IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California...
-
Upload
caitlin-holt -
Category
Documents
-
view
218 -
download
0
Transcript of IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California...
IMN’s Fourth Annual IMN’s Fourth Annual California California
Municipal Finance Municipal Finance ConferenceConference
IMN’s Fourth Annual IMN’s Fourth Annual California California
Municipal Finance Municipal Finance ConferenceConference
April 3, 2006
Steve HemingerSteve Heminger Executive DirectorExecutive Director
Bay Area Toll AuthorityBay Area Toll Authority
2
Bay Area Transportation BasicsBay Area Transportation Basics > 4.5 million cars
> 25 transit agencies with 4,500 buses, railcars and ferries
20,000 miles of local streets and roads
1,400 miles of highway
300 miles of carpool lanes
Eight toll bridges
3
Bay Area drivers made an estimated 21 million trips
Length of average trip increased 25.6 minutes in 1990 to
29.4 minutes in 2000
Recent dip in traffic congestion is recession-related
Traffic Congestion PersistsTraffic Congestion Persists
4
2 million more people and jobs by 2030
Daily regional trips grow from 21 million to 28 million
Length of average trip increased 25.6 minutes in 1990 to
29.4 minutes in 2000 – over 31 minutes by 2030
2030 Travel Trends2030 Travel Trends
5
Top 3 corridors with increase in
daily trips:
116% increase in daily trips over
I-680/Sunol Grade between Alameda
and Santa Clara counties
90% increase on I-580 corridor
between Alameda and Central Valley
counties
68% increase on Routes
12 & 29 from Napa and Solano
counties
Commuters Crisscross Region
Commuters Crisscross Region
6
Making the Down PaymentProjected 25-Year Revenues for Financially Constrained Element
Making the Down PaymentProjected 25-Year Revenues for Financially Constrained Element
$118 billion spending plan is primarily focused on maintaining and operating the existing transportation system
7
More Potholes AheadMore Potholes Ahead $16.7 billion in roadway maintenance costs $10.6 billion in revenues available as down payment Results in $6.1 billion shortfall
Strengthen Prop. 42 Strengthen Prop. 42 to
ensure gasoline tax revenues are directed to transportation
The Problem is Bigger than Prop. 42 Alone.
Years of neglect have left our transportation system in a state of disrepair.
8
Keep Trains and Buses HummingKeep Trains and Buses Humming
$16.7 billion in transit capital costs $13.4 billion in revenues available as down payment Results in $2.8 billion shortfall
Back to the Voters The largest single
shortfall is at BART, which the voters of that special district will need to help address
Promote efficiency Consider institutional and
functional transit consolidation measures that improve efficiency
9
State Highways Showing their AgeState Highways Showing their Age
$14 billion in State highway maintenance costs
$7 billion in revenues available as down payment
Results in $7 billion shortfall
MTC Supports more SHOPP Funding
Delays in maintenance will increase cost of roadway repairs
However, directing more funding to SHOPP addresses repair needs, but leaves less State funding for expansion projects
State Infrastructure Bond could bring money into the STIP and repay past loans
10
Squeezing Better Mileage from Existing Network
Squeezing Better Mileage from Existing Network
$742 million needed to deploy Regional Operations Program
$329 million in revenues available as down payment
Results in $413 million shortfall
Freeway Performance Initiative
Install and operate traffic monitoring systems, ramp metering and traffic signal timing to improve traffic flow
Implement real-time communications systems to clear incidents quickly
Provide commuters travel-time reliability to make their lives better
HOT Network Delivers Carpool Lanes and Congestion Insurance
HOT Network Delivers Carpool Lanes and Congestion Insurance HOV lanes shave 15-20 minutes off
peak commutes, offering commuters a way to beat congestion
Express buses use HOV lanes to bypass traffic and provide faster, more reliable service
HOT lanes introduce pricing element into highway use by giving solo drivers option to pay to bypass congestion Regional HOT Lane Network
I-680 Smart Carpool Lane implementation set for 2009 start-up
MTC and Caltrans to lead Regional HOT Lane Analysis during 2006
12
Moving Goods to MarketMoving Goods to Market
Over 37 percent of Bay Area economic output is manufacturing, freight transportation, and warehouse and distribution businesses
80 percent of freight movement occurs on freeway corridors, especially I-880, U.S. 101 and I-80 corridors, followed by rail and air cargo
Port of Oakland facilitates maritime freight movement, but is increasingly constrained due to congestion problems
I-880 Corridor Improvements Deploy ITS and operational
strategies
I-580 Corridor Improvements Truck climbing lanes; inland
rail/barges; truck toll lanes
I-80 Corridor Improvements I-80/680 interchange
US 101 Peninsula Operational improvements
Southern Gateway SR 152/156 improvements
13
Transit Expansion Needed to Meet Regional Population and Job Growth Projections
$13 billion program with 85% non-federal funding
MTC adopted TOD policy in July 2005
Resolution 3434: Bay Area’s Vision for Transit ExpansionResolution 3434: Bay Area’s Vision for Transit Expansion
MTC Resolution 3434 identifies nine new rail extensions, express buses, ferry service, and enhancements to existing rail and bus corridors
Success of these transit investments depends on many factors, including supportive land uses
14
Enhancing Livability by Connecting Transportation And Land Use
Enhancing Livability by Connecting Transportation And Land Use
Nearly 2 million people and 1.4 million jobs to be added to Bay Area
Partnerships amongst regional and local agencies needed to facilitate integration of transportation and land use
Joint Policy Committee formed to coordinateregional planning efforts and pursue implementation of the Smart Growth Vision, which was adopted in 2002
Provide More Land-Use Planning Funds to Partners
MTC provides local planning funds through T-PLUS and TOD policy
A key ingredient to better mobility is adequate housing in the right places.
