FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ.
IGNACIA S. MORENO Assistant Attorney General U.S. Department of Justice Environment and Natural Resources Division BEVERLY F. LI (WSBA # 33267) Trial Attorney, Natural Resources Section U.S. Department of Justice Environment & Natural Resources Division P.O. Box 7611 Washington, D.C. 20044-7611 Telephone: (202) 353-9213 Fax: (202) 305-0506 Email: [email protected] Attorney for Federal Defendants
UNITED STATES DISTRICT COURT FOR THE DISTRICT OF ARIZONA
PRESCOTT DIVISION GRAND CANYON TRUST, et al., Plaintiffs, v. MICHAEL WILLIAMS, Forest Supervisor, Kaibab National Forest et al., Defendants, and Energy Fuels Resources (USA), INC., et al., Defendants-Intervenors.
) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )
Case No. 3:13-cv-08045-DGC FEDERAL DEFENDANTS’ MEMORANDUM IN OPPOSITION TO PLAINTIFFS’ MOTION FOR PRELIMINARY INJUNCTION
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 1 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. i
TABLE OF CONTENTS
INTRODUCTION ...........................................................................................................................1 STATUTORY BACKGROUND.....................................................................................................2 A. National Environmental Policy Act .............................................................2 B. National Historic Preservation Act ..............................................................3 C. Mining Law of 1872 ....................................................................................3 D. Forest Service Regulation of Surface Resources .........................................5 FACTUAL BACKGROUND ..........................................................................................................5 A. 1986 EIS and ROD Approving Plan of Operations .....................................5 B. Implementation of the Plan Prior to Standby Status ....................................7 C. The Secretary of the Interior’s Land Withdrawal Decision and the Forest Service’s VER Determination .....................................................7 D. The Forest Service’s 2012 Review of 1986 EIS and ROD ..........................8 E. Consultation Under the NHPA ....................................................................8 STANDARD OF REVIEW ...........................................................................................................10 A. Standard for obtaining Preliminary Injunctive Relief ................................10 B. The Administrative Procedure Act ............................................................11 ARGUMENT .................................................................................................................................11 I. RES JUDICATA BARS PLAINTIFFS’ NHPA CLAIMS ....................................11 II. PLAINTIFFS’ CLAIMS ARE TIME-BARRED...................................................12 III. PLAINTIFFS ARE NOT LIKELY TO SUCCEED ON THE MERITS OF THEIR NEPA CLAIM REGARDING THE VER DETERMINATION ..............................................................................................13 IV. PLAINTIFFS ARE UNLIKELY TO SUCCEED ON THE MERITS OF THEIR NHPA CLAIMS ..................................................................................19
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 2 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. ii
A. The Forest Service Fully Complied with Section 106’s Requirements and Properly Followed the Procedures at 36 C.F.R. §800.13(b)(3) .............................................................................19 B. The VER Determination Is Not an Undertaking Under the NHPA .........................................................................................................21 V. PLAINTIFFS HAVE NOT DEMONSTRATED ANY IRREPARABLE INJURY OR THAT THE BALANCE OF HARMS TIPS IN THEIR FAVOR .......................................................................................22 A. Procedural Violations Alone Do Not Constitute Irreparable Harm ..........................................................................................................23 B. Plaintiffs Cannot Show Immediate, Irreparable Harm ..............................23 CONCLUSION ..............................................................................................................................25
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 3 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. iii
TABLE OF AUTHORITIES
CASES Allen v. McCurry,
449 U.S. 90 (1980) .............................................................................................................11 Alliance for Wild Rockies v. Cottrell,
632 F.3d 1127 (9th Cir. 2011) ...........................................................................................11 Amoco Prod. Co. v. Vill. of Gambell,
480 U.S. 531 (1987) ...........................................................................................................23 Attakai v. United States,
746 F. Supp. 1395 (D. Ariz. 1990) ......................................................................................3 Auer v. Robbins,
519 U.S. 452 (1997) ...........................................................................................................21 Bennett v. Spear,
520 U.S. 154 (1997) ...........................................................................................................14 Cameron v. United States,
252 U.S. 450 (1920) .......................................................................................................3, 14 Center for Biological Diversity v. Salazar,
706 F.3d 1085 (9th Cir. 2013) .......................................................................1, 8, 16, 18, 19 Chrisman v. Miller,
197 U.S. 313 (1905) .............................................................................................................3 Christopher v. SmithKline Beecham Corp.,
132 S. Ct. 2156 (2012) .......................................................................................................21 Coal. for Underground Expansion v. Mineta,
333 F.3d 193 (D.C. Cir. 2003) ...........................................................................................22 Cold Mountain v. Garber,
375 F.3d 884 (9th Cir. 2004) .............................................................................................16 Ctr. for Food Safety v. Vilsack,
636 F.3d 1166 (9th Cir. 2011) ...........................................................................................23 Defenders of Wildlife v. Andrus,
627 F.2d 1238 (D.C. Cir. 1980) .........................................................................................17
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 4 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. iv
Earth Island Inst. v. Carlton, 626 F.3d 462 (9th Cir. 2010) .............................................................................................23
Freese v United States, 6 Cl. Ct. 1 (Cl. Ct. 1984), aff’d, 770 F.2d 177 (Fed. Cir. 1985) ..........................................5 Greater Yellowstone Coal. v. Tidwell,
572 F.3d 1115 (10th Cir. 2009) .........................................................................................16 Havasupai Tribe v. Robertson,
943 F.2d 32 (9th Cir. 1991) .....................................................................................7, 16, 24 Havasupai Tribe v. United States,
752 F. Supp. 1471 (D. Ariz. 1990) ......................................................................6, 7, 12, 24 Headwaters, Inc. v. BLM,
665 F. Supp. 873 (D. Or. 1987) .........................................................................................23 Karst Envtl. Educ. & Prot., Inc. v. EPA,
403 F. Supp. 2d 74 (D.D.C. 2005), aff'd, 475 F.3d 1291 (D. C. Cir. 2007) ......................22 Kremer v. Chem. Constr. Corp.,
456 U.S. 461 (1982) ...........................................................................................................11 Lands Council v. McNair,
537 F.3d 981 (9th Cir. 2008) ...................................................................................3, 11, 23 Lydo Enters., Inc. v. City of Las Vegas,
745 F.2d 1211 (9th Cir. 1984) ...........................................................................................23 Marsh v. Or. Natural Res. Council,
490 U.S. 360 (1989) .....................................................................................................11, 19 McKown v. United States,
Case No. 1:09–cv–00810–SKO, 2012 WL 5423863 (E.D. Cal. Nov. 5, 2012) ................14 Mineral Policy Ctr. v. Norton,
292 F. Supp. 2d 30 (D.D.C. 2003) .......................................................................................4 Montana v. United States,
440 U.S. 147 (1979) ...........................................................................................................24 Morris County Trust for Historic Pres. v. Pierce,
714 F.2d 271 (3d Cir. 1983)...............................................................................................20
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 5 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. v
Norton v. S. Utah Wilderness Alliance, 542 U.S. 55 (2004) .......................................................................................................15, 17
ONRC Action v. Bureau of Land Mgmt.,
150 F.3d 1132 (9th Cir. 1998) ...........................................................................................11 Oakland Tribune, Inc. v. Chronicle Publ'g Co.,
762 F.2d 1374 (9th Cir. 1985) ...........................................................................................23 Okinawa Dugong v. Rumsfeld,
No. C 03-4350 MHP, 2005 WL 522106 (N.D. Cal. March 2, 2005) ..........................20, 22 Orantes-Hernandez v. Thornburgh,
919 F.2d 549 (9th Cir. 1990) .............................................................................................23 Pass Minerals, Inc., 151 IBLA 78 (1999)...........................................................................................................14 Pit River Tribe v. U.S. Forest Serv.,
469 F.3d 768 (9th Cir. 2006) .............................................................................................11 Ramsey v. Kantor,
96 F.3d 434 (9th Cir. 1996) ...............................................................................................15 Rein v. Providian Fin. Servs.,
270 F.3d895 (9th Cir. 2001) ..............................................................................................12 Robertson v. Methow Valley Citizens Council,
490 U.S. 332 (1989) .............................................................................................................2 S. Dakota v. Andrus,
614 F.2d 1190 (8th Cir. 1980) .....................................................................................17, 18 Sac & Fox Nation v. Norton,
240 F.3d 1250 (10th Cir. 2001) .........................................................................................17 Save Our Sonoran, Inc. v. Flowers,
381 F.3d 905 (9th Cir. 2004) .............................................................................................25 Sierra Club v. Babbitt,
65 F.3d 1502 (9th Cir. 1995) .............................................................................................17 Sierra Club v. Penfold,
857 F.2d 1307 (9th Cir. 1988) ...........................................................................................13
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 6 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. vi
Sierra Forest Legacy v. Sherman, Nos. 2:05–cv00205–MCE–GGH, 2:05–cv–00211–MCE–GGH, 2013 WL 1627894 (E.D. Cal. Apr. 15, 2013) ....................................................................................23
Swanson v. Babbitt,
3 F.3d 1348 (9th Cir. 1993) ...............................................................................................18 Taylor v. Sturgell,
553 U.S. 880 (2008) ...........................................................................................................11 The Wilderness Society v. Robertson, 824 F. Supp. 947 (D. Mont. 1993), aff'd sub nom., The Wilderness Society v.
