Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC...

45
EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Presented by Bart Van Brabant and Olivier Martens Implementation and Usage of the PI System at ENGIE Business Unit Generation Europe

Transcript of Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC...

Page 1: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Presented by Bart Van Brabant and Olivier Martens

Implementation and

Usage of the PI System

at ENGIE Business Unit Generation Europe

Page 2: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Contents

• About us

• Our PI System story

• Functional evolution of PI System

• Q & A

2

Page 3: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

About us

3

Page 4: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

4

Page 5: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Greece

5

Page 6: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Portugal

2.406 MW 1.830 MW gas

576 MW coal

Germany

1.665 MW of which: 1.553 MW coal

46 MW hydro

20 MW biomass

The Netherlands

3.338 MW 2.607 MW gas

731 MW coal

Greece

422 MW gas

Italy

3.547 MW 3.472 MW gas

75 MW hydro

Spain 1.990 MW gas

France

2 191 MW gas

1.600 Employees

21.815 MW installed

capacity Of which:

16.626 MW

2.860 MW

305 MW Biomass

Gas

Coal & Co-Combustion

9 Countries

United Kingdom

1.841 MW of which: 1.712 MW gas

Belgium

4.416 MW of which: 2.402 MW gas

1.186 MW hydro/pump

285 MW biomass

Hydro/pump 1.306 MW

Business Unit

Generation Europe

Page 7: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

PI Competence Center (PICC)

• Dedicated OT team: PICC

– Operational: 8 people

– Business Analysis: 4 people

• Some statistics:

– Services for 6 ENGIE Business Units

– 19 PI Systems

– Over 400.000 tags

– 7 countries

7

Page 8: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Our PI System story

8

Page 9: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The start

• Trigger: Opening of the energy market

• Management challenge: be ready!

• 2006: Proof of Concept

with PI System

9

Page 10: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The first big project

10

• 2007-2008 – project goals:

– “Every power plant in Belgium should be connected”

– “Keep the technical knowledge in-house”

– “Train the users”

• Two users profiles:

– Tag managers

– End-users

Page 11: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The expansion (1/3)

• 2009-2011: PI System became

default choice (e.g. new power plants)

• Replace legacy systems

with PI System

• New countries, other

Business Units

11

Page 12: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The expansion (2/3)

• User adoption: high

• Users became more

demanding as well:

– Experiments

– Improved availability

– More functional support

12

Page 13: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The expansion (3/3)

• Creation of PICC

– Single mail & telephone

– Monitoring with ACE

notifications

– 24/7 service

– Robust backup system

13

Page 14: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The standstill (1/2)

• 2012 – 2015: Economic reality

• Closing of plants

• IT cost saving

no new investments

• Company reorganization

14

Page 15: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The standstill (2/2)

• No new developments: no AF, no

PI Coresight, …

• But because of diversification of our

services (multiple BU):

– Core of team remained intact

– No difference in service for users

15

Page 16: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The relaunch (1/2)

• 2016 – 2017: New organisation, new

management, new vision…

• ENGIE as a company:

aiming for innovation

• Market: Big data,

industry 4.0, cloud, …

16

Page 17: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

The relaunch (2/2)

• Still cost savings, but in other areas

(e.g. hosting of server infrastructure)

• “We do not need to invest in a new

Big Data platform, because we already

have one…”

• New PI System projects on Business Unit level: additional

server, HA, PI Vision, …

17

Page 18: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Take away: 3 drivers for success

18

Users 1

• Own their data – no black box

• Teach them and let them experiment

Management 2

• Have a vision and use the momentum

OT team 3

• Stay close to the users

• Keep the knowledge in-house

Page 19: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Functional evolution of

the PI System

19

Page 20: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

20

2017 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

First PI System protype server 1/2006

First PI server in production

1/2007

LIMS: PI System as data provider, PE

4/2009

Meuse: Custom web application, ACE

10/2009

Eagle One: AF, a central model for a web application

12/2011

Robin I: web-application with cross-BU operational data

3/2015

Robin II: integration with financial KPI's, H&S information

3/2017

Functional evolution: from pure data archive to OT/IT integration

Page 21: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION

LIMS: Laboratory Information Management System

Monitoring of chemical parameters of water-steam circuits in the power plants.

