If you have any questions or concerns about your ... · Proposed height of the dam wall from...
Transcript of If you have any questions or concerns about your ... · Proposed height of the dam wall from...
1 Application1.1 Proposed licence purpose
PO Box 153 Maffra Vic 3860 Email: [email protected] Phone: 1300 139 510 Fax: 03 5139 3150
Application for licence to take & use surface water and/or construct & operate a dam or pumpApplication for water corporation’s approval for a licence to take & use water and construct & operate works (under sections 51 & 67 of the Water Act 1989)
Privacy collection statement:The information from this form is collected under the Water Act 1989 in order to process this transaction. The information is used to maintain the State Water Register and to provide statistical water market information. Most of the information in the water register is available to the public.
Who this application form is for:• Any landowner or their authorised representative who plans to construct a new works (dams and/or pumps) that will be used to take and use
surface water. This application combines the requirements for:
• Take and Use Licence (licence to extract and use surface water – Section 51)
• Licence to Construct Works (Section 67)
• Licence to Operate Works (Section 67)
What to do:• readtheaccompanyingfactsheetandfeeschedulebeforeyoufillouttheform,plustheinformationnotesatthebackofthisform.
• complete the form
• Iftheproposedworksfitthecriteriaforbeingahazardousoron-streamdam,ensuresection5isalsocompleted.
• Thisapplicationmayrequiresections3,4&5tobecopiedandattachedtotheformifmultipleworksarerequired.
• checkyouhavefilledeverythingincorrectly.Missinginformationcandelayyourapplication.Incorrectinformationmay result in your application being refused. We will return illegible or incomplete applications.
• sendtheformtoSouthernRuralWater,POBox153,Maffra,VIC,3860withthefollowing:
• your payment (cheque or money order)
• copy of title
• photocopied map showing the location
If you have any questions or concerns about your application, please phone us on 1300 139 510.
Tick one or more: Officeuseonly:
New licence to construct works WLI
New licence to operate works WLI
Newlicencetotake&usewater BEI
Form 56
1.2 Applicant(s), signatures & declarationPlease print name(s) in full and in capital letters. All applicants must sign. Illegible applications will be returned. If there are additional applicants please ensure that Annexure 6 is also completed. All notices will be sent to the postal address of the first named party in the State Water Register.
I/we the undersigned certify that the information provided in this application is true and correct.
I/we understand that this information may be referred to other organisations and/or advertised as part of the application and assessment process or released if reasonably required by government business, requested by lawful orders, or in the public interest; particularly in regard to open disclosure of generally collected water entitlements.
Individual applicant(s):
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Dated: _______ / _______/ ________If there are more than two individual applicants please complete Annexure 6. All applicants must sign the declaration.
If applicant is a company:
Name of company:_____________________________________________________________________________________ ABN:___________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Dated: _______ / _______/ ________ If there is more than one applicant company please complete Annexure 6. All applicants must sign the declaration.
Note that the person(s) who signs on behalf of a company must be authorised to do so, for example, a company secretary or director. Southern Rural Water will not accept liability if this form is signed by a person who is not authorised to do so.
1.3 Details of principal applicant (e.g. owner or lessee)Name:____________________________________________________________________________________________________________________________________
Property address:__________________________________________________________________________________________________________________________
Postal address (if different from property):_____________________________________________________________________________________________________
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
Form reference:Version 3
Valid at 17th September 2009
Time and Date Stamp
Please provide details of your proposed use for assessment purposes:
(i) Owner type (select one) Private (e.g. farmer)
Other: ________________________________
________________________________________
________________________________________
________________________________________
(ii) Method of taking (select one)
Direct extraction from waterway Extractionfromawaterwaytofillanoff-waterwaydam
Extractionfromanon-waterwaydam
Extraction with full return to waterway
Harvestingusinganoff-waterwaydam
In-stream(e.g.fishfarm)
(iii) Basin: ______________________________
_________________________________________
(iv) Waterway: __________________________
_________________________________________
1.4 Alternative contact details (e.g. farm manager or other contact person)Name:______________________________________________________________ Relationship to applicant:____________________________________________
Address:__________________________________________________________________________________________________________________________