Dombeck, 168 F.3d 367 (9th Cir. 1999) ............................................................................18 United States v. Coleman,
390 U.S. 599 (1968) .............................................................................................................3 United States v. Curtis-Nevada Mines, Inc.,
611 F.2d 1277 (9th Cir. 1980) .............................................................................................4 United States v. ITT Rayonier, Inc.,
627 F.2d 996 (9th Cir. 1980) .............................................................................................24 Vieux Carre Prop. Owners v. Brown,
948 F.2d 1436 (5th Cir. 1991) ...........................................................................................20 Vt. Yankee Nuclear Power Corp. v. Natural Res. Def. Council,
435 U.S. 519 (1978) .........................................................................................................2, 3 WATCH v Harris,
603 F.2d 310 (2d Cir. 1979)...............................................................................................20 Weinberger v. Romero-Barcelo,
456 U.S. 305 (1982) ...........................................................................................................23 Wilbur v. United States ex rel. Krushnic,
280 U.S. 306 (1930) .............................................................................................................4 Winter v. Natural Res. Def. Council, Inc.,
555 U.S. 7 (2008) ...................................................................................................10, 11, 22 Yerger v. Robertson,
981 F.2d 460 (9th Cir. 1992) .............................................................................................22
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 7 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. vii
Yount v. Salazar, Nos. CV11–8171–PCT DGC, CV12–8038 PCT DGC, CV12–8042 PCT DGC, CV12–8075 PCT DGC, 2013 WL 93372 (D. Ariz. Jan. 8, 2013) .....................................15
STATUTES
5 U.S.C. § 551 ................................................................................................................................11 5 U.S.C. § 706(2)(a) .......................................................................................................................11 16 U.S.C. § 470f ........................................................................................................................3, 22 16 U.S.C. § 470w(7) ........................................................................................................................3 28 U.S.C. § 2401(a) .......................................................................................................................13 30 U.S.C. § 22 ..................................................................................................................................3 30 U.S.C. §§ 22-54 ..........................................................................................................................3 30 U.S.C. § 26 ..................................................................................................................................4 42 U.S.C. §§ 4321-4370 ..................................................................................................................2 42 U.S.C. § 4332(2)(C) ..................................................................................................................15 43 U.S.C. § 1457 ..............................................................................................................................4 Pub. L. No. 102-575, § 4001, 106 Stat. 4600 ..................................................................................9
REGULATIONS 36 C.F.R. § 63.2 ...............................................................................................................................9 36 C.F.R. § 63.3 ...............................................................................................................................9 36 C.F.R. § 228.4 .............................................................................................................................5 36 C.F.R. § 228.4(d) ......................................................................................................................17 36 C.F.R. § 228.7 ...........................................................................................................................14 36 C.F.R. § 800.3(a).........................................................................................................................3 36 C.F.R. §§ 800.4, 800.6 ................................................................................................................3
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 8 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. viii
36 C.F.R. § 800.13 .........................................................................................................................19 36 C.F.R. § 800.13(b)(1) ............................................................................................................1, 20 36 C.F.R. § 800.13(b)(3) ......................................................................................... 2, 10, 19, 20, 21 36 C.F.R. § 800.16 .........................................................................................................................22 36 C.F.R. § 800.16(y) ......................................................................................................................3 36 C.F.R. § 800.16(1)(1) ..................................................................................................................9 43 C.F.R. § 3809.100 .................................................................................................................4, 15 65 Fed. Reg. 77698, 77738 (Dec. 12, 2000) ....................................................................................9 74 Fed. Reg. 35887-01 (July 21, 2009) ...........................................................................................7 77 Fed. Reg. 2317-01 (Jan. 17, 2012) ..............................................................................................7
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 9 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 1
INTRODUCTION
Plaintiffs move for a preliminary injunction (ECF Nos. 36, 39) to prevent the
Forest Service from allowing mining activities at the Canyon Mine on the Kaibab
National Forest in Arizona and to “suspend[] all Forest Service approvals relating to the
Mine.” Pls. Mot. at 2 (ECF No. 36). Plaintiffs argue they are likely to succeed on the
merits of three of their eight claims. They claim the Forest Service failed to comply with
the National Environmental Policy Act (“NEPA”) and the National Historic Preservation
Act (“NHPA”) when it determined in 2012 that the mining claims underlying the Canyon
Mine constituted valid existing rights (the “VER Determination”). Plaintiffs also claim
the Forest Service violated the NHPA because it did not follow the procedures in 36
C.F.R. § 800.13(b)(1) when conducting consultation regarding Red Butte Traditional and
Cultural Property (“TCP”).
The Court should deny Plaintiffs’ Motion. Plaintiffs are not likely to prevail on
the merits of any of their claims, especially in light of the Ninth Circuit’s recent merits
decision in Center for Biological Diversity v. Salazar (“CBD”), 706 F.3d 1085 (9th Cir.
2013), which rejected the plaintiffs’ challenges to the Arizona 1 Mine located on Bureau
of Land Management (“BLM”) lands and involved facts that are closely analogous to the
instant case. Plaintiffs cast their claims as challenging the Forest Service’s 2012 VER
Determination and review of the Canyon Mine, but the authorization of Canyon Mine
occurred in 1986. At that time, the Forest Service prepared an Environmental Impact
Statement (“EIS”) and Record of Decision (“ROD”) that approved the Plan of Operations
(“Plan”), and conducted consultation under the NHPA. This Court and the Ninth Circuit
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 10 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 2
upheld the EIS and ROD against challenges brought by Plaintiff the Havasupai Tribe and
others. Before mining activities were placed on standby status in 1992, in accordance
with the approved Plan, all the surface structures at Canyon Mine had been built and the
mine shaft had been dug to a depth of 50 feet. The Plan has remained valid and in effect.
