PROJECT SUPERVISIONPROJECT SUPERVISION
A training programme for those involved in project supervisionA training programme for those involved in project supervision
AN OVERVIEW OF REVISED IFAD PROCUREMENT
GUIDELINES
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
2
3
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
National Procurement Assessment
• Overarching assessment• carried out during the design
(Ref. III.C - IFAD Procurement Guidelines)
Need to understand Rationale for these changes
Background
In the context of an evolving business model at IFAD (Paris Declaration (2005), Direct Supervision (2007) Accra Agenda for Action (2008), Busan (2011), etc….)
Procurement is the Borrower/ Recipient responsibility
IFAD has a fiduciary responsibility
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
4
Fundamental ChangesRevised General Conditions
New Financing Agreement & Role of LTBRevised Procurement Guidelines & Handbook
New Supervision Modalities – change of roles! Concept of “Entry into Force” – linked to approved first AWPB & PP (+ any additional specific withdrawal conditions) Simplification – Procurement Schedule deleted from FA and standard texts are shifted to GC (remedies, etc) Update of Terminologies with elements of flexibility
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
5
Fundamental ChangesProcurement Guidelines
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Greater emphasis on… Procurement Principles Eligibility Importance of Procurement Plan & Contracts Register Use of National Procurement Systems Default position for ICB
6
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Use of National Procurement Systems
Definitions 4 pillars Assessment – types and tools
7
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
What is meant by:Use of National Procurement
Systems? (1)
By show of hands, how many have worked with or assessed national procurement
systems?
-How did you do it?-Were you satisfied with the results? Why?
8
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
What is meant by:Use of National Procurement
Systems? (2)
Donors satisfied with a countries’ own set of procurement rules and procedures that could be used to administer donor-
financed procurement and reduce transaction costs.
9
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Definitions Paris & Accra: national arrangements and
procedures for procurement …
WB: a country’s legal and institutional framework, consisting of its national, sub-national, or sectoral implementing institutions and applicable laws, regulations, rules and procedures
AfDB: country systems as public management and accountability systems for managing the public resources of a country
DFID: “Putting aid on budget”
10
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Some quoted gaps
Harmonization & Alignment: “When it comes to using country systems…DFID considers country systems as default position, EC on the other hand
budgetary support, MCC use country system where possible, US Government consider use of
country system as an exception rather than a routine practice…..”
GMF paper 2008
11
4 pillars
Procurement Operations and
Markets
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
12
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Procurement PlanNo standard format
Most important elements: Simple but comprehensive!
Description of procurement items by component and type i.e. Civil Works, Goods, Services.. Quantity/ Unit Cost & Estimated Cost Procurement Method Prior Review Requirement Schedule by bidding process – Notice to Award of contract Responsible Entity
13
14
Starting-up the Project: Project Planning and Budgeting
Procurement at Start-Up
Procurement Plan (an integral part of the AWPB)
Desired Features
1. Ideal Structure
2. Coherence with project objectives and annual work plan
3. Financial estimates in line with annual budget and overall funds allocation
4. Procurement methods in line with regulatory framework
5. Realistic timing and scheduling of procurement activities
15
• Ideal Structure
The plan covers 18 months (12 mths for successive plans) and shows for each procurement action: the loan category, financing rate, procurement method, estimated cost, quantities, IFAD review requirement, and anticipated timeline for the entire process.
Procurement actions are presented by project component and properly identified and referenced.
Procurement actions are grouped according to categories (goods/works/services) for each component.
Within each category, procurement actions are grouped into coded lots or packages for increased competition, efficiency and better prices.
Starting-up the Project: Procurement Review of Procurement Plan (1) (refer to checklist)
16
• Coherence with project objectives and annual work plan
Procurement actions are relevant to project objectives.
Nature and quantity of goods/works/services are consistent with design (detailed cost tables).
Nature and quantity of goods/works/services are consistent with activities in the annual work plan.
• Financial estimates in line with annual budget and overall funds allocation
Estimated costs for each procurement action are reasonable and current.
