IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted...

19
Page 1 <Client Name> <Project Name> IM/IT ARB Presentation Template EDRM # xxxxxx Pierre Nantel, Office of the CIO Information Technology Services Branch (ITSB) February 2010

description

IM/IT ARB Presentation Template. EDRM # xxxxxx. Pierre Nantel, Office of the CIO Information Technology Services Branch (ITSB) February 2010. Table of Contents. Introduction Background/Summary Business Requirements and Benefits Summary - PowerPoint PPT Presentation

Transcript of IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted...

Page 1: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Page 1

<Client Name><Project Name> IM/IT ARB Presentation Template

EDRM # xxxxxx

Pierre Nantel, Office of the CIOInformation Technology Services Branch (ITSB)

February 2010

Page 2: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Table of Contents1. Introduction

2. Background/Summary

3. Business Requirements and Benefits Summary

4. Business and Solution Options Summary

5. Solutions Map

6. System Data Flow (Diagram)

7. Application Map

8. RICEF Factors (Reports, Interfaces, Conversion, Extensions, Forms) or Use Case Diagram

9. Gaps

10. Assumptions/Dependencies

11. Conversion/Cutover Considerations

12. System Landscape

13. Deployment Considerations

14. Support Considerations

15. Open Issues

16. Estimating Summary

17. Examples/Back up

Page 3: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Introduction

•The Conceptual Solution outlines the future solution, specifically the application, the technology, the process, and effort/training required for support.•The Conceptual Solution contains the design decisions for application, process, technology, as well as training and performance support.•Create this deliverable in the Plan stage to:

– Identify the applications in the solution and the relationships between them.

– Depict the future business processes at a high level.– Describes a vision of the technical working environment that

will support the defined applications.

Page 4: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Background/Summary

•Describe the project history as it supports the discussion within this document. •Summarize the business problem faced by the client.•Include relevant discussion points on the advantages, regulations, resource availability, and the driving force and rationale for the project.•If the initiative is part of a multi- phase release plan, indicate how the release for this project may be related to other releases within the overall solution strategy.

Page 5: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Business Requirements

Req. ID

Title Requirement Priority

HLR1

HLR2

HLR3

HLR4

HLR5

HLR6

HLR7

HLR8

HLR9

HLR10

<<Enter High-Level Business Requirements to be fulfilled by this conceptual solution.>>

Page 6: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Benefits Summary

•Provide a summary of the expected benefits (when available)

Page 7: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Business and Solution Options Summary

Business Option Solution Option(s) Comments / Recommendation

<business option 1> <solution option 1>

<solution option n>

Page 8: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Solution Map•Identify the solution's applications, for each solution option as appropriate, and the relationships between them. •Take into account any planned and/or existing applications to support the solution. The extent of integration with other applications will need to be considered, as this will have implications for the definition of the application architecture and potential impacts on the Disaster Recovery solution.•Create this deliverable during the plan stage to:

– Map of the applications required to support the solution, showing the various functional and technical layers of the application.

– Provide a basis for the detailed design of the technology build – Illustrate dependencies among the applications – Increase the predictability of application performance because the run-

time behaviour of common components is familiar and consistent – Serve as a construction blueprint and ensure consistency across

systems – Map the functional requirements

Page 9: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

System Data Flow Diagram

•Document:– The information sources/database used – The interface between the systems and end users – Information requirements and flow – Integration with other applications – Disaster Recovery Integration/Requirements

Page 10: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Application Map<<List the different applications involved in the solution and how they interface with one another>>

Business Systems consists of all existing and new Back-Office Applications and Databases that the targeted business applications will leverage for functionality and data. This includes packaged and

custom applications as well as databases, data warehouses and data marts.

Business Systems consists of all existing and new Back-Office Applications and Databases that the targeted business applications will leverage for functionality and data. This includes packaged and

custom applications as well as databases, data warehouses and data marts.

Bu

sin

es

sB

us

ine

ss

Ap

pli

ca

tio

ns

Ap

pli

ca

tio

ns

Bu

sin

es

sB

us

ine

ss

Ap

pli

ca

tio

ns

Ap

pli

ca

tio

ns

The targeted business applications are those suites of solution that the architecture is designed to support.

The targeted business applications are those suites of solution that the architecture is designed to support.

Leveraging information about user working styles, geography and interface requirements, we can identify the required access channels for the targeted applications.

Leveraging information about user working styles, geography and interface requirements, we can identify the required access channels for the targeted applications.