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
1.5 Lodging party (if applicable)The lodging party may be a water broker or solicitor coordinating the application.
Name:______________________________________________________________ Surname / Company:____________________________________________
Address:___________________________________________________________ Party No. PTY
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
1.6 ReferralsTheEnvironmentProtection&BiodiversityConservation(EPBC)Actwasintroducedin1999.
TheEPBCActprovidesalegalframeworktoprotectandmanagenationallyandinternationallyimportantfloraandfauna,ecologicalcommunitiesand heritage places. You are responsible for ensuring your actions will not adversely affect:
FormoreinformationaboutthisActandtodownloadEnvironmentAustraliareferralforms,visitwww.environment.gov.au/epbc email: [email protected] or phone 1800 803 772.
2 Licence details2.1 Proposed licence details
• World Heritage properties
• Ramsar listed wetlands
• Nationallythreatenedflora&faunaandecologicalcommunities
• Internationallyprotectedmigratorybirds,and
• Commonwealth marine areas.
2.2 Proposed use of water
2.3 Extraction details
Tick one only:
Aquaculture Dairy shed water Domestic&stock
Environment Industrial or commercial Intensive animal husbandry (e.g. piggery)
Power generation Seepage&evaporationfromadam Urban water supply
Irrigation supply. Type of crop: _______________________________________________________________ Irrigation area: ________________________ Ha
Reuse.Approximatepercentageofwaterthatisconsideredtobeirrigationrun-off:________________ %
Other. Please specify: ____________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
Total annual volume: _________________________ ML
Please provide details of your proposed works (pumps and/or dams) for assessment purposes. Ensure all works are marked on the map described insection2.6withthesamereferencesasbelow.Detailsfortheworksaretobeenteredintosection3forpumps,and4fordams.
Pumps / dams Type of useExisting (E) or proposed (P)
Annual volume(ML)
Max daily pump capacity
(ML/day)
Maximum daily volume (ML)
Capacity(ML)
(if dam)
Wall height (m)(if dam)
Example 1 Dam 1
Irrigation E 10 n/a 2 20 3
Example 2 Pump 1
Domestic&stock
P 2.2 0.1 0.01 n/a n/a
2.4 Property where water is to be used(i) Attach a copy of the Land Title (the State Water Register requires evidence of ownership)
((ii) Volume and Folio numbers must be provided
Volume:
____________________________________________
Folio:
____________________________________________
Volume:
____________________________________________
Folio:
____________________________________________
Volume:
____________________________________________
Folio:
____________________________________________
Volume:
____________________________________________
Folio:
____________________________________________
2.5 Consent of occupier or crown land managerIfyouarenottheoccupierofthelandwheretheworksarelocated,orthelandiscrownland,printtheoccupierorcrownlandmanager’snamein capital letters and arrange for them to sign the consent below.
Name of occupier or crown land manager: ______________________________________________________________________________________________
Signature: _________________________________________________________________________________ Dated: _________ / _________/ ____________
2.6 Property details - where works are to be located
(i) Address: ___________________________________________________________________________________________ Postcode: ______________________
(ii) Attach a mapAttachasketchorphotocopyofalocalityplanonaseparateA4sheetshowingthelocationsofALLexisting&proposedworks(damsand/orpumps)ontheproperty.Labelexistingworksasnumber1,2,3etcandsiteofproposedworks.Showroads,accesstopropertyandmainfeaturesonpropertyas well as approximate distances to property boundaries or other features. Please ensure that the drawing is neat and clearly labelled.
If crown land: (ensure crown land manager consent is signed)
Crown allotment:
____________________________________________
Section:
____________________________________________
Parish:
____________________________________________
Example locality map
3.1 Pump detailsCopy this page and attach to application if more than three pumps are required.
Reference number on locality map:___________________________________________________________
Office Use Only
WRKWorkslocation(GDA94):
Easting:
E
Northing:
N
AMGzone(deleteasapplicable):
54 / 55
Pump description: _________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
Pump manufacturer: ______________________________________________
Serial number: _____________________________________________________Maximumflowrate:______________________________________________l/s
Workslocation(GDA94):
Easting:
E
Northing:
N
AMGzone(deleteasapplicable):
54 / 55
Pump description: _________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
Pump manufacturer: ______________________________________________
Serial number: _____________________________________________________Maximumflowrate:______________________________________________l/s
WorksLocation(GDA94):
Easting:
E
Northing:
N
AMGzone(deleteasapplicable):
54 / 55
Pump description: _________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
Pump manufacturer: ______________________________________________
Serial number: _____________________________________________________Maximumflowrate:______________________________________________l/s
Reference number on locality map: ____________________________________________________
Office Use Only
WRK
Reference number on locality map: ____________________________________________________