Cost estimates are properly reflected in the annual budget. Cost estimates are within overall project funds allocation (by
expense category).
Starting-up the Project: Procurement Review of Procurement Plan (2)
17
• Procurement methods in line with regulatory framework Use of National Regulations to the extent they are
consistent with IFAD Procurement Guidelines
• Realistic timing and scheduling of procurement activities Anticipated timeline for each procurement action
(from preparation of bidding documents to signature of contract) is realistic
Anticipated delivery dates of goods/works/services are consistent with physical targets as per the AWPB
Starting-up the Project: Procurement
Review of Procurement Plan (3)
18
D. SUPERVISING PROJECT D. SUPERVISING PROJECT IMPLEMENTATIONIMPLEMENTATION
i.i. Project Planning and BudgetingProject Planning and Budgetingii.ii. Procurement Procurement iii.iii. Financing AdministrationFinancing Administrationiv.iv. Financial Management Financial Management v.v. The Supervision MissionThe Supervision Missionvi.vi. Mid-Term Review; Extension of Mid-Term Review; Extension of
Completion DateCompletion Date
19
Agenda
A. Introducing Project Supervision
B. The Financing Agreement & General Conditions
C. Starting-up the Project
D. Supervising Project Implementation
i. Project Planning and Budgeting (AWPB)
ii. Procurement
iii. Financing Administration
iv. Financial Management
v. The Supervision Mission
vi. Mid-Term Review; Extension of Completion Date
E. Closing the Financing (Loan/Grant)
20
Supervising Project Implementation
Introduction
After start-up and setting up all project systems to ensure efficient implementation and development impact, project follows its AWPB and begins to…
1. Purchase goods and services (procurement)…
2. Use funds and other resources from the IFAD financing, government, co-financiers (if applicable) and project beneficiaries (funds administration)…
3. . . .and for which financial management systems are set up.
4. All this is supervised by IFAD at HQ and in the field, beginning considerably before the mission leaves for the field.
21
• Problems and success are a shared concern of all stakeholders (beneficiaries, Govt, co-financiers, IFAD) >> Set up relationship with stakeholders to work as a team.
• This collaborative approach will ensure high
SPN and implementation quality.
• Primary role of IFAD – assist and facilitate implementation, while ensuring fiduciary responsibilities.
• Within results-based COSOP, maximize synergies, partnerships, knowledge management and innovation.
Supervising Project Implementation
General Principles (1)
22
• Monitor progress of the projects against targets, development objectives and indicators.
• Monitor procurement and disbursement of funds.
• Review effectiveness of financial management system.
• Review compliance with FA covenants/overall GC.
Supervising Project Implementation
General Principles (2)
23
Supervising Project Implementation
General Principles (3) • Assess risks and problems to successful
implementation and sustainability, and offer practical solutions.
• Review the continued relevance of the project to the recipient country, the beneficiary, and IFAD development priorities; modify if appropriate.
• Assess implementation quality, safeguard adherence and IMPACT! Do not loose sight of IMPACT on rural poor.
24
D. SUPERVISING PROJECT D. SUPERVISING PROJECT IMPLEMENTATIONIMPLEMENTATION
i. Project Planning and i. Project Planning and BudgetingBudgeting
25
Supervising Project Implementation: Project Planning and Budgeting
Learning Objectives
How are the subsequent years’ AWPBs different from the first year?
What elements complete a AWPB?
What is the AWPB’s typical format?
26
Supervising Project Implementation: Project Planning and Budgeting
Annual Work Plan and Budget – Additional Elements
From Project Year 2, the consolidated AWPB will contain the following additional key elements:
Introduction (as explained for start-up) but including the following:
• Physical progress made in the previous year, including quantitative data.
• Financial progress in the previous year, including cost overruns and savings, and analysis of flow of funds from financiers.
• Procurement performance.
• Constraints and problems from previous year, and recommendations to resolve them.
• Lessons learned and rationale for the activities proposed.
