspended slab t 12.6

649 In attached and isolated beams t 3.2

650 In stairs including landing t 0.5

651 In core walls t 3.8

652 In structural walls t 14.6

653 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 25 to Level 26

654 In suspended slab t 12.6

655 In attached and isolated beams t 3.2

656 In stairs including landing t 0.5

657 In core walls t 3.8

658 In structural walls t 14.6

659 In kerbs on slab t 0.4

Level 26 to Level 27

660 In suspended slab t 12.6

661 In attached and isolated beams t 3.2

662 In stairs including landing t 0.5

663 In core walls t 3.8

664 In structural walls t 14.6

665 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 27 to Level 28

666 In suspended slab t 12.6

667 In attached and isolated beams t 3.2

668 In stairs including landing t 0.5

669 In core walls t 3.8

670 In structural walls t 14.6

671 In kerbs on slab t 0.4

Level 28 to Level 29

672 In suspended slab t 12.6

673 In attached and isolated beams t 3.2

674 In stairs including landing t 0.5

675 In core walls t 3.8

676 In structural walls t 14.6

677 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 29 to Level 30

678 In suspended slab t 12.6

679 In attached and isolated beams t 3.2

680 In stairs including landing t 0.5

681 In core walls t 3.8

682 In structural walls t 14.6

683 In kerbs on slab t 0.4

Level 30 to Level 31

684 In suspended slab t 12.6

685 In attached and isolated beams t 3.2

686 In stairs including landing t 0.5

687 In core walls t 3.8

688 In structural walls t 14.6

689 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 31 to Level 32

690 In suspended slab t 12.6

691 In attached and isolated beams t 3.2

692 In stairs including landing t 0.5

693 In core walls t 3.8

694 In structural walls t 14.6

695 In kerbs on slab t 0.4

Level 32 to Level 33

696 In suspended slab t 12.6

697 In attached and isolated beams t 3.2

698 In stairs including landing t 0.5

699 In core walls t 3.8

700 In structural walls t 14.6

701 In kerbs on slab t 0.4

Level 33 to Level 34

702 In suspended slab t 12.6

703 In attached and isolated beams t 3.2

704 In stairs including landing t 0.5

705 In core walls t 3.8

706 In structural walls t 14.6

707 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 34 to Level 35

708 In suspended slab t 12.6

709 In attached and isolated beams t 3.2

710 In stairs including landing t 0.5

711 In core walls t 3.8

712 In structural walls t 14.6

713 In kerbs on slab t 0.4

Level 35 to Level 36

714 In suspended slab t 12.6

715 In attached and isolated beams t 3.2

716 In stairs including landing t 0.5

717 In core walls t 3.8

718 In structural walls t 14.6

719 In kerbs on slab t 0.4

Level 36 to Level 37

720 In suspended slab t 12.6

721 In attached and isolated beams t 3.2

722 In stairs including landing t 0.5

723 In core walls t 3.8

724 In structural walls t 14.6

725 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)Reinforcement (Cont'd)

Level 37 to Level 38

726 In suspended slab t 12.6

727 In attached and isolated beams t 3.2

728 In stairs including landing t 0.5

729 In core walls t 3.8

730 In structural walls t 14.6

731 In kerbs on slab t 0.4

Level 38 to Level 39

732 In suspended slab t 11.5

733 In attached and isolated beams t 3.2

734 In stairs including landing t 0.5

735 In core walls t 3.8

736 In structural walls t 14.6

737 In kerbs on slab t 0.4

Level 39 to Level 40

738 In suspended slab t 15.8

739 In slab beams t 6.7

740 In attached and isolated beams t 2.1

741 In stairs including landing t 0.8

742 In core walls t 4.0

743 In structural walls t 14.4

744 In kerbs on slab t 0.4

F CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

Level 40 to Level 41

745 In suspended slab t 12.8

746 In attached and isolated beams t 7.9

747 In stairs including landing t 0.5

748 In core walls t 4.3

749 In structural walls t 10.8

750 In kerbs on slab t 0.2

Level 41 to Roof Level

751 In suspended slab t 11.8

752 In attached and isolated beams t 3.5

753 In stairs including landing t 0.5

754 In core walls t 4.0

755 In structural walls t 10.2

756 In kerbs on slab t 0.1

Over Roof Level

757 In suspended slab t 5.4

1054a In core walls t 1.5

1054b In structural walls t 5.2

1054c In kerbs on slab t 0.2

F CONCRETE WORKS (Cont'd)

Concrete Ancillaries

Pipe penetration

758 Item 1

759 Lintels; size 100 x 100mm m 546

760 Lintels; size 200 x 100mm m 71

Concrete Filling over insulation

761 Level 40 m2 95

762 Level 41 m2 93

763 On roof slab m2 732

764 In toilets at all levels m2 252

CONCRETE WORKS (Cont'd)Concrete Ancillaries (Cont'd)

Joints

765 m 750.00

F CONCRETE WORKS (Cont'd)COLLECTION SUMMARY

Pipe penetration through water retaining and water excluding slabs including approved bentonite water bar, approved bonding agent, etc. as per the detailed drawingRCC lintel including all necessary reinforcement, formwork and fixing in position in all floors as per the Drawings and specification

50mm tk. 1:3:6(20) concrete with galvanized steel wire mesh (3 50x50mm), 10mm tk. Expansion joints and sealed with ∅an approved sealant as per the detail drawings

75mm thick RCC slab for fixing of vanity/wash basins including all necessary concrete, reinforcement, formwork as per the Drawings and specification in to the following

Construction joint with compressible filler with sealant on top in RCC slabs including dowels etc. as per the typical detail drawings and specifications (Pro. Qty.)