When the mine operator informed the Forest Service that it intended to resume
operations, the Forest Service in 2012 reviewed the Plan, 1986 EIS and ROD. The Forest
Service reasonably concluded that no further agency decision-making or NEPA analysis
was required. Also, the Forest Service appropriately applied the NHPA consultation
procedures at 36 C.F.R. § 800.13(b)(3) with respect to Red Butte because construction
had commenced. The 2012 VER Determination did not make any decision or authorize
any activities; it was neither a final agency action, a major federal action that triggered
NEPA review, nor an undertaking that required NHPA consultation.
Because Plaintiffs’ claims are without merit, and they have not demonstrated that
any immediate, irreparable injury will occur, or that the balance of harms tips in their
favor, the Court should deny Plaintiffs’ Motion for Preliminary Injunction.
STATUTORY BACKGROUND
A. National Environmental Policy Act
To ensure informed decision-making, NEPA requires federal agencies to analyze
and disclose significant environmental effects of major federal actions in an EIS, but it
does not require any particular decision. See 42 U.S.C. §§ 4321-4370; Robertson v.
Methow Valley Citizens Council, 490 U.S. 332, 350 (1989); Vt. Yankee Nuclear Power
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 11 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 3
Corp. v. Natural Res. Def. Council, 435 U.S. 519, 558 (1978); see Lands Council v.
McNair, 537 F.3d 981, 1000 (9th Cir. 2008) (en banc).
B. National Historic Preservation Act
Section 106 of the NHPA requires a federal agency having jurisdiction over a
proposed undertaking, prior to the issuance of a federal license, to take into account the
effect of the undertaking on a site eligible for listing in the National Register. 16 U.S.C.
§ 470f.1 The federal agency official must determine whether a proposed federal action is
an “undertaking,” and if so, whether it is a type of activity that has the potential to cause
effects on historic properties. 36 C.F.R. § 800.3(a). The consultation process consists of
identification of historic properties that may be affected, an assessment of the property’s
historical significance, a determination of whether there will be an adverse effect on the
property, and consideration of ways to reduce or avoid any adverse effect on such historic
property. 36 C.F.R. §§ 800.4, 800.6; Attakai v. United States, 746 F. Supp. 1395, 1404
(D. Ariz. 1990).
C. Mining Law of 1872
The Mining Law, 30 U.S.C. §§ 22-54, made public lands available “for the
purpose of mining valuable mineral deposits.” United States v. Coleman, 390 U.S. 599,
602 (1968); see 30 U.S.C. § 22; Cameron v. United States, 252 U.S. 450, 460 (1920). It
authorizes citizens to “locate” valid mining claims upon “discovery” of valuable mineral
deposits and compliance with applicable legal requirements. Chrisman v. Miller, 197
1 An “undertaking” is a “project, activity, or program funded in whole or in part under the direct or indirect jurisdiction of a Federal agency, including…those requiring a Federal permit, license, or approval. . . .” 16 U.S.C. § 470w(7); see 36 C.F.R. § 800.16(y).
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 12 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 4
U.S. 313, 320-21 (1905). A valid claim affords its holder the right to possess, occupy,
and extract minerals from federal lands. 30 U.S.C. § 26; Wilbur v. United States ex rel.
Krushnic, 280 U.S. 306, 316 (1930) (a valid mining claim is “property [within] the fullest
sense of that term”); Mineral Policy Ctr. v. Norton, 292 F. Supp. 2d 30, 47 (D.D.C.
2003). The Mining Law does not include any requirement to “diligently develop” or
extract minerals on the claim within a certain time frame. United States v. Curtis-Nevada
Mines, Inc., 611 F.2d 1277, 1281-82 (9th Cir. 1980).
Congress has given the Secretary of the Interior plenary authority to determine the
validity of mining claims. 43 U.S.C. § 1457. The Forest Service conducts validity
determinations pursuant to a Memorandum of Understanding with the Department of the
Interior (“DOI”). See Linden Decl. ¶ 6 (citing Forest Service Manual (“FSM”) 1531.12).
The Forest Service does not have the authority to declare a mining claim void; rather,
such adjudications are conducted by DOI. See AR 7311 (FSM 2819).2
If lands on which mining operations are proposed are withdrawn from mineral
entry, subject to valid existing rights, the surface managing agency will conduct a validity
determination before allowing new operations. 43 C.F.R. § 3809.100; AR 11602 (BLM
Handbook H3809-1, § 8.1.5); AR 7310, 7298 (FSM 2818.3, 2817.23, ¶ 6). This VER
Determination verifies that the mining claims constitute valid existing rights exempt from
the withdrawal based on whether there was a discovery of a valuable mineral deposit at
the time of the withdrawal. See United States v. Pass Minerals, Inc., 168 IBLA 115, 122
2 Defendants cite the administrative record filed with this Court in 1988 as “1988 AR __” and cite the subsequent administrative record for Canyon Mine as “AR __”.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 13 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 5
(2006); Linden Decl. ¶ 7. The VER Determination will also verify that the mining claims
continue to be valid at the time the operator is seeking surface use authorization. Id.
D. Forest Service Regulation of Surface Resources
The Forest Service regulates and permits mineral development activities for
locatable minerals that may affect surface resources on National Forest System lands.
See 36 C.F.R. Part 228A; Freese v United States, 6 Cl. Ct. 1, 11-12 (Cl. Ct. 1984), aff’d,
770 F.2d 177 (Fed. Cir. 1985). Operators must have an approved mining Plan before
conducting operations that cause “significant disturbance.” See 36 C.F.R. § 228.4.
FACTUAL BACKGROUND
A. 1986 EIS and ROD Approving Plan of Operations
In 1984, Energy Fuels Nuclear submitted to the Kaibab National Forest a proposed
Plan to mine uranium at the Canyon Mine site, approximately six miles south of the
Grand Canyon National Park boundary. 1988 AR 193 (Plan). The Forest Service
completed an EIS to evaluate the potential environmental effects of the Plan, and
considered comment and input from federally recognized tribes. 1988 AR 461 (EIS). In
1986, the Forest Service issued the final EIS and ROD, approving the Plan with
modifications. 1988 AR 915 (ROD). The Plan did not have an expiration date.
The Forest Service received twelve administrative appeals on the ROD, including
appeals from the Hopi and Havasupai Tribes, and the Sierra Club Legal Defense Fund.
1988 AR 3932. These parties raised 25 different issues including First Amendment and
American Indian Religious Freedom Act (“AIRFA”) challenges, a variety of NEPA
challenges regarding resources such as groundwater, and a challenge to the validity of
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 14 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 6
mining claims. 1988 AR 3933. The tribes’ appeals were not limited to the record
developed at the time of the EIS and ROD, but included new information.3
In 1987, the Deputy Regional Forester issued his appeal decision, affirming the
ROD. 1988 AR 3928. This decision was based on the entire record, including the new
information tribes had submitted to date. 1988 AR 3931, 3934-35. In 1988, the Chief of
the Forest Service affirmed the decision below after considering all information that had
been presented. 1988 AR 5230. The Chief’s decision discussed the tribal religious issues
(including the sacred nature of Red Butte and the Canyon Mine site), the claimed
groundwater contamination, and mineral claim validity. 1988 AR 5231-39, 5242-44,
5239-40. The Secretary of Agriculture decided not to review the appeal. 1988 AR 5288.
The Havasupai Tribe and others challenged the 1986 EIS and ROD in this Court.
