II - Procure to Pay and Manufacturing Cycle
-
Upload
nishant-koria -
Category
Documents
-
view
19 -
download
7
description
Transcript of II - Procure to Pay and Manufacturing Cycle
![Page 1: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/1.jpg)
Procure to Pay and Manufacturing Cycle
Prepared by
Sivakumar Ganesan Senior Financials Consultant
Global Technology Services LLC
![Page 2: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/2.jpg)
13. Enter Purchase Requisitions
We have to Create Purchase requisition (PR) for the Purchased items
In Purchasing Responsibility
Requisitions � Requisitions
![Page 3: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/3.jpg)
Enter the Purchase Requisition for Flextronics Inc for Purchase of other
Board, Compact disc Drive and Floppy Drive.
Enter Each Item One by one and choose the following for each of the record
and save the record.
Organization - M1-Seattle Manufacturing,
Location – F1 Seattle,
Sub Inventory – RM Stores
Supplier – Flextronics Inc,
Site – New york and save the record
click on the Distributions Button.
![Page 4: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/4.jpg)
The Distributions form will open and show the account to which the charge
account will get booked.
Close the Form and go to the main form. Click on Approve button.
![Page 5: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/5.jpg)
Approve Document forms Open up
Check Submit for Approval check Box is enabled and click OK.
Click OK and go to Requisition summary form to check whether the created
PR is approved or not.
![Page 6: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/6.jpg)
Navigation Path
Purchasing Responsibility
Requisitions � Requisition Summary
Enter the Requisition Number in the Field and Click on Find Button.
![Page 7: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/7.jpg)
Check the Status of the Purchase Requisition in Requisition Headers
Summary Form.
The Status shows Approved.
![Page 8: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/8.jpg)
If the Status of the PR is in the status of in-Process click on tools menu �
view Action History Button to find out who is the approver for this Purchase
Requisition.
![Page 9: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/9.jpg)
In this Case the Buyer and Approver are same. Hence the Purchase
Requisition is showing as approved.
![Page 10: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/10.jpg)
Similarly we need to create another Purchase Requisition (PR) for Purchase
of Mouse and Printers.
Click on Approve Button and check the Status of the Purchase Requisition is
approved or not in Purchase Requisition Summary.
![Page 11: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/11.jpg)
Purchase Requisition 1757 for HP Incorporated for Purchase of Mouse and
Printer is approved.
![Page 12: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/12.jpg)
14. Create Purchase Orders
Next we have to create Purchase order from the Purchase Requisition
created above. We have auto-create Purchase order option to create Purchase
order (PO) from Purchase Requisition (PR)
Using Auto-create also there are Two Options to create Purchase order.
(i.e) Manual or Automatic.
We will use For PR 1756 Manual option and for PR 1757 Automatic Option.
Navigation Path
Purchasing Responsibility
Auto-create Form
![Page 13: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/13.jpg)
Click on the Form and enter Purchase Requisition (PR) 1756 and click on
Find Button
Note: By default when you open the Form, Buyer field and Ship-to Location
Field would have populated with default values. Before clicking the Find
Button remove those default values and then click on Find Button otherwise
system will show as No data found.
![Page 14: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/14.jpg)
This Opens auto-create Documents form. Choose the checkbox against the
each of the item and click on manual button
![Page 15: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/15.jpg)
This opens the form New Document Form. Choose the Supplier Flextronics
Inc and click create Button.
![Page 16: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/16.jpg)
It creates a Document Builder in Autocreate Documents Form
![Page 17: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/17.jpg)
Choose Item one by one and click on Add to document Button. This will add
each Item to Document Builder Tab. After adding all the Items click on
Create button in the Bottom.
![Page 18: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/18.jpg)
A message pops up stating the PO created with the PO Number. Click Ok to
view the PO Details.
![Page 19: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/19.jpg)
View the PO created from the above, which is as follows. The Status of the
PO is showing as Incomplete. We need to approve the PO.
Before approving the PO click on Shipments form and change the receipt
Routing to Direct Delivery in receiving Controls button for each of the Item.
![Page 20: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/20.jpg)
Click on Shipments Button and go to More tab and change the Match
Approval level to 2 way matching and click on Receiving Controls Tab.
