     IHC Offshore Tools

    IHC Hydrohammer   Piling hammersNoise Mitigation Systems

    IHC Handling Systems  Internal/external lifting toolsleveling toolsGripper & Guiding toolsUpending tools

    IHC Seasteel Piling templatesFast Frame

    TiNS & TiS Version: 04-2014 

  • 8/19/2019 IHC Construction Spreads

    2/31

    2.916 piles installed for wind foundations in 59 projects

    2.205 Mono-Piles - 667 Jacket Piles - 30 Power Station Piles - 14 Metmast Piles

    Reliable pile driving & handling equipment

    • Pile diameters from 1.52 m up to 6.50 m

    • Hammer Types SC-150 up to S-2000

    • Water depths 0 up to 45 m• Internal Lifting Tools ILT

    • Up-End Systems

    • Levelling Systems

    The piling innovator

    Under construction with Noise Mitigation 

    Realized with Noise Mitigation

    IHC Hydrohammer equipment 

    IHC Handling Systems equipment 

    IHC Sea Steel Template Solution 

  • 8/19/2019 IHC Construction Spreads

    3/31

    Noise Mitigation System

    Research - Test – Commercial projects

    6,5m

    S1800 30m

    3,5m

    S800 30m

    3,5m

    S800 30m

    2,2m

    S300 8m

    1,2m

    S90 4m

    0,3m

    S30 3m

    S2000 30m

    6,0m

    Pile 

    Hammer 

    er  

    H O2

    Diameter

    kilo Joule

    expected

    2014

    S2000 23m

    6,5m

    expected

    2014

    Variations:

    • Water depth

    • Location

    • Sea floor conditions

    • Weather conditions• Diameter pile

    • Hammer size/force

    • Running/fixed pile

    • Temperature

    • Sea level (waves)

    • Salt percentage

    • Vessel type

    •   ……….….. 

    Indications

    • Back ground noiseNorth Sea

    100 - 110 dB

    • Total noise with vesselstand-by on side

    130 - 140 dB

    • Rain increases the background level

    10 - 15 dB

  • 8/19/2019 IHC Construction Spreads

    4/31

     

    Air Isolated Barrier, using different medium & materials

    • Outer screen

    •  Air gap between inner/outer screen

    • Inner screen

    • Isolated inner & outer screen

    Contained Bubble Screen

    • Multi level bubble injection system (water depth compensated)

    • Multi size bubble injection (water depth compensated

    Extra features•  Adjustable Upper Guiding

    • Fixed Lower Guiding

    • Rotation Tool

    • Inclination Tool

    • Global Positioning System

    • Preservation protection system

    • Modular system

    IHC-NMS is a two systems integrated solution

     Air isolated barrier and a contained bubble screen mitigating respectively low/high frequencies

  • 8/19/2019 IHC Construction Spreads

    5/31

    NMS – awarded projects execution 2014

    Riffgrund NMS-6000 Butendiek NMS-6500

    Riffgrund NMS-6000

    http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=dfVEwZ3uDUSgnM&tbnid=Sua93kaHCP64QM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.sciencedirect.com%2Fscience%2Farticle%2Fpii%2FS0308597X09001900&ei=i_06UumYL6Km0wX0oYAg&bvm=bv.52288139,d.d2k&psig=AFQjCNG-KUoR8PaXPgQEGwkNinWQOW2pcw&ust=1379684072311741http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=dfVEwZ3uDUSgnM&tbnid=Sua93kaHCP64QM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.sciencedirect.com%2Fscience%2Farticle%2Fpii%2FS0308597X09001900&ei=i_06UumYL6Km0wX0oYAg&bvm=bv.52288139,d.d2k&psig=AFQjCNG-KUoR8PaXPgQEGwkNinWQOW2pcw&ust=1379684072311741

  • 8/19/2019 IHC Construction Spreads

    6/31

    OWF Riffgrund started 01-2014

    NMS-6000/34 Hammer S2000 - Hs 2,0 m - Current 0,8 m/s - 80 Mono-Piles

  • 8/19/2019 IHC Construction Spreads

    7/31

    Repair Axial supports

    12 axial cushioning supports – 12 radial cushinoning supports (total 24)

