42
IMPLEMENTATION OF MOBILITY FOR SECONDARY EQUIPMENT MAINTENANCE (MSEM) IN TNB, DISTRIBUTION. 3A Mobility Solution Amcorp Mall 3.8.2017

Transcript of IMPLEMENTATION OF MOBILITY FOR SECONDARY...

Page 1: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

IMPLEMENTATION OF MOBILITY FOR SECONDARY EQUIPMENT MAINTENANCE

(MSEM) IN TNB, DISTRIBUTION.

3A Mobility Solution

Amcorp Mall

3.8.2017

Page 2: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

CURRENT PROCESS

1

FUTURE PROCESS

2

3

MSEM & SCOPE of Project

BASIC USER MSEM4

Way Forward Activity5

Page 3: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

MSEM Project

Mobility for Distribution Secondary Equipment Maintenance Management System is partof the initiative by TNB to introduce transformation for Work Management and MobilityWorkforce. The solution shall cover the following IBM Maximo modules:▪ Maximo for Utilities▪ Maximo Scheduler▪ Maximo Anywhere▪ Maximo HSE

The solution shall integrate, but not limited to, TNB existing systems such as SAP-ERP(SAP PM, SAP PS, SAP MM, SAP FI, SAP HR and DPMS) and other systems.

To setup SEM platform and cover Development, Staging / Quality Assurance,Production, Disaster Recover (DR) and Training environments.

To lead the project management activities throughout the implementation.This projectshall be implemented and rollout for Distribution Division nationwide after successfullyimplemented in a pilot area (Perlis).

The implementation of this project will be in Perlis (estimated 20 users) but the systemperformance should cater for nationwide (estimated 200 users inclusive of TNBemployees and contractors).

Page 4: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope

PREVENTIVE AND CORRECTIVE MAINTENANCE Location & Asset Job Plan Safety Plan Meter (Technical Reading/Measuring Point) Checklist Route

WORK SCHEDULING Work Assignment Labor Assignment

WORKFORCE EXECUTION Mobile execution Notification

DASHBOARD AND REPORTING Work order status Notification Status Asset Statistic List of Outstanding/complete Work Order List of Outstanding/complete Notification

Page 5: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope- Physical BoundarySource: Maintenance Guidelines for Distribution Protection System

Primary & Secondary equipment & Layout of AC/DC Cable

Page 6: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope- Physical BoundarySource: Maintenance Guidelines for Distribution Protection System

Layout of Control cable

Page 7: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope- Physical Boundary

Diagram of Circuit Breaker Depicting physical Boundary on CT &VT

Source: Maintenance Guidelines for Distribution Protection System

Page 8: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Source: Maintenance Guidelines for Distribution Protection System

Diagram of Circuit Breaker Depicting physical Boundary on CT &VT

Project Scope- Physical Boundary

Page 9: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Source: HandbookofRTUforDistributionScada

SCADA Major Interfaces

Project Scope- Physical Boundary

Page 10: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Source: HandbookofRTUforDistributionScada

Primary RTU and SIP installed in PMU

Project Scope- Physical Boundary

Basic major Components of RTU

Page 11: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04
Page 12: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04
Page 13: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

ProjectScope- Physical Boundary

Page 14: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope- Physical Boundary

