Implementation of Green Energy for HVAC
of Multi-Use Public Facility
Josh BouchieJosh Bouchie
Dylan KuglerDylan Kugler
Tim MacIsaacTim MacIsaac
Duncan MacRaeDuncan MacRae
![Page 2: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/2.jpg)
Design IdentificationDesign Identification
Implementation of a heating, ventilation, and Implementation of a heating, ventilation, and air conditioning system in a health care facilityair conditioning system in a health care facility
Utilization of multiple systems to fill Utilization of multiple systems to fill requirements and standards of ASHRAErequirements and standards of ASHRAE
![Page 3: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/3.jpg)
Background InformationBackground Information
Research into ASHRAE requirements Research into ASHRAE requirements
Analyzing different systems for heating, Analyzing different systems for heating, ventilating and air conditioningventilating and air conditioning
Examined Florida’s climate Examined Florida’s climate
![Page 4: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/4.jpg)
The Ginsburg tower is a 15 story existing The Ginsburg tower is a 15 story existing hospital in downtown Florida.hospital in downtown Florida.
It contains 440 patient beds and one of the It contains 440 patient beds and one of the largest Emergency Departments in the United largest Emergency Departments in the United
States.States.The mechanical equipment we choose for our The mechanical equipment we choose for our
design will be located in an adjacent design will be located in an adjacent mechanical plant that we can design to our mechanical plant that we can design to our
liking. liking.
![Page 5: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/5.jpg)
![Page 6: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/6.jpg)
Engineering SolutionEngineering Solution
Ensuring environmental regulations are metEnsuring environmental regulations are met
Finding efficient and cost effective way to Finding efficient and cost effective way to implement and maintain an HVAC systemimplement and maintain an HVAC system
Hospitals and peoples health are always going Hospitals and peoples health are always going to be in demandto be in demand
![Page 7: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/7.jpg)
Problem SolvingProblem Solving
Ventilation Design - major areas requiring Ventilation Design - major areas requiring different air flowsdifferent air flows
Heating/Air Conditioning Design - different Heating/Air Conditioning Design - different areas are operated around the clock as areas are operated around the clock as opposed to some areas only open during opposed to some areas only open during working hoursworking hours
![Page 8: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/8.jpg)
Project SpecificationsProject SpecificationsDesigning an HVAC system for the following Designing an HVAC system for the following major areas:major areas:
Lobby and ReceptionLobby and Reception
Emergency RoomEmergency Room
Food and Service AreaFood and Service Area
Gift ShopGift Shop
Diagnostic ImagingDiagnostic Imaging
Patient RoomsPatient Rooms
Conference RoomsConference Rooms
Common AreasCommon Areas
![Page 9: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/9.jpg)
CriteriaCriteria
Use of energy efficient designUse of energy efficient design• Green Aspects of DesignGreen Aspects of Design
• Heat RecoveryHeat Recovery
• Geothermal AspectsGeothermal Aspects
• Coordinating design with occupancy and hospital Coordinating design with occupancy and hospital scheduling.scheduling.
![Page 10: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/10.jpg)
![Page 11: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/11.jpg)
Stages of ProjectStages of Project
Current Methods of HeatingCurrent Methods of Heating
• Radiant Panel HeatingRadiant Panel Heating
• Electric Baseboard HeatingElectric Baseboard Heating
• Infloor HeatingInfloor Heating
• Boiler/Hot Water HeatingBoiler/Hot Water Heating
![Page 12: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/12.jpg)
Radiant Infloor Heating Installation
![Page 13: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/13.jpg)
Stages of ProjectStages of Project
Current Methods of CoolingCurrent Methods of Cooling
• Large Industrial ChillersLarge Industrial Chillers
• Absorption CoolingAbsorption Cooling
• Vapour Compression Cooling CycleVapour Compression Cooling Cycle
• Geothermal CoolingGeothermal Cooling
![Page 14: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/14.jpg)
Water-Cooled Chiller
![Page 15: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/15.jpg)
Stages of ProjectStages of Project
Current Methods of VentilationCurrent Methods of Ventilation
• Ducted Supply and ReturnDucted Supply and Return
• Plenum Supply and ReturnPlenum Supply and Return
• Combination of bothCombination of both
![Page 16: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/16.jpg)
![Page 17: Implementation of Green Energy for HVAC of Multi- Use Public Facility Josh Bouchie Dylan Kugler Tim MacIsaac Duncan MacRae.](https://reader035.fdocuments.in/reader035/viewer/2022070306/55169f49550346f6208b4bfb/html5/thumbnails/17.jpg)
ScheduleScheduleDatesDates GoalsGoals
JanuaryJanuary Proposal/Trace 700 CalculationsProposal/Trace 700 Calculations
February 1 - 7February 1 - 7 ASHRAE Ventilation RequirementsASHRAE Ventilation Requirements
February 8 - 14February 8 - 14 Starting Ventilation DesignStarting Ventilation Design
February 15 - 21February 15 - 21 Completing Ventilation DesignCompleting Ventilation Design
February 22 - 28February 22 - 28 Starting Heating DesignStarting Heating Design
March 1 - 7March 1 - 7 Completing Heating DesignCompleting Heating Design
March 8 - 14March 8 - 14 Starting Cooling DesignStarting Cooling Design
March 15 - 21March 15 - 21 Completing Cooling DesignCompleting Cooling Design
March 22 - 28March 22 - 28 Drafting/Report WritingDrafting/Report Writing
March 29 - April 5March 29 - April 5 CompletionCompletion