ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09...

22
Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1 ILC roles Interferometry Results 2009 / 2010
  • date post

    15-Jan-2016
  • Category

    Documents

  • view

    215
  • download

    0

Transcript of ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09...

Page 1: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

1

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Page 2: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

2

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010M.S. Warden, P. A. Coe, D. Urner and A. Reichold

MONALISA

• ILC roles and requirements

• Interferometer measurements

• Recent results

• Highlights 2009/10

Page 3: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

3

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Roles at ILC

• Monitor most position sensitive magnets– Final focus quadrupoles– Energy chicane magnets– Beam delivery system

• Provide independent monitor of position– Cross check beam-based measurements– Provides measurement when beams absent– Help relocation after push-pull

ILC

role

s

Page 4: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

4

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

(Random example) ILD Letter of Intent

• QD0 alignment ILC

role

s

Page 5: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

5

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

ILC detectors• All 3 concepts call for interferometer system

– letters of intent mention the idea– 19 Apr push pull ACFA and GDE/BDS session

• Later detailed engineering – where and how to arrange lines of sight– trade off between different options

• studies at ATF-2 and CLIC will inform this process

– other outstanding issues would include:• monitoring cold mass non-trivial• opening / closing lines of sight not yet mentioned in

push-pull plans – probably too early to discuss now

ILC

role

s

Page 6: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

6

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

LHC lessons

• Routing fibre –coupled interferometers requires more space than you might think

ATLAS FSI

Put lines of sightinto the design asearly as possible

CMS

ILC

role

s

Page 7: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

7

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Narrow lines favoured through detector

Platform attachedTo Detector

5cm vacuum tubes

ILC

role

s

Page 8: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

8

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Interferometer: Distance meter

Absolute distanceDisplacement

• Operates in two modes– Absolute Distance (< m resolution)– Displacement measurement (nm resolution)

• Two modes combined– Displacements referred to absolute distance– Tolerant to interruption of measurements

Inte

rfero

metr

y

Page 9: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

9

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

1. Simulated fringe pattern – read out with parallel fibre array2. Converted to interferometer phase reading3. Measurements all based on phase values

Interferometer: Distance meter

Inte

rfero

metr

y

Page 10: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

10

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Interferometer head• Prototype tested at Oxford

Inte

rfero

metr

y

Page 11: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

11

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Interferometers: Make relative measurements

• Distance Meters measure point to point– Range and displacements ( changes)

• 2 lasers reduce systematic errors of range– We use FSI laser and the FFI laser

• Compact Straightness monitor– Combines distance meters to measure object to

object• 3 translational degrees of freedom• 3 rotational degrees of freedom

Inte

rfero

metr

y

Page 12: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

12

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Instruments: CSM• Compact Straightness Monitor• Example from ATF2

– Measures plane to plane• Internal displacements and rotations measured• CSM always blind to 6 external DoF

100 mm

Inte

rfero

metr

y

Page 13: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

13

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Recent tests

• Verified laser frequency stability– EUROTeV-Report-2008-031

(EPAC08 Paper: TUPC121)

• Demonstrated FFI and FSI agreement inside vacuum vessel– see next slide R

esu

lts

Page 14: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

14

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Changing pressure

atmvac

• Good agreement between FSI and FFI

• Strong correlation between pressure and measured OPD

Displacement (microns)

-0.2 0 0.2

Calculated overall change: 62m

Resu

lts

Page 15: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

15

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Highlights 2009 / 2010• Installation at ATF-2

– July 09 install, test vacuum vessel at ATF2– Autumn install, test optics at ATF2– Commissioned system by Jan/Feb 2010

• Test magnet at CLIC – Simple initial interferometers mid 2010– Upgrade to CSM tests 2011

• Laser stabilisation system at Oxford– to provide Rb frequency reference– commissioning in 2009

2009 /

2010

Page 16: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

16

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

ATF-2 installation 2009

2009 /

2010

Double bellow system– encloses vacuum in

centre– high pressure outer

Shintake table

QD0

CSM interferometers– lines of sight along centre– reflectors on Shintake– launch heads on QD0

Page 17: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

17

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Monitoring CLIC magnet 2010

Floor

Magnet• Test several points along the magnet– at first independent DMs

• Compare readings with accelerometers– on the magnet– and on the floor

2009 /

2010

Page 18: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

18

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Summary

• Installation at ATF-2 2009 / 2010

• Installation at CLIC test magnet 2010/11

• System testing / development ongoing at Oxford

Valuable information from this programme feeds directly into ILC and CLIC requirements for interferometric monitoring

Page 19: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

19

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Thank you for listening

Page 20: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

20

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Back up slides – beyond this point

Page 21: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

21

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Ideal Case: Direct View of QD0

Yoke

QD0Enclosure

Needs retractionmechanism

2d laser grid

QD0

QD0

Only small connectionforce required to kick-start vacuum.

ILC

role

s

Page 22: ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr 2009 10:00 JST (01:00 UTC) MDI 2 @ TILC09 – Tsukuba OXFORD MONALISA 1.

Mon 20 Apr 2009 10:00 JST (01:00 UTC)

MDI 2 @ TILC09 – TsukubaOXFORD MONALISA

22

ILC

role

sIn

terf

ero

metr

yR

esu

lts

2009 /

2010

Separation of Tasks: No direct view

YokeQD0

QD0Enclosure

2d laser grid

In air: unclearhow accuratethis can be.

In vacuum

Produces fairlydifficult to understandregion.

4cm

ILC

role

s