IMPLEMENTATION OF MOBILITY FOR SECONDARY EQUIPMENT MAINTENANCE
(MSEM) IN TNB, DISTRIBUTION.
3A Mobility Solution
Amcorp Mall
3.8.2017
CURRENT PROCESS
1
FUTURE PROCESS
2
3
MSEM & SCOPE of Project
BASIC USER MSEM4
Way Forward Activity5
MSEM Project
Mobility for Distribution Secondary Equipment Maintenance Management System is partof the initiative by TNB to introduce transformation for Work Management and MobilityWorkforce. The solution shall cover the following IBM Maximo modules:▪ Maximo for Utilities▪ Maximo Scheduler▪ Maximo Anywhere▪ Maximo HSE
The solution shall integrate, but not limited to, TNB existing systems such as SAP-ERP(SAP PM, SAP PS, SAP MM, SAP FI, SAP HR and DPMS) and other systems.
To setup SEM platform and cover Development, Staging / Quality Assurance,Production, Disaster Recover (DR) and Training environments.
To lead the project management activities throughout the implementation.This projectshall be implemented and rollout for Distribution Division nationwide after successfullyimplemented in a pilot area (Perlis).
The implementation of this project will be in Perlis (estimated 20 users) but the systemperformance should cater for nationwide (estimated 200 users inclusive of TNBemployees and contractors).
Project Scope
PREVENTIVE AND CORRECTIVE MAINTENANCE Location & Asset Job Plan Safety Plan Meter (Technical Reading/Measuring Point) Checklist Route
WORK SCHEDULING Work Assignment Labor Assignment
WORKFORCE EXECUTION Mobile execution Notification
DASHBOARD AND REPORTING Work order status Notification Status Asset Statistic List of Outstanding/complete Work Order List of Outstanding/complete Notification
Project Scope- Physical BoundarySource: Maintenance Guidelines for Distribution Protection System
Primary & Secondary equipment & Layout of AC/DC Cable
Project Scope- Physical BoundarySource: Maintenance Guidelines for Distribution Protection System
Layout of Control cable
Project Scope- Physical Boundary
Diagram of Circuit Breaker Depicting physical Boundary on CT &VT
Source: Maintenance Guidelines for Distribution Protection System
Source: Maintenance Guidelines for Distribution Protection System
Diagram of Circuit Breaker Depicting physical Boundary on CT &VT
Project Scope- Physical Boundary
Source: HandbookofRTUforDistributionScada
SCADA Major Interfaces
Project Scope- Physical Boundary
Source: HandbookofRTUforDistributionScada
Primary RTU and SIP installed in PMU
Project Scope- Physical Boundary
Basic major Components of RTU
ProjectScope- Physical Boundary
Project Scope- Physical Boundary
Object Type PSI DESCRIPTION Jenis Kerja
D_P_R_OCEF 18-WI-01 CT Preventive Maintenance
18-WI-11 PRIMARY Preventive Maintenance
18-WI-03 SECONDARY OCEF Preventive Maintenance
D_P_R_BSS 18-WI-01 BSS CT Preventive Maintenance
18-WI-11 PRIMARY Preventive Maintenance
18-WI-18 SECONDARY BSS Preventive Maintenance
D_P_R_ATS 18-WI-01 CT Preventive Maintenance
18-WI-11 PRIMARY Preventive Maintenance
18-WI-03 SECONDARY OCEF Preventive Maintenance
18-WI-19 ATS Preventive Maintenance
D_P_R_PWR 18-WI-09-BORANG 2 PWR IR Preventive Maintenance
18-WI-09-BORANG 1 PWR SEC Preventive Maintenance
18-W1-15 Borang 3 STABILITY Commissioning
D_P_R_AVR 18-WI-02 Potential Tx test Preventive Maintenance
18-WI-12 BORANG 1 MAINT ALATUBAH KUASA Preventive Maintenance
D_P_R_ILS 18-WI-17 ILSS Preventive Maintenance
D_P_R_TXG 18-WI-10 BORANG 2 UJIAN FUNCTIONAL TXG Preventive Maintenance
18-WI-12 BORANG 2 MAINT ALATUBAH KUASA Preventive Maintenance
D_P_R_CD 18-WI-04 SECONDARY CD Preventive Maintenance
18-W1-15 Borang 4 STABILITY Preventive Maintenance
D_P_R_REF 18-WI-07 SECONDARY REF Preventive Maintenance
18-W1-15 Borang 1 STABILITY Preventive Maintenance
D_P_R_ARC 18-WI-16 ARC Preventive Maintenance
D_P_R_SBEF 18-WI-08 SECONDARY SBEF Preventive Maintenance
THERMOSCANNING 39-WI-06 Preventive Maintenance
D_P_D_BATT 18-WI-13 DISCAS Preventive Maintenance
39-WI-05 DC MAINT 110 Preventive Maintenance
D_P_R_TXD 18-WI-05 SECONDARY TXD Preventive Maintenance
18-W1-15 Borang 2 STABILITY Preventive Maintenance
D_P_D_CHGR 33-WI-03 DCEF
• ENGR-750-24-QR-01– Laporan KejanggalanSistem SCADA
Project Scope- Physical Boundary
PROTECTION SCADA
What is MSEM?