27
• Consolidation of e.g., validated Village/ Community Development Plans into project AWPB
Plus:
• Inputs for PMU and implementing agencies (investment + recurrent)
• Contract costs of service providers/ TAs
• Project specific inputs
Supervising Project Implementation: Project Planning and Budgeting
Annual Work Plan and Budget
Typical Inputs from Year 2
28
Supervising Project Implementation: Project Planning and Budgeting
Project Planning and Budgeting
Conclusion - Question to Ask Ourselves: (for discussion)
Apart from good supervision and review, what are the contextual factors that contribute to a good AWPB?
Not necessarily linked to the poverty levels of the country or the general capacity of national institutions.
What could it be then?
(i) Degree of influence donors may have on specific institutional processes and procedures of implementing agencies?(i) Project Manager or Project institutional arrangements?(ii) Technical Assistance?(iii) Country Programme Manager, ICO, CPMT?(iv) Other factors?
29
1. You have the criteria and standards to be applied in your review and supervision of the quality of the AWPB.
2. You have also contributed with your own experience in the AWPB review; collectively now you have identified some of the most common factors that affect quality.
Supervising Project Implementation: Project Planning and Budgeting
Word of conclusion – (1)
The importance of a good AWPB cannot be over-emphasized – it is not just about procedures or about timeliness!
30
Supervising Project Implementation: Project Planning and Budgeting
Word of conclusion – (2)
What are the implications for the supervision and review process?
• Your style, intensity and focus of supervision will vary in time and context depending on how these factors play in the particular project you are supervising and how it evolves over time (development effectiveness.) Examples – change in Project Manager, Institutional changes; etc
• Monitoring the evolution of those factors in your checklist may help you anticipate any problems or constraints and take timely preventive and corrective action - It is an Art!
31
D.D. SUPERVISING PROJECT SUPERVISING PROJECT IMPLEMENTATIONIMPLEMENTATION
ii. Procurementii. Procurement
32
Agenda
A. Introducing Project Supervision
B. The Financing Agreement & General Conditions
C. Starting-up the Project
D. Supervising Project Implementation
i. Project Planning and Budgeting (AWPB)
ii. Procurement
iii. Financing Administration
iv. Financial Management
v. The Supervision Mission
vi. Mid-Term Review; Extensions of PCD
E. Closing the Financing (Loan/ Grant)
F. Special Issues
33
What are IFAD’s role and responsibility in procurement for projects?
What are the tasks involved in procurement supervision?
How is procurement supervision conducted?
Supervising Project Implementation: Procurement
Learning Objectives
34
• Inefficient or ineffective procurement may have serious consequences:
expected project results and impacts not achieved.
delays in project implementation. higher cost of implementation.
• Procurement is a sensitive activity: can be conducive to corruption and
fraud. complexity of certain procurement
actions. combined use of national & IFAD
regulations / guidelines.
Supervising Project Implementation: Procurement
Introduction
Purchasing goods, services and works (procurement) is a critical element of project implementation. . .
Supervising Project Implementation: Procurement
Overriding Principle!
35
36
Supervising Project Implementation: Procurement
Procurement Cycle
37
Procurement Process
38
Importance of Strategic PlanningEnsures:
•Financier policies are followed•Procurement contributes to meeting project objectives•Align with best practice in procurement•Achieve best value for money•Manage risks
Supervising Project Implementation: Procurement
Procurement Planning
39
Identification of Need Needs or Wants?
Categories: Projected Requirements Interim Requirements One-off/ emergency requirements
Module F1 – IFAD Procurement Handbook
Supervising Project Implementation: Procurement
40
SpecificationsSupervising Project Implementation: Procurement
41
Drivers for Specs Functional Performance Technical
Supervising Project Implementation: Procurement
42
43
Supervising Project Implementation: Procurement
Tendering Process
Formation of Bid Evaluation Committee; N-O by I FAD
Prepare Specifications and tender documents (Advertisement/ I TBs/ RFPs/ RFQs as applicable)
Key
I TB –Invitation to Bid
RFP – Request for Proposal
RFQ –Request for Quotation
Bid Evaluation and draft contractI FAD Prior Review and No-Objection (if
required)
Contract Award to best evaluated bid
44
• Different methods (ranging from International Competitive Bidding to Direct Contracting) are used for the different categories of procurement depending on nature, amount and other criteria - guiding principle being economy and efficiency.