Havasupai Tribe v. United States, 752 F. Supp. 1471 (D. Ariz. 1990). In that proceeding,
the plaintiffs submitted additional evidence about tribal religious concerns as an offer of
proof to the District Court. Id. at 1485 n.7. The Court “assum[ed] that all of plaintiff’s
assertions about the religious sanctity of the Canyon Mine site and adverse effects on the
Havasupai [religion] are true,” id. at 1485, and found in favor of the Forest Service on all
3 The information included: (1) The Havasupai Tribe’s affidavit on tribal religious issues and sacred sites (1988 AR 3137-43); (2) The hearing held in the Office of the Chief on the appeal of the Regional Forester’s denial of a stay (1988 AR 3716–825), which included discussions from Havasupai Tribe leaders and their counsel on tribal religious issues and sacred sites (1988 AR 3733-69); (3) The hearing held on the merits of the appeal before the Deputy Regional Forester, at which Havasupai Tribe representatives spoke on tribal religious issues and sacred sites and presented expert testimony on groundwater issues (1988 AR 1882–992, 1811-14).
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 15 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 7
of the plaintiffs’ NEPA, First Amendment, and AIRFA claims. Id. at 1505. The Ninth
Circuit affirmed. Havasupai Tribe v. Robertson, 943 F.2d 32 (9th Cir. 1991).
B. Implementation of the Plan Prior to Standby Status
In the 1990s, all surface structures at the Canyon Mine were constructed, including
access roads, hoist, storage buildings, the power line, a perimeter fence and diversion
structures, a head frame, support buildings, and sediment ponds. AR 10487
(confidential), Pls. Ex. 15 at 5 (ECF No. 39-4) (redacted). The sinking of the mine shaft
had begun, but stopped at approximately 50 feet when Canyon Mine went into standby
status in 1992. Id.; Schuppert Decl. ¶ 3. The Plan remained in effect, and the mine
operator has maintained a reclamation bond throughout this time period. Id.
C. The Secretary of the Interior’s Land Withdrawal Decision and the Forest Service’s VER Determination
Canyon Mine is within the area in northern Arizona that was the subject of the
Secretary of the Interior’s July 2009 proposal to withdraw certain public lands from
location and entry under the Mining Law for up to twenty years, subject to valid existing
rights. Notice of Proposed Withdrawal, 74 Fed. Reg. 35887-01 (July 21, 2009). The
Notice of Proposed Withdrawal temporarily “segregated” or closed the designated lands
to entry and location of new mining claims.
In January 2012, after completing an EIS and other studies, the Secretary of the
Interior published a “Public Land Order,” which withdrew approximately one million
acres from mineral location and entry for twenty years. 77 Fed. Reg. 2317-01 (Jan. 17,
2012). The withdrawal was subject to valid existing rights and the EIS for the
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 16 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 8
withdrawal expressly contemplated that mining will proceed at Canyon Mine, as well as
three other previously authorized mines on BLM-managed lands. AR 10313-14, 8657.
Although Canyon Mine was approved before the segregation and withdrawal, the Forest
Service on April 18, 2012 took a conservative approach and completed a VER
Determination of the mining claims though it was not required by law to do so.4 This
VER Determination confirmed that the mining claims were valid as of the date of the
segregation, and thus were unaffected by the withdrawal. AR 10487 (confidential), Pls.
Ex. 15 at 5 (ECF No. 39-4) (redacted).
D. The Forest Service’s 2012 Review of 1986 EIS and ROD In 2011, the mine operator informed the Forest Service that it intended to resume
active mining operations under its existing Plan. In 2012, the Forest Service conducted a
review of the 1986 EIS and ROD, and associated documents. AR 10594. The Forest
Service determined that no amendment or modification of the Plan was required because
there was no unforeseen significant disturbance of surface resources and there was no
new proposal. Id. Accordingly, no further federal authorizations were needed for mining
activities at Canyon Mine to continue. AR 10592.
E. Consultation Under the NHPA
In conjunction with the 1986 EIS and ROD, the Forest Service completed
consultation under Section 106 of the NHPA. In 1992, the NHPA was amended to
provide for more robust tribal consultation and explicit inclusion of TCPs as historic
4 BLM did not prepare a VER Determination of the mining claims at the Arizona 1 Mine. See CBD, 706 F.3d 1085.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 17 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 9
properties. See Pub. L. No. 102-575, § 4001 et seq., 106 Stat. 4600. The Advisory
Council on Historic Preservation (“ACHP”) subsequently amended its regulations to
define “historic property” as including “properties of traditional religious and cultural
importance to an Indian tribe . . . that meet the National Register criteria.” 36 C.F.R. §
800.16 (l)(1); see 65 Fed. Reg. 77698, 77738 (Dec. 12, 2000).
As early as 2008, the Forest Service communicated with multiple tribes,
including the Havasupai, about potential resumption of operations at Canyon Mine
during yearly tribal consultation meetings and through letters. Lyndon Decl. ¶3.
In 2010, in response to a separate proposed undertaking, the Forest Service
determined that the Red Butte TCP was eligible for inclusion on the National Register.
Lyndon Decl. ¶ 2.5 This determination of eligibility evaluated the physical integrity of
Red Butte TCP as a cultural landscape and took into account that all surface structures at
Canyon Mine had been built and the drilling of the mine shaft had begun.
Because there were no new proposed activities that would require a modification
of the existing mining Plan or a new Plan, the Forest Service concluded there was no new
federal undertaking subject to NHPA Section 106 compliance. However, since the
definition of “historic property” had changed since the 1986 ROD, the Red Butte TCP
could be considered a newly “discovered” historic property, and potential effects could
then be considered “unanticipated effects” to a historic property. AR 10544.
5 The Forest Service’s “determination of eligibility” is an internal determination that the agency will treat the historic property as eligible for the National Register and subject to NHPA procedural requirements. See 36 C.F.R. § 63.2. Only the Keeper of the National Register can make a formal determination of eligibility. See 36 C.F.R. § 63.3.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 18 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 10
Accordingly, on June 25, 2012, the Forest Service officially initiated consultation with
the Havasupai and other tribes, Arizona State Historic Preservation Officer (“SHPO”),
and ACHP regarding the potential effects of mining activities on the Red Butte TCP. AR
10592. The Forest Service applied the procedures in 36 C.F.R. § 800.13(b)(3) to the
consideration of Red Butte TCP because the undertaking had already been approved and
construction activities had begun. AR 10555-57.
The Forest Service recognized that the regulation’s 48-hour response timeline may
not provide for adequate consultation and, consequently, extended the response period to
allow thirty days from the date of its letter for a response. AR 10545. The Forest
Service acknowledged that mining activities would adversely affect Red Butte TCP and
sought to work with the tribes to identify actions to address their concerns. Hangan Decl.
¶ 2. The Havasupai Tribe and the Forest Service subsequently exchanged letters
regarding consultation for several months and met in person on multiple occasions.
Lyndon Decl. ¶¶ 3-4.
On April 6, 2013, Energy Fuels Resources, which had acquired the mining
interests, began drilling the mine shaft past 50 feet. Schuppert Decl. ¶ 5.
STANDARD OF REVIEW
A. Standard for Obtaining Preliminary Injunctive Relief
To obtain a preliminary injunction, a plaintiff must show four elements: (1) a
likelihood of success on the merits, (2) a likelihood of irreparable harm in the absence of
an injunction, (3) that the balance of equities tips in his favor, and (4) that the injunction
is in the public interest. Winter v. Natural Res. Def. Council, Inc., 555 U.S. 7, 20 (2008).
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 19 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 11
The Ninth Circuit has held that its “serious questions” test – a “sliding scale test” under
which a lesser showing of “serious questions going to the merits” may be sufficient for an
injunction provided that the other three prongs for preliminary injunctive relief also have
been established – survives Winter. See Alliance for Wild Rockies v. Cottrell, 632 F.3d
1127, 1134 (9th Cir. 2011).