CURRENT PROCESS
1
FUTURE PROCESS
2
3
MSEM & SCOPE of Project
BASIC USER MSEM4
Way Forward Activity5
ASSIGN WO
TO
FOREMAN
MANUAL
CREATE WORK
ORDER &
RELEASE
WORK ORDER.
WORK
ORDER
DISTRIBUTE
ASSIGNMENT TO
TECHNICIANS/
TEAM
PRINT TEST SHEETS /
CHECKLIST / FORMS
& BRING
MANUAL / PSI
TRAVEL TO SITE
MEASURE
READING ON
PAPER RETURN
TO
OFFICE
COMPLETE
PAPERWORKCOMPLETE
PAPERWORK
ENTER
DATA INTO
SYSTEM
DOWNLOAD
DATA
ANALYSIS
DATA
CREATE
REPORT
REPORT
GENERATED
DASHBOARD
MONITORING
CURRENT PROCESS
What is MSEM?
CURRENT PROCESS
1
FUTURE PROCESS
2
3
MSEM & SCOPE of Project
BASIC USER MSEM4
Way Forward Activity5
SUPERVISOR
SCHEDULE & ASSIGN
SO TO TEAM LEAD
Reduce requirement of supervisor using online SO assignment
Reduce supervisor man-hour due to online SO updating
Reduce requirement of teams in every station due to no physical SO required. Teams are designed to cover larger geographical area.
SO
DISTRIBUTE
ASSIGNMENT TO
TECHNICIANS/
TEAM
PRINT TEST SHEETS /
CHECKLIST / FORMS
& BRING
MANUAL / PSI
MEASURE
READING ON
PAPER RETURN
TO
OFFICE
COMPLETE
PAPERWORKCOMPLETE
PAPERWORK
DOWNLOAD
DATA
ANALYSIS
DATA
CREATE
REPORT
REPORT
GENERATED
DASHBOARD
MONITORING
AUTO/MANUAL
CREATION &
RELEASE OF
SERVICE
ORDER (SO).
TEAM LEAD TRAVEL
TO SITE & PERFORM
SO
UPLOAD &
COMPLETE
SO
MOBILE APPS (MAXIMO ANYWHERE -TEAM LEAD)MAXIMO (SUPERVISOR) MAXIMO (SUPERVISOR)
FUTURE PROCESS
What is MSEM?
CURRENT PROCESS
1
FUTURE PROCESS
2
3
MSEM & SCOPE of Project
BASIC USER MSEM4
Way Forward Activity5
• Super user for MSEM
• Have access to everything of Maximo. Can manage
•Users Login, creating user, labor, etc. Can access reports
•as well.
Admin
Executives
• Use MSEM through
workstation
• View reports in the
form of dashboard.
• Through the workstation
monitor service orders, day to day
business operations, schedulers,
assignments and dashboard.
•Perform operational
processes according to
the work assigned.
Supervisors Team Leaders
BASIC USER MSEM
What is MSEM?