Office Use Only
WRK
3 Pump
4 DamCopy this page and attach to application if more than one dam is required.
Office Use Only
WRK
4.1 Proposed dam site & photographsProvidefivesetsofphotographsoftheproposeddamsite,takenfrom:
• upstream(A)
• downstream(B),and
• thewaterway/drainageline/gully/depressionetc.downstreamoftheproposedsiteatseverallocations,upto500mdownstreamortothenextmajortributary,whicheveristhelesser.
Thephotographsmustbelabelledwithsitedetailsanddistances.Theymustalsobeclear,focussedandshowsufficientdetailsoftheproposed site and other relevant sites. Please indicate on your locality plan where the photographs were taken from.
Locationofproposeddam(GDA94):
4.2 Water harvesting arrangementsIs the proposed site of the dam on a waterway with high ecological values or on a water course? Is the area/waterway a habitat for aquatic life? Yes No
IfSRWhasundertakenanon-siteinspectionofyourfarmdam,pleaseprovidedetailssuchasdateandnameofinspectingofficer.
Officer:__________________________________________________
Dated: _________ / _________/ __________
Areyouharvestingcatchmentrun-off? Yes No
4.3 Proposed new dam specificationsNote: Certain large dams or dams on waterways that have high ecological values will require technical advice from an engineer before approval is given and construction can begin.
Proposed total volume of dam at full supply level: _________________________________________________________________ megalitres
Proposed height of the dam wall from downstream toe to top of dam wall: __________________________________________ meters
Easting:
E
Northing:
N
AMGzone(deleteasapplicable):
54 / 55
4.4 Potential downstream / upstream impactsWill the proposed storage inundate a neighbouring property if it breaks? Yes No
Please identify the nearest downstream development and its approximate distance:
Township: ______________________________ km Occupied dwelling: ______________________ km Road crossing: _________________________ km
Railway crossing: _______________________ km Dam: ___________________________________ km
Please identify the nearest upstream development and its approx. distance: Dam: ___________________________________ km
Please list any environmental features upstream or downstream of the proposed dam: ___________________________________________________________
__________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
Please advise the distance to the closest high voltage power line either upstream or downstream of the proposed dam. _______________ m
When is the proposed construction period? From: _________ / _________/ ___________ To: _________ / _________/ ___________
4.5 Design & specifications for a typical gully damWorks Existing dam
Map: ______________________________________ Scale 1: ___________________________________________________
Catchment area: ____________________________________Ha Measured Observed
Soil type: clay Topography: flat Vegetation: pasture
loam gentle forest
sand hilly
other: _____________________________ steep
Details of existing dam (standard design format)
Embankmentcross-sectionelevationview(nottoscale)
a) Downstream height to crest: _____________________________ m b) Downstream batter length: ______________________________ m
c) Crest width: ____________________________________________ m d) Upstream batter length: _________________________________ m
e) Upstream height to crest: ________________________________m f) Core trench depth: _____________________________________ m
g) Core trench width: ______________________________________ m h) Embankment base width: _______________________________ m
i) Outlet pipe height: _____________________________________ m j) Outlet pipe downstream exposed length: _________________ m
k) Outlet pipe upstream exposed length: ___________________ m
Downstream batter slope (a/b): _____________________________m Upstream batter slope (e/d): _______________________________ m
Embankmentlongitudinalcross-sectionincludingspillway(nottoscale)
l) Embankment length: ____________________________________ m m) Spillway bottom width: _________________________________ m
n) Spillway depth from crest: _______________________________ m
Estimated storage capacity
Vol=0.4xMaxWaterDepthxSurfaceArea
0.4/1000x_____________(m)x_____________(m2)=______________(ML)
5.1 Details of engineer responsible for investigation, design & surveillanceSurname:___________________________________________________________ Given name:________________________________________________________
Company name:___________________________________________________________________________________________________________________________
Postal address:____________________________________________________________________________________________________________________________
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
Eligibility for Institute of Engineers Australia membership:
No Yes Membership No. ________________
Qualifications&experience:________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
5.2 Details of engineer responsible for supervising dam constructionSurname:___________________________________________________________ Given name:________________________________________________________
Company name:___________________________________________________________________________________________________________________________
Postal address:____________________________________________________________________________________________________________________________
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
Eligibility for Institute of Engineers Australia membership:
No Yes Membership No. ________________
Qualifications&experience:________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________
5 Large or on-stream damTo be completed by the engineer responsible for supervising the construction of the dam where:
• Theproposeddamwillbelocatedonawatercourse,orifthedamfitsthecriteriaforabigdam;
• Theoff-streamdamhasawallheightof5metresormoreandacapacityof50megalitresormore;
• Theoff-streamdamhasawallheightof10metresormoreandacapacityof20megalitresormore;
• Theoff-streamdamhasawallheightof15metresormoreregardlessofcapacity.