Domain experts start to use PI System

• Online chemical data

available in PI System

• Custom build web

service for PI System

• Business logic in PE

• Manual samples

verified by online data

• Continuous follow up

LIMS: Integrating PI with domain applications

21

• Third party LIMS

application

• Processing of manual

measurements

Page 22: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

LIMS: Integrating PI System with domain applications

22

Page 23: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION

Legacy applications are being replaced by PI System-based web

applications

Use of Analytics Engine calculations to implement business logic

• RT data through GPRS

• Calculations in

Analytics Engine

• Web Visualization

• Validation by user

• Data available in PI

System

• Easy rollout (browser)

• Stable, business

critical application.

Meuse: PI System takes over

legacy applications

23

• Environmental permit

temperature limits &

flow

• Multiple power plants

along the river.

Page 24: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

24

Meuse: monitoring river temperature

power plant

temperature/debit measurement

Page 25: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION

A model-centric view on power plant emissions

Visualization, calculations, alerting & configuration is

managed from within a central AF model

• Centralized web

application

• Build on top of PI & AF

• AF provides the core

model

• Dynamic & standard

dashboards based on

AF model

• Standardized

calculations

• Lower maintenance

costs

Eagle One: To a central CEMS modeled by AF

25

• EU regulations and

aging required an

update of the CEMS

• Local implementations

in each plant

• Integration with PI

System

Page 26: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

26

Eagle One: Centralized Emission Monitoring System

Page 27: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Eagle One: AF Integrated Dynamic HMI

27

Page 28: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Eagle One: AF Integrated Dynamic HMI

28

Page 29: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Eagle One: plant specific configurations

29

Page 30: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Eagle One: AF based calculations

30

Page 31: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Eagle One: AF for model-centered applications

Processing

Data

31

Administration M

D

P

V

A

Page 32: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION

Real Time Online Business Information Network

AF unifies all European operational data of local PI servers.

• Central web application

• Access not restricted to

company network

• Mobile ready

• Build on top of PI

Server & AF

• Visualize anything

• Unified the BU

• Intented for topex

initially, now hundreds

of users across the

organisation.

Robin: Consolidation and vertical integration of PI into all levels

of the organisation.

32

• A new organisation

brought the power

plants in several

locations together.

• There was a demand

for digital initiatives

from the management.

Page 33: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Demo

LIVE DEMO

BACKUP SLIDES

33

Page 34: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Main view

34

Page 35: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Plant view

35

Page 36: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Equipment group view

36

Page 37: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Graphical elements kept simple

37

Page 38: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Content is not limited to process data

38

Page 39: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: Interface is shaped dynamically based on AF

39

M

D

P

V

A

Page 40: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: A generic model allows for visualizing anything

40

M

D

P

V

A

Page 41: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Robin: AF configuration examples

41

Page 42: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Functional evolution of PI: Concluding thoughts

• From pure historian over integration platform to big data platform

Analytics e.g. for predictive maintenance, DIY reporting

• Web-based interfaces

Future use of PI vision

• Principle of AF-modelled dynamic applications.

integration of other applications

42

Page 43: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Olivier Martens

[email protected]

Service Delivery Manager

ENGIE – Business Unit Generation Europe

Bart Van Brabant

[email protected]

Team Lead Business Analysis

ENGIE – Business Unit Generation Europe

43

Page 44: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

44

Questions

Please wait for the

microphone before asking

your questions

Please remember to…

Complete the Online Survey

for this session

State your

name & company

Page 45: Implementation and Usage of the PI System at ENGIE...EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC Portugal 2.406 MW 1.830 MW gas 1.306 576 MW coal Germany 1.665

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

Thank You

All presentation content rights reserved by ENGIE

Graphics in “Our PI story”: Designed by iconicbestiary / Freepik