Implementing PMU-based Systems for Transmission and ...

28
Implementing PMU-based Systems for Transmission and Distribution System Analysis Marianna Vaiman, V&R Energy and Mohd Khairun Nizam Mohd Sarmin, TNB

Transcript of Implementing PMU-based Systems for Transmission and ...

Page 1: Implementing PMU-based Systems for Transmission and ...

Implementing PMU-based Systems for Transmission and Distribution System Analysis

Marianna Vaiman, V&R Energyand

Mohd Khairun Nizam Mohd Sarmin, TNB

Page 2: Implementing PMU-based Systems for Transmission and ...

Contents

1. TNB’s Experience Deploying a PMU-Based EMS System

Mohd Khairun Nizam Mohd Sarmin, TNB and Marianna Vaiman, V&R Energy

2. Real-Time PMU-based Distribution System Monitoring Platform

Marianna Vaiman, V&R Energy

Page 3: Implementing PMU-based Systems for Transmission and ...

1. TNB’s Experience Deploying a PMU-Based EMS System

Mohd Khairun Nizam Mohd Sarmin, Head of Power System Unit at TNB Research

andMarianna Vaiman, CEO at V&R Energy

Page 4: Implementing PMU-based Systems for Transmission and ...

Background• Tenaga Nasional Berhad (TNB) is the largest electricity utility in Malaysia serving 9.2

million customers– TNB owns 57.2% of the 26.296 MW generation installed capacity, and operates transmission network

with a total circuit length of 23,082 km and distribution network with a total circuit length of 660,038 km

– TNB has recorded the highest demand of 18,566 MW and the highest energy demand of 391.85 GWh/day

• TNB Research has been instrumental in implementing the Wide-Area Intelligent System program at TNB which explores the potential benefits of PMU

– Several real-time PMU-based applications have been successfully developed

• TNB aims for full network observability with PMUs for voltage levels of 500 kV and 275 kV by 2021

Page 5: Implementing PMU-based Systems for Transmission and ...

PMU-Based EMS System

• TNB PMU ROSE is PMU-based EMS system developed by V&R Energy

• Consists of multiple integrated applications: – LSE POM Server

– POM-Cascading Analysis application

– POM-OPM remedial actions application

– TNB PMU Viewer

– TNB Cascading Viewer

- LSE Linear State Estimation;

- LSE RAW PMU-based State Estimator cases in Siemens PTI PSS/E .raw data format;

- POM Physical and Operational Margins Suite;

- PMU Phasor Measurement Unit streaming data;

- RAW Conventional State Estimator (CSE) cases;

- LSE PMU Conditioned and expanded PMU streaming data

- RAW PMU Voltage magnitude and phase from CSE cases

Page 6: Implementing PMU-based Systems for Transmission and ...

LSE POM Server Analysis Framework

• Multi-step process:– Bad data detection– Event detection– Filtering and smoothing– LSE (e.g, weighted least

squares method)– Creation of expanded and

conditioned PMU data stream– Creation of PMU-based State

Estimator cases (e.g., LSE Case)

Page 7: Implementing PMU-based Systems for Transmission and ...

TNB PMU ROSE System Facts

• The conventional State Estimator (CSE) cases represent TNB system operational model with over 1,500 buses/2,800 branches after topology processing

• Signals from 1218 PMUs / 7 PDCs are sent to TNB PMU ROSE at the rate of 25 samples/second

• Linear state estimation and all related computations are performed at the rate of 25 samples/second

• LSE cases are created at a user-defined intervals, when bad data is detected for longer then a certain interval, or an Event is detected by TNB PMU ROSE

Page 8: Implementing PMU-based Systems for Transmission and ...

Testing and Validation of TNB PMU ROSE

• The conventional State Estimator (CSE) and the PMU are emulated using real-time data from the real-time simulator of OPAL-RT

• TNB PMU ROSE is run on a dedicated server

• Control signals are sent to the real-time simulator for remedial action

Page 9: Implementing PMU-based Systems for Transmission and ...

• The results show that LSE (dark green line) successfully suppress the error and provides voltage estimates with a difference of less than 0.01% compared to the true value

• Substation with multiple PMU measurements with random errors and noise denoted by yellow, light green and red lines

• The true value is blue line

Estimating Values Using LSE

Page 10: Implementing PMU-based Systems for Transmission and ...

POM – Cascading Analysis Application

• Performs automated cascading analysis using LSE Cases created by the LSE POM

• Cascading outages are simulated based on consecutive AC contingency analysis

• Two cascading scenarios are incorporated: – “Thermal” scenario

“Voltage” scenario

• Cascading analysis may be performed with and without remedial actions

Page 11: Implementing PMU-based Systems for Transmission and ...

Cascading Analysis Framework

• There are three approaches to use OPM (Optimal Mitigation Measures) remedial actions during execution of cascading analysis: – (1) Determine remedial actions after an

Initiating Event (IE); – (2) Determine remedial actions at the last

tier (e.g., at the end of cascading process); – (3) Determine remedial actions after an IE

and at the last tier.

Page 12: Implementing PMU-based Systems for Transmission and ...