Supervising Project Implementation: Procurement
Procurement Methods
Supervising Project Implementation: Procurement
Common Procurement Methods
• International Competitive Bidding (ICB): for high value requirements. (1)
Advertise in widely circulated newspapers, local representatives, Embassies, UN Development Forum
Pre-qualification Public bid opening Bid evaluation based on
point scoring system (technical + financial)
• National Competitive Bidding (NCB): for public procurement in Borrower’s country (2)
Advertise in local newspapers (note: foreign suppliers may bid)
Same
Same
Same
45
46
Supervising Project Implementation: ProcurementCommon Procurement MethodsInternational Shopping (3): short-list at least three
reputable suppliers in at least two member countries of IFAD
issue ITB to the short-listed suppliers
receive bids in original form (not faxed)
bid evaluation based on lowest cost for compliant offers
sign contract
Local Shopping (4): prepare specifications
and request for quotations
short-list at least three reputable suppliers
issue request for quotations to the short-listed suppliers
Same
Same
Direct Contracting (5): Extension of/ addition to an existing contract Standardisation of goods with existing project assets
Note: Competitive process is not required.
Supervising Project Implementation: Procurement
Common Procurement Methods
47
48
Difference Between Procuring Goods and Works and Selecting Consulting Services . . .
GOODS, WORKS AND TECHNICAL SERVICES
CONSULTING SERVICES
Product based Knowledge based
Open competition Selective competition
Public bid opening Non-public bid opening of technical offers
Public opening of financial proposals
Price is a major factor Quality is a major factor
Detailed specification Terms of Reference
(general work program)
Single-stage procedure Two-stage procedure
Negotiations rarely Negotiations usual
Supervising Project Implementation: Procurement
Goods & Works vs. Consulting Services
49
• Procurement rules and procedures applicable to a particular project come from different sources: IFAD General Conditions National procurement rules &
regulations IFAD Procurement Guidelines IFAD Procurement Handbook Project design report
• Applicable rules, methods, prior review thresholds and procedures are specified in the Letter to the Borrower.
Supervising Project Implementation: Procurement
Regulatory Framework
Must adhere to regulatory framework . . .
50
PMU has overall responsibility forProcurement• Procurement planning (in line with
project objectives and AWPB).
• Preparation and issuance of bidding documents and invitation to bid.
• Opening and evaluation of offers.
• Negotiation, award and signature of contract.
• Monitoring of contract execution (technical and financial/administrative).
• Delivery of goods/works/services.
• Payment.
Supervising Project Implementation: Procurement
Role of Borrower/PMU in Procurement
51
IFAD’s Fiduciary responsibility:
• Proper use of funds: IFAD must ensure its financing are used only for intended purpose: specifically CPM and ICO.
• Economy and efficiency requirements in project implementation in general and procurement in particular: IFAD must ensure contract awards result from a competitive process.
• IFAD must ensure equity, integrity, transparency and good governance in procurement process.
• Concept of “no objection”.
Supervising Project Implementation: ProcurementImportance of Procurement Supervision by IFAD
52
CPM must ensure:
• coherence of procurement actions with project objectives, AWPB and procurement plan, and timing within project implementation period.
• funds availability: cost of procurement must not exceed funds allocated in financing agreement and annual budget.
• transparency and equity: procurement must be conducted in compliance with applicable rules and procedures.
• best value for money: procurement must be the result of a competitive process.
- IFAD staff must maintain neutrality and impartiality. - Flexibility is a must – but know rules and regulations.