CURRENT PROCESS
1
FUTURE PROCESS
2
3
MSEM & SCOPE of Project
BASIC USER MSEM4
Way Forward Activity5
Project Timeline
June 19June 17 Dec 17 June 18
MLAM 33kV
Mobility for
LVORR
MSMS 33kV &
11kV
Mobility for
MVORR
MLAM 11kV
Dec 18Mar 18Sept 17 Dec 19
AD
O &
M
Sept 18 Mar 19 Sept 19 June 20Mar 20
Mobility for SL
Mar 17
KL Selangor South EastNorth
KL Selangor South EastNorth
All
KLSelangor South
KL Selangor SouthNorth
East
KL Selangor SouthNorth
East
EastNorth
MCMS 11kV
MCMS 33kV
Mobility for
Service
All
Selangor SouthNorth
East
KL Selangor SouthNorth
East
KL
Mobility for Civil All
KKB for Service All
SAM 33kV All
ZDC LV
Street Furniture
NBM
KL
LV
SLGR
LVSouth
LV
East
LV
North
LV
KL
Selangor South
EastNorth
KL
MV
SLGR
MVSouth
MV
North & East
MVZDC MV
Steering Committee Consent
ICTTC Approval
ICTGC Approval
Syndication
Finalize Technical Requirement
Tender Approval
Tender Float
Technical Evaluation
POC
Commercial Evaluation
Award
Reference Visit
Blueprint
Realization
Integration
SIT / UAT
Training
Go live
Tactical Implementation Plan (TIP) – Mobility For Secondary Equipment for PMU/PPU/SSU 33kV
Activity
Planned Actual
Jan Feb
2017
Mar Apr May Jun Jul Aug Sept Oct Nov Dis Jan Feb Mar Apr
In Progress Delay
May
Revise Plan
2018
L.O.A MSEM
PIC Key Accountabilities
1
PIC Authorities
2
PIC Composition And Structure
Way Forward Activity / Decision
3
Project Implementation Committee (PIC)
4
Propose of PIC And Key User Team Member5
PURPOSE
Project Implementation Committee (PIC)
To monitor development and progress of Mobility for Secondary
Equipment Maintenance System Project for Distribution Division by
implementing advance technology adoption using mobility solution
towards achieving Productivity Revolution through 6 PRIDES.
PIC Key Accountabilities
1
PIC Authorities
2
PIC Composition And Structure
Way Forward Activity / Decision
3
Project Implementation Committee (PIC)
4
Propose of PIC And Key User Team Member5
PIC Key Accountabilities
1. Provide advice during development of MSEM operational aspects of mobility
solution to ensure best practice of mobility solution comply with the relevant
specifications or standards
2. Responsible to determine the boundary and scope of system for all related
stakeholder
3. To participate in the evaluation of scope and timeline of MSEM project as well as
endorsement of progress payment
4. To evaluate and endorse progress payment of MSEM project
5. To monitor and review the effectiveness of the MSEM project framework and
recommend improvements if required
PIC Key Accountabilities
1
PIC Authorities
2
PIC Composition And Structure
Way Forward Activity / Decision
3
Project Implementation Committee (PIC)
4
Propose of PIC And Key User Team Member5
Authority of PIC
• Acquire all MSEM project information necessary to fulfill its oversight responsibilities.
• Obtain any document related to the project.
• Seek advice from internal and external experts (PMO) to discharge its functions.
• Any other matters whereby PMO couldn’t resolve because of their authority will then be escalated to Steering Committee.
• Responsible in determination of boundary and scope of system for all related stakeholder.
• To participate in the evaluation of scope, timeline of MSEM project and endorsement for progress payment.
• To monitor and review the effectiveness of the MSEM framework and recommend improvements.
PIC Key Accountabilities
1
PIC Authorities
2
PIC Composition And Structure
Way Forward Activity / Decision
3
Project Implementation Committee (PIC)
4
Propose of PIC And Key User Team Member5
PIC Composition And Structure
Steering Committee
Implementation Committee-Dr. Abd Rahman Bin Khalid (Chief Engineer (Protection)-Pengerusi)
-Pn.Zarina Bt Mohd Said (Chief Engineer (SCADA O & M)-Pengerusi Pengganti/Ahli)
Head of Business Partner
ICT Division
Team Member PROTECTION O&M
Team Member SCADA O&M
Project Leader
Pn.Masliza binti Md Noah (Mobility Solution)
- En. Khairul Md Yassin (PM-Mobility Solution)
-En.Mohd Hazzim Bin Zainal (PM-Utility Solution, TNB ICT)
Subject Matters Experts
-En. Muhamad Had Kadir ( Mobility)
- En.Kamal Azharan b. Azman (TNB ICT)
Team Member Mobility
PMO
IBM
PIC Key Accountabilities
1
PIC Authorities
2
PIC Composition And Structure
Way Forward Activity / Decision
3
Project Implementation Committee (PIC)
4
PIC And Key User Team Member5
Bil No.Pekerja Nama Jawatan/Jabatan
1 10024234 Dr. Abd Rahman Bin Khalid Chief Engineer (Protection), DN TNBD
2 10023956 Pn. Zarina Bt Mohd SaidChief Engineer (SCADA O&M), DN TNBD
3 10025145Dr. Syed Ahmad Fuad bin Syed Abdul Hamid
BP (DN), Bahagian ICT, TNB
4 10022556 Jamaludin bin Ahmad Razali SM Utility Solution, ICT,TNB
5 10023269Wan Khairuzzaman Bin Wan Nordin
Chief Engineer (Asset Strategy & Policy) DN, TNBD
6 10024306 Zahari Bin DollahChief Engineer (Asset Information) DN, TNBD
7 10027754 Pn.Masliza Binti Md Noah Mobility Solution
PIC Team Member
Bil No.Pekerja Nama Jawatan/Jabatan
8 10028277 Mohd Shukri Bin IsmailPrincipal Engineer (Protection System Operation), DN TNBD.