![Page 21: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/21.jpg)
In Receiving Controls Tab change the receipt Routing from standard Receipt
to Direct Delivery and click on OK button.
Standard Routing : This process wil receive the Inventory in Main Inventory
Org and you need to do a manual transfer to Sub-inventory if we choose this
option.
Direct Delivery:- This Process Delivers the Goods directly in Sub-
inventories.
Inspection required: This Process requires inspection of Goods before
Receiving the Goods in the inventory org.
Perform the above steps for Items Floppy Drive and Compact Disc Drive
Also.
![Page 22: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/22.jpg)
After doing the above steps for all the three Items, Click on Approve Button
to Approve the PO.
![Page 23: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/23.jpg)
In Approve Document screen click on OK Button.
Click OK and check the status of the PO.
![Page 24: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/24.jpg)
Status of the PO is now showing approved. We can Receive Inventory
against this Purchase Order.
![Page 25: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/25.jpg)
Similarly we will use Auto-create option to create automatic approval for PR
1757.
Navigation Path.
Purchasing Responsibility
Auto-create Form
Click on Find Button
![Page 26: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/26.jpg)
It opens Auto-create Documents form. Choose the two Items and click on
Automatic button.
![Page 27: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/27.jpg)
It opens the New Documents Button. Click on Create Button.
![Page 28: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/28.jpg)
This has created a new PO 3610.Click Ok to view the PO.
![Page 29: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/29.jpg)
The PO 3610 is created with a status of Incomplete.
We need to perform the above steps as we did for Previous Purchase order.
Change the Match Approval level to 2 Way in Shipments � More Tab and
in Receiving controls change the Receipt Routing to Direct Delivery before
Approving the Receipt.
Click on Approve button after doing the above steps.
![Page 30: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/30.jpg)
View the status of the PO after Approval.
![Page 31: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/31.jpg)
We will create PO without PR for Monitor and approve it for 10 Units.
Click on Approve Button in the same lines.
![Page 32: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/32.jpg)
Check the PO 3611 created is Approved status.
![Page 33: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/33.jpg)
15. Enter Receipts (Inventory Receipt)
Next we need to Receive Inventory against PO 3609
Navigation Path.
Purchasing responsibility
Receiving � Receipts
![Page 34: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/34.jpg)
Click on the Receipts Form and enter the PO Number 3609 and click on find
Button
![Page 35: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/35.jpg)
Receipt Header Form Opens. Enter Comments Filed PO 3609 and close the
window.
![Page 36: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/36.jpg)
Receipts screen opens up. Select all the three Items on the Left-hand side
check Box and Save the record.
![Page 37: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/37.jpg)
Click on the Header Button to note down the Receipt Number
Similarly Receive the Inventory against PO 3610 and PO 3611.
Receipt 6150 and 5151 created.
![Page 38: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/38.jpg)
You can view the details of Inventory receipts in the Following Screen Shot.
Log into Inventory Responsibility
On- Hand availability � On-hand Quantity
![Page 39: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/39.jpg)
Click on the Form and choose M1- Seattle Manufacturing Inventory and
choose Sub inventory as RM Stores. Click on the Find Button at the bottom.
![Page 40: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/40.jpg)
Material Workbench Form opens up and you can view the stock of Floppy
Drive, Compact Disc Drive, Mother Board, Printer, Monitor and Mouse
showing on–hand stock as 10 units.
![Page 41: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/41.jpg)
16. Auto-create Supplier Invoice
Next we have to run Pay on Receipt Program to create self Billing Invoices
for Receipts 5150 and 5151
Navigation Path
Purchasing Responsibility
Requests
![Page 42: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/42.jpg)
Click on the Requests Window
Choose the Pay on Receipts Autoinvoice Program
Enter the Receipt Number 5150
![Page 43: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/43.jpg)
Click Ok and Submit the Request. View the Request 1770748 to check the
status.
![Page 44: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/44.jpg)
View the Invoice Report and Note Down the Invoice number ERS – 09-
Nov-03
Similarly run the Pay on Receipt Auto-invoice for Receipt 5151 also
![Page 45: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/45.jpg)
17. Create, View Invoices and Make Payments in Payables
View the Invoice created in AP Responsibility
Log into Payables Responsibility
Invoices � Invoices.