Supervising Project Implementation: Procurement
Role of IFAD in Procurement Supervision
53
• A complete financial and administrative procedures manual (Implementation/ Operations Manual)
• A well-prepared start-up workshop with a technical sessionThe technical session should include discussions about the importance of quality submissions, frequent causes of delays, timing issues …
• A ‘procurement table’ summarizing procure-ment methods, appli-cable rules and prior review requirements as provided in the loan agreement
Supervising Project Implementation: Procurement
Key Tools for Successful Procurement Supervision (1)
54
• Assessment of procurement capacity at the national/project level.
• Training of relevant PMU and national partners in all aspects of procurement
• Procurement expertise at national/project level (complemented by on-going capacity building).
• Procurement expertise at IFAD level (procurement specialist to assist CPM in supervision).
Supervising Project Implementation: Procurement
Key Tools for Successful Procurement Supervision (2)
55
Under the responsibility of the CPM (assisted by a procurement expert)Prior review procedures:
Review of procurement plans. Review of pre-qualification of bidders. Review of bidding documents Review of procurement progress reports.
Ex-post review procedures: - As part of the review of WA’s
- During field supervision As part of the review of statements of expenditure. Review of procurement progress and processes (technical and
financial/administrative). Identification of issues and constraints. Coaching of national and/or PMU staff. Issuance of recommendations for improvement.
Supervising Project Implementation: Procurement
Different Levels of Procurement SPN
56
I. Review of pre-qualification of bidders (where applicable)(for large/complex works or expected significant time/cost savings => need advanced procurement skills).
Prior to issuance of invitations to pre-qualify, IFAD reviews: draft advertisement and invitation to pre-qualify. draft pre-qualification documents, including pre-qualification
questionnaire and evaluation criteria and methodology.
After borrower’s evaluation of bidders’ submissions, IFAD reviews: draft evaluation report. list of pre-qualified bidders and statement of their qualifications. reasons for excluding any applicant from pre-qualification.
Supervising Project Implementation: Procurement
Prior Review Procedures (1) (refer to workflow 1. & checklists)
57
II. Review of procurement of goods and works.
Prior to issuance of invitations to bid, IFAD reviews: conformity of procurement with applicable rules/procedures,
approved AWPB/procurement plan and funds availability. draft bidding documents, including invitation to bid,
instructions to bidders, technical specifications, evaluation criteria, contractual conditions.
proposed composition of the bid evaluation committee (for comments).
After borrower’s evaluation of bidders’ submissions, IFAD reviews: minutes of public bid opening. bid evaluation report, including evaluation and comparison of
bids and award recommendation. evidence of individual evaluations by each committee member draft contract.
Supervising Project Implementation: Procurement
Prior Review Procedures (2)
58
III. Review of procurement of consulting services.
Prior to issuance of request for proposal (RFP), IFAD reviews: conformity of procurement with applicable rules/procedures,
approved AWPB/procurement plan and funds availability. draft RFP, including instructions to consultants, terms of reference,
selection method and evaluation criteria, shortlist of consultants, cost estimate, contractual conditions.
After borrower’s evaluation of technical proposals, IFAD reviews: technical evaluation report, including description of the process,
summary of scores and award recommendation. technical scores/ranking given to each consultant on each evaluation
criterion. scores given by each evaluation committee member. copy of proposals, if requested by IFAD.
Supervising Project Implementation: Procurement
Prior Review Procedures (3)
59
III. Review of procurement of consulting services using the following methods: (Handbook Module H3)
Quality and cost-based selection (QCBS) Quality based selection (QBS) Selection under a fixed budget (FBS) Least-cost selection (LCS) Single-Source selection (SSS)
After borrower’s evaluation of financial proposals, IFAD reviews: (Handbook Module L)
minutes of public bid opening. account of adjustments made to prices of the proposals and
determination of the evaluated price. final evaluation report and award recommendation.
(The above review step is not applicable for quality-based selection, selection based on consultants’ qualifications, single source selection or individual consultant selection).
In all cases, IFAD reviews and provides No-Objection to the negotiated draft contract.