5.3 Contractor details for dam constructionSurname:___________________________________________________________ Given name:________________________________________________________
Company name:___________________________________________________________________________________________________________________________
Postal address:____________________________________________________________________________________________________________________________
Town:________________________________________________________________________________________________ Postcode:_______________________
Telephone: ______________________ Mobile: _________________________ Email: ________________________ Fax: ____________________________
5.4 Proposed dam’s technical featuresPlease provide details for the proposed dam.
Type of Dam:Earthfill:
Homogeneousearthfill Zonedearthfill
Rockfill: Earth&Rockfill Rockfill Rockfillwithimperviousface
Concrete / masonry: Arch Buttress Gravity
Other details:Proposed height of dam wall (from downstream toe to top of wall): ___________________________________________m
Capacity of dam at full supply level: ______________________________ (ML)
Surface area of water: __________________________________________ (M2) Spillway capacity: __________________________________________(ML/day)
Designflood(AEP)1in:_______________________________________years
Hazardcategory
Very low Low Significant
High A High B High C Extreme
Engineer’ssignature:_________________________________________________________________________________ Dated: ______ / ______/ __________
Outlet pipe:diameter: _____________________________(mm) Upstream valve: ___________________________ Downstream valve: __________________________
6 NotesNotes to assist you to complete this application form.
1. SouthernRuralWater(SRW)stronglyrecommendsthatyouspeaktooneofourassessmentofficersbeforesubmittingthisapplication.
2. Assessing&determiningtheapplication
a. Iftheproposalrelatestoacommercialorirrigationusedam,SRWwillundertakeawateravailabilityassessmentforthecatchment.Fees apply in these circumstances.
b. Ifyourapplicationrelatestoadamlocatedonawaterwayorifthedamisforacommercialorirrigationuse,yourapplicationwillbe referred to other agencies (e.g. DSE) for comment.
c. You may be required to submit an environmental assessment report as part of your application.
d. Ifyourapplicationrelatestoadamthatwillbegreaterthan10megalitresinsize,youwillneedtogivewrittennoticetooccupiersoflandupstream and downstream of the site. You will also have to advertise the proposal. SRW will give you more information if this applies to your application.
e. Ifyourapplicationrelatestoadamlessthan10megalitresincapacityandlocatedinanenvironmentallysensitivearea,youmayberequired to advertise the proposal.
f. Inmostinstances,forlargedams,thedammayneedtobedesignedandtheconstructionsupervisedbyaqualifiedEngineer.
3. ContactDetails:pleaseprovideyourpostaladdressandphonenumbers.Ifyouareacurrentcustomer,providedetailsofyourlicencenumber.
4. Use (Section 2.2): Only one proposed purpose for the water can be selected. The descriptions below may help you select the correct one.
Ifyourequirealicencethatinvolvesusingwaterformorethanonepurpose,youwillnedaseparatelicenceforeachpurpose.
5.
6. Works location (Section 2.6)
a. A copy of title is essential to provide details of the location of the property on which the dams and or pumps are located. Ensure Volume &Foliodetailsarecompleted.
b. Provide a locality plan of the proposed works site including (Australian Map Grid Reference) Easting and Northing coordinates for the dam. ThiscanbetakenfromtheMelwaysorVicRoads(onlargerproperties),orcanbedeterminedwiththehelpofyourlocalSRWAssessment Officerifunknown.Thisplanshouldalsoshowthelocationofexistingdamsandpumpsontheproperty.
c. AMelwaysorVicRoadsreferenceshouldincludemapnumberandcoordinates.Forexample-Melwaysmap120E5.