15
7
S O N O M A
A L A M E D A
S O N O M A
A L A M E D A
S O N O M A
A L A M E D A
In 1998 BATA was created In 1998 BATA was created to manage the voter to manage the voter approved base toll and approved base toll and $1.2b construction $1.2b construction programprogram
In 2004 BATA was In 2004 BATA was expanded by the voters to expanded by the voters to manage a second toll dollar manage a second toll dollar and additional $1.5b and additional $1.5b transit capital funding transit capital funding programprogram
In 2005 the state legislature In 2005 the state legislature put BATA in charge of all put BATA in charge of all tolls and the $8.6b seismic tolls and the $8.6b seismic retrofit programretrofit program
BAY AREA TOLL AUTHORITYBAY AREA TOLL AUTHORITY
16
Capital Program Encompasses 3 Plans
RM1 $2.3 billion of projects approved by voters in 1988 Includes projects for Bridge System and other transportation
improvementsRM2 $1.5 billion of projects approved by voters in 2004 36 transit and bridge/transportation projects in Bay Area BATA is not required to fund cost increases for RM2 projects RM2 operating transfers to MTC capped at 38% and
subordinate to debt serviceSeismic Retrofit Program Response to 1989 Loma Prieta earthquake $8.7 billion plan funded by toll dollars and State sources
17
RM1 Capital Plan
R M 1 P r o je c t s S t a t u sC o m p le t io n
D a t e
S a n M a t e o - H a y w a r d B r i d g e W i d e n i n g C o m p l e t e d N o v e m b e r - 0 2
S t a t e R o u t e 8 4 ( B a y f r o n t E x p r e s s w a y ) W i d e n i n g C o m p l e t e d J u l y - 0 3
N e w C a r q u i n e z S u s p e n s i o n B r i d g e C o m p l e t e d N o v e m b e r - 0 3
R i c h m o n d - S a n R a f a e l B r i d g e R e h a b i l i t a t i o n C o m p l e t e d A u g u s t - 0 5
1 9 2 7 C a r q u i n e z B r i d g e D e m o l i t i o n I n P r o g r e s s S e p t e m b e r - 0 7
N e w B e n i c i a - M a r t i n e z B r i d g e P r o j e c t I n P r o g r e s s D e c e m b e r - 0 7
R i c h m o n d - S a n R a f a e l B r i d g e D e c k O v e r l a y A d v e r t i s e d J a n u a r y - 0 7
I n t e r s t a t e 8 8 0 / S t a t e R o u t e 9 2 R e c o n s t r u c t i o n 9 5 % D e s i g n D e c e m b e r - 1 0
18
RM1 Capital Plan: New Carquinez Suspension Bridge
19
RM1 Capital Plan: New Benicia – Martinez Bridge Project
20
SRP Capital Plan: Component/Status
Toll Bridge Seismic Retrofit StatusSeismic Safety
Achieved
San Mateo-Hayward Bridge Completed June-00
Carquinez Bridge Completed Jan-02
Benicia-Martinez Bridge Completed Aug-02
Richmond-San Rafael Bridge Completed Jul-05
San Francisco-Oakland Bay Bridge
East Span Interim Retrofit Completed June-00
West Span Completed June-04
West Approach Construction 2009
East Span Replacement Construction 2013
21
SRP Capital Plan: SF-Oakland Bay Bridge
22
SRP Capital Plan: East Span Skyway
23
SRP Capital Plan: East Span Skyway
24
SRP Capital Plan: East Span SAS Superstructure
25
SRP Capital Plan: SAS Superstructure Contract
2 bids received on March 22, 2006 Joint venture of American Bridge & Fluor Corp. apparent low bid of
$1.434 billion Total contract cost now estimated at $1.767 billion Contract provides for project completion in March 2013 SRP Capital Plan includes $989 million funded program
contingency for risk factors