Bu

sin

es

s

Bu

sin

es

s

Sy

ste

ms

Sy

ste

ms

Bu

sin

es

s

Bu

sin

es

s

Sy

ste

ms

Sy

ste

ms

Inte

gra

tio

nIn

teg

rati

on

Se

rvic

es

Se

rvic

es

Inte

gra

tio

nIn

teg

rati

on

Se

rvic

es

Se

rvic

es

Integration Services are the enabling technology for providing integration capability for the disparate application systems. The Integration services layer consists of Business objects, Collaborators and Adapters. Business Objects provide a wrapper to logically grouped transactions. This provides the business applications with a generic interface that hides the complexity of interaction with back-end

systems. Collaborators assemble data from multiple back-end systems by leveraging Adapters, which provide simplified access to a each of the back-end systems. Some Adapters may be custom developed

while others can be reasonably provided by a third party.

Integration Services are the enabling technology for providing integration capability for the disparate application systems. The Integration services layer consists of Business objects, Collaborators and Adapters. Business Objects provide a wrapper to logically grouped transactions. This provides the business applications with a generic interface that hides the complexity of interaction with back-end

systems. Collaborators assemble data from multiple back-end systems by leveraging Adapters, which provide simplified access to a each of the back-end systems. Some Adapters may be custom developed

while others can be reasonably provided by a third party.

Us

ers

Us

ers

Us

ers

Us

ers

Technology ServicesTechnology Services The technology services are a comprehensive set of run-time services required to support the targeted applications and processing styles.

Page 11: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

RICEF Factors

•RICEF Factors is a list of objects that are required for the solution. •RICEF stands for Reports, Interfaces, Conversions, Extensions and Forms.•RICEF objects should be presented in a table format. The table needs to identify

– Source system– Complexity (Simple, Medium or Complex)– If object is new or a modification to an existing object– Name of the object– A description of object to be modified or added.

Page 12: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Gaps

• Identify and described any Business requirement(s) that cannot be incorporated into the solution. Provide a rational as to why?

• The definition of a GAP is:

1. For packaged software, gaps are areas of functionality that are not supported by the standard packaged software configuration.

2. A business requirement that cannot be meet through a system / application solution.

Page 13: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Assumptions/Dependencies

•List all of the assumptions that you have made in reference to the Solution. The intention is not to repeat the project Assumptions, but those that are more focused on what must be in place for the Solution to be implemented in the described manner•Examples of assumptions to consider are:

– Changes to existing Applications that are required.– Infrastructure that is required.– Skills from the client that are expected I.e. UAT at a specific

time.– Existing Disaster Recovery Solution will be leveraged.

Page 14: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Conversion/Cutover Considerations

•Describe Conversion and cutover processes that are required for this solution.

– Are they manual conversions vs. automated conversions?– What will be the process to convert the data and what are the

timing considerations?•Definition

– The conversion of data from the current format to the structure required by the new application. A conversion can be performed via an automated program or can be completed manually.

Page 15: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

System Landscape

•The Technical Architect defines the landscape for Development ,Execution and Operations environments•At a macro level, Technical Architecture defines the infrastructure components in the enterprise.•At an implementation level, Technical Architecture is the physical infrastructure (co-hosted or dedicated) and application components that describe to designers and developers the environments that need to be built and maintained during the Development Lifecycle.

Page 16: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Deployment Considerations

•List any major deployment activities requirement for this solution.

– Are there new processes and technology getting deployed regionally.

– Described how many users / sites may be impacted?

– Is a new solution recommended to be included in the Disaster Recovery annual test?

•Definition

– A stage that introduces the new business capability into the Operating environment. The tasks within this stage transition the workforce, deploy new processes and technology, and stabilize the operations. These tasks are repeated for each deployment unit.

Page 17: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Support Considerations

•Are there any impacts to the current SLAs?•Are there any impacts to the Disaster Recovery solution?

– Need Application Management to be involved in this assessment.

•New applications?•New Disaster Recovery components?

1 PY skilled programmer to support on-going application fixes

½ PY Linux expert to support OS.

24/7 on-call support.

Page 18: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Open Issues

•List all of the Issues that are required to bring to conclusion regarding the Conceptual Solution.•It can be listed in table format – sample below

ID Issue Severity Action Status

1

2

3

Page 19: IM/IT ARB Presentation Template By keefer 1080 SlideShows Follow User 37 Views Presentation posted in: General

Estimating Summary•Insert a summary of the estimating model that has been approved as Client Facing.•One-time costs:

– Custom development– Configuration– Training– Packaged Software– Hardware and System software

•On-Going costs:– Application and service support– Data services– License maintenance– Hardware support