B. The Administrative Procedure Act
Because NEPA and NHPA do not create an independent cause of action, courts
must review those claims under the APA, 5 U.S.C. § 551 et seq.; Pit River Tribe v. U.S.
Forest Serv., 469 F.3d 768, 778 (9th Cir. 2006); ONRC Action v. Bureau of Land Mgmt.,
150 F.3d 1132, 1135 (9th Cir. 1998). The APA imposes a narrow and highly deferential
standard of review limited to a determination of whether the agency acted in a manner
that was “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance
with the law.” 5 U.S.C. § 706(2)(a); see Marsh v. Or. Natural Res. Council, 490 U.S.
360, 378 (1989); McNair, 537 F.3d at 987.
ARGUMENT I. RES JUDICATA BARS PLAINTIFFS’ NHPA CLAIMS
Res judicata bars relitigation of claims and issues that were or could have been
litigated in a prior action. See Taylor v. Sturgell, 553 U.S. 880, 892 (2008); Allen v.
McCurry, 449 U.S. 90, 94 (1980). Res judicata “bar[s] claims arising from the same
[cause of action], even if brought under different statutes.” Kremer v. Chem. Constr.
Corp., 456 U.S. 461, 481 n.22 (1982) (citation omitted). The four factors to consider
when determining whether two cases involve the same cause of action are:
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 20 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 12
(1) whether rights or interests established in the prior judgment would be destroyed or impaired by prosecution of the second action; (2) whether substantially the same evidence is presented in the two actions; (3) whether the two suits involve infringement of the same right; and (4) whether the two suits arise out of the same transactional nucleus of facts.
Rein v. Providian Fin. Servs., 270 F.3d895, 903 (9th Cir. 2001) (citation omitted). Here,
Plaintiffs clearly “might” have pursued claimed violations of the NHPA in Havasupai
Tribe, as archaeological sites subject to the NHPA had been identified before Plaintiffs
brought their challenge to the 1986 ROD. AR 10601. Instead, they claimed that the
1986 ROD violated AIRFA, their First Amendment right to free exercise of religion, and
NEPA because the Forest Service allegedly had not adequately considered the
Havasupai’s religious concerns. Havasupai Tribe, 752 F. Supp. at 1484-86, 1488-89,
1493-1500. Under these circumstances, Plaintiffs’ NHPA claims in this case allege
essentially the same cause of action that they brought in Havasupai Tribe. The Forest
Service’s 1986 ROD that was upheld in the previous action could be impaired by a
conflicting judgment in this case. Because both cases involve exactly the same mining
Plan, substantially the same administrative record would be at issue. Both suits alleged a
failure to sufficiently consider the importance of the Canyon Mine area, including the
area now determined to be eligible as the Red Butte TCP, to Plaintiffs’ religious
practices. And, both arise out of the same “transactional nucleus of facts”– the Forest
Service’s authorization of the Plan. Thus, res judicata bars Plaintiffs’ NHPA claims.
II. PLAINTIFFS’ CLAIMS ARE TIME-BARRED
The Court also lacks jurisdiction because the statute of limitations and laches bar
Plaintiffs’ claims. The six-year statute of limitations set forth in 28 U.S.C. § 2401(a)
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 21 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 13
applies to claims brought under the APA. See Sierra Club v. Penfold, 857 F.2d 1307,
1315-16 (9th Cir. 1988). The 1986 ROD is the only agency decision that authorizes the
mining activities at issue. The Plan has remained in effect despite the hiatus in mining
operations. Thus, any claim challenging the ROD or Plan is time-barred. To the extent
Plaintiffs may argue the intervening changes in law due to the 1992 amendments to the
NHPA or regulations issued in 1999 and 2000 create a retroactive obligation the statute
of limitations on any such claim has also run. Such a suit is also barred by laches.
III. PLAINTIFFS ARE NOT LIKELY TO SUCCEED ON THE MERITS OF THEIR NEPA CLAIM REGARDING THE VER DETERMINATION
Even if the Court finds that Plaintiffs have established jurisdiction, Plaintiffs are
not likely to succeed on the merits of their NEPA claim. Contrary to Plaintiffs’
assertions, the VER Determination was not necessary before mining activities at Canyon
Mine could continue and did not trigger NEPA. Pls. Mem. at 17-20 (ECF No. 39).
First, Plaintiffs’ arguments arise from their misunderstanding of the VER
Determination. As explained in BLM guidance that the Forest Service follows,
[a] mineral report serves two functions. One is to give a professionally prepared and technically reviewed report on the merits of the mining claim. . . . Secondly the mineral report can be a powerful tool when submitted into evidence at a contest hearing.
AR 5901, 6796 (BLM Handbook H-3870-1, at IV-B; id. at H-3890-3, at VI-1); see AR
7286 (FSM 2815.04); Linden Decl. ¶¶ 5-6. In other words, a VER Determination is an
internal document that the agency uses as a tool in later decision-making processes or
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 22 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 14
adjudications, but has no legal effect by itself. 6 Additional processes would be needed
before the Forest Service could revoke or invalidate the Plan, even if as a first step the
VER Determination had reached a finding of invalidity. Thus, Plaintiffs’ claim fails
because they have not challenged a final agency action by which rights or obligations
have been determined, or from which legal consequences will flow. Bennett v. Spear,
520 U.S. 154, 177-78 (1997).
Second, while Plaintiffs claim that a VER Determination was required for active
operations at Canyon Mine to resume because of the withdrawal, they are mistaken. Pls.
Mem. at 17. A VER would be required for a new Plan on an existing mining claim, but
no VER is required when a Plan was approved before the withdrawal. As noted in the
ROD for the withdrawal, “On withdrawn lands, neither the BLM nor the USFS will
process a new notice or plan of operations until the surface managing agency conducts a
mineral examination and determined that the mining claims on which the surface
disturbance would occur were valid as of the date the lands were segregated or
6 If the mineral report concluded that valid existing rights were not established, the Forest Service would forward its conclusion to BLM with a recommendation regarding whether to contest the mining claim. AR 7284, 7310 (FSM 2814.11, 2819); see also McKown v. United States, 2012 WL 5423863, at *7-11 (E.D. Cal. Nov. 5, 2012) (describing the lengthy administrative adjudicatory process for deciding validity of mining claims). If BLM concurs with the Forest Service’s finding of no valid existing rights, BLM could initiate a mineral contest against the mining claim on behalf of the Forest Service. See Cameron, 252 U.S. at 464. The VER Determination would then be submitted as an expert report in support of the contest charges. Linden Decl. ¶ 6. Until DOI makes a final determination of invalidity--and that determination withstands any subsequent federal court challenge--the Forest Service could not terminate or revoke a Plan on withdrawn lands. Ctr. for Biological Diversity, 162 IBLA 268, 281 (2004); Pass Minerals, Inc., 151 IBLA 78, 87 (1999); AR 7279-80 (FSM 2811.5). Any Plan revocation or suspension would involve a further adjudicatory process under 36 C.F.R. § 228.7 with opportunity for administrative appeal and judicial challenge.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 23 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 15
withdrawn.” AR 10314-15 (emphasis added). This is consistent with Forest Service
policy to conduct VER determinations for new proposals to authorize new mineral
exploration or mining in withdrawn areas, see Linden Decl. ¶ 7; AR 7310, 7298 (FSM
2818.3, 2817.23, ¶ 6), as well as BLM guidance. 43 C.F.R. § 3809.100; AR 11602
(BLM Handbook H3809-1, § 8.1.5). Even for new proposals in withdrawn areas a VER
determination itself does not provide authorization for mining activities as it is only one
step in an agency’s decision-making process.7
No law or policy requires a VER determination for already-approved mines with
effective Plans. Nonetheless, the Forest Service retains the discretion to conduct a VER
determination at any time, Linden Decl. ¶ 4; AR 7284, 7310 (FSM 2814.11, 2819).