Query for Supplier 5091
You can view the Invoice Created for Receipts 5150 and 5151.
![Page 46: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/46.jpg)
Next we have to create an Invoice for the PO 3609 and Match it with an
Invoice.
Navigation Path
Payables responsibility
Invoices � Invoices
![Page 47: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/47.jpg)
Click on Match Button. Find Purchase Orders for Matching Window pops
up. Enter the PO number 3609 and click on Find
![Page 48: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/48.jpg)
Match to Purchase Orders Window Pops up. Enable the Match check Box on
the Left hand corner.
![Page 49: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/49.jpg)
Click on Distributions Button to view the Distributions.
Click on Actions Button to Validate the Invoice.
![Page 50: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/50.jpg)
Invoice Actions Screen Opens up. Enable the validate check box and click
OK
![Page 51: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/51.jpg)
Check the Status of the Invoice Now. It will have status as validated.
Click on Actions Button again.
![Page 52: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/52.jpg)
Enable Create Accounting Check Box and Click Ok.
![Page 53: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/53.jpg)
Click on Tools Menu and view Accounting to view the accounting entries
Created.
![Page 54: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/54.jpg)
Output of the Accounting Entries
Close the window and Click on Actions Button from the Invoice Screen to
make Payment for the Invoice.
![Page 55: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/55.jpg)
In Invoice Actions Button enable Pay in full check Box and click Ok.
![Page 56: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/56.jpg)
Payments Window opens up. Choose the Type as Quick and choose the
Bank account and Document Type and save the Record.
Payment Document Generated for this record.
Close the Screen and Query for the Invoice again to View the Payment
details in Invoice Header Screen.
![Page 57: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/57.jpg)
View the Details of the Payments in Invoice Header screen.
![Page 58: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/58.jpg)
Click on the Overview Button to view the complete details of Invoice and
Payments.
![Page 59: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/59.jpg)
We need to Account for the Check Payment what have been made.
Navigation Path
Accounts Payables
Payments � Entry � Payments
![Page 60: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/60.jpg)
Click on the Payment form and Query for the Document Number 95003
![Page 61: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/61.jpg)
Click on Actions Button and Enable the Create Accounting Check Box and
Click Ok Button.
![Page 62: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/62.jpg)
Click on Tools Menu to view the Accounting Entries created for the
Payment
![Page 63: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/63.jpg)
The View Accounting Screen Displays the Accounting Entries Generated for
the Payment we have made for Invoice 2345.
![Page 64: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/64.jpg)
18. Payments Reconciliation
Next, we need to Log into Cash Management Responsibility and Reconcile
the Payments
We need to enter the Bank Statement First in the system and call the
Payment advice to reconcile with Bank Statement.
Navigation Path
Cash Management Responsibility
Bank Reconciliation � Bank Statements.
![Page 65: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/65.jpg)
Click on the Bank Statements and Click on the new Button
![Page 66: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/66.jpg)
These Opens the Bank Statements Form and enter the Bank Account for
which you want to enter the Bank Statement. Enter in Control Totals �
Payments field 20000 and click on Lines Button.
![Page 67: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/67.jpg)
Click on the New Button and Enter the Lines for a Bank statement and enter
20000 in the amount column and save the record.
Close the Window.
![Page 68: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/68.jpg)
Next we need to call the Payment advice 95003 and reconcile with the Bank
Statements.
Navigation Path
Cash Management Responsibility
Bank Reconciliation � Manual Clearing � Clear Transactions
![Page 69: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/69.jpg)
Open the Form and Find Transactions Window, by default the Radio Button
Details will be enabled and all the check Box (Receipts, Payments &
Miscellaneous) will be enabled. Uncheck the Receipts and Miscellaneous
Check box and choose the Bank Account Number from the LOV. Click on
Find Button.
![Page 70: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/70.jpg)
Clear Transaction Form opens and you will find number of transactions,
which are not cleared. In the Number field Query for the Payment advice
95003.Enable the Check box on the left-hand side and click the Clear
Transaction.