  • 8/19/2019 IHC Construction Spreads

    8/31

    NMS-6000 Riffgrund project

     Axial rubber cushioning top

  • 8/19/2019 IHC Construction Spreads

    9/31

    NMS-6000 Riffgrund project

    double set of radial rubber cushioning @ top section

  • 8/19/2019 IHC Construction Spreads

    10/31

    Performed Tests: FEM analyses NMS design

    Engineering estimation of “Eigen” Frequency NMS 

  • 8/19/2019 IHC Construction Spreads

    11/31

    Performed Tests - Acceleration tests on inner and outer screen 

    tests: after assembly – during piling – after refurbishing – during piling

  • 8/19/2019 IHC Construction Spreads

    12/31

    NMS-6000 Riffgrund project

     Axial stiffening middle section Eemshaven acceleration Tune Test

  • 8/19/2019 IHC Construction Spreads

    13/31

    NMS-6000 Riffgrund project Noise Results Pile 01 

    40 blows per 25 cm – SEL 163 dB – 1400 kJ

  • 8/19/2019 IHC Construction Spreads

    14/31

    NMS-6000 Riffgrund project Noise Results Pile 15 

     Adaptive pile driving @ reduced energy max 59 blows/min

  • 8/19/2019 IHC Construction Spreads

    15/31

    NMS-6000 Riffgrund project Noise Results Pile 16 

     Adaptive pile driving @ reduced energy max 59 blows/min

  • 8/19/2019 IHC Construction Spreads

    16/31

    NMS-6000 Riffgrund Muller-BBM Report

    Independent report based on measurements Baker Consultancy

    Without

    NMS

    With

    NMSWithNMS

    WithoutNMS

    With

    NMSWith

    NMS

  • 8/19/2019 IHC Construction Spreads

    17/31

    NMS-6000 Riffgrund Muller-BBM Report

    Independent report based on measurements Baker Consultancy

  • 8/19/2019 IHC Construction Spreads

    18/31

    Environmental situation before NMS

    No preventive measures were used

    160

    without NMS

    Background noise level

  • 8/19/2019 IHC Construction Spreads

    19/31

    Pingers & Seal and soft blows

    The equipment scares away harbor porpoises to prevent harm

    160

    without NMS

    Background noise level

  • 8/19/2019 IHC Construction Spreads

    20/31

    Questioning: are Pingers & Seal scarers necessary?

    Is this equipment improving or deteriorating the conditions

    160

    Background noise levelwith NMS

  • 8/19/2019 IHC Construction Spreads

    21/31

    Questioning: are Pingers & Seal scarers necessary?

    Is this equipment improving or deteriorating the conditions

    160

    Background noise levelwith NMS

    http://www.owp-butendiek.de/

  • 8/19/2019 IHC Construction Spreads

    22/31

    NMS – awarded projects execution 2014

    Butendiek NMS-6500

    Butendiek NMS-6500 

    http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=dfVEwZ3uDUSgnM&tbnid=Sua93kaHCP64QM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.sciencedirect.com%2Fscience%2Farticle%2Fpii%2FS0308597X09001900&ei=i_06UumYL6Km0wX0oYAg&bvm=bv.52288139,d.d2k&psig=AFQjCNG-KUoR8PaXPgQEGwkNinWQOW2pcw&ust=1379684072311741http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=dfVEwZ3uDUSgnM&tbnid=Sua93kaHCP64QM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.sciencedirect.com%2Fscience%2Farticle%2Fpii%2FS0308597X09001900&ei=i_06UumYL6Km0wX0oYAg&bvm=bv.52288139,d.d2k&psig=AFQjCNG-KUoR8PaXPgQEGwkNinWQOW2pcw&ust=1379684072311741http://www.owp-butendiek.de/http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=8SOxkMOcbqPsjM&tbnid=bYvB724otDN3fM:&ved=0CAUQjRw&url=http%3A%2F%2Fforum.skyscraperpage.com%2Fshowthread.php%3Ft%3D177613&ei=rAE7UvbmD5Go0wX4_oHQBg&psig=AFQjCNEwiUekx8dHdmoynsbmlJ1opk1MOQ&ust=1379685103315186http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=LV7AxqDZvabx5M&tbnid=8zLkShqpFGEYsM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.fcdordrecht.nl%2Fnode%2F322&ei=5AA7UrbrB4nP0QWQpoDQCQ&psig=AFQjCNHcxyyD2luCqzkT0KwAhEqZLZNM_A&ust=1379684956736908http://www.google.nl/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=dfVEwZ3uDUSgnM&tbnid=Sua93kaHCP64QM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.sciencedirect.com%2Fscience%2Farticle%2Fpii%2FS0308597X09001900&ei=i_06UumYL6Km0wX0oYAg&bvm=bv.52288139,d.d2k&psig=AFQjCNG-KUoR8PaXPgQEGwkNinWQOW2pcw&ust=1379684072311741http://www.owp-butendiek.de/

  • 8/19/2019 IHC Construction Spreads

    23/31

    OWF Butendiek started 30-03-2014

    Noise Mitigation by NMS-6500 – Piling equipment S2000

    Variations on SEL values by:

    • Water depth

    • Location

    • Sea floor conditions

    • Weather conditions

    • Diameter pile

    • Hammer size/force

    • Penetration speed

    • Running/fixed pile

    • Temperature

    • Sea level (waves)

    • Salt percentage

    •   ………….….. 