Object Type PSI DESCRIPTION Jenis Kerja

D_P_R_OCEF 18-WI-01 CT Preventive Maintenance

18-WI-11 PRIMARY Preventive Maintenance

18-WI-03 SECONDARY OCEF Preventive Maintenance

D_P_R_BSS 18-WI-01 BSS CT Preventive Maintenance

18-WI-11 PRIMARY Preventive Maintenance

18-WI-18 SECONDARY BSS Preventive Maintenance

D_P_R_ATS 18-WI-01 CT Preventive Maintenance

18-WI-11 PRIMARY Preventive Maintenance

18-WI-03 SECONDARY OCEF Preventive Maintenance

18-WI-19 ATS Preventive Maintenance

D_P_R_PWR 18-WI-09-BORANG 2 PWR IR Preventive Maintenance

18-WI-09-BORANG 1 PWR SEC Preventive Maintenance

18-W1-15 Borang 3 STABILITY Commissioning

D_P_R_AVR 18-WI-02 Potential Tx test Preventive Maintenance

18-WI-12 BORANG 1 MAINT ALATUBAH KUASA Preventive Maintenance

D_P_R_ILS 18-WI-17 ILSS Preventive Maintenance

D_P_R_TXG 18-WI-10 BORANG 2 UJIAN FUNCTIONAL TXG Preventive Maintenance

18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance

D_P_R_CD 18-WI-04 SECONDARY CD Preventive Maintenance

18-W1-15 Borang 4 STABILITY Preventive Maintenance

D_P_R_REF 18-WI-07 SECONDARY REF Preventive Maintenance

18-W1-15 Borang 1 STABILITY Preventive Maintenance

D_P_R_ARC 18-WI-16 ARC Preventive Maintenance

D_P_R_SBEF 18-WI-08 SECONDARY SBEF Preventive Maintenance

THERMOSCANNING 39-WI-06 Preventive Maintenance

D_P_D_BATT 18-WI-13 DISCAS Preventive Maintenance

39-WI-05 DC MAINT 110 Preventive Maintenance

D_P_R_TXD 18-WI-05 SECONDARY TXD Preventive Maintenance

18-W1-15 Borang 2 STABILITY Preventive Maintenance

D_P_D_CHGR 33-WI-03 DCEF

• ENGR-750-24-QR-01– Laporan KejanggalanSistem SCADA

Page 15: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Scope- Physical Boundary

PROTECTION SCADA

Page 16: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

What is MSEM?

CURRENT PROCESS

1

FUTURE PROCESS

2

3

MSEM & SCOPE of Project

BASIC USER MSEM4

Way Forward Activity5

Page 17: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

ASSIGN WO

TO

FOREMAN

MANUAL

CREATE WORK

ORDER &

RELEASE

WORK ORDER.

PRINT

WORK

ORDER

DISTRIBUTE

ASSIGNMENT TO

TECHNICIANS/

TEAM

PRINT TEST SHEETS /

CHECKLIST / FORMS

& BRING

MANUAL / PSI

TRAVEL TO SITE

MEASURE

READING ON

PAPER RETURN

TO

OFFICE

COMPLETE

PAPERWORKCOMPLETE

PAPERWORK

ENTER

DATA INTO

SYSTEM

DOWNLOAD

DATA

ANALYSIS

DATA

CREATE

REPORT

REPORT

GENERATED

DASHBOARD

MONITORING

CURRENT PROCESS

Page 18: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

What is MSEM?

CURRENT PROCESS

1

FUTURE PROCESS

2

3

MSEM & SCOPE of Project

BASIC USER MSEM4

Way Forward Activity5

Page 19: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

SUPERVISOR

SCHEDULE & ASSIGN

SO TO TEAM LEAD

Reduce requirement of supervisor using online SO assignment

Reduce supervisor man-hour due to online SO updating

Reduce requirement of teams in every station due to no physical SO required. Teams are designed to cover larger geographical area.

PRINT

SO

DISTRIBUTE

ASSIGNMENT TO

TECHNICIANS/

TEAM

PRINT TEST SHEETS /

CHECKLIST / FORMS

& BRING

MANUAL / PSI

MEASURE

READING ON

PAPER RETURN

TO

OFFICE

COMPLETE

PAPERWORKCOMPLETE

PAPERWORK

DOWNLOAD

DATA

ANALYSIS

DATA

CREATE

REPORT

REPORT

GENERATED

DASHBOARD

MONITORING

AUTO/MANUAL

CREATION &

RELEASE OF

SERVICE

ORDER (SO).

TEAM LEAD TRAVEL

TO SITE & PERFORM

SO

UPLOAD &

COMPLETE

SO

MOBILE APPS (MAXIMO ANYWHERE -TEAM LEAD)MAXIMO (SUPERVISOR) MAXIMO (SUPERVISOR)

FUTURE PROCESS

Page 20: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

What is MSEM?

CURRENT PROCESS

1

FUTURE PROCESS

2

3

MSEM & SCOPE of Project

BASIC USER MSEM4

Way Forward Activity5

Page 21: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

• Super user for MSEM

• Have access to everything of Maximo. Can manage

•Users Login, creating user, labor, etc. Can access reports

•as well.

Admin

Executives

• Use MSEM through

workstation

• View reports in the

form of dashboard.

• Through the workstation

monitor service orders, day to day

business operations, schedulers,

assignments and dashboard.

•Perform operational

processes according to

the work assigned.

Supervisors Team Leaders

BASIC USER MSEM

Page 22: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

What is MSEM?

