Iit Rendevous 2012
-
Upload
rishabh-kapoor -
Category
Documents
-
view
215 -
download
0
Transcript of Iit Rendevous 2012
-
8/13/2019 Iit Rendevous 2012
1/8
-
8/13/2019 Iit Rendevous 2012
2/8
generating interest from potential
sponsors.
Total of 160 sponsors for 2012event, with contribution ranging
from Rs. 20 lacs to some free
magazines and T-shirts.
Problems faced by the studentsorganizing the event can bedivided into 4 types:-
1.Organizing Team2.Audience3.Participants4.Competition and events
Problems faced by the organizing team:-
1.Selection of students to form variousorganizing teams for the event.
2.Deciding on events to be held in theevent along with scheduling.
3.Coordinating with college staff andprofessors.
-
8/13/2019 Iit Rendevous 2012
3/8
4.Sponsors not paying up at the lastminute due to deliverables not being
met as promised.5.Getting work done from the college staffand professors as May and June are
vacation months and contacting
required people for necessary
permissions is difficult, especially for
the infrastructure team.6.Getting big artists to perform at the PRO
shows.
Problems at the audience end:-
1.Security concerns for an audience of10000 people spread over 4 days,
across such a huge campus.
2.Selection of events so as to generatemaximum of interest from audience.
Problems at the participants end:-
1.Accepting and validating participantentries.
-
8/13/2019 Iit Rendevous 2012
4/8
2.Selection of prizes to be distributed towinners of different competitions.
3.How to send prizes to winners andwhere, i.e. to their college or at time of
event. This depends on factors like
availability of funds in their bank
account.
Problems at competitions and events:-
1.Deciding the performers at the 4 PROshows at the event as per budget and
date constraints.
2.Handling last minute artist demands atthe PRO shows.
3.Availability of judges at thecompetitions and arranging for
replacement in case any judge backs out
at the last moment.
4.Making sure the event is in order aspasses are limited for the PRO shows,
but somehow due to loopholes some
people manage to break the system and
this results in over capacity.
-
8/13/2019 Iit Rendevous 2012
5/8
Phases of organizing the event:-
PHASE 1-
This phase begins in the months of
February and continues till March. The
work done in this phase includes:-
Theme selectionList of eventsAnalyzing past event to correct
mistakes and build on the good events
Selection of various teams to organizethe event
PHASE 2-
This phase begins in April and continues till
July. The work done in this phase includes:-
Building contacts for sponsorshipsCold callingSending brochuresArranging meetingsCoordinating deliverablesPublicity of the event
-
8/13/2019 Iit Rendevous 2012
6/8
Scheduling events since flexibility is notquite possible
Arranging for Audio/Video, as it is byfar the most important and expensive
part of the set-up. It costed Rs. 15 lacs
out of the total budget of 75 lacs in the
year 2012.
Getting the infrastructure in order andrenovating wherever necessary.
Inviting judges and chief guests forevents.
Selection of gifts and prizes for judges,eminent personalities and winners of
various events.
PHASE 3-
this phase begins in August and goes on tillthe 1stweek of October. The work done in
this phase includes:-
Arranging for accommodation ofoutstation students
-
8/13/2019 Iit Rendevous 2012
7/8
setting up branding of sponsors incollege
last minute checks of variousarrangements like security,
Audio/Video, hoardings and banners
put up inside the campus.
Cleaning of common facilities likewashrooms.
Various teams to organize event-
Core TeamCreative TeamMarketing TeamHospitality TeamPublicity TeamSecurity TeamInfrastructure and Logistics TeamInformal Events TeamSocial Campaign TeamRegistration TeamEvent ManagersTechnical Coordinators
-
8/13/2019 Iit Rendevous 2012
8/8