Third, whether Plaintiffs’ NEPA claim is viewed as a request for a new EIS or
supplementation of the 1986 EIS, their claim fails because the VER Determination is not
a major federal action. An EIS is required only for “major Federal actions significantly
affecting the quality of the human environment.” 42 U.S.C. § 4332(2)(C).8 A
supplemental EIS is required “only if there remains major Federal action to occur.”
Norton v. S. Utah Wilderness Alliance, 542 U.S. 55, 73 (2004) (“SUWA”) (internal
quotation marks, citation, and alteration omitted). Likewise, once an agency has taken
7 Plaintiffs cite Yount v. Salazar, 2013 WL 93372, at *2, 4, 8 (D. Ariz. Jan. 8, 2013), to argue that a VER determination is mandatory on withdrawn lands, Pls. Mem. at 15 n.6, but that case is distinguishable because it did not address Plans that pre-date the withdrawal. Similarly, Plaintiffs’ reliance on Ramsey v. Kantor, 96 F.3d 434, 444 (9th Cir. 1996), where a federal permit was required, is inapposite. See Pls. Mem. at 17. The Forest Service did not retain discretionary control after approving the Plan. 8 A new EIS is not required for the further reason that the VER Determination does not authorize any activities, and thus does not significantly affect the environment.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 24 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 16
action to approve a regulated project, “there is no ongoing ‘major Federal action’
requiring supplementation” and the agency’s “obligation under NEPA has been fulfilled.”
Cold Mountain v. Garber, 375 F.3d 884, 894 (9th Cir. 2004); see also Greater
Yellowstone Coal. v. Tidwell, 572 F.3d 1115, 1122 (10th Cir. 2009) (no ongoing major
federal action where agency issued permit for use of federal land; NEPA applies only to
federal agencies, so actions of non-federal party implementing project are not relevant).
In CBD, the Ninth Circuit rejected a NEPA claim similar to the one brought here.
In that case, the BLM had approved the Plan for the Arizona 1 Mine in 1988, after which
the mining company began developing the mine until mining activities suspended in
1992. 706 F.3d. at 1088. In 2007, the mine operator informed BLM of its intention to
restart mining operations after a 17-year hiatus under the existing Plan. Id. at 1089. The
Ninth Circuit held that the NEPA review for the 1988 Arizona 1 Plan was complete and
no major federal action triggered supplemental NEPA analysis for the 1988 Plan, which
had remained in effect despite the period of inactivity. Id. at 1095-96. Furthermore, the
court rejected the plaintiffs’ arguments that more recent agency actions, such as BLM’s
issuance of a gravel permit, its requirement of a new air quality control permit, and its
approval of an updated reclamation bond were major federal actions that triggered
NEPA. Id. at 1095. Instead, the court found those actions did not affect the validity or
completeness of the 1988 Plan. Id.
No major federal action remains to occur here. The Forest Service prepared a
thorough NEPA analysis of Canyon Mine and conducted consultation when issuing the
1986 ROD. Havasupai Tribe, 943 F.2d at 32. The federal action came to an end in 1986
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 25 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 17
when the Forest Service issued its ROD. See SUWA, 542 U.S. at 73. The existing Plan
remains in effect despite the hiatus in mining activities, so there is no federal action left
to occur, and no further NEPA analysis was required.9 AR 10600-01.
Finally, Plaintiffs try to save their NEPA claim by characterizing the VER
Determination as a “discretionary agency action,” but this argument misses the mark.
Pls. Mem. at 15. The fact that the Forest Service decided in its discretion to evaluate the
validity of the mining claims for the Canyon Mine does not render the outcome of the
VER Determination “discretionary”--nor does it trigger any requirement to undertake
NEPA analysis. Once the Forest Service initiated the VER Determination, the outcome
of the VER Determination was governed strictly by the facts pertaining to the mining
claim. The Forest Service was not at liberty to make a choice among alternatives, nor to
consider environmental impacts, when reaching its conclusion in the VER Determination.
In that sense, the VER was nondiscretionary and therefore did not trigger NEPA. See,
e.g., Sierra Club v. Babbitt, 65 F.3d 1502, 1512 (9th Cir. 1995) (collecting cases
demonstrating that nondiscretionary agency action is excused from the operation of
NEPA); Sac & Fox Nation v. Norton, 240 F.3d 1250, 1262-1263 (10th Cir. 2001)
(“NEPA compliance is unnecessary where the agency action at issue involves little or no
discretion on the part of the agency”); Defenders of Wildlife v. Andrus, 627 F.2d 1238,
1245 (D.C. Cir. 1980); S. Dakota v. Andrus 614 F.2d 1190, 1193 (8th Cir. 1980); see also
9 A supplemental Plan is needed only if there is a proposal for significant disturbance of surface resources not covered by the initial Plan. 36 C.F.R. § 228.4(d). There is no such proposal here. AR 10598-600.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 26 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 18
CBD, 706 F.3d. at 1096 (NEPA not required for BLM’s ministerial actions associated
with update of reclamation bond).
In The Wilderness Society v. Robertson, the court rejected the plaintiffs’ claim that
an EA or EIS had to be prepared for a VER determination. 824 F. Supp. 947, 953 (D.
Mont. 1993), aff’d sub nom. The Wilderness Society v. Dombeck, 168 F.3d 367 (9th Cir.
1999). The court held that “[t]he Forest Service’s decision-making process in
determining the validity of a mining claim under Section 1133(d)(2) of the Wilderness
Act is not a discretionary matter of granting or denying a privilege, but rather is a non-
discretionary act of determining whether rights conferred by Congress have come into
existence.” 824 F. Supp. at 953. The court explained that an EIS is not required for
nondiscretionary agency action for which “no viable options or alternatives exist.” Id.10
VER Determinations contain objective analyses and recommendations as to
whether a property right exists as of a date certain. Plaintiffs argue that an agency can
reach alternative outcomes when preparing a VER determination, based on the costs
analysis involved. Pls. Mem. at 16-18. However, the requisite cost factors do not
provide unbounded discretion to consider environmental impacts. See Linden Decl. ¶ 12;
AR 6767 (BLM Handbook H3890-3). The costs analysis that the Forest Service properly
conducted, see Linden Decl. ¶¶ 12-14; AR 10500-02 (confidential), Ps. Ex. 15 at 18-20
(ECF No. 39-5) (redacted), did not constitute a “meaningful opportunity” to consider
10 Moreover, DOI’s issuance of mineral patents, which involves a VER determination at one stage of the proceedings, is nondiscretionary, and thus not subject to NEPA. Swanson v. Babbitt, 3 F.3d 1348, 1353-54 (9th Cir. 1993); S. Dakota, 614 F.2d at 1194-95; Linden Decl. ¶ 4. Because a VER Determination is only one subcomponent of the entire mineral patenting process, a VER Determination is not subject to NEPA.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 27 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 19
environmental impacts and choose among alternatives. Marsh, 490 U.S. at 372, 374.
Rather, the VER Determination is akin to the “crunching [of] some numbers” that the
Ninth Circuit in CBD found to be exempt from NEPA. 706 F.3d at 1096.