9 10089006Rina Jamilia binti Jamaluddin
Senior Engineer (System Performance)Protection DN TNBD
10 10028506 Nurul Azni Binti Abdul SipatPrincipal Engineer (Operational Application & Configuration), SCADA DN TNBD
13 10091959 Azneeza Binti Md NayiSenior Engineer (Operation Performance) SCADA DN TNBD
12 10082408 Rahimah UzirHQ- Asset Strategy (AMU) –Protection
& SCADA
PIC Team Member
Bil No.Pekerja Nama Zon/ Unit
1 10082408 Rahimah UzirHQ- Asset Strategy (AMU) –Protection
& SCADA
2 10087172Pershanta Kumar a/l J.Raman
HQ-Asset Info
3 10028277 Mohd Shukri Bin Ismail HQ-Protection (O&M)
4 10089006Rina Jamilia binti Jamaluddin
HQ-Protection (O&M)
5 10087256Wan Mohd Suhaizul b. Wan Suliman
Utara- Kedah/Perlis-Protection (O&M)
6 10089241 Nurlailie Izani bt. Azizan Utara- Perak -Protection (O&M)
Key User Team Member
Bil No.Pekerja Nama Zon/ Unit
7 10070813Radzlan Hisham Bin Mohd Arifin
Utara-P.Pinang-Protection (O&M)
8 10083970 Mohd Nasrom Bin Yusoff K.Lumpur-Protection (O&M)
9 10081546 Suhaimi Bin TajudinSelangor/P.Jaya-Selangor-Protection
(O&M)
10 10083991Mohd Zulhilmi bin Abdul Majid
Selatan-N.sembilan- Protection (O&M)
11 10085703Mohamad Erwan bin Samsudin
Selatan-Melaka-Protection (O&M)
12 10089181Mohd Hazman b. Kamal Bahri
Selatan-Johor-Protection (O&M)
Key User Team Member
Bil No.Pekerja Nama Zon/ Unit
13 10083971 Md Elmi bin Abdullah Timur-Pahang- Protection (O&M)
14 10087033Muhammad Hafiz b. Mohd Rashdi
Timur-Kelantan-Protection (O&M)
15 10094074 Mohd Mahzuz b. Mamat Timur-Terengganu- Protection (O&M)
16 10027516 Tukiran Tonot HQ-SCADA (O&M)
17 10028506 Nurul Azni Binti Abdul Sipat HQ-SCADA (O&M)
18 10091959 Azneeza Binti Md Nayi HQ-SCADA (O&M)
Key User Team Member
Bil No.Pekerja Nama Zon/ Unit
19 10083411 Ammar bin Ahmad Yusoff Utara- Kedah/Perlis-SCADA (O&M)
20 10091070 Dzar-Abdullah bin Amir Utara- Perak-SCADA (O&M)
21 10023361Mohamad Bin Abdul Rahman
Utara- P.Pinang- SCADA (O&M)
22 10082061 Nor Asyikin Binti Dinyati K.Lumpur- SCADA (O&M)
23 10091038 Aizatul Azlin Binti Ghazali Selangor-SCADA (O&M)
24 10085163Siti Aeishah Binti Mohd Salleh
Selatan-Melaka/N.Sembilan/Johor
Utara-SCADA (O&M)
Key User Team Member
Bil No.Pekerja Nama Zon/ Unit
25 10081541 Sahril Bin Salim Selatan-Johor Selatan- SCADA (O&M)
26 10028226 Sharul Amri Bin Ismail Timur- Pahang- SCADA (O&M)
27 10084288 Mohd Nor bin Ali Timur-Terengganu- SCADA (O&M)
28 10082401Nurfarhana Binti Mohd Hasnan
Timur-Kelantan-SCADA (O&M)
Key User Team Member
THANK YOU