![Page 71: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/71.jpg)
After clicking Clear Transactions You will find there are No Transactions in
the screen. This indicates the Transaction is cleared and reconciled.
![Page 72: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/72.jpg)
19. Create, Release, Complete, Close Discrete Job for CPU Subassembly
Next we need to create a Discrete Job for the CPU Subassembly to build
inventory for the CPU Sub assembly.
Navigation Path.
Manufacturing and Distribution Manager.
WIP � Discrete � Discrete Job
![Page 73: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/73.jpg)
Click on the Discrete Job form and enter the following details.
Choose the Inventory Org as M1- Seattle Manufacturing Responsibility and
click on the New Button.
![Page 74: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/74.jpg)
Discrete Job form Opens, Click on the Assembly field then automatically
Discrete Job number is created. Choose CPU Subassembly Item in the
Assembly Field. The Type field as Standard, Class Field as Discrete and
Status Field as Unreleased defaults from the system. Enter the Start Quantity
and Start Date and click on the Routing Tab.
![Page 75: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/75.jpg)
Choose the Sub-inventory field as FG Stores in Discrete Job form and save
the record.
![Page 76: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/76.jpg)
We need to release the discrete Job to shop floor to get the job executed.
Change the status of the Discrete Job from Unreleased to Released and Save
the Record.
![Page 77: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/77.jpg)
We need to complete the Discrete Job to get the Finished Goods entry to be
created.
Navigation Path
Manufacturing and Distributions Manager.
WIP � Move Transactions � Move Transactions
![Page 78: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/78.jpg)
Click on the Form and click on the LOV of Job Field and find Job number
59099. In the Transaction Type, enable the complete button and choose the
From Seq to have the value of 10 and step field as ‘Queue’ and To Sequence
to have the value of 20 and the step field as ‘To Move’.
Enter Quantity Field under Transaction as 5, which indicates those many
CPU subassembly units are completed and save the transaction.
![Page 79: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/79.jpg)
The Moment you click the save button, you will find the screen is blank for
the record created. This indicates the Job is completed.
![Page 80: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/80.jpg)
Now you can go back to Discrete Job screen and view the status of the Job.
Navigation Path
Manufacturing and Distribution Manager
WIP � Discrete � Discrete Job
![Page 81: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/81.jpg)
The Discrete Job for CPU subassembly 59099 need to be closed in order to
get the Account Distributions for the above Job. Unless we close the Job, the
Distribution entries are created only for the Material Consumption, but the
Transaction value for the Finished Goods (i.e) CPU subassembly is not
created. The Transaction Value for the Discrete Job is created only when we
close the Job.
Navigation Path
Manufacturing and Distributions Manager
WIP � Discrete � Close Discrete Jobs � Close Discrete Job (Forms)
![Page 82: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/82.jpg)
To close the Discrete Job, Find window pops up. Enter the job number
59099 and click the find button.
![Page 83: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/83.jpg)
Close Discrete Job form opens. Click on Tools Menu and click on Close 1
Button
![Page 84: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/84.jpg)
Close Discrete Jobs Request screen opens. Keep the Report type as
Summary and click OK. This will generate a Concurrent Request.
![Page 85: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/85.jpg)
Concurrent Request ID Number is 1772713.
![Page 86: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/86.jpg)
View the Concurrent Request 1772713. It is completed Normal.
Click on View Output to view the Report.
![Page 87: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/87.jpg)
The output of the file will be as follows.
![Page 88: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/88.jpg)
We can view the Material Distributions for this Job now.
Navigation Path.
Manufacturing and Distributions Manager
Inventory � Transactions � Receiving � Material Transactions
![Page 89: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/89.jpg)
Click on the Form and Enter the Item Detail and click the Find Button.
![Page 90: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/90.jpg)
Material Transactions Window Opens and Primary Quantity field shows the
Quantity available. Click on Distributions window to view the accounting
Entries generated for the CPU subassembly.
![Page 91: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/91.jpg)
Material Transaction Distributions window Opens and you can view the
accounting distribution entries. Click on Type Tab to view the Accounting
Type
![Page 92: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/92.jpg)
The Type Tab shows the Accounting Type of Transactions.