IV. PLAINTIFFS ARE UNLIKELY TO SUCCEED ON THE MERITS OF THEIR NHPA CLAIMS
A. The Forest Service Fully Complied with Section 106’s Requirements
and Properly Followed the Procedures at 36 C.F.R. § 800.13(b)(3)
Plaintiffs claim that the Forest Service should have followed Section 800.13(b)(1)
of the NHPA regulations when engaging in formal consultation with the Havasupai Tribe
regarding the Red Butte TCP. Pls. Mem. at 11-13. This claim lacks merit.
In 1986 when the Forest Service issued the ROD, it completed consultation for
Canyon Mine in accordance with Section 106 of the NHPA. The qualities that now make
Red Butte TCP eligible for listing were known and all information disclosed by tribes
was considered in the agency’s final decision, which the Ninth Circuit upheld.
After approval of an undertaking, further Section 106 compliance may be required
in only limited circumstances. The NHPA regulations allow for reasonable
considerations of potential effects to historic properties if they were not anticipated or if
new historic properties are “discovered” after the Section 106 process concluded, but the
undertaking has not been completed and there is still an opportunity to avoid, minimize,
or mitigate effects from the undertaking. 36 C.F.R. § 800.13. Section 800.13(b)(3)
provides that “[if] the agency official has approved the undertaking and construction has
commenced, determine actions that the agency official can take to resolve adverse
effects, and notify the SHPO/THPO, any Indian tribe . . . that might attach religious and
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 28 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 20
cultural significance to the affected property, and the Council within 48 hours of the
discovery.” Section 800.13(b)(3) also provides a 48-hour timeline for consulting parties
to respond with their concerns.
Because the mine operator did not propose any new activities that would require a
modified or new Plan, there was no new federal undertaking subject to the NHPA after
the agency issued the 1986 ROD.11 Since the undertaking had been approved and
construction had begun, the Forest Service properly applied 36 C.F.R. § 800.13(b)(3),
rather than subsection (b)(1). In fact, the Forest Service went above and beyond the
requirements of subsection (b)(3) by providing Plaintiffs up to 30 days for comments and
not merely 48 hours. AR 10545; Hangan Decl. ¶ 2. The agency then sought to establish
agreed-upon mitigation measures to address effects to Red Butte TCP. Hangan Decl. ¶ 9.
Plaintiffs rely heavily on the ACHP’s August 1, 2012 letter, AR 11335, in which
the ACHP stated that it believed the Forest Service should proceed under 36 C.F.R. §
800.13(b)(1). Pls. Mem. at 13. However, in subsequent communications with the
ACHP, it became evident that this letter was based on a misunderstanding about the
status of the construction at Canyon Mine before standby status. Hangan Decl. ¶¶ 4-5. In
11 The cases Plaintiffs cite to argue that there is an ongoing federal action subject to the NHPA are inapposite. Pls. Mem. at 3-4 (citing Vieux Carre Prop. Owners v. Brown, 948 F.2d 1436, 1445 (5th Cir. 1991); Morris County Trust for Historic Pres. v. Pierce, 714 F.2d 271, 280 (3d Cir. 1983); WATCH v Harris, 603 F.2d 310, 325-26 (2d Cir. 1979); Okinawa Dugong v. Rumsfeld, 2005 WL 522106, at *13 (N.D. Cal. March 2, 2005)). These cases all involved situations that required further federal action to fund or approve activities, which is not comparable to the Forest Service’s one-time approval of a Plan that a private party would implement without requiring further federal involvement.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 29 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 21
an April 3, 2013 conference call, after the misinformation was clarified, the ACHP stated
that its letter set forth a policy position, not a legal position. Hangan Decl. ¶ 8.
Plaintiffs argue that deference should be given to the statements in the ACHP’s
letter, but the prerequisite conditions for such deference are not present here. Ordinarily,
courts may give some degree of deference to an agency’s interpretation of its own
ambiguous regulation. Auer v. Robbins, 519 U.S. 452, 461-62 (1997). However, Auer
deference is inappropriate “when the agency’s interpretation is ‘plainly erroneous or
inconsistent with the regulation,’” or “when there is reason to suspect that the agency’s
interpretation does not reflect the agency’s fair and considered judgment on the matter in
question.” Christopher v. SmithKline Beecham Corp., 132 S. Ct. 2156, 2166 (2012)
(internal quotations and citations omitted)). Here, the plain language of the regulations
requires the use of 36 C.F.R. § 800.13(b)(3) after “the agency official has approved the
undertaking and construction has commenced.” The ACHP letter is inconsistent with the
unambiguous regulation. Additionally, the statements in the ACHP letter do not
constitute a fair and considered judgment of the agency, and instead reflects the ACHP’s
evolving position as factual mistakes were clarified. See Hangan Decl. ¶¶ 4, 8. Thus, no
deference to the ACHP’s letter is warranted. The Forest Service’s application of Section
800.13(b)(3) was proper and should be upheld.
B. The VER Determination Is Not an Undertaking Under the NHPA
Contrary to Plaintiffs assertions, Pls. Mem. at 15, a VER determination by itself
cannot legally constitute a federal undertaking that triggers NHPA consultation because it
is not a “project, activity, or program,” nor is it a “Federal permit, license or approval.”
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 30 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 22
16 U.S.C. § 470f; 36 C.F.R § 800.16. It is also not a final agency action, as discussed
above. Whether an undertaking exists under the NHPA is analogous to the question of
whether a major federal action exists under NEPA. Coal. for Underground Expansion v.
Mineta, 333 F.3d 193, 197 n.7 (D.C. Cir. 2003); Karst Envtl. Educ. & Prot., Inc. v. EPA,
403 F. Supp. 2d 74, 79 (D.D.C. 2005), aff’d, 475 F.3d 1291 (D. C. Cir. 2007); Okinawa
Dugong, 2005 WL 522106, at *12 (“The standards for identifying ‘undertakings’ under
the NHPA have been widely held to be ‘similar’ to those for identifying ‘major federal
actions’ under [NEPA].”). Because the VER Determination is not a major federal action,
as discussed above, it is also not an undertaking under the NHPA.12 Thus, Plaintiffs are
not likely to succeed on the merits of their NHPA claims.
V. PLAINTIFFS HAVE NOT DEMONSTRATED ANY IRREPARABLE INJURY OR THAT THE BALANCE OF HARMS TIPS IN THEIR FAVOR To succeed on their Motion, Plaintiffs must show that they are likely to suffer
irreparable harm in the absence of preliminary relief.13 Winter, 555 U.S. at 20. Plaintiffs
have the burden to prove a substantial and immediate irreparable injury by a
12 Additionally, because a VER Determination merely sets forth an expert’s position on the ownership of minerals located at the site and has no direct effect on the historic property, it is not an NHPA undertaking. See Yerger v. Robertson, 981 F.2d 460, 465 (9th Cir. 1992) (Forest Service’s assertion of ownership of historic structure is not an undertaking because mere existence of ownership rights does not affect the historic property even when the assumption of control is clearly preparatory to action that will affect the site). Indeed, mineral patenting (for which a VER determination is only one step) has been exempted from any Section 106 requirements under the Regional Programmatic Agreement with the Arizona SHPO and the ACHP. AR 6834. 13 Plaintiffs’ requested relief poses redressability issues. Plaintiffs seek to enjoin the Forest Service from allowing mining, but the agency completed its authorization in 1986 and only private action to implement the Plan remains. Plaintiffs’ request to suspend the Plan that has withstood legal challenges would bypass several administrative processes at both the Forest Service and DOI, which is not a party to this case.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 31 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 23
preponderance of the evidence. Orantes-Hernandez v. Thornburgh, 919 F.2d 549, 558
(9th Cir. 1990). Courts “should pay particular regard for the public consequences in
employing the extraordinary remedy of injunction.” Weinberger v. Romero-Barcelo, 456
U.S. 305, 312 (1982). In balancing harms, the Court should consider not just potential
environmental harms but also economic harms.14 See Earth Island Inst. v. Carlton, 626
F.3d 462, 475 (9th Cir. 2010); McNair, 537 F.3d at 1005.
