IES Faculty March 2014Part L2A 2013 Update and Priority
Schools Building Programme (PSBP)
Overview
• 1400 Introduction
• 1415 Part 1 – Part L 2013 Changes
– School Test Case
• 1515 Q&A
• 1530 Part 2 – PSBP Overview
– Schools Test Case
• 1630 Q&A
Part L Timeline
20022006
-28%
2010
-25%
2013
-9%
2016
-20-30%
2019
-30-40%
Source: UKGBC Building Zero Carbon report February 2014
Part L 2013 Headlines
• Aggregate 9% improvement
• 4 classes of notional building
• Notional building air permeability is sub divided by
size; Window U value reduced from 1.8 to 1.6
• Criterion 2 – buildings with high heat gains can have
a less demanding are weighted U value
• Improvements depend on type of building including
lighting efficacy, terminal SFP’s etc
2013
Changes
Part L The Future
UKGBC Non Domestic Zero Carbon Task Group
The Performance Gap
Real vs Compliance
Real vs Compliance
Enhanced Modelling
� Radiators and chilled ceilings may now be
autosized
� Using specified room temperatures and loads
(either manually entered or generated by a
System Loads analysis)
� Users can elect to autosize the number of
units of a chosen type and the required water
flow.
Part L2A 2013
Navigators detail all the steps that
should be considered in a Compliance
Assessment.
•Once data is entered users check the
associated entry recording who
completed the action and when.
•Users can record their own notes via
the Navigator either for future reference
or for others working on the same
Project.
Part L2A 2013
Part L2A 2013
Constant illuminance added (see Room Data:
NCM lighting)
Part L2A 2013 Q&A
Part L2A 2013
School Test Case
School – Naturally Ventilated
Part L2A 2013 Test Case
Building Attribute Differences 2010 Notional Building 2013 Notional Building
Glazing U-Value 1.8 W/m2.K 1.6 W/m2.K
Air Permeability 5 3
Lighting Efficacy 55 lm/W 60 lm/W
Lighting - Occupancy Sensing Controls None Yes
Demand Control Ventilation None None*
*DCV is only applicable in Mechanically Ventilated Buildings
School
Part L2A 2013 Test Case
Result 2010 Notional
Building
2013 Notional
Building
Reduction
TER (kg.CO2/m2) 19.0 19.67 -4%
Heating Energy
(kg.CO2/m2)
1.98 1.74 12%
Cooling Energy
(kg.CO2/m2)
1.23 1.3 -6%
Auxiliary Energy
(kg.CO2/m2)
8.35 8.40 -1%
Lighting Energy
(kg.CO2/m2)
5.97 6.82 -14%
DHW Energy
(kg.CO2/m2)
1.46 1.41 3%
School
Part L2A 2013 Test Case
0
2
4
6
8
10
12
14
16
18
20
Heating DHW Cooling Auxiliary
Energy
Lighting Total
2010 Notional
2013 Notional
PSBP
Priority Schools Building Programme
(PSBP)
Daylighting Criteria – DA & UDI
Adaptive Comfort
PSBP
• Announced mid 2013
• The Priority School Building Programme
(PSBP) is the government’s largest School
building programme.
• The PSBP covers 261 schools which will be
wholly or substantially rebuilt.
• The PSBP covers Secondary, Primary and SEN
Schools in England
PSBP
• Daylight Factors OUT – CBDM IN
• Climate Based Daylighting Modelling
• Daylight Factors: simulated using overcast sky
models
• CBDM uses actual weather data –realistic outputs
PSBP
• Primary Measure of CBDM is UDI
• UDI Target: 100 – 200Lux for 80% of the
occupied time
PSBP
• Secondary Measure of CBDM is DA
• DA Target: spaces receive target Illuminance
for 50% of the occupied hours
PSBP
PSBP
PSBP Images
PSBP Images
PSBP Q&A
PSBP Q&A