Inv Valuation Dr
WIP Valuation Cr
![Page 93: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/93.jpg)
We can also view the Material Consumption accounting entries for the
Manufacture of CPU subassembly.
Navigation Path
Manufacturing and Distributions Manager
Inventory � Transactions � Receiving � Material Distributions.
![Page 94: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/94.jpg)
Click on the Form and Enter in the Sub inventory field as RM Stores and
click on Find Button.
![Page 95: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/95.jpg)
This will show the Material Transaction Distributions value for 10000
Click on the Type Tab.
![Page 96: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/96.jpg)
The Type Tab shows the Accounting Type of Transaction
WIP Valuation Dr
Inventory Valuation Cr
![Page 97: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/97.jpg)
We can also view the Resource Transactions for the CPU subassembly
Navigation Path.
Manufacturing and Distributions Manager
WIP � Resource Transactions � View Resource Transactions.
![Page 98: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/98.jpg)
Click on the View Resource Transactions form and enter the Job Number
and click on Find Button
![Page 99: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/99.jpg)
This will show the individual details of Resource Cost and Overhead cost for
the Job 59099.We need to click Distributions Line one by one Line to get the
value of 6250.
![Page 100: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/100.jpg)
Click on Tools Menu View Accounting to view the Accounting entries
generated.
WIP Valuation Dr
Overhead Absorption Cr.
![Page 101: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/101.jpg)
20. Create, Release, Complete, Close Discrete Job for Dell Computer
Next, We have to create a Discrete Job for Finished Goods Item Dell
Computer. The Steps involved are same as CPU Sub assembly.
Navigation Path.
Manufacturing and Distributions Manager
WIP � Discrete � Discrete Job
Discrete Job 59100 has been created to Produce 3 units of Dell computer
with the Status of Unreleased.
![Page 102: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/102.jpg)
Release the Discrete Job 59100.
![Page 103: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/103.jpg)
Complete the Discrete Job 59100. Enter the Details and Save the
Transactions.
Navigation Path
Manufacturing and Distributions Manager
WIP � Move Transactions � Move Transactions
![Page 104: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/104.jpg)
We have to Close the Discrete Job 59100 for the Finished Goods Item Dell
computer to get the accounting Entries Generated.
Navigation Path.
Manufacturing and Distributions Manager
WIP � Discrete � Close Discrete Job � Close Discrete Job (Forms)
Click on Tools Menu and click on Close 1 to close the Discrete Job.
![Page 105: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/105.jpg)
Closing the Discrete Job generates a Concurrent Request ID.
![Page 106: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/106.jpg)
View the Concurrent Request 1772830. It is Completed Normal. Click on
View Output to view the accounting entries generated.
![Page 107: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/107.jpg)
View the Output file for the Discrete Job Value Report 59100.
![Page 108: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/108.jpg)
We can check the Inventory created for the Finished Goods Item
Navigation Path.
Manufacturing and Distributions Manager
Inventory � On Hand Availability � On Hand Quantity.
![Page 109: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/109.jpg)
Click on the Form and Enter the Sub inventory as FG Stores and click Find
Button.
![Page 110: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/110.jpg)
Material Workbench form opens up and you can view the Stock on Hand for
the Dell Computer is showing as 3 Units and the CPU subassembly is
showing as 2. This indicates that 3 units of CPU subassembly has been
consumed for the manufacture of Dell Computer.
![Page 111: II - Procure to Pay and Manufacturing Cycle](https://reader033.fdocuments.in/reader033/viewer/2022052322/55721441497959fc0b941f0c/html5/thumbnails/111.jpg)
Similarly will view the Stock in Hand for the RM Stores also.
This shows the
Stock Purchase and Consumption details as follows.
Raw Material Consumption = Received Inventory less Consumed in
Manufacture of CPU Sub assembly
Compact Disc Drive = 10-5 = 5
Floppy Drive = 10-5 = 5
Mother Board = 10-5 = 5
Raw Material Consumption = Received Inventory less Consumed in
Manufacture of CPU Sub assembly
Monitor = 10-3 = 7
Printer = 10-3 = 7
Mouse = 10-3 = 7