IHC Offshore Tools€¦ · IHC Seasteel Piling templates Fast Frame TiNS & TiS Version: 12-2013....

8
IHC Offshore Tools IHC Hydrohammer Piling hammers Noise Mitigation Systems IHC Handling Systems Internal/external lifting tools leveling tools Gripper & Guiding tools Upending tools IHC Seasteel Piling templates Fast Frame TiNS & TiS Version: 12-2013

Transcript of IHC Offshore Tools€¦ · IHC Seasteel Piling templates Fast Frame TiNS & TiS Version: 12-2013....

  • IHC Offshore Tools

    IHC Hydrohammer Piling hammers Noise Mitigation Systems

    IHC Handling Systems Internal/external lifting tools leveling tools Gripper & Guiding tools Upending tools

    IHC Seasteel Piling templates Fast Frame TiNS & TiS Version: 12-2013

  • Noise Mitigation System Research - Test – Commercial projects

    6,5m

    S1800 30m

    3,5m

    S800 30m

    3,5m

    S800 30m

    2,2m

    S300 8m

    1,2m

    S90 4m

    0,3m

    S30 3m

    S2000 30m

    6,0m

    Pile

    Hammer

    er H O 2 Diameter

    kilo Joule •  Outer screen •  Air gap between

    inner/outer screen •  Inner screen •  Bubble screen

    Extra features

    •  Multi level bubble injection system

    •  Multi size bubble injection

    •  Isolated inner & outer screen

    Pile guiding

    •  Upper guiding •  Lower guiding

    Creating barriers with different medium &

    = FLOW supported project

  • Next NMS-6000 Riffgrund operational 01-2014 Pile integrity by integrated functionality

    Each contractor is not only using a piling hammer.

    A lot of tools and equipment is involved, consuming: • Deck space • Operators • Energy • Controls • Handling time • Costs • Etc…………..

    Combining functionality in one piece of equipment is: • Speeding up the installation • Increasing workability • Ensuring accurate installation • Eliminating risks • Reducing costs

  • Next Generation NMS & Installation Equipment Research - Develop - Test - Innovate - Research - Develop - Test - Innovate

    NMS Improvements

    Thanks to FLOW support knowledge and experience is gained during the installation of the Riffgat project. Resulting in the next generation NMS with improved mitigation of approximately 9 dB. The overall under water noise mitigation is expected to be 20-29 dB on the SEL at 750 m.

    Cost reduction by: ! Increased workability ! Enlarging the weather window ! Integrated installation tools more functionality ! Less risk ! Safety & comfort for crew ! Contingency by HiLo piling option ! Fatigue reduction piles 30-60% ! Fatigue reduction equipment ! Optimized pile design (by less fatigue to pile during installation) ! Reliable proved installation method (1782 foundations 1.82 – 6.5m) ! No down time (proven design and technology)

  • Cost reduction by border crossing cooperation between companies Utility company - Turbine manufacturer - Contractor - Equipment supplier - etc

  • Joint Project Handling Systems

    & Hydrohammer

    Cooperation example : Next Step NMS & LARS XL Mono Pile Water depth 40m - current 2 m/s - significant wave Hs 2.5 m - Period Tz 3-8s

    Click to Start Movie

  • Thank you for your attention !

    Henk van Vessem GSM +31653149031 [email protected]