7. Wateruselocation(Section2.4):Providedetailsoflandonwhichthewateristobeused.Thesedetailscanbefoundonyourpropertytitle. Ifpossible,pleaseattachcopiesofalltitlesconcernedincludingthesegmentshowingthecurrentownership.EnsureVolume&Foliodetails are completed on the application form. Crown description of the land can also be obtained from your Council rate notice.
Use of water Description
Domestic and stock Domesticandstockuse-aswellasgeneralnon-irrigationfarmuse.
RefertoSRW’swebsiteat www.srw.com.auforafulldefinitionofDomestic&Stockuse.
Irrigation Irrigation-aswellasdomesticandstockuse,dairyuse,andgeneralnon-irrigationfarmuse
Dairy Dairyuse-aswellasdomesticandstockuseandgeneralnon-irrigation farm use
Intensive animal husbandry Intensiveanimalhusbandryuse-aswellasdomesticandstockuseandgeneralnon-irrigationfarmuse
Industrial or commercial Industrialorcommercialuse-aswellasdomesticandstockuse
Environment Environmental use
Urban water supply Urban water supply
Power generation Power generation
Aquaculture Aquacultureuse-aswellasdomesticandstockuse
Seepage and evaporation Seepage and evaporation
8. Photographsofdamsite(Section4.1):Itisessentialtoprovide5setsofphotographsshowingtheproposeddamsite,upstreamofthesiteand downstream of the site.
9. Catchment. In what catchment is the proposed dam?
a. Providethenamethewaterwaythedamistobelocatedon,orthewaterwaythatwaterwouldflowintoifitwerenotcapturedinyourdam(Section 2.1)
b. Ifpossible,identifythecatchmentareaoftheproposeddam.Thiscannormallybecalculatedfromatopographicalmap.Inadditiondescribethegeneraltopographyofthearea(Section4.5).
c. Ifthestreamisunnamed,thenindicatethisfollowedbythenameofthestreamthatthewaterwouldnormallyflowinto.Forexample–waterwouldnormallyflowintoanunnamedgullythatthenflowsintoStringybarkCreek.
10. Proposeddamspecifications(Section4.3):Theanswerstothisquestionhelpustodeterminethesizeofthedam.Asaminimum,youshouldinclude the approximate proposed total volume of dam at full supply level and the proposed height of the dam wall from downstream toe to the top of dam wall.
11. Potentialimpacts(Section4.4):UsedinconjunctionwithSection5todeterminewhetherthedamcouldbepotentiallyhazardousifafailureoccurs. Please identify:
a. Upstream,butmoreimportantlydownstreamdevelopments.Thisincludesroads,buildings,townshipsandanyothersignificantinfrastructure.
b. Indicate if water in the proposed dam will inundate neighbouring property if breached.
c. Indicatetheapproximatedistancetothenearesthouseandroadorothersignificantdevelopmentsbelowthedam.
These should also be drawn on your map of the works location.
12. Large or onstream dam (Section 5): To be completed by the engineer responsible for supervising the construction of the dam where:
a. Theproposeddamwillbelocatedonawatercourse;
b. Theoff-streamdamhasawallheightof5metresormoreandacapacityof50megalitresormore;
c. Theoff-streamdamhasawallheightof10metresormoreandacapacityof20megalitresormore;
d. Theoff-streamdamhasawallheightof15metresormoreregardlessofcapacity.
This section may need to be completed once it is determined that your proposal needs to be designed (Section 5.1) and construction supervised (Section 5.2) by an Engineer. If you are submitting engineering plans, please attach 5 copies. SRW may request that the applicant engage their engineer to produce a Surveillance Program and Emergency Response Plan prior to issuing a construction licence. These plans must also be reviewed at least every 5 years.
13. Environmentalissues(Section4.4):Inordertoassesswhethertheproposeddamwillimpactonsensitivemattersofenvironmentalsignificance,pleaseidentifyallknownorobservedwetlandsandanyfloraorfaunaissuesatthedamsiteorinthegeneralarea.