    Noise level indications North Sea:

    • North Sea with back ground noise100 - 110 dB

    • Total noise with vessel stand-by on side130 - 140 dB

    • Rain increases the back ground level10 - 15 dB

    http://www.owp-butendiek.de/

  • 8/19/2019 IHC Construction Spreads

    24/31

    NMS air systems

    Water removing from annulus by pressurized air and contained bubble curtain

  • 8/19/2019 IHC Construction Spreads

    25/31

    NMS = 360° current and wave independent mitigation

    Diameter 1500 m circular protection all directions covered area = 442 m2

    Current

    NMS Benfits:

    • bubbles emerge @ the release point• Limited air supply: 20 m3/min = 130 kW

    • Less CO2 emission (vessel & compressors)

    Air bubbles rise with 0.25 m/s

    Air released @ 30 m water depth will take 120 s to reach the surfaceWith a current of 1 m/s the bubbles emerge @ 120 m from the release point

  • 8/19/2019 IHC Construction Spreads

    26/31

    IHC Piling Methods 

    High Frequency - Low Energy

    Increased Blow Rate approx. 90 blows per minute (standard = 40 / min)

    Increased Blow Count of approx. 60 blows per 25 cm

    Resulting in lower impact energy and a lower noise emission

    Advantages

    • Decreased pile stress = reduced fatigue

    • Reduced load on piling equipment

    • Minimum influence in piling time depending on soil

    • Lower noise level 3-6 dB SEL

    Disadvantages

    • Hard & Software improvements required

    http://silvergravy.com/wp-content/uploads/2012/04/high_low_freq2.jpg?9d7bd4

  • 8/19/2019 IHC Construction Spreads

    27/31

    IHC Piling Methods 

    Smart Pile Driving - programmed SPD Expected 2015+

    Pile driving with real-time monitoring

    • Pile penetration per 10 blows

    • Noise level per blow @ 750 meter

    • Impact energy

    • Blow count

    Advantages

    • Immediate intervention if the noise requirements are

    exceeded

    • Optimization of piling time (energy/frequency)

    • Decreased pile stress resulting in reduced fatigue damage

    • Less restrictions on pile design

    • Reduced load on piling equipment

    • Primary or back-up noise mitigation measure

    • “SMART” piling by “smart IHC operators” available 

    Disadvantages

    • Hard & Software improvements in development

  • 8/19/2019 IHC Construction Spreads

    28/31

    “Efficient Pile Driving” EPD a new way of piling 

    Reducing of the piling energy = reducing the impact on the environment

    Possible future piling campaign

    Increased Blow Rate approx. 80-90 blows per minute

    Increased Blow Count of approx. max 100 blows per 25 cm

     After reaching 100 blows /min energy will be increased gradually

    Challenges:• the data processing 30 sec  – 60 sec

    • using a near field array (testing)

    Benefits:

    • Less noise

    • Less CO2 emission

    • Less fatigue in pile• Less fatigue on equipment 

    http://programsuccess.files.wordpress.com/2012/04/efficiency.jpghttp://programsuccess.files.wordpress.com/2012/04/efficiency.jpghttp://programsuccess.files.wordpress.com/2012/04/efficiency.jpghttp://programsuccess.files.wordpress.com/2012/04/efficiency.jpghttp://programsuccess.files.wordpress.com/2012/04/efficiency.jpghttp://programsuccess.files.wordpress.com/2012/04/efficiency.jpg

  • 8/19/2019 IHC Construction Spreads

    29/31

    Challenges for the next generation NMS-8000

    Past performance is no guarantee for the future.  it’s time to make a changeRealizing the noise mitigation performance regardless of:

    • Hammer energy and size

    • Mono Pile dimensions

    • Water depths & Soil conditions

    • Future legislation

    • Legislation in different countries

    Methods:

    • Modifications to air gap and bubble injection systems

    • HiLo, Smart Pile Driving, Efficient Pile Driving

    • Introduction of a 3th mitigation system

    • R&D analyses of data, FEM prediction, factory tuning.

    • R&D ground born noise research,

  • 8/19/2019 IHC Construction Spreads

    30/31

    Special thanks for corporation & sharing information!Collaboration is the key to innovation 

  • 8/19/2019 IHC Construction Spreads

    31/31

     

    Thank you for your attention 

    Henk van VessemGSM [email protected] 

    mailto:[email protected]:[email protected]