• Cascading Viewer visualizes results of online cascading analysis

• 1877 N-1 initiating events are analyzed in one run

• 41 critical cascading events were identified and ranked based on severity measured using the performance index

Cascading Analysis

Page 13: Implementing PMU-based Systems for Transmission and ...

• A critical Initiating event results in stability violation

• The initiating event was tripping a transformer which leads to overload on other branches

Stability Violation as a Result of Cascading

Voltage Unstable after Cascading Event

Page 14: Implementing PMU-based Systems for Transmission and ...

• Optimal mitigation measures are identified to alleviate this stability violation

• The effect of these measures can be seen in the PMU Viewer

Effect of Remedial Actions

Voltage Stable after Remedial Actions

Page 15: Implementing PMU-based Systems for Transmission and ...

Conclusions and Future Work• PMU-based EMS system was successfully deployed at TNB• The LSE increases network visibility with accurate state estimates derived

based on a set of observable PMU measurements:– PMU measurements are smoothed and bad data are filtered, and bus fault and line

trip events are detected

• The online cascading analysis application has been demonstrated as the use case of LSE utilizing the PMU-based state estimator case – Fast AC contingency analysis solved with the full Newton method

• Remedial actions were demonstrated to be effective in alleviating thermal, voltage and stability violations

• Future work will involve integration with production SCADA/EMS system and PMUs, and exploring other potential applications that will benefit from the LSE

Page 16: Implementing PMU-based Systems for Transmission and ...

Thank you!

Mohd Khairun Nizam Bin Mohd Sarmin

[email protected]

Marianna Vaiman

[email protected]

Page 17: Implementing PMU-based Systems for Transmission and ...

2. Real-Time PMU-based Distribution System Monitoring Platform

Marianna Vaiman, CEO at V&R Energy

Page 18: Implementing PMU-based Systems for Transmission and ...

Real-Time Distribution System Monitoring Platform• Provides real-time situational awareness in order to

improve resilience of the distribution grid and enhance its reliability

• D-PMU ROSE platform consists of the following functionalities:– Three-phase distribution linear state estimation (D-LSE)

– Bad PMU data detection and correction

– Observability analysis for real-time situational awareness

– Identifying switching events

– Archiving and alarming

– Advanced visualization of distribution grid state

– Optimal PMU placement for full distribution grid observability

– Validating model and PMU measurements

Page 19: Implementing PMU-based Systems for Transmission and ...

Components of D-LSE Framework

• Multi-step process:1. Bad data detection, correction, alarming, reporting2. Combination of filtering and smoothing techniques 3. Observability analysis4. Three-phase Distribution Linear State Estimation 5. Detection of switching events (only based on PMU

data)6. Real-time system monitoring (voltage and thermal)7. Visualization, archiving

• Machine learning is used to improve accuracy of event detection in real-time

Page 20: Implementing PMU-based Systems for Transmission and ...

• Step 1: Data pre-screening

• Step 2: Filtering & smoothing

• Step 3: LSE

– Considers relationship between signals

– Based on WLS method

Bad Data Detection and Conditioning

Page 21: Implementing PMU-based Systems for Transmission and ...

Bad Data Detection and Conditioning

Raw PMU values (phase B)

Estimated values after the D-LSE (filtering and weighted least squares method): Yellow

Source: ComEd

Page 22: Implementing PMU-based Systems for Transmission and ...

Observability Analysis and PMU Placement

• Purpose of observability analysis is to identify portions of the network observable with existing PMUs– Performed in real-time

– Generates observability reports

• Purpose of optimal PMU placement is to determine locations of PMU installations to achieve full system observability– Off-line calculation

– Creates PMU placement file

Page 23: Implementing PMU-based Systems for Transmission and ...

D-LSE Result –Observability

Analysis & Visualization

D-PMU ROSE considers a

power system network to

be observable for a given

network topology if voltage

vector at each node can be

calculated based on the

PMU measurements

Blue – nodes and branches

that are observable with

planned PMU installations

(for current network

topology)

Black – non-observable

nodes and branches

– PMU installations

Source: ComEd

Page 24: Implementing PMU-based Systems for Transmission and ...

Detecting and Alarming on Switching Events

Source: ComEd

Page 25: Implementing PMU-based Systems for Transmission and ...

Topology Change

• Estimated value follow raw data during both steady state and transient conditions

• D-LSE identifies defined topology correctly

Source: ComEd

Page 26: Implementing PMU-based Systems for Transmission and ...

Alarming

• Event Alarm– If a switching event is identified, the Event Alarm indicator turns red

• Bad Data Alarm– If bad data is identified, Bad Data alarm turns red

• Violation Alarm– If a violation of voltage and/or thermal limit occurs, the Violation Alarm

indicator turns red

• Multiple types of alarms might be issued simultaneously

Page 27: Implementing PMU-based Systems for Transmission and ...

Use of the Platform for Grid Modernization Applications

• The platform consists of the following applications:– Hybrid State Estimator that uses both PMU and SCADA data– Advanced applications:

• FLISR (Fault Location, Isolation and Service Restoration) enhancement • Volt/Var optimization• DER dispatch

• NYSERDA demonstration project with Quanta Technology and Central Hudson

Page 28: Implementing PMU-based Systems for Transmission and ...

Thank you!

Marianna Vaiman

[email protected]