14.Proposeddesign&dimensionsofthedam(Section5.4):Thissectionshouldbecompletediftheproposeddamistobelocatedonawaterwayorisagullydam.Iftheproposalrelatestoacatchmentdamthatwillbeusedforcommercialorirrigationpurposes,pleaseprovideasketchoftheproposed design with all dimensions including depth.
15. Licencestotakeandusewaterbelongtothepersonandnottheproperty.ThereforeSRWisunabletoformallyregisterinterestsbyanythirdparty,including mortgages.
16. Application fees received with this application may be non refundable or only partially refundable should you decide to opt out of the process at anytimeafterwereceivethisapplicationform.WerecommendthatyoudiscussthisproposalwithanSRWAssessmentOfficerbeforesubmittingyour application.
Southern Rural Water’s Privacy StatementSouthern Rural Water (SRW) values and protects the personal and private information we collect from customers or applicants as part of our businessactivitiesandresponsibilities.Wehavealwaysdemonstratedastrongcultureofprotectingtheconfidentialityofthisinformation.Ourpolicy is to collect only the information we need to conduct our business or to provide a service to customers. Essential personal information suchasacustomer’sname,addressortelephonenumberisonlyreleasedoutsideSRWwiththecustomer’sconsentorifreasonablyrequiredforrelatedgovernmentbusiness,suchastheprocessingofcouncilratesorifrequestedbylawfulorders.Asourresponsibilitiesdemandsustainablemanagementofwaterresourcesandthenurturingofthebusinesses,communitiesandenvironmentsthatsupportanddependonthem,SRWadoptsanopen,transparentapproachtothemanagementofwaterresourcesandentitlements.Webalancethedisclosureofcustomerrelatedwaterentitlementswiththenon-disclosureofpersonalinformation.SRWtakesallreasonablestepstoensurethatthemanagementofallpersonalinformation collected and disclosed complies with the Water Act 1989 requirements and privacy principles. All customers can access their own information.
Privacy ComplaintsIfyouconsiderthatyourprivacyhasbeenbreachedorinterferedwith,youshouldcontacttheSRWPrivacyOfficeratPOBox153,MaffraVic3860, or phone SRW on 1300 139 510.
More informationIfyouwanthelpwithyourapplicationormoreinformationonSurfaceWaterLicences,visitourwebsiteatwww.srw.com.au or phone Southern Rural Water on 1300 139 510andaskfortheSurfaceWaterFactSheetorspeaktoanAssessmentOfficer.
DisclaimerSouthern Rural Water will use the information provided in this Application Form to act on and/or make a Surface Water Licence decision. Should this informationbeincorrectorchange,wemaytakestepstorevokeanylicencegrantedandrequireyoutosubmitanewapplicationtogetherwiththeapplicable fee.
Annexure 6Copy this annexure and attach to application if there are more applicants than provided for.
Please print name(s) in full and in capital letters. Illegible applications will be returned. All applicants must sign. All notices will be sent to the postal addressofthefirstnamedpartyintheStateWaterRegister.
I/we the undersigned certify that the information provided in this application is true and correct.
I/we understand that this information may be referred to other organisations and/or advertised as part of the application and assessment process or released if reasonably required by government business, requested by lawful orders, or in the public interest; particularly in regard to open disclosure of generally collected water entitlements.
If applicant is a company:
Name of company:___________________________________________________________________________________ ABN:___________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Name of company:___________________________________________________________________________________ ABN:___________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Given name(s):
________________________________
Surname:
________________________________
Signature:
________________________________
Position:
________________________________
Dated: ____________ / _____________/ __________________If there are more than two additional applicant companies, please copy this Annexure and attach to application. All applicants must sign the declaration.
Notethattheperson(s)whosignsonbehalfofacompanymustbeauthorisedtodoso,forexample,acompanysecretaryordirector.Southern Rural Water will not accept liability if this form is signed by a person who is not authorised to do so.
Individual applicant(s):
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Given name(s):
____________________________________________
Surname:
____________________________________________
Signature:
____________________________________________
Dated: ________ / _________/ ______________
If there are more than six additional applicants, please copy this Annexure and attach to application. All applicants must sign the declaration.