CURRENT PROCESS

1

FUTURE PROCESS

2

3

MSEM & SCOPE of Project

BASIC USER MSEM4

Way Forward Activity5

Page 23: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Project Timeline

June 19June 17 Dec 17 June 18

MLAM 33kV

Mobility for

LVORR

MSMS 33kV &

11kV

Mobility for

MVORR

MLAM 11kV

Dec 18Mar 18Sept 17 Dec 19

AD

O &

M

Sept 18 Mar 19 Sept 19 June 20Mar 20

Mobility for SL

Mar 17

KL Selangor South EastNorth

KL Selangor South EastNorth

All

KLSelangor South

KL Selangor SouthNorth

East

KL Selangor SouthNorth

East

EastNorth

MCMS 11kV

MCMS 33kV

Mobility for

Service

All

Selangor SouthNorth

East

KL Selangor SouthNorth

East

KL

Mobility for Civil All

KKB for Service All

SAM 33kV All

ZDC LV

Street Furniture

NBM

KL

LV

SLGR

LVSouth

LV

East

LV

North

LV

KL

Selangor South

EastNorth

KL

MV

SLGR

MVSouth

MV

North & East

MVZDC MV

Page 24: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Steering Committee Consent

ICTTC Approval

ICTGC Approval

Syndication

Finalize Technical Requirement

Tender Approval

Tender Float

Technical Evaluation

POC

Commercial Evaluation

Award

Reference Visit

Blueprint

Realization

Integration

SIT / UAT

Training

Go live

Tactical Implementation Plan (TIP) – Mobility For Secondary Equipment for PMU/PPU/SSU 33kV

Activity

Planned Actual

Jan Feb

2017

Mar Apr May Jun Jul Aug Sept Oct Nov Dis Jan Feb Mar Apr

In Progress Delay

May

Revise Plan

2018

Page 25: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

L.O.A MSEM

Page 26: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1

PIC Authorities

2

PIC Composition And Structure

Way Forward Activity / Decision

3

Project Implementation Committee (PIC)

4

Propose of PIC And Key User Team Member5

Page 27: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PURPOSE

Project Implementation Committee (PIC)

To monitor development and progress of Mobility for Secondary

Equipment Maintenance System Project for Distribution Division by

implementing advance technology adoption using mobility solution

towards achieving Productivity Revolution through 6 PRIDES.

Page 28: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1

PIC Authorities

2

PIC Composition And Structure

Way Forward Activity / Decision

3

Project Implementation Committee (PIC)

4

Propose of PIC And Key User Team Member5

Page 29: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1. Provide advice during development of MSEM operational aspects of mobility

solution to ensure best practice of mobility solution comply with the relevant

specifications or standards

2. Responsible to determine the boundary and scope of system for all related

stakeholder

3. To participate in the evaluation of scope and timeline of MSEM project as well as

endorsement of progress payment

4. To evaluate and endorse progress payment of MSEM project

5. To monitor and review the effectiveness of the MSEM project framework and

recommend improvements if required

Page 30: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1

PIC Authorities

2

PIC Composition And Structure

Way Forward Activity / Decision

3

Project Implementation Committee (PIC)

4

Propose of PIC And Key User Team Member5

Page 31: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Authority of PIC

• Acquire all MSEM project information necessary to fulfill its oversight responsibilities.

• Obtain any document related to the project.

• Seek advice from internal and external experts (PMO) to discharge its functions.

• Any other matters whereby PMO couldn’t resolve because of their authority will then be escalated to Steering Committee.

• Responsible in determination of boundary and scope of system for all related stakeholder.

• To participate in the evaluation of scope, timeline of MSEM project and endorsement for progress payment.

• To monitor and review the effectiveness of the MSEM framework and recommend improvements.

Page 32: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1

PIC Authorities

2

PIC Composition And Structure

Way Forward Activity / Decision

3

Project Implementation Committee (PIC)

4

Propose of PIC And Key User Team Member5

Page 33: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Composition And Structure

Steering Committee

Implementation Committee-Dr. Abd Rahman Bin Khalid (Chief Engineer (Protection)-Pengerusi)

-Pn.Zarina Bt Mohd Said (Chief Engineer (SCADA O & M)-Pengerusi Pengganti/Ahli)

Head of Business Partner

ICT Division

Team Member PROTECTION O&M

Team Member SCADA O&M

Project Leader

Pn.Masliza binti Md Noah (Mobility Solution)

- En. Khairul Md Yassin (PM-Mobility Solution)

-En.Mohd Hazzim Bin Zainal (PM-Utility Solution, TNB ICT)

Subject Matters Experts

-En. Muhamad Had Kadir ( Mobility)

- En.Kamal Azharan b. Azman (TNB ICT)

Team Member Mobility

PMO

IBM

Page 34: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

PIC Key Accountabilities

1

PIC Authorities

2

PIC Composition And Structure

Way Forward Activity / Decision

3

Project Implementation Committee (PIC)