A. Procedural Violations Alone Do Not Constitute Irreparable Harm
Contrary to Plaintiffs’ arguments about their procedural NEPA and NHPA claims,
Pls. Mem. at 20-21, “[a] procedural injury alone is insufficient to . . . demonstrate the
irreparable injury required to justify injunctive relief.” Sierra Forest Legacy v. Sherman,
2013 WL 1627894, at *7 (E.D. Cal. Apr. 15, 2013). It is well settled that there is no
presumption of irreparable injury in environmental cases. Amoco Prod. Co. v. Vill. of
Gambell, 480 U.S. 531, 545-46 (1987); Ctr. for Food Safety v. Vilsack, 636 F.3d 1166,
1171 n.6 (9th Cir. 2011); McNair, 537 F.3d at 1005. Rather, moving parties must show
tangible irreparable injury. See Amoco Prod., 480 U.S. at 542.
B. Plaintiffs Cannot Show Immediate, Irreparable Harm15
Plaintiffs claim irreparable harm from the impacts that mining activities will have
14 Defendants anticipate that Intervenors will discuss such harms in their brief. 15 Plaintiffs’ delay in bringing their Motion undermines any claim of irreparable harm. Oakland Tribune, Inc. v. Chronicle Publ’g Co., 762 F.2d 1374, 1377 (9th Cir. 1985); Lydo Enters., Inc. v. City of Las Vegas, 745 F.2d 1211, 1213 (9th Cir. 1984); Headwaters, Inc. v. BLM, 665 F. Supp. 873, 876 (D. Or. 1987). Although they have known for years of the mine operator’s intent to resume activities, Plaintiffs waited until now to seek emergency injunctive relief. To the extent Plaintiffs challenge the 2012 Mine Review, Plaintiffs waited nine months before filing suit.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 32 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 24
on tribal resources. Pls. Mem. at 21-22. Throughout the consultation process, the Forest
Service has taken the Havasupai Tribe’s assertions of impacts to tribal resources at face
value. Courts have already considered the Tribe’s claims regarding their religious and
cultural practices, and the current operations at Canyon Mine are no more of an impact
than what was at issue in the earlier litigation. Even though operations at Canyon Mine
began over twenty years ago, the Havasupai Tribe has been continuing its ceremonial and
gathering practices. See AR 10633. Since the early 1990s, the Forest Service has worked
with tribes to insure the continued use of Red Butte for traditional gatherings,
ceremonies, and collection of medicinal plants. AR 10605. The Forest Service has made
management decisions to better protect Red Butte, such as by restricting motor vehicle
use, and continues to identify protective measures. See AR 5708.
In addition, Plaintiffs allege harm from effects on groundwater, although none of
the claims that form the basis of Plaintiffs’ emergency motion involves groundwater. Pls.
Mem. at 22-23. As the 1986 EIS explained, however, no operations at the depth of the
aquifer were proposed, no dewatering of the aquifer was proposed or permitted, and thus
no effect on the springs fed by that aquifer was expected. 1988 AR 773; see Congdon
Decl. ¶ 5. The conclusions of the 1986 EIS regarding groundwater were actually litigated
and resolved in favor of the Forest Service in Havasupai Tribe, 943 F.2d at 34;
Havasupai Tribe, 752 F. Supp. at 1500-03. Collateral estoppel bars re-litigation of these
groundwater issues. See Montana v. United States, 440 U.S. 147, 153 (1979); United
States v. ITT Rayonier, Inc., 627 F.2d 996, 1000 (9th Cir. 1980). The 2012 Mine Review
considered the analysis of the original Plan and found no reason to reevaluate the
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 33 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 25
groundwater conditions. AR 10624. Likewise, the EIS for the withdrawal found that
Canyon Mine would not impact the water quantity or quality of springs fed by perched
aquifers, and would have negligible to immeasurable impacts on only one spring. AR
9518-21. Any perched aquifers the mine shaft would encounter would be highly unlikely
to affect the local water supply. Congdon Decl. ¶ 11. As for Plaintiffs’ arguments about
the Pinenut Mine, Pls. Mem. at 23, conditions at one site cannot be generalized to another
mine. Congdon Decl. ¶ 6. Canyon Mine is located in a manner such that any seepage
would flow away from Grand Canyon springs. Congdon Decl. ¶¶ 6, 8, 10.16
CONCLUSION
For all the foregoing reasons, Federal Defendants respectfully requests that the
Court deny Plaintiffs’ Motion for Preliminary Injunction.17
Dated: May 10, 2013 Respectfully submitted,
IGNACIA S. MORENO Assistant Attorney General /s/ Beverly F. Li
BEVERLY F. LI Trial Attorney, Natural Resources Section Environment & Natural Resources Division U.S. Department of Justice
Attorney for Federal Defendants
16 As for Plaintiffs’ arguments regarding a 2010 U.S. Geological Survey (“USGS”) Report, Pls. Mem. at 23; Pls. Ex. 11, most of the information in that report was already contained in an earlier USGS report, and the 2010 Report did not did not change the agency’s conclusions. See AR 11788. 17 Plaintiffs ask that the Court not impose a bond. Pls. Mem. at 25 n.9. Under the general rule in Federal Rule of Civil Procedure 65(c), parties seeking a preliminary injunction, including environmental groups and citizens, must post a bond. See Save Our Sonoran, Inc. v. Flowers, 381 F.3d 905, 915-16 (9th Cir. 2004). Defendants support imposition of an appropriate bond and expect that Intervenors will provide evidence on this issue.
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 34 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 26
TABLE OF EXHIBITS
Exhibit Number Exhibit Name A Declaration of Michael Lyndon B Declaration of Michael Linden C Declaration of Elizabeth Schuppert D Declaration of Margaret Hangan E Declaration of Roger Congdon
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 35 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 27
CERTIFICATE OF SERVICE
I hereby certify that on May 10, 2013, a copy of the foregoing was served by
electronic means on the following:
Marc D. Fink Center for Biological Diversity 209 E 7th St Duluth, MN 55805 218-525-3884 Fax: 218-525-3857 Email: [email protected] Neil Levine Grand Canyon Trust 4438 Tennyson St. Denver, CO 80212 303-455-0604 Email: [email protected] Richard Warren Hughes Rothstein Donatelli Hughes Dahlstrom Schoenburg & Bienvenu LLP 1215 Paseo De Peralta Santa Fe, NM 87504 505-988-8004 Fax: 505-982-0307 Email: [email protected] Roger Flynn Western Mining Action Project P.O. Box 349 Lyons, CO 80540 303-823-5738 Fax: 303-823-5732 Email: [email protected] Attorneys for Plaintiffs Bradley Joseph Glass David J DePippo
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 36 of 37
FED. DEFS.’ OPP’N TO PLS.’ MOT. FOR PRELIM. INJ. 28
Michael K Kennedy Gallagher & Kennedy PA 2575 E Camelback Rd., Ste. 1100 Phoenix, AZ 85016-9225 602-530-8000 Fax: 602-530-8500 Email: [email protected] Email: [email protected] Email: [email protected] Attorneys for Intervenors
/s/ Beverly F. Li Beverly F. Li
Counsel for Federal Defendants
Case 3:13-cv-08045-DGC Document 53 Filed 05/10/13 Page 37 of 37