Supervising Project Implementation: Procurement
Prior Review Procedures (4)
60
Supervising Project Implementation: ProcurementExample of Weights for Consultant Evaluation Criterion
EVALUATION CRITERION: POINTSConsultants / firms specific experience 5 - 10Methodology 20 - 50Key personnel (general qualificationsadequacy for the assignment) 30 - 60Transfer of knowledge 0 - 10Participation by nationals 0 - 10TOTAL 100
– Could be divided into sub-criteria, but should be kept to the essential
– For training - high points on key Personnel– Points may be adjusted for specific circumstances
61
At HQ or Field
Post-award review of procurement actions
PMU makes available to IFAD all bidding documents, evaluation reports, award recommendations, signed contracts, updated contract record, payment files and individual contract monitoring forms.
IFAD reviews conformity of procurement with applicable rules/procedures, project objectives, approved AWPB/procurement plan and funds availability.
Supervising Project Implementation: Procurement
Ex-Post Review Procedures (1) (refer to checklist)
62
Supervising Project Implementation: Procurement
Ex-Post Review Procedures (2)
The supervision mission team also:
assesses the physical and financial progress of procurement actions and the quality of final products (through site visits for works, review of consultants’ reports, review of the contract monitoring forms, etc.).
identifies procurement issues and constraints.
briefs/coaches borrower and/or PMU staff on procurement issues.
issues recommendations for improvement (e.g. training of staff, fielding of implementation support missions, streamlining of workflows, …).
63
Supervising Project Implementation: ProcurementFrequent causes for delay in procurement (1)
Lack of procurement plan or inadequate/incomplete procurement plan
Poorly designed and/or unrealistic AWPB
Imprecise and ambiguous terms or documents for the bid evaluation method and selection criteria
Absence of confidentiality at various stages of the bid evaluation process and/or selection of winning bid
Failure to justify rejection of bids or non-selection of a competitive bid
Political interference in the procurement process
Corruption, fraud, conflicts of interest and miss-procurement
64
Supervising Project Implementation: ProcurementFrequent causes for delay in procurement (2)
Poor qualification of evaluation committee members
Lack of procurement capacity at borrower and/or project level
Poor understanding of IFAD procedures at borrower and/or project level
Confusion between national procedures and IFAD guidelines/loan agreement procedures
Cumbersome procedures and bureaucracy for approval of procurement documents at borrower level
Long delays in issuance of no-objections by IFAD
Long response time by IFAD to queries from PMU
65
Supervising Project Implementation: ProcurementMonitoring of Procurement at HQ
Several source documents for monitoring procurement .
AWPB and updated procurement plan
Results of prior reviews and ex-post reviews at HQ
Supervision mission reports
Progress reports
Based on monitoring results, follow-up on issues and problems identified.
66
Supervising Project Implementation: ProcurementMonitoring of Procurement at HQ
Requirements
A conformed copy of each and all awarded contract to be financed from the loan proceeds – in part or in full – must be submitted to IFAD on their signature or before disbursement.
Form C-10 of LDH (Register of contracts) Form C-11 of LDH Contract Monitoring Form
CMF Guide.xlsx
Contracts RegisterContract Monitoring Form
67
Supervising Project Implementation: ProcurementProcurement in Project Completion Process
• To ensure that all goods are delivered/works completed/services rendered by the project completion date: Closely review and monitor the final procurement plan
and progress reports during the last year of the project Take measures to facilitate completion of physical
execution of contracts Cancel activities that cannot be executed within the
completion date
• Ensure that only contracts executed by project completion date are paid
• Ensure that procurement files are complete and obtain missing documents from project
• Report on lessons learned and make recommendations for future projects
68
Supervising Project Implementation: Procurement
Message
Good procurement means continuous reforms in all procurement systems, well established and new ones.
Professor Khi Thai , Ph.D., Director, School of Public Administration &
Interim Director, School of Criminology & Criminal Justice
Florida Atlantic University
69