4

PIC And Key User Team Member5

Page 35: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Jawatan/Jabatan

1 10024234 Dr. Abd Rahman Bin Khalid Chief Engineer (Protection), DN TNBD

2 10023956 Pn. Zarina Bt Mohd SaidChief Engineer (SCADA O&M), DN TNBD

3 10025145Dr. Syed Ahmad Fuad bin Syed Abdul Hamid

BP (DN), Bahagian ICT, TNB

4 10022556 Jamaludin bin Ahmad Razali SM Utility Solution, ICT,TNB

5 10023269Wan Khairuzzaman Bin Wan Nordin

Chief Engineer (Asset Strategy & Policy) DN, TNBD

6 10024306 Zahari Bin DollahChief Engineer (Asset Information) DN, TNBD

7 10027754 Pn.Masliza Binti Md Noah Mobility Solution

PIC Team Member

Page 36: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Jawatan/Jabatan

8 10028277 Mohd Shukri Bin IsmailPrincipal Engineer (Protection System Operation), DN TNBD.

9 10089006Rina Jamilia binti Jamaluddin

Senior Engineer (System Performance)Protection DN TNBD

10 10028506 Nurul Azni Binti Abdul SipatPrincipal Engineer (Operational Application & Configuration), SCADA DN TNBD

13 10091959 Azneeza Binti Md NayiSenior Engineer (Operation Performance) SCADA DN TNBD

12 10082408 Rahimah UzirHQ- Asset Strategy (AMU) –Protection

& SCADA

PIC Team Member

Page 37: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Zon/ Unit

1 10082408 Rahimah UzirHQ- Asset Strategy (AMU) –Protection

& SCADA

2 10087172Pershanta Kumar a/l J.Raman

HQ-Asset Info

3 10028277 Mohd Shukri Bin Ismail HQ-Protection (O&M)

4 10089006Rina Jamilia binti Jamaluddin

HQ-Protection (O&M)

5 10087256Wan Mohd Suhaizul b. Wan Suliman

Utara- Kedah/Perlis-Protection (O&M)

6 10089241 Nurlailie Izani bt. Azizan Utara- Perak -Protection (O&M)

Key User Team Member

Page 38: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Zon/ Unit

7 10070813Radzlan Hisham Bin Mohd Arifin

Utara-P.Pinang-Protection (O&M)

8 10083970 Mohd Nasrom Bin Yusoff K.Lumpur-Protection (O&M)

9 10081546 Suhaimi Bin TajudinSelangor/P.Jaya-Selangor-Protection

(O&M)

10 10083991Mohd Zulhilmi bin Abdul Majid

Selatan-N.sembilan- Protection (O&M)

11 10085703Mohamad Erwan bin Samsudin

Selatan-Melaka-Protection (O&M)

12 10089181Mohd Hazman b. Kamal Bahri

Selatan-Johor-Protection (O&M)

Key User Team Member

Page 39: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Zon/ Unit

13 10083971 Md Elmi bin Abdullah Timur-Pahang- Protection (O&M)

14 10087033Muhammad Hafiz b. Mohd Rashdi

Timur-Kelantan-Protection (O&M)

15 10094074 Mohd Mahzuz b. Mamat Timur-Terengganu- Protection (O&M)

16 10027516 Tukiran Tonot HQ-SCADA (O&M)

17 10028506 Nurul Azni Binti Abdul Sipat HQ-SCADA (O&M)

18 10091959 Azneeza Binti Md Nayi HQ-SCADA (O&M)

Key User Team Member

Page 40: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Zon/ Unit

19 10083411 Ammar bin Ahmad Yusoff Utara- Kedah/Perlis-SCADA (O&M)

20 10091070 Dzar-Abdullah bin Amir Utara- Perak-SCADA (O&M)

21 10023361Mohamad Bin Abdul Rahman

Utara- P.Pinang- SCADA (O&M)

22 10082061 Nor Asyikin Binti Dinyati K.Lumpur- SCADA (O&M)

23 10091038 Aizatul Azlin Binti Ghazali Selangor-SCADA (O&M)

24 10085163Siti Aeishah Binti Mohd Salleh

Selatan-Melaka/N.Sembilan/Johor

Utara-SCADA (O&M)

Key User Team Member

Page 41: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04

Bil No.Pekerja Nama Zon/ Unit

25 10081541 Sahril Bin Salim Selatan-Johor Selatan- SCADA (O&M)

26 10028226 Sharul Amri Bin Ismail Timur- Pahang- SCADA (O&M)

27 10084288 Mohd Nor bin Ali Timur-Terengganu- SCADA (O&M)

28 10082401Nurfarhana Binti Mohd Hasnan

Timur-Kelantan-SCADA (O&M)

Key User Team Member

Page 42: IMPLEMENTATION OF MOBILITY FOR SECONDARY ...impressive-communications.com/project/msam/wp-content/...18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance D_P_R_CD 18-WI-04